SM-PROJ-M-WH / SM-PROJ-M-BLK

Similar documents
ECM-D70T / ECM-D70T1.5

AMF112 Instruction Manual

AMF112 ( <00>) 13mm (1/2 in.)

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

Beadboard Wall Bookcase

A701 ( <01>)

Sliding Door Hardware Installation Instructions

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

Guidelines for Earthquake Bracing Residential Water Heaters

WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS

Steel Door Frame Installation in Steel Stud Construction

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Panel Track Installation Guide

Seismic Installation for Attic Storage System

Assembly and Usage Instructions

Speed-Mat Rectangle Cutter

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

DE Frame with C Series Sidelight

Guidelines for Earthquake Bracing of Residential Water Heaters

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

1. SAFETY RULES WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR PERSONAL INJURY, MOUNT FAN TO OUTLET BOX MARKED "ACCEPTABLE FOR FAN SUPPORT".

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

SELF-STEERING AXLE TABLE OF CONTENTS

Chelsea Loft Bed WARNING:

OWNER S MANUAL Table Tennis Table Patent Pending

2&3 SECTION LOFT LADDER

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions

SAN25 ( <00>)

DIY CABINET REFACING INSTALLATION GUIDE

K17.12 Door closers K17. Doors

Assembly Instructions

Articulating TV Wall Mount for 19" to 70" Flat Panel TVs

Building an Off-Center Fixture for Turning Pendants

Awning Instructions. Standard Manual 1.5m to 4.5m

Owner s Guide and Installation Manual. Vancouver Model Name , Model No. English Español

BUNK BED. Model No.: DA3797E - Espresso DA3797P- Pine. UPC CODE: (Espresso) (Pine) NOTE: Lot number: Date of purchase:

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Ceiling Mounted Folding Attic Ladders Installation Instructions

Basic Spring Motor Roller Shades

Generator Transfer Switch Model # HTS15-AUTO

Calvert USA, Inc. Attic Stairs

INSTRUCTIONS: LocknCharge Laptop Carts

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual.

Samuel Shorty Bunk Bed

1. SAFETY RULES. 8. Avoid placing objects in the path of the blades.

Horizontal Mini Blinds Installation Guide

Determine the desired location fixture and center the coaxial cord location to the electrical box.

AZEK Rail Install Guide

MEDIUM FLAT PANEL DISPLAY STATIC MOUNT MSR Series

In-Ground Basketball System Owners Manual

60" TulleTM. Instruction Manual. A Kichler Select ceiling fan

Window Installation Instructions

AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech

RadianceRail Installation Guide

CRASH RAIL INSTALLATION HEIGHT

INSTALLATION MANUAL. Contents JAPANESE ENGLISH GERMAN FRENCH ITALIAN SPANISH. To the installing technician: CEILING BRACKET

R O A D M A S T E R, I N C.

INSTRUCTION BOOK FOR. Single Monitor Video Conference Cart

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

INSTRUCTION BOOK FOR. Dual Monitor Video Conferencing Cart

INSTALLATION INSTRUCTIONS

SPIRAL STAIR KIT INSTALLATION MANUAL

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

Structural Holding System

R O A D M A S T E R, I N C.

Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

BUILD A TABLETOP LOOM

Removable Aluminium posts

Item #: BTOL Assembly Instructions

DC Series Digital Conversion Alarm Operator s Manual

Extra Tall Wide Span Gate

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.

Basement Window Installation Guide Hopper and Sliding

CortezTM A Kichler Décor Ceiling Fan

SureSite Magnetic Liquid Level Indicator

INSTITUTIONAL BARRIER FREE SHOWER INSTALLATION

Atlanta CAUTION READ INSTRUCTIONS CAREFULLY FOR SAFE INSTALLATION AND FAN OPERATION. IF UNSURE CONSULT A QUALIFIED ELECTRICIAN

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

INSTALLATION INSTRUCTIONS

NBA Arena Portable System

Please Do Not Return This Product to the Store!

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Sash Replacement Guide

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

Models HD920EV HD930EV LW5000EV WD962KEV WD962KPEV WD962MLEV

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

EZ-48-3AB Weather Station Mounting Tripod and Mast

White Industries Rear Hub Instructions

Premier & Deluxe 3-Season Room Sliding Glass Door

Installation Instructions

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

Transcription:

SM-PROJ-M-WH / SM-PROJ-M-BLK Strong Universal Projector Mount INSTRUCTION MANUAL

1. Warnings and Important Safety Instructions CAUTION: This ceiling mount is intended for use only with the maximum weight of 30 lbs. Use with heavier than the maximum weights indicated may result in instability causing possible injury. We highly recommend this product be installed by a qualified professional. Do not begin installation until you have thoroughly read and understand these instructions. Safety gear and proper tools must be used. Failure to do so can result in property damage and/ or serious injury. Verify that the ceiling will safely support four times the combined weight of the mount and projector before installation, or reinforce the structure to be capable. Under no circumstances should this product be mounted to metal studs. Follow all instructions and recommendations regarding adequate ventilation and suitable locations for mounting your projector. Consult the owner s manual for your projector for more information. The manufacturer does not accept responsibility for incorrect installation. 2. Table of Contents 1. Warnings and Important Safety Instructions 2. Table of Contents 3. Strong Mounts Product Overview 4. Package Contents 5. Tools Required 6. Installation Considerations 6.1. Mounting Height and Location 6.2. Ceiling Mounting Options 7. Installation Step 1. Install the Mounting Plate or Accessory on the Ceiling A. Wood Joist Ceiling Instructions B. Concrete Ceiling Instructions Step 2. Attach the Projector Mount Body and Optional Extension Accessories Step 3. Attach the Mounting Base and Arms to the Projector A. Finding the Center of Balance B. Attaching the Mounting Base and Arms to the Projector Step 4. Hang the Projector Step 5. Adjusting the Projector 8. Specifications 9. Dimensions 10. Warranty 11. Contacting Technical Support 3 3 4 4 4 5 5 5 5 5 5 6 6 7 7 7 8 8 9 10 11 11 www.snapav.com Support: 866.838.5052 Pg. 3

3. Strong Mounts Product Overview Thank you for purchasing a Strong projector mount. We appreciate your purchase and are committed to providing the highest quality products possible. This Strong SM-PROJ-M Projector Mount was designed to provide the most installer-friendly experience possible. It uses a hanging mount design that allows for easy height adjustment using standard 1.5 NPT threaded hanging rods, and supports a variety of Strong accessories to allow mounting to almost any ceiling and provide wiring concealment. 4. Package Contents (A) Wood screw x2 (F) M4 x 16 Screw x4 (K) M6 x 30 Screw x4 (O) Mount Arm x4 (B) Concrete Anchor x2 (G) M4 x 30 Screw x4 (L) M5 Washer x4 (P) 6mm Spacer x4 (C) Arm Screw x4 (H) M5 x 16 Screw x4 (D) 6mm Allen Key x2 (I) M5 x 30 Screw x4 (M) Mount Base x1 (Q) Mount Body x1 (E) 3mm Allen Key x1 (J) M6 x 16 Screw x4 (N) Ceiling Plate x1 (R) M4 Washer x4 5. Tools Required Ladder or scaffolding to allow access to the mounting area Pencil (for making temporary alignment marks) #2 Philips Screwdriver Electric Drill 3/16 Drill Bit and Stud Finder (for pilot holes in wood joist ceiling) 5/16 Masonry Drill Bit (if mounting in concrete ceiling) Hammer (if mounting in concrete ceiling) Pg. 4 2013 Strong

6. Installation Considerations Review this section before beginning to ensure the best possible experience during and after installation of the SM-PROJ-M projector mount. 6.1. Mounting Height and Location The ideal parameters for projector height and distance from the screen vary with every installation depending on the equipment in use and the operating environment. Before installation, consult with the projector and screen manufacturer documentation to plan the location that is best for performance. Also, make sure that nothing will obstruct installation of the projector mount and wiring from the sources. This can include items like concealed plumbing, ductwork, electrical wiring or conduit. Ensure that no exposed items on the ceiling or walls will obstruct the line of sight or prevent any part of the system from being mounted correctly. 6.2. Ceiling Mounting Options The SM-PROJ-M projector mounting plate and all Strong mounting accessories utilize 1.5 NPT threads for attachment of mount parts and accessories. The mount body is female-threaded to screw onto the male-threaded ceiling plate. Strong accessories include ceiling hangers that allow mounting to non-standard ceiling surfaces and materials, extension poles of fixed or adjustable length, and adapters for attaching these accessories to any Strong ceiling mount. For complete information on using the correct extensions and adapters for this mount, please see the Ceiling Mount Accessory Guide, available at the Support tab on the product page for the SM-PROJ-M at www.snapav.com. 7. Installation Step 1. Install the Mounting Plate or Accessory on the Ceiling If an alternative mounting accessory is being used to hang the mount from the ceiling, refer to the installation manual for that part to ensure that step 1 of SM-PROJ-M installation is completed correctly. If the included ceiling plate is being used, continue with the directions below for either wood or concrete ceiling material mounting. Warning! When installing the ceiling plate: Do not over-tighten any fasteners used to mount to the ceiling plate. Over-tightening could cause damage to the fasteners, reducing their rated holding strength and increasing the possibility of failure. Damage to the mount or projector due to improper installation or fasteners is not covered under warranty. A. Wood Joist Ceiling Instructions 1. Locate the ceiling plate (N) and wood screws (A). 2. Place the ceiling plate in the desired location and mark the two mounting holes, and the location of the plate. The use of a stud finder is highly recommended to ensure that screws are threaded into the center of the board above the ceiling surface. Note: It may be necessary to add extra wood bracing above the ceiling to allow for both screws to be securely fastened to the ceiling frame structure. (A) (A) (N) 3. Pre-drill each hole using a drill and 3/16 drill bit to a depth of at least 2 (51mm). 4. Using a #2 Phillips screwdriver, insert the screws through the plate mounting slots and tighten them until the plate is securely attached and will not move freely. Hold the plate in place over the alignment marks while tightening the screws. www.snapav.com Support: 866.838.5052 Pg. 5

B. Concrete Ceiling Instructions Warning! For Concrete or Cinder Block Mounting: Cinder block must meet ASTM C-90 specifications. Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor. Verify that there is a minimum of 1-3/8 of concrete thickness to be used for the included concrete wall anchors. Do not drill into mortar joints! Be sure to mount in a solid part of the block, generally 1 minimum from the side of the block. It is suggested that a standard electric drill on slow setting is used to drill the hole instead of a hammer drill to avoid breaking out the back of the hole when entering a void or cavity. Make sure that the supporting surface will safely support the combined load of the equipment and all attached hardware and components. plaster/ drywall plaster/ drywall concrete concrete 1. Locate the ceiling plate (N), concrete anchors (B), and wood screws (A). 2. Place the ceiling plate in the desired location and mark the two mounting hole locations, and the location of the plate. 3. Using a drill and a 5/16 masonry bit, drill one hole to a depth of at least 2 (51mm) in each of the four marked locations. 4. Install the concrete anchors into the holes, tapping them in lightly with a hammer as needed. 5. Using a #2 Phillips screwdriver, insert the screws through the plate mounting slots and into the masonry anchors. Tighten them until the plate is securely attached and will not move freely. Hold the plate in place over the alignment marks while tightening the screws. (B) (A) (B) (A) (N) Step 2. Attach the Projector Mount Body and Optional Extension Accessories After the ceiling plate or accessory is secured to the ceiling, the projector mount may be secured to it, or an extension accessory may be installed, followed by attachment of the mount body. Refer to the extension documentation to perform any pre-assembly necessary before beginning this step. A. For direct mounting, thread the projector mount body (Q) into the ceiling plate (N) by hand as tightly as possible while still pointing toward the screen correctly - and then skip to step D. B. If an extension pole is being utilized, thread the extension and any adapters together, and then thread the top of the extension into the ceiling plate/adapter by hand as tightly as possible. Tighten any setscrews for the accessories at this time (see extension or adapter documentation for specific instructions). C. Thread the projector mount body into the bottom of the extension or adapter by hand as tightly as possible while still keeping the mount pointed in the direction of the screen. D. After the mount body is aimed at the screen, use the 3mm Allen key (E) to tighten the set screws on the mount body. (Minor alignment changes can be made after installation is complete.) (E) (Q) (N) Pg. 6 2013 Strong

Step 3. Attach the Mounting Base and Arms to the Projector A. Finding the Center of Balance In order for the projector to hang evenly from the mount once it is installed, the mounting base must be attached and secured to the projector so that the center of gravity of the projector is centered in relation to the center of the mounting base. Usually the center of gravity will not be in the center of the unit, but slightly closer to the side the lens is on. 1. To allow for the correct balance when attaching the projector to the mount, begin by picking up the projector on opposite sides and trying to balance it between both hands. Move hands forward or back until the projector nearly balances in your hands. Once the balance is found, make a temporary mark or note to indicate the balance on that axis. 2. Repeat step A for the opposite axis. 3. The intersection of the lines is the approximate center of balance. Make a temporary mark or note of this point for use in the next step of installation. Center of Balance Step A Step B B. Attaching the Mounting Base and Arms to the Projector After the center of balance is found, the mounting base must be attached to the projector. Attachment will vary for every projector, so a variety of hardware is included to ensure compatibility with most common brands. 1. Loosely assemble the projector mount base (M) and arms (O), using the arm screws (C) and washers (L). Attach the arms to the base so that one arm is attached to each of the four slots. 2. Next, identify the screw thread pitch needed to attach the projector to the arms. Screws (F, G, H, I, J, K) are included for this purpose. Gently try to thread one screw at a time into a projector mounting hole until the correct thread pattern is found. If none of the included screws fit, consult with the projector manufacturer to get the correct thread pitch and length to use. (M) Step A Arm and Base Assembly (C) (L) (O) Step B Note: If screws (F) or (G) are used for attaching the arms to the projector, use one M4 washer (R) between the screw (F) or (G) and the mounting arm (O) when attaching the arm. 3. Next, lay the mounting base assembly over the center of gravity mark. Position one arm over each of the mounting holes on the projector mount body. Pivot the arms in the slots as needed to maintain balance in relation to the arms. 4. If the arms cannot attach to the projector due to lack of spacing, spacers (P) may be used between the projector and the mounting arms. Center of Balance Use spacers (P) and longer screws for added clearance www.snapav.com Support: 866.838.5052 Pg. 7

Step 4. Hang the Projector After the projector has been attached to the mounting base, it can be attached to the projector mount body. A. Carefully hook the mount base (M) with your projector attached to the mount body (Q). B. Tighten the Allen screws on all four sides of the mount base (M) with Allen keys (D) to prevent the projector from being knocked off of the mount body (Q). (Q) Two Allen keys are provided for this step to allow for easier tightening. Installation is now complete. Continue to the next section for picture adjustment instructions. (D) (M) Step 5. Adjusting the Projector Warning! When adjusting the direction, only turn the mount enough to reach the desired direction. DO NOT CONTINUALLY TURN THE PROJECTOR OR MOUNT IN A COUNTER-CLOCKWISE DIRECTION! This can cause the mount to come apart due to unthreading and may cause damage and/or injury. Now that the mount and projector are fully assembled and installed, complete all wiring connections and supply power to the projector. Final adjustments can then be made to perfectly align the projected image with the screen. To change the tilt of your projector, use Allen keys (D) to first loosen the Allen screws on the mount base (M). Tilt the projector into the desired position and re-tighten the screws. To change the direction your projector faces, first loosen the set screw with the Allen key (E). Turn the projector to the desired direction and re-tighten the set screw. For easier adjustments, loosen the screws only enough to allow for movement of the parts while maintaining some friction (1/8-1/4 turn). Note: The SM-PROJ-M can tilt up to 35 from horizontal between the mounting surface and projector. If the mounting angle of the ceiling plate (N) is greater than 15 from horizontal (as with Front sloped Viewor angled ceilings) then the projector mount may need to be adjusted so that tilt can be increased. The image below illustrates the axes on which the mount can tilt and the maximum angle available in each axis. If adjustment is necessary, loosen the setscrew at the mount body (Q) to ceiling plate (N) threads and adjust the orientation of the mount base (M) as needed to allow for enough tilt. 15.0 15.0 Front View Side View 35.0 35.0 15.0 15.0 Side View 35.0 35.0 Pg. 8 2013 Strong

8. Specifications General Color Finish Type Product Weight Certifications White or Black Powder Coated, Matte Finish 2.87 lbs UL Compatibility Maximum Projector Weight Minimum Mounting Pattern Maximum Mounting Pattern Maximum Offset- Projector to Arm 30lbs. 2.36 x 2.36 (60mm x 60mm) 16.5 x 16.5 (419mm x 419mm).23 (6mm) Adjustments Maximum Tilt +/- 35 from Horizontal Horizontal Rotation 360 Offset From Projector 0,.23 (includes 1 optional spacer per screw) www.snapav.com Support: 866.838.5052 Pg. 9

9. Dimensions 6.70" 6.7 (170.18mm) 3.70 (94) 3.70" (94mm) 8.35 8.35" (212.31mm) (212.31) 16.48 16.48" (418.81mm) (418.81) 6.08 6.08"(154.58mm) (154.58) w/o 6mm spacer w/o 5.85" 6mm (148.58mm) spacer 5.85 (148.58) Pg. 10 2013 Strong

10. Warranty Lifetime Lifetime Limited Warranty Strong Mounts have a Lifetime Limited Warranty. This warranty includes parts and labor repairs on all components found to be defective in material or workmanship under normal conditions of use. This warranty shall not apply to products which have been abused, modified or disassembled. Products to be repaired under this warranty must be returned to SnapAV or a designated service center with prior notification and an assigned return authorization number (RA). 11. Contacting Technical Support Phone: (866) 838-5052 Email: Techsupport@snapav.com www.snapav.com Support: 866.838.5052 Pg. 11

2013 STRONG 130712-1015