SPECIFICATION FOR PRECAST PRESTRESSED SPUN PILE

Similar documents
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

GLOSSARY OF TERMINOLOGY

SECTION STORM DRAIN SYSTEM

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

METHOD OF STATEMENT FOR STATIC LOADING TEST

SECTION 1 GENERAL REQUIREMENTS

SECTION PRECAST CONCRETE STRUCTURES

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

High Strain Dynamic Load Testing of Drilled Shafts

SECTION SITE PREPARATION

PRE INSTALLATION MANUAL

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Designed and Engineered to Perform

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Site Auditing for Building Works. This practice note provides details of the strategy on auditing building works by the Buildings Department (BD).

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Federation of Piling Specialists Testing Datasheet No 1

SECTION STORM DRAINAGE SYSTEM

SECTION STORM DRAINAGE TABLE OF CONTENTS

Section 2100-Trenching and Tunneling

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

PILE FOUNDATION CONSTRUCTION INSPECTION

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS Materials Materials shall be in accordance with the following:

SECTION GRAVITY SANITARY SEWERS

Texas Building Pros Foundation Repair Services

SECTION 3 SANITARY SEWER DESIGN

INSTALLATION SPECIFICATION FOR DRIVEN PILES

Wastewater Capital Projects Management Standard Construction Specification

King Post Wall Information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

SECTION WINDOW WASHING SYSTEMS

Design and Construction of Cantilevered Reinforced Concrete Structures

2. Division 05 Structural Steel Framing for steel framework requirements

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

DIVISION 4300 STORM DRAINAGE

HIGH TENSION CABLE BARRIER

CCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

For ease of reference the clauses are arranged in 12 sections as follows:-

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

WATERPROOFING FOR CONCRETE STRUCTURES

LS 2540 SEWER LATERALS AND INSPECTION TEES

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Safe & Sound Bridge Terminology

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

How To Retaining Wall Guide

Code of Standard Practice for Timber Frame Structures

PILE TESTING SPECIFICATION

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SECTION GUARDRAILS

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Laying the First Course. 1. Excavate the site and construct the footing.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SECTION EARTH MOVING

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Measuring the Condition of Prestressed Concrete Cylinder Pipe

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Guide to working on Public Sewers

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):

Mechanical Installation

Construction Specification for Concrete Curb and Concrete Curb and Gutter

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Underground Commercial Electric Service

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

Integrated Manhole Ladder System

Chapter. Restoration of Damaged Structures

SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS

Chapter 2 Basis of design and materials

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

INSTALLATION. General. Important Note. Design. Transport

SECTION SUPPORT OF EXCAVATION

SECTION IX SLIP LINING PIPELINES

Table 4.9 Storm Drain Inlet Protetion Applicable for

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Trenching and Excavation Safety

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

Professional Engineers Providing Structural Engineering Services In Buildings

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

PVE Piling and Drilling Rigs Powerful, Versatile and Efficient. PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines

PART E SPECIFICATIONS

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

DESCRIPTION OF WORK:

SECTION SHEETING, SHORING AND BRACING

Transcription:

SPECIFICATION FOR PRECAST PRESTRESSED SPUN PILE 1.0 GROUND CONDITION The Contractor shall check the existing site condition including levels, slopes, drainage, presence of obstacles such as foundation, tree stumps, etc and shall allow in his rate for completing the work as intended, no claims whatsoever in respect of any discrepancies shall be entertained. 1.1 Obstruction The rates in the Bills of Quantities for piling work shall include for excavation of any material to remove obstruction below existing ground level which may prove to be sufficient to prevent installing or which interfere with the proper alignment of the piles, timbering, backfilling, the restoration of the ground around the piles and any other works which may require to complete the operation to the satisfaction of the Engineer. Obstructions below the level which occur during the course of work (e.g. broken sea wall shoes or piles, etc) shall likewise be removed by the Contractor at his own expense. Provision of preboring has been provided in the Bills of Quantities for overcoming the piling obstruction at deep level. No standing time for rigs or extension of time will be allowed in consequence of obstructions of any kind. All materials shall be new. Materials, workmanship and conditions for the manufacture and installation of piles foundations shall be strictly in accordance with the relevant clauses of the specification. Where certain items of pile foundation are not covered by the specification, they shall comply with the latest British Standard specification, Code of Practice etc, with regard to design, workmanship, material, etc. 2.0 SETTING OUT The Contractor shall be responsible for setting out final positions and levels of each pile from some given baselines and datum levels on the site agreed by the Engineer, and shall be responsible for the accuracy of the setting out. He shall employ a licensed surveyor approved by the Engineer to do the work. 3.0 TOLERANCE The maximum permissible deviation of the centre of each finished pile from the correct centre point as approved by the Engineer is 75 mm in any direction. Allowable deviation of the centre of pile for any single pile group or single line of piles carrying structural load shall not be more than 25 mm laterally from its correct position. The verticality of each pile shall not deviate at any point below the ground by more than 1 in 75 from the true vertical position. The Contractor shall bear the cost of any additional work which in the opinion of the Engineer, is necessary due to any pile being installed in a position not within this tolerance. 4.0 TENDERER TO ACQUAINT HIMSELF WITH THE SITE OF WORK Before tendering, the tenderers shall be deemed to have visited the site to acquaint PPSP 1

themselves with the existing site conditions, means of access, nature and proximity of adjacent properties and other matter liable to affect their tenders. No extra payment will be entertained at a later date due to the tenderer's failure to allow for contingencies arising out of the work and the nature of existing site conditions. 5.0 ADJACENT PILES Piles shall be driven in such a manner as to ensure that no damage and minimum disturbance is caused to previously driven piles in adjacent positions. 6.0 STRIPPING OR CUTTING OF PILES TO CUT-OFF LEVELS Upon completion of piling, the Contractor shall strip off the piles to the required cut-off level as shown in the drawings provided. The piling contractor should allow for the above work in the contract price. From the cut-off level, pile starter bars should be constructed to not less than 40 times the bar diameter as per drawings, for an adequate embedment into the pilecap. Stripping should be done carefully by the Contractor to avoid shattering and damage to the pile. Any cracked or defective concrete should be cut away and made good with new concrete properly bonded to the old one. The edges should be cut square unless the pile head is to be encased in a cap. The Contractor shall follow up directly by checking the levels and giving accurate details of the pile positions as compared with the positions as indicated on the pile layout drawings. After stripping of pile to cut-off level by the Contractor, the pile shall be inspected by the Engineer. If in the Engineer's opinion, the pile is defective, the Contractor shall be responsible to carry off necessary remedial work as required by the Engineer. Also, the eccentricity of all piles shall be checked by a licensed surveyor, employed by the Contractor, at cut-off level. If the eccentricity exceeds the allowable limit, all expenditure to remedy the work shall be borne by the Contractor. The Engineer's decision in this regard shall be final. 7.0 CLEANING UP The Contractor shall remove from the site at intervals during the course of the work and on completion, all unnecessary materials, plant, cut-off piles, rubbish and debris resulting from the piling operations. 8.0 EQUIPMENT AND LABOUR The Contractor shall provide all frames, equipment, lifting devices and labour necessary for the driving of piles. He shall only use the type of piling rigs approved by the authority for the work. Before the commencement of works, the Contractor shall submit to the Engineer full details of his working programme, including the type of hammer which he intends to use. The Engineer shall order the removal or replacement of any equipment whenever he thinks that such equipment and staff are not suitable for the works. 9.0 OSLO POINT If specified to be used in the drawings, the Oslo point tip shall have a Brinell Hardness greater than 300 and a yield strength of exceeding 700 MPa for a pile with 140 T capacity. All PPSP 2

components used shall be of high tensile steel. The welding shall be carried out to the requirements of the British Standard specification and the indication in the enclosed diagram. The Oslo points shall be fabricated as an integrated part of the starter pile. 10.0 PILE SHOES Unless otherwise specified in the drawings, every pile shall have proper pile shoes of cast iron or fabricated steel should be provided where specified to protect and reinforce the tip of pile. The shoes should have a small hole for escape of trapped air and water during casting of the pile. The pile shoes shall comply to the following as relevant: i. Chilled-hardened cast iron shoe as use for making grey castings to BS 1452. Grade 10 or ii. Mild steel to BS 4360, Grade 43A or iii. Cast steel to BS 3100, Grade A For piles bearing in rock, pile shoes shall be made of hardened steel of Brinell Hardness 400-600. 11.0 SPLICING AND JOINTING The number of joints shall be as minimal as possible. The distance between joints shall not be less than 12m unless otherwise approved by the Engineer. Splicing of piles shall be made in accordance with the details approved by the Engineer. In the case of welded connections, splices, etc, all work shall be done with approved methods, materials and by qualified and certified welders, whose ability to perform acceptable welding shall be fully demonstrated to the satisfaction of the Engineer. Before welding proceeds, the extension pile shall be accurately positioned and true to line and vertical with the main piles. After welding is completed at the joints, the waiting time shall not be less than THIRTY MINUTES before driving of the piles continue. 12.0 HANDLING, PITCHING AND DRIVING OF PILES The greatest care, to the satisfaction of the Engineer, shall be taken in handling and slinging of piles and no pile shall be lifted other than by slinging from approved lifting holes or points. Piles shall be pitched accurately in their positions and on the appropriate lines and levels. No pile which has deflected from its course or wrongly aligned shall be forcibly brought back to alignment. Before commencing the driving of each pile, the leaders or guides of the pile frame shall be checked for plumb in any two directions and shall be maintained plumb during driving to the satisfaction of the Engineer. At no time during driving operation shall the centre of the pile monkey (or hydraulic ram) be more than 40mm off centre in respect to the pile being driven in any given direction. During driving, the heads of piles shall be protected by helmets of cast or mild steel, fitted closely around the pile heads. A packing of coiled hemp rope or asbestos-free fibre, 25mm thick, covering the head of the pile and cushioning it, shall be placed within the helmet. The top of the helmet shall be recessed and fitted with a stub dolly 300mm long. The packing and stub dolly shall be renewed as often as necessary or as directed by the Engineer to prevent PPSP 3

any damage to the pile. Driving of the piles shall be continuous without interruption. Hydraulic hammers are to be used to drive each pile to the required penetration length or the required set so as to provide the required load carrying capacity as pre-determined. Any pile damaged during handling, pitching, driving or at any other times shall be replaced with new piles at the Contractor's expense, even if piles of bigger capacity are required. The pre-determined weight, type, and the height of fall of the hydraulic hammer to be used and the final set to which the pile shall be driven, shall be strictly observed and shall be to the approval of the Engineer. For pile to set : use of extension dolly or diesel hammer for driving piles to the required set as determined shall be strictly disallowed. No driving shall be carried out without the presence of the Engineer or his representative who reserves the absolute right to take measurements as and when he deems fit and necessary. Sequence of driving of pile shall be to the approval or as directed by the Engineer. Any pile which is cracked or damaged during driving shall be cut off and recast or rejected as the Engineer may decide. The welding/cutting and/or replacement of piles shall be at the Contractor's expense. The extra cost involved in constructing bigger or different pilecaps as a result of the defects as described above, shall be borne by the Contractor. All piles to be driven shall bear an identifying reference number marked in 300mm divisions measured from the tip throughout the length of the pile. 13.0 PILE DRIVING RECORD The Contractor is to keep a complete continuous record for the actual penetration of each and every pile driven and shall furnish copies of these records signed by him and the Engineer's representative. These copies are to be submitted daily to the Engineer. The piling records shall include data on the pile diameter or size, length, location, type, weight of hammer, calculated safe working load, rate of penetration and number of blows for every 300 mm penetration, penetration under the last thirty blows of the pile, temporary compression and set, cut-off level and final penetration and any other relevant information which the Engineer may require. The proposed type of recording forms to be used by the Contractor shall be approved by the Engineer prior to the commencement of the piling works. 14.0 RE-DRIVING Observation and measurement shall be made at the site during the progress of driving piles, by any suitable method approved by the Engineer, to determine whether a driven pile has been lifted from its original seat during the driving operation of adjacent piles. The Contractor shall provide the necessary tools, instruments, and any other assistance to record these measurements. Where such observations or measurements indicate that a pile has been unseated, it shall be re-driven to the specified set as determined by the Engineer. No payment shall be made for re-driving of heaved piles. The Engineer reserves the right and authority to accept or reject any pile unseated and heaved piles rejected under this circumstance shall be considered as "failed" and shall be replaced at the Contractor's expense as directed and to the satisfaction of the Engineer. PPSP 4

Specification for Precast Pretensioned Spun Pile 27 April 2001 TABLE OF CONTENTS Description Page 1.0 GROUND CONDITION... PPSP1 1.1 Obstruction... PPSP1 2.0 SETTING OUT... PPSP1 3.0 TOLERANCE... PPSP1 4.0 TENDERER TO ACQUAINT HIMSELF WITH THE SITE OF WORK... PPSP1 5.0 ADJACENT PILES... PPSP2 6.0 STRIPPING OR CUTTING OF PILES TO CUT-OFF LEVELS... PPSP2 7.0 CLEANING UP... PPSP2 8.0 EQUIPMENT AND LABOUR... PPSP2 9.0 OSLO POINT... PPSP2 10.0 PILE SHOES... PPSP3 11.0 SPLICING AND JOINTING... PPSP3 12.0 HANDLING, PITCHING AND DRIVING OF PILES... PPSP3 13.0 PILE DRIVING RECORD... PPSP4 14.0 RE-DRIVING... PPSP4 PPSP i