PLAN SUBMITTAL INFORMATION



Similar documents
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

BUILDING SAFETY UNIT

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Oviedo Commercial Shell Building Permit Application Guidelines

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Residential Building Permits

October 5, 2015 Dear Client,

Does Wall Township require an inspection by the building department on resale of a home?

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

The City of Basehor, Kansas

How To Get A Building Permit In Florida

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

CHARLOTTE COUNTY Community Development Department

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Building Permit Application

Botetourt County, Virginia. Frequently Asked Questions

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Residential Building Permit Process

Bureau Veritas Contact Information

HOMEOWNER S PERMIT GUIDE

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

2. What building projects are exempted? (permit not required)

APPLICATION FOR NEW CONSTRUCTION

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

C I T Y O F P E A R S A L L

Inspection Tech. (330) Inspected By: Aaron Westerburg

Notice to Property Owners

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

Building Permits: When are they required?

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

Building Permits Permit Counter

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

South Carolina Home Inspector Standards of Practice

Sample Drawing Package for One and Two Family Dwelling Applications

Estimating Database Checklist

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

Inspecton Report. Property Address:

Home Inspection Report

Building Condition Assessment Report

How To Make A House Safe

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

PROPERTY INSPECTION REPORT

Crawford Inspection Services C.C.B. #

Vision Home Inspection

A Homeowner s Guide to Building Permits

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Building Condition Assessment Report

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

( Staple Upper Right Corner ) MINNEAPOLIS TRUTH-IN-SALE OF HOUSING DISCLOSURE REPORT

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Building Code Inspections and Fees

I NI NP R Inspected Items

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

Requirements for Building Application Submission

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

BUILDING PERMIT SPECIFICATIONS

Schedule B to By-law

A Guide for the Homeowner/Builder

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance Section 17. Types of Authorized Contractor Licenses.

Georgia Association of Home Inspectors

Truth in Sale of Housing Disclosure Report NOTICE - Read Entire Report Carefully. This is not a Buyer's Inspection!

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

Home Inspection Report

Uniform Construction Code (UCC) Building Permit Application Package

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

API America s Property Inspections

Important Information for Owners of Buildings in Flood Zones

Development Services City of Lawrence, KS

Repairs, Remodeling, Additions, and Retrofitting

City of St. Charles Basement Finish or Remodel

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

Building Information Packet

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Development Services Guidelines

Substantial Improvement/Damage Notice to Property Owners

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Certification: Building Plans Examiner. Exam ID: B3

Transcription:

PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following: 1. The land is properly zoned for the type of construction planned, 2. Public easements and rights-of-way on the land will not be encroached upon by the completed structure, 3. Public improvements have been made or will be constructed to City standards and accepted by the City. Before submitting plans to the Building Division, please research any deed restrictions and applicable condominium approval for the work being done for which the board must sign and seal the condominium approval form. To apply for a building permit, you must supply the following documents: SITE PLAN INFORMATION 1. Tax folio number 2. Legal description. Lot dimensions and bearings, easements. 3. North arrow 4. Street/water way names 5. Flood Elevation 6. Existing to remain or to be removed or new. Topographical data; existing and new finish floor elevation of existing and new elements. 7. Existing or new (Water service, meter, sanitary sewer or septic tank, electrical.) 8. New buildings or additions to existing. Setbacks. 9. Lowest finish floor elevation. 10. Equipment (pool, a/c, and similar). Other improvements (pool decks, docks, paving, walks, slabs, walls, fences, planters) EXTERIOR ELEVATION INFORMATION Scale: Same as Plans Dimensions: Vertical features and horizontal projections. Envelope: Exterior doors, windows, skylights, hatches, wall finish, roof material and pitch, and similar. Design pressures for wind. Floor: Elevations above grade and distance between floors.

BUILDING SECTION AND DETAIL INFORMATION Scale: 1 / 4 "=l'-0" Wall sections and 3 / 4 "-l '0" Main details, (or metric) Dimensions: Vertical features and horizontal projections. All structural elements, their size and reinforcing, insulation, connectors, and similar. Wind design pressures for openings Finishes: Exterior and interior wall finishes and construction, roof and ceiling finishes and construction. Schedules: Items such as footings, slabs, columns, beams, may be coded and listed on a schedule. FLOOR PLAN INFORMATION Scales: 1 / 4 "=l '0" minimum for all buildings of less than 5,000 sq.ft. or equivalent metric scale. Dimensions: All required to define design and required to build. Rooms: Room names and finishes. Floor: Floor finishes, elevations, steps, ramps, curbs, dashed outline of structures occurring below this floor. Wall/Partitions: Materials or construction. Section cuts, fire rated walls or partitions, all structural columns and load bearing partitions. Ceiling: Attic access, fold down ladders, skylights, dashed outline of structures occurring above this floor. Doors/Windows: Door type and size, swing, code required hardware; Window type and size egress requirements. Vertical Access: Stairs with number of risers, elevators, chutes. Equipment/Fixtures: Indicate and label all kitchen equipment, toilet fixtures, laundry equipment, water heaters, a/c equipment, electrical panels, fireplaces, built in cabinets, and similar. Ventilation: All through the wall ventilation, (garage vents, dryer vents, exhaust fans, Kitchen exhausts, and similar. Schedules: Items such as finishes, doors, windows, fixed glass, fixtures equipment, partition construction, may be coded and listed on a schedule.

FRAMING PLAN INFORMATION Scale: ¼"=l '0" minimum for all buildings of less than 5,000 sq.ft. Dimensions: All structural elements, their sizes and reinforcing (rafters, trusses bracing, beams, girders, and similar). Columns occurring below beam level, roof mounted equipment, skylights, hatches, dashed outline of structure below this level, Section cuts, roof chimneys, and similar. Design: Pressures for wind design. Loads and load transfer calculations Drainage: Roof slope, drains, gutters, crickets, overflow scupper calculations required by the Code. Material: Roofing and sheathing material (Including Product Approval Number). Ventilation: Attic ventilation calculations. FOUNDATION PLAN INFORMATION Scale: '/ 4 "=l'0" minimum required for all buildings of less than 5,000 sq.ft. Dimensions: All required. Site: Structure: Underground: Design: Schedules: Topography/fill requirements. All structural elements, their size and reinforcing (footings, slabs, filled cells, poured columns, bearing partitions, and similar) Slab elevation depression, changes in level, section cuts, and similar. Major slab items (cook-top vents, drainage and/or sanitary lines, and similar. Soil bearing values, as per geo-technical engineer's reports or based on known soil properties at the site. Items such as footings, slabs, columns, may be coded and listed on corresponding schedules. ELECTRICAL PLUMBING AND H.V.A.C. INFORMATION Scale: 1 / 4 = 1'0" minimum required for all buildings of less than 5,000 sq.ft, or equivalent metric scale. 1 / 2 "=1'-0" minimum for designated electrical equipment rooms and elevation shall be provided. Dimensions: Non-typical outlets, fixtures and conditions. Outlets/Fixtures System: Electrical: show all interior and exterior receptacles, fixtures, switches, electrical exhaust and ceiling fans, attic fans, or roof top receptacles, fixtures or equipment, all electrical equipment,(water heaters, a/c equip., pumps, and similar).

Service/Panel: Schedules/Riser: Calculation: Plumbing: show all fixtures, sanitary drainage, vents, water supply, water heaters, and similar. H.V.A.C. all ducts and diffuser sizes, fan coil and condensing unit location, specifications, and CFM's per outlet. Electrical: all items circuited as the code. Panel size, all circuits with use, load, wire, breaker and conduit size indicated. Diagram with size of service, meter, ground, disconnect switches, feeders, and panels. Plumbing Diagram with size of all lines and location of all fixtures and the number of fixtures units of the fixture groups they serve. In commercial work provide isometric drawings of the sanitary drainage, water supply and the storm drainage piping. H.V.A.C. Equipment may be coded and have their specifications listed on a schedule. Electrical. Load calculation per N.E.C. H.V.A.C. As required per Energy Code, including heat and cooling load calculations. HVAC DESIGN REQUIREMENTS Check yes or no HVAC Design Requires Yes No Duct smoke detector Fire damper(s) Smoke damper(s) Fire rated enclosure Fire rated roof/floor ceiling assembly Fire stopping Smoke control Also needed: 1. A signed permit application (notarized, if qualifier not present). 2. Two (2) sets of signed and sealed construction plans. 3. Four (4) sets of signed and sealed paving and drainage plans. 4. Two (2) copies of surveys (showing existing condition of property), less than 1 year old. 5. Two (2) sets of signed and sealed site plans. 6. Two (2) sets of air conditioning plans (incorporated into sealed building plans). 7. Two (2) sets of signed and sealed plumbing plans and isometric drawings.

8. Two (2) sets of signed and sealed energy calculations. 9. A soil boring report (when required) with signed and sealed cover letter. 10. A contractor registration form. (Including current license and insurances). 11. Health Department Approval (when required). 12. Folio Number of project property. 13. Legal Description of project property. 14. Owner's Affidavit form, signed and notarized. 15. Structural drawings and calculations signed and sealed, (when required), 16. A copy of the signed contract for the work. 17. If applicable, the condominium board has to approve the work being done and they must have signed and sealed the condominium approval form. ZONING AND LANDSCAPE INSPECTIONS The Community Development Department requires that all projects comply with the City Zoning and Landscape Ordinances before a Certificate of Occupancy can be issued. Copies of these ordinances can be obtained at the Community Development Department, telephone (305) 948-2966. Landscape inspections can be requested by calling (305) 957-3530. ROLL-OFF CONTAINERS Roll-off containers are required for certain types of projects to remove waste materials from the property. Containers may be used only from waste hauling companies licensed with the City to provide this service. The Building Division can provide a list of these vendors upon request. The following types of listed projects as well as others deemed necessary by the City Manager or designee shall provide a construction debris container on-site for the duration of the construction of the permitted project. These project types are as follows: construction of a new building, construction of an addition to an existing building, renovation of an existing building, demolition of an existing building or part of a building, re-roofing. The container shall be emptied, whenever filled, the debris generated by the construction as well as the litter generated by the workers shall be placed in the construction debris container. Debris or litter from the construction site shall not be permitted to appear off-site onto neighboring properties.

PUBLIC FOOD SERVICE ESTABLISHMENTS Prior to applying for building permits with the City of North Miami Beach, the plans for public food service establishments must be submitted to the Department of Business and Professional Regulation, Division of Hotels and Restaurants, Bureau of Licensing and Enforcement in Miami-Dade County. Three (3) sets of plans must be submitted to this agency for review and approval. Two (2) sets will be returned to the applicant stamped approved. These two (2) sets are the sets that must be submitted to the City of North Miami Beach for permits. QUICK REFERENCE MATERIAL The following quick reference information applies to all construction trade types. Certificate of Competency - (Miami-Dade County) Address: 140 W. Flagler Street 16th Floor Miami, FL 33128 Telephone: (305) 375-2527 Certificate of Competency - (State Certification) Address: 140 W. Flagler Street, 16th Floor Miami, FL 33128 Telephone: (305) 375-2527 Miami-Dade County Building Department Address: 11805 SW 26 th Street Telephone: (786) 315-2000 Miami-Dade County Planning & Zoning Department Address: 11805 SW 26 th Street Telephone: (786) 315-2000 Miami-Dade County Department of Environmental Resources Management (DERM) Address: 11805 SW 26 th Street Telephone: (786) 315-2000 24 hour hotline: (305) 372-6955

Miami-Dade County Fire Department Address: 11805 SW 26 th Street Telephone: (786) 315-2000 Miami-Dade County Impact Fees Address: 11805 SW 26 th Street Telephone: (305) 375-2000 Florida Department of Children & Families (formerly HRS) Miami-Dade County Department of Public Health (District 11) Address: 7755 NW 48 Street Building E, Suite 130 Miami, FL 33166 Telephone: Address: (Septic Tank) PERMITS (305) 513-3459 Dade County Department of Public Health 11805 SW 26 th Street Telephone: MAIN NO. (305) 623-3500 Miami-Dade County Public Works Department Address: 11805 SW 26 th Street Telephone: (305) 315-2000 Miami-Dade County Water and Sewer Department Address: 11805 SW 26 th Street Telephone: (305) 315-2000

State Department of Business and Professional Regulation Division of Hotels and Restaurants Bureau of Licensing and Enforcement Address: DBPR 1940 North Monroe Street Tallahassee, FL 32399-1011 Telephone: (850) 487-1395 North Miami Beach Building Division Address: City of North Miami Beach Building Department 17050 N. E. 19th Avenue North Miami Beach, FL 33162-3100 Telephone: (305) 948-2965 Fax: (305) 919-3708 North Miami Beach Community Development Department Planning & Zoning Division Address: City of North Miami Beach Community Development Department 17050 N.E. 19th Avenue` North Miami Beach, FL 33162-3100 Telephone: (305) 948-2966 Fax: (305) 957-3517 North Miami Beach Public Utilities/Public Works Department Address: City of North Miami Beach Public Services Department 17050 N. E. 19th Avenue North Miami Beach, FL 33162 Telephone: (305) 948-2967 North Miami Beach Sanitation Division Address: City of North Miami Beach Sanitation Division 1965 N. E. 151 Street North Miami Beach, FL 33162 Telephone: (305) 948-2904 State Contractor/Professionals Hot Line Telephone: 1-800-851-1204

State of Florida Department of Transportation (FDOT) Address: District VI 1000 N. W. 111th Avenue Miami, FL 33172 Telephone: (305) 470-5197 State of Florida Department of Business and Professional Regulation Construction Industry Licensing Board Address: 1940 N. Monroe Street Tallahassee, FL 32390-0784 Attn: Construction Board Telephone: 1-850-487-1395 State Department of Agriculture & Consumer Services Telephone: 1-800-HELP FLA (1-800-435-7352)

"QUIK" PERMITS The "Quik" Permit allows permits to be issued "over-the-counter" to licensed contractors for specific installations, repair and maintenance activity when the following conditions exist: The contract price is $2,500 or less ($7,500 or less for mechanical air conditioner work). The applicant is a qualified licensed contractor. Permit is not submitted as a result of any Code Enforcement violation. The work is not being done on property where an active "Master" permit exists. The owner and contractor agree to obtain the required inspections within 30 days. Quik Permits will be issued for the following: BUILDING Replace or repair garage door (with product approval) + Replace or repair exterior door (with product approval) Replace or repair exterior window (with product approval) ELECTRICAL Low voltage intercom, burglar alarm, or smoke detectors Ceiling fans Replace devices (outlets, switches, light fixtures, etc.) PLUMBING Replace irrigation or swimming pool pumps Replace or repair water service lines Replace water heater + Replace drain field A/C MECHANICAL Replace A/C fan coil or condensing unit (exact exchange only) Wall/window A/C unit replacement Replace gas appliances Repair/replace above ground L.P. gas tanks ALL WORK SHALL BE PERFORMED TO COMPLY WITH THE 2010 FLORIDA BUILDING CODE. Please remember to bring a copy of your license and insurance certificates to the counter before 3:00 PM and bring cash, check, or money order for payment.