Banks Lake Pumped Storage Project (North Dam Site)

Similar documents
Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010

US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Levelized Cost of New Electricity Generating Technologies

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

Resource Planning Opportunities

Electric Energy Generation in Washington State. Key Findings from the Association of Washington Business

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

Chapter 5 Renewable Energy

Energy Storage Activities at New York Power Authority

Appendix D: Electricity Price Forecast Preliminary Draft

The Real Cost of Electrical Energy. Outline of Presentation

Commonly asked Question about Green Power, and Kit Carson Renewable Energy Program.

February 3, SUBJECT: Proposed Standard Scenario Results Comparison Metrics

Access to Capital Workshop. July 26, pm 5 pm Rates Hearing Room Portland, Oregon passcode: 4433#

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

The Bureau of Reclamation's Sustainable Energy Strategy. Fiscal Year

Washington State Consortia Model

Alaska Energy Authority: Renewable Energy Fund and Susitna-Watana Hydro

Making Energy Storage Work for The Pacific Northwest

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Oregon s Renewable Portfolio Standard. December 5, 2014 Julie Peacock, Energy Policy Analyst Oregon Department of Energy

Distributed (Solar) Generation

petratherm Explorer and Developer of Geothermal Energy Renewable Energy 2007 Impetus for Economic Energy Market Transformation REGA Forum

Expanding Renewable Energy Options for Companies Through Utility-Offered Renewable Energy Tariffs

Renewable Energy and Energy Efficiency for Tribal Community and Project Development. Basic Energy and Market Terms

Modeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems

Wholesale Renewable Energy Generation Feasibility Presented to Las Gallinas Valley Sanitary District Board June 27, 2013

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

TABLE OF CONTENTS Integrated Resource Plan

CAN THE ELECTRIC GRID ACCEPT LARGE AMOUNTS OF WIND AND SOLAR POWER?

2 nd Tuesday Technical Shorts. Episode 1: Federal Small Hydropower Regulations Milton Geiger March 11, 2014

Power Generation. Lilian Macleod Power Supply Manager National Grid

Integrating Renewable Electricity on the Grid. A Report by the APS Panel on Public Affairs

Hydropower. Corps Hydro Plants Non-Federal Plants

A Green Sector Overview

Oregon Renewable. Energy. Resources. Inside this Brief. Background Brief on. Overview of Renewable Energy. Renewable Portfolio Standard

August 31, Electric Integrated Resource Plan

PRESENTATION TITLE. Corps of Engineers Agreement with. Columbia Riverkeeper Regarding Hydropower Plant Discharges

January 21, The Honorable Gina McCarthy Administrator, Environmental Protection Agency 1200 Pennsylvania, Ave., NW Washington, D.C.

The State of the Electrical Grid in Washington State. Michael Pesin, PMP, P.E. Seattle City Light

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) ) Reliability Technical Conference ) Docket No.

Frequently Asked Questions (FAQs) on Hydropower

Wave & Tidal Energy. Wave and Tidal Energy. What is Wave energy? What is Tidal Energy?

Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant

Black Canyon Hydroelectric Project FERC Project No. P Proposed Fish Passage Study Plan September 2012

Distributed Generation: Frequently Asked Questions

Nellis Solar Array II. Owned by NV Energy Operational late Renewable Energy

Renewable Choice Energy

Unlocking Electricity Prices:

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -

Fiscal Year 2011 Resource Plan

Combustion Turbine Flexibility

Methodology for Merit Order Dispatch. Version 1.0

VERBUND AG,

NV Energy ISO Energy Imbalance Market Economic Assessment

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

Asian Journal on Energy and Environment

Selling Renewable Energy in Michigan. Julie Baldwin Michigan Public Service Commission Michigan Wind Conference 2009 March 3, 2009

Renewable Energy Certificates

Tax Credit Extension: Impact on Renewables Investment and Emissions Outcomes

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Vectren Integrated Resource Plan (IRP) Stakeholder Meeting 3 of 3. Discussion of Analysis Results September 24, 2014

NARUC International Relations Committee Meeting February 5, 2012 Washington, D.C. Jay Godfrey Managing Director, Renewable Energy

Natural Gas and Electricity Coordination Experiences and Challenges

TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO

Clean Energy Trends in North Carolina.

Renewable Development Funds Guidelines

FCRPS Cultural Resources Sub-Committee (CRSC) Quarterly Meeting December 9-10, 2014

Section 1: Introduction

Renewable Energy in Turkey

Renewable Energy and the Role of Energy Storage

Office of Energy Projects Energy Infrastructure Update For August 2012

Energy Storage Systems and Role for the US Grid

Wind energy development in Spain. Luis Atienza Chairman & Chief Executive Officer April, 3rd 2009

Overview on SEA output

How To Build A Power Line From A Single Campus To A Power Plant

Implementing Renewable Energy at Water Utilities

Energy Forecast UPDATE TO THE WHOLESALE ELECTRICITY PRICE FORECAST

USBR PLEXOS Demo November 8, 2012

California Energy Commission Agricultural Peak Load Reduction Program. For Water Agencies Administered by the Irrigation Training and Research Center

12.5: Generating Current Electricity pg. 518

CHAPTER 3 RESEARCH DESIGN

Transmission Planning in the ERCOT Interconnection

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

Challenges and Opportunities For New Pumped Storage Development. A White Paper Developed by NHA s Pumped Storage Development Council

Exploring the Possibilities of Small Hydropower Development Utilizing NRCS-Assisted Flood Control Dams

PIER FINAL PROJECT REPORT RESEARCH EVALUATION OF WIND GENERATION, SOLAR GENERATION, AND STORAGE IMPACT ON THE CALIFORNIA GRID

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system

Appendix D: Wholesale Electricity Price Forecast

Kevin Kennedy Natural Gas and Special Projects Office

Hydro Power Projections Report. Jennifer Palmer

The Effects of Closing Indian Point on Westchester Electric Rates

Increasing Costs in Electric Markets

GHG Accounting Guidance Note Manufacture of Renewable Energy Climate Related Products

HVDC Transmission Line Project for Moving ERCOT Wind Into SERC

Renewable Energy Credit (REC) Price Forecast (Preliminary Results)

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS

Transcription:

Banks Lake Pumped Storage Project (North Dam Site) FERC Project No. 14329 Mid-C Seminar Wenatchee, WA. July 27, 2016 Presented By: Lloyd Reed

Columbia Basin Hydropower Generation from Irrigation Columbia Basin Hydropower (CBHP) provides administration, operations, and maintenance functions for hydroelectric generation facilities owned by the 3 Irrigation Districts that make up the Columbia Basin Irrigation Project, approximately 700,000 acres. The Districts currently own seven projects, ranging in size from 2-94 MW with total generation capacity of all projects = approx. 150 MW. The power from the five projects that CBHP operates and maintains goes to the cities of Seattle and Tacoma. Two other hydroelectric facilities are operated and maintained under contract by Grant County PUD. All of the existing projects are FERC licensed projects. CBHP has a number of additional sites in the process of being studied for new development. Projects range from 600 kw small hydro, up to 500 MW pumped storage.

BANKS LAKE PUMPED STORAGE PROJECT FACTS & FIGURES The Project would be located at the North Dam of Banks Lake in central Washington State near Grand Coulee Dam. The Project would be a separate project from the Bureau of Reclamation s existing Keys pump-generation plant (which is sometimes referred to as the Banks Lake Pumped Storage Plant). Generating Capacity: 500 MW. Turbine Type: 2 to 4 adjustable speed pump-generating units. Maximum Project design flow: 25,000 CFS at 500 MW. Head: 280 to 360 feet (average = approx. 300 feet).

BANKS LAKE PUMPED STORAGE PROJECT FACTS & FIGURES (Cont.) Powerhouse: Located on the west side of Lake Roosevelt just upstream of Grand Coulee Dam and near the Bureau of Reclamation s (BOR) existing Keys pump-generation plant. Estimated 2025 annual generation: 769,600 Mwh. Upper Intake/Reservoir: Banks Lake. Lower intake/reservoir: Lake Roosevelt. Transmission Interconnection: Grand Coulee Dam 230 kv or 500 kv switchyards.

BANKS LAKE PUMPED STORAGE PROJECT NEED FOR THE PROJECT Construction of base load power plants has slowed. Increase of non-dispatchable intermittent generation resources (Wind Plants, Solar Panels) are stressing the bulk power grid. Utilities need to meet State imposed renewable portfolio standards. Early retirement of three large coal-fired power plants in the region due to environmental reasons and potential retirement of others in the near future. Installation and operation of gas fired combustion turbines may be limited due to greenhouse gas emission restrictions. Additional generating capacity needed in 2020 2022.

BENEFITS OF THE BANKS LAKE PUMPED STORAGE PROJECT The Project would not require the construction of any new dams/reservoirs. Both of the Project s upper and lower reservoirs have very large storage capabilities relative to other proposed PNW pumped storage facilities. Banks Lake active storage = 715,000 acre-feet. Lake Roosevelt active storage = 5,200,000 acre-feet. The Project would utilize adjustable-speed pump/generators which would allow the plant s pumping load to be varied in real-time (in addition to being able to vary generation output in real-time). The Project would have the capability to provide back-up pumping services to the BOR s existing Keys pump-generation plant.

BENEFITS OF THE BANKS LAKE PUMPED STORAGE PROJECT (Cont.) The Project could provide incremental benefits to existing Pacific Northwest hydro system. Water releases from the Project could increase the energy and sustained peaking capability of the PNW hydro system from Grand Coulee Dam and downstream dams during regional power system stress events. Potential for the Project to be incorporated into the Mid-Columbia Hourly Coordination Program. Management of system over-generation events. The Project is eligible to receive discounted long-term financing from the Department of Energy.

ENVIRONMENTAL AND REGULATORY ISSUES

BARRIERS/CHALLENGES TO THE BANKS LAKE PUMPED STORAGE PROJECT DEVELOPMENT Relatively high initial capital cost. Long development timeline (approx. 7-10 years). Investors needed to proceed from the pre-feasibility stage to feasibility to design stage. The Project s overall cost will be highly dependent upon sitespecific conditions (especially geological) that have not yet been fully evaluated. Existing operational and/or environmental constraints at Lake Roosevelt and Banks Lake.

BARRIERS/CHALLENGES TO THE BANKS LAKE PUMPED STORAGE PROJECT DEVELOPMENT (cont.) CBHP must secure the cooperation of the BOR, BPA, the Upper Columbia River Tribes and other partners/stakeholders. Pumped storage plants in general are very complex to analyze from both an operational and economic perspective. Valuation of the capacity and ancillary service products that the Project can provide is challenging due to the lack of liquid spot and forward markets for these products in the PNW region. The Project will need to enter into one or more long-term contracts with off-takers in order to secure bond financing.

PROJECT DEVELOPMENT NEXT STEPS Meet with the BOR and BPA to discuss operational issues/modeling of the Project, transmission interconnection, and Lease of Power Privilege Agreement. Continue to meet with regional utilities to gauge level of interest. Perform more detailed valuation studies that include potential regional benefits. Refine the design and cost of the Project. Continue stakeholder consultation process/begin environmental scoping for project licensing and permitting. Submit applicable license and permit documents.

THANK YOU P.O. Box 219 457 1st Avenue NW Ephrata, WA 98823 (509) 754-2227 www.cbhydropower.org