Integrating Performance Standards into an Asset Management System



Similar documents
(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES

Rx Whitepaper. Using an Asset Management Framework to Drive Process Safety Management and Mechanical Integrity

Guidance note. Risk Assessment. Core concepts. N GN0165 Revision 4 December 2012

WORKING IN CONFINED SPACES GUIDELINES

The Asset Management Landscape

Confined Space Air Monitoring

U.S. Chemical Safety and Hazard Investigation Board

Safe Operating Procedure

Risk Management at Chevron

IBM Maximo Asset Management solutions for the oil and gas industry

UPTIME MAGAZINE. june/july15 JUNE/JULY uptimemagazine.com

Solution Overview Better manage environmental, occupational safety, and community health hazards by turning risk into opportunity

Fire & Gas Detection; Reducing Risks in Rail Loading/Unloading Facilities. By Todd Spicer Technical Specialist Spartan Controls Fire & Security

Jonathan Wilson. Sector Manager (Health & Safety)

Life Cycle Asset Management

TABLE OF CONTENT

Operational Excellence Management System

Fire and Gas Solutions. Improving Safety and Business Performance

Business Management System Manual. Context, Scope and Responsibilities

AMEC 6007: Linear Velocity and Acceleration Learning Outcome. CHEM 6012: Oil and Gas Compositions and Sales Specifications Learning Outcome

ISRS. For the health of your business SAFER, SMARTER, GREENER

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

Achieving Functional Safety with Global Resources and Market Reach

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.

SAFETY AND HEALTH PROGRAM

Confined Space Plan Prepared by: Environmental Health and Safety Office October, 2014

INTERNATIONAL STANDARD

Application Requirement

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

READ FIRST. Confined Space Entry Procedure. San José State University Environmental Health and Safety. Confined Space Entry Procedure

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

Confined Spaces. Notes

Practical Examples of Fire Protection Engineering Practices and Technology for PSM

Proposed changes to the Acceptable Solution for Building Code clause F7 (Warning Systems) Proposed amended Acceptable Solution for Warning Systems

Owner-User Pressure Equipment Integrity Management Requirements

Aberdeen Drilling Consultants Presentation on Asset Integrity and The ADC TRAMS System

Elgin Fire Department

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01

MSC/Circ June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

Controlling Risks Risk Assessment

Fire Safety Log Book

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEMS MANUAL

Sample Written Program. For. Confined Space OSHCON

ISO 55000: Why Do We Need a New Standard for Asset Management

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

HAZARD COMMUNICATION PROGRAM PURPOSE

THE DETECTION OF GREENHOUSE GASES

On-Site Risk Management Audit Checklist for Program Level 3 Process

Integrated Risk Management:

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS

Labour and Workforce Development. Confined Space Entry

Confined Space Procedures

Safe Work in Confined Spaces

Powering Today and Tomorrow. Energy Solutions

Fire Safety Risk Assessment Checklist for Residential Care Premises

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000

Fire, Explosion and Risk Assessment Topic Guidance Issue 1

Volume 11 Number 4 July 2007

GE Intelligent Platforms. solutions for dairy manufacturing

UNIVERSITY OF KENTUCKY CONFINED SPACE PROGRAM

Practical Implementation of Safety Management Systems at Unregulated Upstream Oil & Gas Facilities

Overview of Standards for CO Detection Products

Enviro Safety Products Resource Center. OSHA Checklist for General Industry

Confined Space Management Procedure

TECHNICAL INFORMATION

Risk Assessment / Risk Management Protocol

A Safe Workplace A Workplace Safety and Health Manual for Your Community Section: III-C Subject: G-9

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

FIRE SAFETY REGISTER. Premises Name: Premises Address: Fire Safety Manager: Contact No. Kerry County Fire Service

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

Compliance Document for New Zealand Building Code Clause F7 Warning Systems Fourth Edition

Integrated Fire and Gas Solution - Improves Plant Safety and Business Performance

An inventory of hazardous materials used in your workplace will prove useful.

Emergency Preparedness Guidelines

Global Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems.

CONFINED SPACE ENTRY WORK STANDARD

Leveraging CMMI framework for Engineering Services

CHAGUARAMAS TERMINALS LTD.

WORK IN CONFINED SPACES

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

CONFINED SPACE PROGRAM

OSHA Compliance Checklist ASC

ENERGISTICS E&P BUSINESS PROCESS REFERENCE MODEL

sierra monitor corporation Fire and Gas Detection Systems

Basic Fundamentals Of Safety Instrumented Systems

Internal Audit Checklist

functional Safety UL Functional Safety Mark

Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified.

Pharmaceutical Wholesaler Site Inspection Checklist

Process Safety Management

TÜV Rheinland Functional Safety Program Functional Safety Engineer Certification

TOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD

Q U A D S C A N I I GENERAL User Interface Enclosure Display QUADSCAN II Temperature Range RECEIVER DISPLAY Sensor Weight Optional Relay Enclosure

1.0 Purpose Definitions Hot Work Operations. 5

Camar Aircraft Products Co. QUALITY MANUAL Revision D

OPITO APPROVED STANDARD Basic H 2 S Training. OPITO Standard Code: 9014

Transcription:

Integrating Performance Standards into an Asset Management System Leveraging ISO 55000 in the Oil and Gas Industry By Mike Poland, CMRP, CRL 4360 Corporate Road Charleston, SC 29405-7445 843.744.7110 www.lce.com The discipline of physical asset management is currently undergoing substantial change. Nowhere is this change evolving faster than in the oil and gas industry. Two significant developments within this industry are converging to create shifts in how companies view and manage their physical assets. The first of these developments is predictably value and safetyrelated. Companies are challenged to create, implement and maintain robust reliability and maintenance-based performance standards critical to detecting and preventing catastrophic equipment failures. The second development is the newly released ISO 55000 Asset Management System Standard. This standard defines the minimally accepted criteria for establishing a management system for asset management. Both the performance standards and the ISO 55000 Asset Management standard share the common objectives of achieving value from assets and optimizing cost, risk and performance across the lifecycle of the asset. This presents an excellent opportunity to improve the quality and overall impact that performance standards have on the business through the integration with the ISO 55000 standard and the leveraging of the asset management capabilities that are foundational to an ISO 55000 compliant asset management system. The ISO specifies that organizations develop an asset management policy linked to its strategic plan. The asset management policy is supported by an asset management strategy. This strategy typically identifies an implementation framework where defined capabilities result in establishing key asset management objectives. These SMART objectives are necessary to achieve select aspects of the organization s strategic plan (reference Figure I). Establishing oil and gas performance standards represent such an objective. The performance standards, moreover, comprise much of what can be considered as an asset management plan (reference Appendix A for a performance standard example). Figure 1 Asset Management System Key Elements

The direct link to the ISO 55000 standard can be located in section 6.2.2 of the 55001 requirements document. This section, Planning to Achieve Asset Management Objectives, identifies 11 key criteria that an organization shall determine and document when developing a plan to achieve their asset management objectives and, in this particular example, their performance standards. The following presents an overview of the 11 key criteria, with implementation tips and recommendations on the use of various tools and techniques: 1) The method and criteria for decision making and prioritizing of the activities and resources to achieve its asset management plan(s) and asset management objectives a. Here it is important to understand that this standard is value and risk-based. Therefore we must consider a risk-based asset implementation model as below in Figure 2: Figure 2 Risk Based Asset Management Implementation Model b. In the Classify phase, the value stream and hierarchical structure of the business is identified and mapped. Since asset management plans are created for individual assets, asset type, asset class, asset system and/or asset portfolio, it is necessary that the hierarchical structure defines how assets will be grouped. The hierarchy (see ISO 14224:2006) must take into account all asset relationships, including parent-child, linear and matrix. This will provide a scalable approach to implementing asset management plans. c. In the Analyze phase, the assets are prioritized based on the potential risks to production, health, safety, environmental and reputation. This methodology is called criticality analysis and yields the assets, prioritization for executing activities and applying resources. 2

2) The processes and methods to be employed in managing its assets over their life cycles a. Asset management plans should be fed back into the design and operation of the asset management system. This is accomplished by the use of a risk-based asset management model combined with business processes to define standard work. Business processes for managing assets through their life cycle provide the organization with a visual map of the process steps that occur, decision points, and interfaces with other processes and systems. b. Figure 3 shows the asset life cycle and some of the relevant processes for each phase: Business Case Life Cycle Cost Analysis, Cost Benefit Analysis Concept & Design Feasibility Study, Functional Design and Technical Specification Development Procure & Construct Procurement Specification, Front End Loaded Project Management Commission Precision Installation, Baseline Testing, Commission Plans, Acceptance and Validation Operate and Maintain Work Management, Material Management, and Loss Elimination Replace, Decommission, Dispose Accretion of Liability, Front End Loading Project Plan Figure 3 Processes Within the Asset Life Cycle 3) What will be done a. This is the application of the business processes that define the requirements to manage the assets throughout the life cycle. b. Examples of these requirements are preventive maintenance tasks, predictive maintenance routes, external inspections, internal audits and the management of change process. c. Each of these requirements will have criteria established that will generate data in the form of current state as compared to the criteria which will result in asset management information that defines deficiencies and departures from specifications. d. This asset management information model is depicted in Figure 4. 3

Figure 4 Asset Management Information Model 4) What resources will be required a. The human capital required to execute the business processes, along with other corporate allocations and overhead expenses such as contract labor, make up the required resources. b. Part of the consideration of the asset management plan is the asset-based budget that is prepared to support the annual increments of resources. c. The documentation of organizational charts, contracting agreements and budgets address the majority of these requirements. 5) Who will be responsible a. Clearly defined roles and responsibilities for resources that support the asset management plan along with RACI charts for business processes identify those responsible for the asset management plan. RACI is an acronym for who is responsible, accountable, who to communicate with and who to inform. 4

6) When it will be completed a. Planning and scheduling the activities required in the asset management plan are two of the more difficult components of the asset management system. Planning and scheduling consider the requirement, resources condition, measurement data, and production window required to execute the activities, along with the targeted date and duration. b. Outside the Operate and Maintain phase of the life cycle, a front-end loaded project plan will dictate when items will be completed. Within the Operate and Maintain phase, a majority of requirements will be planned and scheduled much like the process depicted in Figure 5. Figure 5 Work Management Workflow Example 7) How the results will be evaluated a. There are several results that must be evaluated to understand the effectiveness of the asset management system and plans i) Asset Performance: The purpose of the asset is to meet a function within the value stream to create value for the organization. This function must be documented to provide this level of evaluation (1) There is a design rate at which it can meet its function. This information is necessary to calculate overall equipment effectiveness and asset utilization. (2) There is the mean time between each failure: MTBF = Operating time (hours) Number of Failures. This information is necessary to evaluate the reliability of the asset and how effective it is at mitigating failure modes within the system. 5

(3) There is mean time to repair: MTTR is the average time needed to restore an asset to its full operational capabilities after a failure. This information is necessary to understand the maintainability of the asset and how effective the planning and scheduling activities are within the system. ii) Failure Analysis: Within the work management business processes, the use of failure coding for asset types provides relevant data within work order history to evaluate planned activities and their effectiveness. It also identifies failure modes that have no current mitigation within the system. iii) Financial Analysis: Asset-based budgets and asset-based accounting yield the information necessary to use budget variations to identify losses and issues impacting bottom line performance. There is also the analysis of the work order cost for each asset. This is only beneficial if all the costs are captured in work order history particularly labor, material and lost market opportunity or production cost. 8) The appropriate time horizons for the asset management plans a. A time horizon, also known as a planning horizon, is a fixed point of time in the future when certain processes will be evaluated or assumed to end. b. In an asset management and risk management system, it is necessary to assign such a fixed horizon time so that alternatives can be evaluated for performance over the same period of time. c. Time horizons are dependent on the industry, processes and assets. Items that impact time horizons are patent expirations, end-of-life determinations, budget cycles and break even points on capital investments. Common time horizons should be identified in the strategic asset management plan to ensure consistency across the enterprise. d. Life Cycle Cost Analysis is an example of where uniform time horizons must be identified. 6

9) The financial and non-financial implications of the asset management plans a. Financial implications are the costs and lost market opportunity related to the execution of the asset management plans. A roll-up of the annualized, programmed investment for implementing these plans provides the basis for an asset-based budget, depicted in Figure 6. Budget variations can then be tracked and analyzed for improvement opportunities. b. Non-financial implications are mostly from the time and resources required to execute the plan. This is necessary for level-loading the tasks in the asset management plan with the resources and time allocations such as in Figure 7. Figure 6 Roll-up of Asset-Based Budget Figure 7 Resource Plan 10) The review period for the asset management plans a. This review period defines how often the asset management plans will be updated based on the monitoring, measurement, analysis and evaluation defined within the system. 11) Actions to address risks and opportunities associated with managing the assets, taking into account how these risks and opportunities can change with time, by establishing processes for identification of risks and opportunities; assessment of risks and opportunities; determining the significance of assets in achieving asset management objectives; implementation of the appropriate treatment; and monitoring of risks and opportunities. a. The fundamental guidance here is to have a risk management system in place using the guidance of ISO 31000:2009 i) Risk is the effect of uncertainty on the ability of an organization to meet its objectives. ii) Risk management is the range of activities that an organization intentionally undertakes to understand and reduce these effects. iii) Effective risk management requires executing these activates efficiently and in a way that demonstrably improves the ability of the organization to meet its objectives in a repeatable fashion. 7

b. ISO 31000:2009 is: i) An international standard that provides principles and guidelines for effective risk management ii) Not specific to any industry of sector iii) Able to be applied to any kind of risk iv) Able to be applied to any kind of organization v) Intended to be tailored to meet the needs of the organization vi) Provides the principles and guidelines for managing any form of risk in a systematic, transparent, and credible manner and with any scope and context. c. Figure 8 is an example of the process flow of this system. The numbers in parentheses are the applicable sections in the ISO standard. Figure 8 Risk Management System d. Once an organization has mapped their value stream, they can then determine the risks to that value stream. A corporate risk matrix is then developed to identify how the organization assigns quantitative and qualitative risk for evaluating and selecting mitigation and controls. This risk matrix is then used to help define categories and criteria for asset criticality analysis, defining the parameters used to determine risk priority numbers for accomplishing failure modes and effects analysis (see IEC 60912), and establish the baseline for performing a process hazard analysis as part of implementing a process safety management plan (see OSHA 1910.119). 8

Figure 9 Corporate Risk Matrix With the components of the asset management system more clearly defined, let s take a closer look at the asset management plan. Recall from Figure 1 that the asset management system bridges the gap between the strategic plan and the asset management plan that includes the specific technical requirements. It also documents information that specifies the activities, resources and timescales required for an individual asset, or a grouping of assets, to achieve the organization s asset management objectives. Finally, it should be fed back into the design and operation of the asset management system. The best example of an asset management plan is one that already meets all of the above requirements. Take the National Offshore Petroleum Safety and Environmental Management Authority s (NOPSEMA) Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009. A portion of this regulation specifies that operators of offshore drilling and the production process are to conduct risk assessments that include both formal safety assessment and other occupational health and safety risks. These assessments should identify the evidence to be provided in the safety case that identifies how risks are reduced to a level that is as low as reasonably practicable (ALARP) and include the following: Hazard Identification Supporting Safety Studies Risk Assessment ALARP Performance Standards and Control Measures Performance standards and control measures are the asset management plans for the systems defined by the asset management system dictated in the regulation. An example of the performance standards and control measures are found in Appendix A. 9

Appendix A (A-1) Mobile Offshore Drilling Unit Semi Performance Standard (PS) Fire and Gas Detection Systems DESCRIPTION Detection Systems (Attachment 1) DESIGN FUNCTION To detect and alarm for hazardous levels/quantities of smoke, heat, flame, toxic gas (H2S), and combustible gases Rig (Attachment 2): DESIGN SPECS ABS MODU Code 2001 IMO MODU Code 1989 System ABS MODU Code 2001: 4-3-2/19.3 references 4-4-1/23.1 (Attachment 3) Specific performance criteria: combustible gas detectors are to alarm between 25-60% of the lower explosive limit (LEL) IMO MODU Code 1989: 9.7, 9.8 (Attachment 4) Republic of Liberia, Marine Notice FIR-001, Rev. 06/12, Maintenance and Inspection of Fire-Protection Systems and Appliances (Attachment 5) REGULATORY DRIVEN MAINTENANCE REQUIREMENTS Summary of key provisions applicable to this system: 1.1: Arrangements are required to ensure safety not diminished if system under repair 1.2.4: Log and records of testing, inspection, maintenance, non-conformities and targeted completion dates 1.4.2.6: Monthly verification that fixed firefighting system alarm devices are in place and do not appear damaged 1.6.2: Annual fire detection systems tested for proper operation 1.6.3: Annual fire dampers are tested for remote operation 10

Appendix A (A-2) Mobile Offshore Drilling Unit Semi Performance Standard (PS) Fire and Gas Detection Systems PLANNED AND REGULAR RIG AND EQUIPMENT INSPECTION (Attachment 6) PREVENTATIVE MAINTENANCE INSTRUCTIONS Gas Detection System Electrical 3M Fire Detection Manual Call Station 2M Portable Gas Detection Monitoring - 2M Summary (Attachment 7) MEASURABLE RIG SPECIFIC PERFORMANCE CRITERIA FOR CRITICAL OPERATING PARAMETERS (COPS) RESOURCE REQUIREMENTS AND SKILLS H2S, CH4, and O2 detectors: zero-calibration, span calibration, function test to measure and record time from application of test gas to alarm, including under battery power see Attachment 7 for details. Smoke, heat, flame (IR) detectors: function test, confirm detection system automatically generates general alarm within 120 seconds when in automatic mode. Portable H2S gas detector alarm levels are 5-10 ppm per EU regulations. Expertise in installation, operation and maintenance of fixed H2S gas detection system on mobile offshore drilling units. (Attachment 8) 11

Appendix A (A-3) Mobile Offshore Drilling Unit Semi Performance Standard (PS) Fire and Gas Detection Systems CORPORATE AND RIG SPECIFIC DOCUMENTS Safety Policy Manual Rig Inspections Safety Policy Manual Confined Space Entry Authorized Gas Tester Competency Checklist Offshore Training Matrix From Risk Assessment: MAE OR CCE FOR WHICH THIS EQUIPMENT PROVIDES RISK REDUCTION MEASURE FUNCTION (NOTE: MAE = MAJOR ACCIDENT EVENT, CCE = CAUSAL OR CONSEQUENTIAL EVENT) Hydrocarbons in the Formation o Fixed MODU Hydrocarbon Gas Detection System/Shaker Area and Mud Pit Hydrocarbon Gas Detection System o Fixed Fire Detection System o MODU Ventilation Shutdown Flammable Substances//Large Scale Fires o Atmosphere Testing Before and During Operation o Galley, Laundry Room, Engine Room, Emer. Gen Room, Shaker Area, Mud Pit Fire Detection o Fixed Fire Detection System Hydrogen Sulphide Gas (H2S)//Toxic Gas Release o Fixed MODU H2S Gas Detection System Atmosphere in Enclosed Spaces // Personnel Exposed to Unsafe Atmosphere o Atmosphere Testing Before and During Operation AVAILABILITY & RELIABILITY These factors with Human Factors are combined into Risk Reduction Measure Effectiveness rankings, as shown in the risk assessment SURVIVABILITY (NOTE: INCLUDES ASSESSMENT OF DEPENDENCY AND REDUNDANCY) Survivability is assessed under the Emergency System Survivability Analysis (ESSA) via evaluation of vulnerability, fail-safeness, redundancy, and dependency. 12

Mike Poland, CMRP, CRL, serves as the Vice President of Asset Management Services for the Reliability Consulting Group and Vice President of Engineering Support Services for the Federal Solutions Group at Life Cycle Engineering (LCE). Mike is also a facilitator with the Life Cycle Institute where he uses high impact learning techniques to teach courses including Risk-Based Asset Management and Predictive Maintenance Technologies. In addition to being a Certified Maintenance and Reliability Professional (CMRP) and a Certified Reliability Leader (CRL), Mike is certified in Prosci s Change Management methodology. You can reach Mike at mpoland@lce.com. 13