Capacity Requirements Planning (CRP)



Similar documents
An Introduction to Capacity Planning

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -

BILL OF RESOURCES AND PRIORITY-CAPACITY BALANCING

Functional Area Systems Production / Operation Systems

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

Operations Management

Understand How and Where Computers are used in Manufacturing

Case Study Why a Shop Floor Execution (SFX) System is an Essential Component to Enterprise Systems

Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y

Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET

The Truck Roll; why it shouldn t be the first choice response to trouble

Farm Direct Marketing. Susan A. Kelly

CISCM STUDY GUIDE. International Purchasing and Supply Chain Management Institute,

RESTORATION PROCESS. Step 1 Empire s storm restoration team assesses the damage to the system. This assessment allows Empire. = Location of damage

TU-E2020. Capacity Planning and Management, and Production Activity Control

Substrate. The substrate gives a sign rigidity. Sheeting Material. The sheeting material. Standard foreground and background (not a standard sign)

Outline PRODUCTION/OPERATIONS MANAGEMENT P/OM. Production and Operations. Production Manager s Job. Objective of P/OM

Introduction to production scheduling. Industrial Management Group School of Engineering University of Seville

Manufacturing Planning. Master Production Schedule. Material Requirements Plan. Work Order/ FPO Maintenance. Soft Bill Maintenance

Manufacturing Applications in Microsoft Dynamics GP 10.0

Local company growing through disaster cleanups, biomass needs

INTRODUCTION TO MANUFACTURING EXECUTION SYSTEMS MES CONFERENCE & EXPOSITION. Baltimore, Maryland

ERP Meets Lean Management

Getting Started with Turbo Your PC

Manufacturing Data Management CAP Live

Advanced Planning and Scheduling

Atlas. Automatic Storage & Retrieval Systems

White Paper EMBEDDED GPUS ARE NO GAMBLE

Cloud Computing project Report

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부

LEAD COLLECTION SYSTEMS WORKER

Functional Area Systems Lecture 5

Ask the groups to read their cards and give them 5 10 minutes to think about their roles. How do they feel about it? Is everything clear?

AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS

Oracle Capacity User s Guide

CHAPTER 10 CAPACITY MANAGEMENT DAVID A. COLLIER AND JAMES R. EVANS. OM, Ch. 10 Capacity Management 2009 South-Western, a part of Cengage Learning

INTRODUCTION. What is Enterprise Resource Planning?

2012 Program Report. Agricultural Group Drainage Program

Fleet Management Services

Department of Economics. Agricultural Finance Economics 466 Capital budgeting with finance, inflation, taxes and risk (Chapters 10 &11)

TRAINING AND EQUIPMENT MANUAL 307 SALVAGE EQUIPMENT EFFECTIVE: OCTOBER 2007

Position Summary. Essential Duties and Responsibilities. Job Title:

Evolving To The Enterprise Production System (EPS)

Job Description Production Manager, Landscape Management

2.5 Checklist for ERP Implementation

HISTORY OF MOTION AND TIME STUDY IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS

Back to School Car Safety. Direct Buy Warranty Staff September 19, 2014

4. Maintenance and Materials Management

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Audit Worksheet Sort

Top Five Fleet Tracking Benefits for the Landscaping Industry

for Sage 100 ERP Work Order Overview Document

TRAVERSE Manufacturing

Solid Waste Management

Efficient and reliable fans, compressors and blowers

Interpreting the Numbers: From Data to Design. William Elenbark, Consultant Gross & Associates ; belenbark@grossassociates.

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

NON-INSTRUCTIONAL NONBARGAINING

ARMORED TRANSPORT OPTIMIZATION

Master Scheduling and Rough-cut Capacity Planning

A Diagnostic Approach to Scheduling

Determining the Optimum Staffing Levels for a Maintenance and Reliability Department

Resume Writing. Common Resume Writing Questions/Answers: Resume Writing Tips

Chapter 10. Hauling Equipment

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

TIME MANAGEMENT FOR PROJECT MANAGERS

Virginia EBT. Customer Service. A safe and easy way to use your SNAP benefits hours a day, 7 days a week.

Manufacturing Planning and Control

Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1

Oracle Process Manufacturing Capacity Planning with RHYTHM Factory Planner

Evaluating Real Costs for Building Maintenance Management

The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions:

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection

LANDSCAPE MAINTENANCE SERVICES

Orange County Fertilizer Application Education Course for Citizens

AUTOMATIC TANK CLEANING (ATC) LITE On-the-fly automatic tank cleaning and recycling technology

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

GROUNDS MAINTENANCE-WATER USE DFC Environmental Management System

Info Net LAMAR SOFTWARE, INC. Enterprise Resource Planning. Efficiency. Productivity. Flexibility

ENERGY EFFICIENCY ENERGY EFFICIENCY: Saving Dollars While Clearing the Air

NEW PRODUCT DEVELOPMENT PROCESS FOR SMEs BUYING IN CHINA

CONVEYING TECHNOLOGY LOADING TECHNOLOGY PALLETIZING TECHNOLOGY PACKAGING TECHNOLOGY SORTATION AND DISTRIBUTION SYSTEMS.

Transcription:

Capacity Requirements Planning (CRP)

Capacity requirements planning (CRP) A A computerized system that projects the load from a given Material Requirements Plan (MRP) onto the capacity of a system and identifies underloads and overloads. -Russell and Taylor*

Uses of CRP To Know: If a construction company can start new projects in the future. If production plant can produce a spontaneous order. If there is enough labor to make up for increased seasonal sales. If the orders that are do Tuesday can be accomplished with current staff.

Information entered into CRP Planned order releases Equipment and labor routing file Open orders file

Planned order releases From the MRP. Tells when the order should be started so that it is completed on time.

Equipment and Labor Routing File Requirements of equipment and labor to complete the needed orders.

Open Orders File Contains the information of the orders started that need to be completed.

Information Provided by CRP Load profile for each operation in the production system

Load profile Makes a comparison of the work that needs to be completed and the work in progress with the systems capacity.

CRP is company specific and requires complex calculations. For large companies professional help is needed in designing their CRP models because of the complexity and importance of accurate information.

Calculating a simple Load Profile Inputs into a simple load profile are capacity and load. *Capacity is the productive capability of the system. *Capacity = (number of machines or workers)*(number of shifts)*(utilization) *(efficiency)

Definitions of Capacity Utilization is the percentage of total time that the worker works or the machine runs. Efficiency refers to how well the machine or worker performs to a given standard.

Definition of Load *Load is the standard hours of work (or equivalent units of production) assigned to a production facility.

Simple Load Profile A simple load profile can be used by calculating the Load Percent. *Load Percent = (load/capacity)*100% Systems with a Load Percent over 100 will not complete assignments on time without adjustments to the system.

*Solutions to Overloaded Conditions Eliminate unnecessary requirements. Reroute jobs or labor. Splitting the job between two systems. Increase normal capacity. Subcontract. Increase efficiency. Push work back to later periods Revise the master schedule

Load Percent Example A local construction company needs each of its houses cleaned of all construction debris before they can close with the buyer. They have one dump truck and a part time worker who works twenty-five hours a week. Because of the part time status the worker takes no breaks. For every four hours of work there is one hour to drive the debris to the landfill to be unloaded. Five percent of the time at the site is use to prepare the dump truck for travel. For the month the construction company has 3 houses closing at the end of the first week, 5 at the end of the second week, 4 at the end of the third week and 6, at the end of the forth week. What is the load percent at the end of each week and can the work be accomplished in that week.

Construction Load Calculations (Capacity) No. of hours =25 Shifts = 1 Utilization = 4/5 = 80% Efficiency = 95% Capacity = 25*1*0.8*0.95 = 19 hours

Construction Load Capacity (Load) Load Week 1 = 3*4 = 12 Week 2 = 5*4 = 20 Week 3 = 4*4 = 16 Weak 4 = 6*4 = 24

Construction Load Capacity (Load Percent) Load Percent Week 1 = 12/19 = 63% Can Accomplish Week 2 = 20/19 = 105% Cannot Accomplish Week 3 = 16/19 = 84% Can Accomplish Weak 4 = 24/19 = 126% Cannot Accomplish

Test Exercise of Load Percent A cabinet shop produces and installs cabinets into new houses. The cabinets need to be installed in the houses the week they required to be installed to not slow down construction. A crew of two people each working 40 hours can install a set of cabinets in 3 hours. They spend about an hour each person driving to each installation location. Lunch breaks are not part of the forty hours worked and the cabinets are delivered by a separate crew. Due to experience they are a hundred percent efficient. For the month 10 installations are needed for week one, 7 for week two, 13 for week three, 14 for week four. What is the load percent for each week and can the installations be completed.

Capacity Requirements Planning Used to calculate the ability of the company to meet its orders. Best if company specific. Load percentage can be used for simple operations.