Anchorplex retaining wall construction guide

Similar documents
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

Specification Guidelines: Allan Block Modular Retaining Wall Systems

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Storm Drain Inlet Protection - IP

The Verdura Wall check with your local building department

How To Retaining Wall Guide

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Section 2100-Trenching and Tunneling

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

1. ASTM C Sampling and Testing Concrete Masonry Units 2. ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Design Ideas by Allan Block

Table 4.9 Storm Drain Inlet Protetion Applicable for

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

SECTION STORM DRAIN SYSTEM

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

Chapter 3 Pre-Installation, Foundations and Piers

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION SHEETING, SHORING AND BRACING

Stormwater/Wetland Pond Construction Inspection Checklist

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Designed and Engineered to Perform

LS 2540 SEWER LATERALS AND INSPECTION TEES

v2 AB Classic 2 AB Jumbo Junior 6 AB Lite Stone v6 AB Classic 4 AB Jumbo Junior 8 AB Lite Stone 10 AB Classic 10 AB Jumbo Junior

Section 600 Incidental Construction

Division 2 Section Section 02795

SECTION 1 GENERAL REQUIREMENTS

Precast Modular Block (PMB) for Retaining Wall Systems

SECTION EARTH MOVING

Part 9 SUBDRAIN DESIGN AND LAYOUT

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

How To Build A Wall System

DESIGN GUIDELINES FOR EARTH RETENTION

Moving Small Mountains Vesuvius Dam Rehab

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Specifications for Residential Property Owners Connection to New Public Sewer

Section 402. STORM SEWERS

Residential Foundations and Basements

Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

Section SEWER PIPE INSTALLATION AND TESTING

SECTION SUPPORT OF EXCAVATION

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION PRECAST CONCRETE UTILITY STRUCTURES

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Team Skills Challenge Event # 1 Plant Layout Score Sheet

Connex. Mortarless Masonry Block System

Construction Specifications for Keyhole Pavement Coring and Reinstatement

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Storm Drain Inlet Protection

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Permeable Pavement Construction Guide

SECTION STORM DRAINAGE SYSTEM

Installation Guidelines for Segmental Block Wall. Contents 1. INTRODUCTION MATERIALS... 2

Free-Form Concrete Pool

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SECTION GRAVITY SANITARY SEWERS

SE-10 STORM DRAIN INLET PROTECTION. Objectives

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Module 7 (Lecture 24 to 28) RETAINING WALLS

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

Installation PowerPoint for Grasscrete Formers

Machine Foundation Design

Advancements in Permeable Pavements

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

Wastewater Capital Projects Management Standard Construction Specification

Transcription:

Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems

Table of Contents and Introduction table of contents ow to Use This Guide 2 About the Anchorplex System 2 Anchorplex System Material Specifications 3 Anchorplex System Material Quantity Estimating 3 Anchorplex System Construction Basics 4 Construction Details for the Anchorplex System 6 Material Estimating Charts for Structural Backfill 9 how to use this guide Use this Construction Guide to gain a general understanding of the basics of building Anchorplex retaining walls. Do not use this Construction Guide in lieu of construction drawings provided by a qualified engineer. Contact Anchor Wall Systems at 1-877-295-5415 for more information about designing and building Anchorplex retaining wall systems. Because of these efficiencies and the design flexibility afforded with Anchorplex construction, millions of square feet of Anchorplex retaining walls have been installed and are performing well in Australia. Anchor Wall Systems is now introducing this construction method in North America and other parts of the world. APPLICATIONS Retaining Walls Up to 10 Feet Anchorplex construction is often a more cost-effective solution than building with geogrid reinforcement in walls up to about 10 feet tall. Limited Room to Excavate It is often possible to build an Anchorplex wall in situations where traditional geogrid reinforcement is not an option because of lot lines, rock outcroppings or other obstructions that limit the amount of excavation that can be done. Competing with Machine-Placed Big Blocks For wall heights less than 11 feet, Anchorplex walls are almost always more economical than machine-placed big block walls and are always better-looking structures. ABOUT the ANCORPLEX system The Anchorplex system is a retaining wall built with Anchor products and self-compacting structural backfill that meets specifications developed by Anchor Wall Systems, Inc., and that is backed by engineering support tools developed by Anchor Wall Systems. Structural backfill, also known as no-fines concrete, is a widely available, easily workable, highly porous mixture of clean stone, cement and water. In the mid-1990s, Anchor s licensee in Australia, Pioneer Building Products Ltd., developed a system of building retaining walls up to about 5 meters (about 15 feet) high from Anchor retaining wall blocks reinforced with a zone of structural backfill placed immediately behind the block facing. When used in combination with blocks of the appropriate shape, the structural backfill attaches itself to the wall facing, effectively extending the depth and mass of the facing. In addition, the structural backfill zone also serves as the required drainage zone. The Anchorplex construction method completely eliminates the need for the construction of a mechanically stabilized earth zone behind the wall facing and requires substantially less excavation and compaction than is usually necessary in a grid-reinforced wall construction project. The structural backfill that meets Anchor Wall Systems, Inc. s specifications allows water to drain behind the wall. 2

About the Anchorplex System ANCORPLEX system MATERIAL SPECIFICATIONS Structural Backfill Component This component is made by mixing cementitious material, coarse aggregate and water. The cementitious material should be hydraulic cement (ASTM C 150 or C 1157), fly ash (ASTM C 618) or slag (ASTM C 989). The stone should be coarse aggregate, size number 6, 8 or 57 ( 1 /2 inch to 3 /4 inch), type 3S (ASTM C 33). Stone size selection should be based on the application. Generally, a block with a large core or one with large voids between it and adjacent bloc ks can more easily accept a mix design with larger aggregates. The water should be potable. The mixing ratios (by weight) of aggregate to cementitious material should be between 6:1 and 7:1. The mixing ratio (by weight) of water to cementitious material should be no more than 1:2. Facing-Block Component The following Anchor retaining wall products can be used to build Anchorplex retaining walls: Diamond Pro Stone Cut products Diamond Pro products ighland Stone products Diamond Stone Cut products Diamond products Too little water ANCORPLEX system MATERIAL QUANTITY ESTIMATING Estimate the quantity of block needed on an Anchorplex job by conventional methods. Conventional block quantity estimating tools are available at www.. Estimate the quantity of Anchor-specified structural backfill material needed on an Anchorplex job using the Anchorplex Estimating Chart for Structural Backfill for the particular Anchor wall block system that you are using on the job. Each Anchorplex Estimating Chart for Structural Backfill is based upon Anchor s proprietary design methodology and is available for downloading at www.. Proper amount of water The Anchorplex Estimating Charts for Structural Backfill for the Diamond Pro wall system are included in this Construction Guide for illustrative purposes. Too much water 3

Anchorplex System Construction Basics 1. SETTING OUT TE WALL AND EXCAVATION his step is no different for Anchorplex system construction T than for conventional construction, except that the amount of excavation will probably differ. Verify wall layout and wall location with the client and other appropriate parties. Survey grade stakes with distance to wall face, elevation for bottom of wall and steps in the foundation should be marked. Mark the location of the excavation trench so that, when dug, it is wide enough to accommodate the wall block and leveling pad and complies with drawings and specifications. See Excavation Detail on page 6. A geotechnical engineer should evaluate the foundation soil to verify that there is adequate bearing capacity for support of the structure before placing aggregate in the trench. Firmly compact the soil in the base of the trench, using either a vibrating plate compactor or small vibrating trench roller before installing the leveling pad base aggregate. 2. LEVELING PAD This step is no different for Anchorplex system construction than for conventional construction. Build the leveling pad from granular stone base material or 3/4 -inch angular aggregate. The pad must be a minimum of 6 inches deep after compaction. An additional distance of at least 6 inches in front of and behind the wall block must be included in the leveling pad. See Excavation Detail on page 6. Fully compact the leveling pad using a vibrating plate compactor. Make sure the base material is level front to back and side to side. 4 3. BASE COURSE This step is no different for Anchorplex construction than for conventional construction. It is the most important step in the construction process. Starting at the lowest point, lay the first block, checking level both front to back and side to side. Place additional blocks side by side, flush against each other at the face, making sure the blocks are in full contact with the leveling pad. Use a string line along back of blocks to align the wall units. Use a 4- to-6-foot level along the top of foundation blocks to check the level side to side and use a shorter level to check the level from front to back. 4. CONSTRUCTION OF ADDITIONAL COURSES This step is no different for Anchorplex system construction than for conventional construction. Clean any debris off the top of blocks. Place the second course of blocks on top of the base course. Maintain running bond by placing units in a staggered pattern, running bond, to the course beneath. Pull each unit forward until the shear device is securely in contact with the units below. Use string line on each course to align the blocks along the wall. Do not exceed 2 feet vertical stacking of block before placing a lift of structural backfill.

Anchorplex System Construction Basics 5. DRAINAGE DESIGN This step is no different for Anchorplex system construction than for conventional construction. The ground levels on a site will determine at what level to install the perforated drainpipe, but generally the drainpipe is positioned as low as possible behind the wall so water drains down, out and away from the wall into a storm drain or to an area lower than and away from the wall. The perforated pipe should be placed approximately 6 inches behind the back of the block. The actual location of the drainpipe should be noted on the engineered shop drawings. 6. INSTALLATION OF structural backfill After completion of the leveling pad, base course, drainpipe installation and stacking block 2 feet above grade, the first lift of structural backfill that meets Anchor Wall Systems, Inc. s specifications can be installed. The structural backfill can be placed directly from delivery vehicle or with skid-type loader or other equipment. It should be placed behind the blocks and worked into all voids and cores of the blocks. When properly formulated, the structural backfill material will not leak through the face of the wall. After installation of the first lift of structural backfill, install additional courses and repeat the process. Place additional lifts from 8 to 24 inches depending on site conditions and project scale. Subsequent pours can be made as soon as the structural backfill in the previous lift has set usually not longer than 2 to 3 hours. 7. CAPPING Follow standard practice when capping the wall. 8. FINISING Protect the wall with a finish grade at the top and bottom. 5

Construction Details for the Anchorplex System typical base preparation Construction Details show the use of Diamond Pro products. Details for other Anchor products are located at www.. 1:1 Excavation detail Structural-Backfill Depth Diamond Pro Block Leveling Pad Trench Approximate Limits of Excavation Finished Grade 7 6" Minimum Compacted Granular-Base Leveling Pad Native Soil (Minimum) LPd LPd LPd LPd = Leveling Pad Depth Compacted Granular-Base Leveling Pad ready for first pour first pour Structural-Backfill Depth Fabric Optional Finished Grade 7 4" Diameter Drainpipe Finished Grade 7 (Typical) 6" 6" 4" Diameter Drainpipe NOTES: 1. Structural backfill is to be placed in 8- to 24-inch (typical) lifts. 2. Structural backfill must be manipulated into all voids between blocks to ensure adequate bond between block and concrete mass. Structural-Backfill Depth per Design Ensure void areas between units are filled completely 6

Construction Details for the Anchorplex System subsequent pours DIAMOND PRO PRODUCTS Construction Details show the use of Diamond Pro products. Details for other Anchor products are located at www.. Low-Permeability Soil Filter Fabric Diamond Pro Block Structural Backfill 7 Optional Lightweight Geogrid (Typical) Finished Grade 4" Diameter Drainpipe 6" 6".3 to.4 of (Typical) daylight details 4" Diameter Pipe Weep oles Remove Portion of Adjacent Units to Allow Weep oles Through Face 4" Daylight Drainpipe Through Wall Face 2" Cut 2nd Course 1st Course Spacing Varies 50' Maximum 7

Construction Details for the Anchorplex System fence details Construction Details show the use of Diamond Pro products. Details for other Anchor products are located at www.. Fence or Railing (Designed by Others) Low-Permeability Soil Filter Fabric Cap Block Diamond Pro Block Structural Backfill 7 NOTE: Batter may vary by manufacturer Sleeve and Non-Shrink Grout Around Post Sleeve Installed During Wall Construction Diamond Pro Block Cap Block 8

Material Estimating Charts for Structural Backfill no slope or surcharge Estimating Charts show the use of Diamond Pro products. Estimating Charts for other Anchor products are located at www.. CLAY AND SILT SOIL SILTY/CLAYEY SAND SOIL CLEAN SAND AND GRAVEL SOIL = 26 = 30 = 34 NO SLOPE OR SURCARGE NO SLOPE OR SURCARGE NO SLOPE OR SURCARGE NOT REQUIRED NOT REQUIRED NOT REQUIRED 0.22 x Wall Length = 0.22 x Wall Length = 0.22 x Wall Length = 0.29 x Wall Length = 0.29 x Wall Length = 0.29 x Wall Length = 1'-8" [500 mm] 1'-4" [400 mm] 0.53 x Wall Length = 0.45 x Wall Length = 0.37 x Wall Length = [600 mm] 1'-8" [500 mm] 1'-4" [400 mm] 0.73 x Wall Length = 0.64 x Wall Length = 0.54 x Wall Length = Detail shown is conceptual only and should not be used for construction without the seal of a local qualified engineer. 9

Material Estimating Charts for Structural Backfill 250 psf surcharge Estimating Charts show the use of Diamond Pro products. Estimating Charts for other Anchor products are located at www.. CLAY AND SILT SOIL SILTY/CLAYEY SAND SOIL CLEAN SAND AND GRAVEL SOIL = 26 = 30 = 34 250 PSF (12 KPA) SURCARGE 250 PSF (12 KPA) SURCARGE 250 PSF (12 KPA) SURCARGE 0.15 x Wall Length = 0.15 x Wall Length = 0.15 x Wall Length = 1'-7" [480 mm] 1'-4" [400 mm] 1'-4" [400 mm] 0.31 x Wall Length = 0.27 x Wall Length = 0.27 x Wall Length = 2'-4" [700 mm] [600 mm] 1'-7" [470 mm] 0.55 x Wall Length = 0.49 x Wall Length = 0.41 x Wall Length = 2'-7" [770 mm] 2'-4" [700 mm] [600 mm] 0.76 x Wall Length = 0.69 x Wall Length = 0.61 x Wall Length = 3'-4" [1000 mm] 3'-0" [900 mm] 2'-4" [700 mm] 1.13 x Wall Length = 1.03 x Wall Length = 0.83 x Wall Length = Detail shown is conceptual only and should not be used for construction without the seal of a local qualified engineer. 10

Material Estimating Charts for Structural Backfill 3:1 crest slope Estimating Charts show the use of Diamond Pro products. Estimating Charts for other Anchor products are located at www.. CLAY AND SILT SOIL SILTY/CLAYEY SAND SOIL CLEAN SAND AND GRAVEL SOIL = 26 = 3 0 = 34 1 3 3 1 1 3 0.15 x Wall Length = NOT REQUIRED NOT REQUIRED 0.22 x Wall Length = 0.22 x Wall Length = 0.22 x Wall Length = 1'-8" [500 mm] 1'-4" [400 mm] 0.42 x Wall Length = 0.36 x Wall Length = 0.29 x Wall Length = 2'-4" [700 mm] 1'-8" [500 mm] 1'-4" [400 mm] 0.69 x Wall Length = 0.53 x Wall Length = 0.45 x Wall Length = 3'-0" [900 mm] 2'-4" [700 mm] [600 mm] 1.03 x Wall Length = 0.83 x Wall Length = 0.73 x Wall Length = Detail shown is conceptual only and should not be used for construction without the seal of a local qualified engineer. 11

Anchorplex Retaining Wall Construction Guide 2010 Anchor Wall Systems, Inc. The Diamond, Diamond Pro, Diamond Pro Stone Cut, Diamond Stone Cut and ighland Stone wall systems are manufactured under license from Anchor Wall Systems, Inc. (AWS). The Anchor Build Something Beautiful logo, Anchorplex, Diamond, Diamond Pro, Diamond Pro Stone Cut, Diamond Stone Cut and ighland Stone are trademarks of AWS. The wall system blocks are covered by the AWS Limited Warranty. For a complete copy, visit your local dealer or see. Anchor Wall Systems, Inc., 5959 Baker Road, Suite 390, Minnetonka, MN 55345. A&B1001 EW810 DPRO 10/10 12