Final Feasibility Study released for the Ming Mine Copper Gold Project 23.7% Pre Tax Internal Rate of Return

Similar documents
Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Detour Gold Provides New Life of Mine Plan for Detour Lake

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

(NYSE-MKT:XRA, TSX:XRC,

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

Sabina Gold & Silver Corp.

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

Copper and Gold at Our Core

Economic Highlights (In US$ unless otherwise indicated)

AVINO SILVER & GOLD MINES LTD.

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

Aurvista Gold Plans Significant Exploration Program at Douay

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

FORWARD LOOKING STATEMENTS

Savannah North Scoping Study Looking into the future 3 February 2016

Corporate Presentation October 2015

FORWARD-LOOKING STATEMENTS

FOR IMMEDIATE RELEASE

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

Pebble Copper Gold Molybdenum Project Alaska, USA. A First World & Top Class Mining Asset

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

Copper and Gold at Our Core

NOVEMBER January 2013

Candelaria and Ojos del Salado Chile

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

Focusing on Near Term Production and Exploration in Quebec

Yellowhead Mining Inc. (TSX-V: YMI) - Positive Feasibility Study Demonstrates Strong Economics

CNSX: TV

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

INVESTOR PRESENTATION January 2014

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

Red Mountain Project British Columbia s Next High-Grade Gold Mine. February 2015

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Galahad Gold plc (Galahad)

China Gold International Resources Corp. Ltd.

FORWARD LOOKING STATEMENT

Corporate Presentation November 2015 TSX: ORA

Golden Band Resources Inc.

Forward Looking Statements

AGNICO-EAGLE MINES LIMITED

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

Acquisition of Rice Lake. December 2015

FIJI GOLD LION ONE METALS

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Q3 Highlights. Company earnings during the quarter totaled $3.3 million ($0.01 per share).

Denver Gold Show September 24, 2013

January Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing

March, 2013 Update. A Company in Transition

MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014

Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia

Sabina Gold & Silver Corp. A Gold Miner in the Making

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

CANADA S INTERMEDIATE GOLD PRODUCER

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014

Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements March 31, 2013.

Cash Flowing Today and Positioned for the Next Cycle

For personal use only. MRV Metals Launch February 2016

SEPCO III Completes Successful Site and Country Visit to Tanzania

NEWS RELEASE. Centerra Gold 2015 Year-End Reserve and Resource Update

CORPORATE PRESENTATION

Building a Sustainable Future in Silver

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

HARTE GOLD CORP. Gold Exploration and Mine Development in White River, Ontario, Canada APRIL 2016 TSX : HRT

Trip to Pulacayo. Pulacayo - Paca

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

Incorporated 1968 December 2013

Positioned for Production: Exploring for Growth

For personal use only

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Press Release 30 th October 2015

Forward-Looking Statements

Corporate Presentation January 25, 2016

Corporate Presentation January New Leader in Precious Metals

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

ACQUISITION OF TWO QUALITY MINES IN NEVADA

2015 Third Quarter Results Webcast October 29, 2015

2015 FOURTH QUARTER REPORT BUILDING VALUE

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

Reservoir Minerals Reports Further High Grade Copper-Gold Drill Intercepts from the Upper Zone of the Cukaru Peki Deposit, Serbia

Antapaccay Precious Metals Stream

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

Corporate Presentation September 28, 2015

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

Transcription:

1 26 August, 2010 Final Feasibility Study released for the Ming Mine Copper Gold Project 23.7% Pre Tax Internal Rate of Return London, England & Baie Verte, Newfoundland and Labrador (All figures in US dollars except where noted) Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ( Rambler or the Company ) is pleased to announce positive results from the Feasibility Study on its 100% owned Ming Mine Project, located at Baie Verte, in Newfoundland and Labrador, Canada. The Feasibility Study was compiled by a number of 3 rd party consultants including Stantec (TSX: STN, NYSE: STN) for the mining and economics of the project. The report confirms an initial 6 year mine life with an average annual production of 7.7 million lbs of copper, 11,600 ounces of gold and 42,600 ounces of silver. Highlights of the Feasibility Study Highlights of the Feasibility below are based on an average copper price of $3.00 per lb, gold $1,000 per ounce and silver $14.50 per ounce. An initial 6 year mine life at 630 tonnes per day ( tpd ) Initial capital costs of $25.5 million. Sustaining capital costs of $27.9 million during the life of the mine. Pre tax operating cash flow of $71.0 million, Net Present ( NPV ) 6% of $14.3 million, payback 1.5 years and Internal Rate of Return ( IRR ) of 23.7%. Average annual production of 7.7 million lbs of copper, 11,600 ounces of gold and 42,600 ounces of silver. Targeting production in Q2 2011. The project will, for the first two years, support an operation producing 24.6 million lbs of copper, 24,455 ounces of gold and 101,644 ounces of silver as the high grade 1807 copper zone and gold rich 1806 zone are brought online. In an effort to continually improve the life of mine, the Company will be investing $1.4 million in exploration and definition diamond drilling throughout the first 2 years of the Project to increase the mineable reserve and extend the known high grade ore bodies. As a complement to the results of the Feasibility Study, in August the provincial government approved an early construction request for the Nugget Pond foundation work and the second means of egress from the Ming Mine. Contractors are in the process of being commissioned and construction is expected to be completed in time for first production in Q2 2011. George Ogilvie, P.Eng, President and CEO, Rambler commented: Today, the Company has taken another dramatic step forward transitioning from explorer to mine producer. We are confident that the initial life of mine will provide a solid financial basis for the Company to expand the reserves at the Ming Mine. With Feasibility work behind us we look forward to beginning construction while completing our permitting for the Ming Mine site and port facility, expected in Q3 2010.

2 In addition before year end we will be re initiating our exploration program on the Ming Mine property outside of the 1.5 million tonne reserve envelope, where there is the potential to add additional high grade reserves. Ming Mine Feasibility Study Results The Feasibility Study outlines an average annual production of 7.7 million lbs of copper, 11,600 ounces of gold and 42,600 ounces of silver. The total revenue is projected to be $210 million with unit revenue estimated to be $167.52 per tonne. The Net Smelter Return ( NSR ) is projected to be $151.42 per tonne utilising a Treatment Charge ( TC ) and Refining Charge ( RC ) of $35 and $0.35 per tonne respectively. Total unit operating costs [cash cost] are projected to be $110.89 per tonne. Operating costs have been developed from first principles and from actual operating costs being incurred from the Ming Mine and Nugget Pond mill required to support the mine and its associated processing, maintenance, transportation and administration activities. As the operating costs will be incurred in Canadian dollars an exchange rate of US$/Cdn$0.95 was assumed. The pre production capital estimate is $25.5 million which, when one considers the purchase cost of the Nugget Pond Mill of $CAD3.5million and engineering sunk costs of $1.5 million, is in line with management s initial estimation of $30 million. Sustaining capital is estimated to be $27.9 million with the bulk of the expenditures being assigned to equipment, capital development and exploration drilling. Capital costs herein are expressed in Q3 2010 US dollars. Table 1 and 2 below summarizes the project economics and associated parameters for the Ming Copper Gold Mine. Table 1: Project Economics Copper produced (lbs) 46,242,281 Gold produced (ozs) 69,468 Silver Produced (ozs) 255,388 Total Revenue ($US million) $ 210 Pre tax Operating Cash flow ($US million) $71.0 Net Present before tax ( 6% discount, $US) $14.3 Internal Rate of Return ( IRR ) 23.7% Payback (years) 1.5 Table 2: Summary of Economic Parameters Average Copper Price 1 ($US per lbs) 3.00 Average Gold Price 1 ($US per oz) 1,000 Average Silver Price 1 ($US per oz) 14.50 $US/$CDN Exchange Rate 0.95 Pre production Capital ($US millions) Processing $10.5 Mine Site $10.6 Port Site $2.1 Contingency $2.3 Total $ 25.5 million Sustaining Capital ($US millions) Mine Closure 2 ($US millions) $ 27.9 million $ 1.3 million Operating Costs ($US per tonne milled) Average Mining $62.55

3 General & Administration $12.29 Sub total $74.84 Processing $15.70 Port Operations $0.59 Ore transportation & concentrate handling $12.16 Treatment & Refining Charge $3.93 Royalty 3 $2.63 Reclamation $1.04 Total ($US per tonne milled) $ 110.89 per tonne Other Parameters Mining Dilution (Stopes, Drifts) 15%, 0% Mining Recovery (Stopes, Drifts) 90%, 100% Mill Recoveries (Cu, Au, Ag) 92.4%, 66.4%, 55% Concentrate Grade (Cu) 29.1% 1 Current price forecasted decline over the life of mine to a long term price of $2.50 Cu per lb, $900 Au per oz, and $12.00 Ag per oz. 2 Mine Closure costs are estimated only and have not been reviewed/ approved by the NL Dept. of Natural Resources as required under the Mining Act. The closure bond for the existing facilities at Nugget Pond is already in place. 3 Includes $US1.045 million buy back on 3% project royalty. Mineral Reserve and Resources Since the company s last NI43 101 resource update in February 2009, Rambler s geological team have been actively compiling all historical information so that any un mined and pillar remnants left from previous operators could be added to the resource. This exercise has added 7,980 ounces of gold in the indicated category along with 17,601 ounces of gold in the inferred category, along with the associated pounds of copper. With additional drilling and sampling much of the inferred resources will be upgraded to the measured and indicated categories and eventually into a minable reserve. The table below summarizes the total resource estimates for the Ming Copper Gold Mine Project. Table 3: Underground Mineral Resource Estimate Resource Quantity Grades Contained Metal Classification Copper Gold Silver Zinc Copper Gold Silver Zinc (000't) % g/t g/t % tonnes oz oz tonnes Measured Massive Sulphides 1,283 2.07 2.47 13.72 0.71 26,524 102,074 565,836 9,131 Stringer Sulphides Indicated Massive Sulphides 1,171 1.90 2.06 9.14 0.50 22,271 77,695 307,594 5,252 Stringer Sulphides 8,218 1.65 0.11 1.63 0.02 135,736 29,120 430,512 1,372 Combined Measured + Indicated Inferred Massive Sulphides 2,454 1.99 2.28 11.07 0.59 48,795 179,770 873,430 14,383 Stringer Sulphides 8,218 1.65 0.11 1.63 0.02 135,736 29,120 430,512 1,372 Total 10,672 1.73 0.61 3.85 0.15 184,531 208,890 1,303,942 15,755 Massive Sulphides 1,847 1.91 1.83 8.82 0.66 35,355 108,421 445,961 10,313 Stringer Sulphides * Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. All figures are rounded to reflect the accuracy of the estimate. Cut off grades of 1.0 per cent copper for the massives sulphides, 1.25 grams per tonne gold for the 1806 zone, 1.25 per cent copper for the stringer sulphides. Cut offs are based on an NSR model and metal prices of US$2.50/lb copper and US$1000/oz gold, and US$15/oz silver. Zinc does not contribute to the revenues.

4 The Feasibility Study is based on the Company s first Mineable Reserve statement of Proven 651,563 tonnes of 2.25% Cu (32.4 million lbs Copper), 3.24 g/t Au (67,612 ounces gold) and 16.44 g/t Ag (343,008 ounces silver) and Probable 572,292 tonnes of 1.67% Cu (21.0 million lbs copper), 2.61 g/t Au (47,938 ounces gold) and 9.90 g/t Ag (182,131 ounces silver). The underground Minable Reserve has been calculated using a mining recovery of 90% with 15% dilution. Metal price estimates vary over the mine s life but for the feasibility study the following average values were used: $3.00 per lb for copper, $1,000 per ounce gold and $14.50 per ounce silver. Only measured and indicated massive sulphide resources have been considered in the conversion from resource to minable reserve. The table below summarizes the total minable reserve estimates for the Ming Copper Gold Mine Project. Table 4: Underground Minable Reserve Estimate Reserve Quantity Grades Contained Metal Category Copper Gold Silver Zinc Copper Gold Silver Zinc (000't) % g/t g/t % tonnes oz oz tonnes Proven 652 2.25 3.24 16.44 0.75 14,707 67,612 343,008 4,878 Probable 572 1.67 2.61 9.90 0.43 9,545 47,938 182,131 2,433 Dilution (all sources) 274 0.00 0.00 0.00 0.00 0 0 0 0 Total Proven and Probable 1,498 1.62 2.40 10.90 0.49 24,252 115,549 525,139 7,311 * An underground cut off was set at NSR $US 70 per tonne for all longhole mining methods. This cutoff was based on 15% dilution, 90% mining recovery, copper recovery of 92.4% and gold recovery of 66.4%. Project Update With the recent release from environmental assessment and the near completion of the feasibility study, Rambler is now preparing for the upcoming construction campaign. Early in August the provincial government approved an early construction request for the Nugget Pond foundation work and the second means of egress from the Ming Mine. The bid process for both of these projects is now complete and the company is in the process of contacting the successful contractors. Once notified, the contractor will begin mobilizing immediately so that all work can be completed in the next 10 months, meeting the planned 2011 start up. Upon receipt of the feasibility study, and subsequent submission of the complete development plan to the provincial Department of Natural Resources, the project s financiers Sandstorm Resources (see press release dated March 4 th, 2010) will then be in a position to assess, for release, the remaining portion of the $US 20M financing. This final $US 15M instalment will allow the company to construct all new infrastructure for the three sites in preparation for first production by June of 2011. In addition to construction, Rambler also has short term plans to initiate a new underground diamond drilling exploration program. This new program will specifically target high grade copper and gold areas of known mineralization as well as other anomalous areas identified during the Titan Geophysics survey conducted in 2009. Of primary interest is the down plunge extension of the 1807 zone that, with a modest investment, Rambler s geological team believes new resources and reserves can easily be added to the existing mine plan. For further information, please contact: George Ogilvie, P.Eng. President and CEO Rambler Metals and Mining Canada Limited Tel No: 709 532 4990 Nandita Sahgal Seymour Pierce Limited Tel No: +44 (0) 20 7107 8000 Leslie Little Company Secretary Rambler Metals & Mining Plc Tel No: +44 (0) 14 8341 9942 Charles Vivian / Philippe Polman Pelham Bell Pottinger Tel No: +44 (0) 20 7861 3232

5 Guy Wilkes Ocean Equities Limited Tel No: +44 (0) 20 7786 4370 Website: Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Mr. Larry Pilgrim, P.Geo. is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining plc. The NI43 101 technical report has been complied by a number of independent, third party, consultants. Including: George Darling, P.Eng., Stantec: reserve estimate, mining methodology and project economics; Dave Barbour, P.Geo.,Barbour Geo Consulting: resource estimate; Dean Thibault, P.Eng., Thibault and Associates: metallurgical processing; James Powell, P.Eng., Stantec: environmental. About Rambler Rambler was founded in 2004 when Altius Minerals Corporation ("Altius"), a Newfoundland and Labrador resource company, contributed to Rambler's asset base with an option to acquire and develop the Ming Mine. Following the acquisition of the Ming Mine, Rambler, listed on London AIM in 2005 and Toronto TSX V in 2007. The Ming property had been a former underground copper and gold producing mine that ceased production when the deposit reached a then third party property boundary. This neighbouring property was subsequently consolidated before being brought into Rambler s portfolio. Rambler now owns a 100% interest in the property. The area where the mine is located is a former mining centre and subsequently good existing infrastructure including roads, fresh water, hydro, access to a working port while the town of Baie Verte, population 1,300 is located 17km away. Over the last several years Rambler has been exploring on the property leading to the publication of two NI43 101 resource statements, the discovery of mineralized lenses and the extension of pre existing mineralized lenses. Today all mineralized lenses remain open in multiple directions while, importantly, the deposit has not been cut off at depth. The underground workings have been dewatered and services including air, water and electrical re installed. In October 2009, Rambler purchased an operational gold hydrometallurgical mill, Nugget Pond, which is situated approximately 40km from the Ming Mine. Rambler intends to expand the mill so that it is capable of handling massive sulphides from the mine to produce a copper concentrate with gold and silver as by products as well as recover any free gold. Rambler is about to embark on the construction phase of the project with the intention of bringing the Ming Mine into production in 2011. Forward Looking Statement Some of the statements contained herein may be forward looking statement, which involve known and unknown risks and uncertainties. Without limitation, statements regarding future plans and objectives of the Company are forward looking statements that involve various degrees of risk. It is important to note that the Company's actual results could differ materially from those in such forward looking statements.