CITY OF COLTON APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

Similar documents
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements

Memorandum. This memorandum requires Board action. Executive Summary

104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

California s Electricity Market. Overview

Report of Independent Auditors and Combined Financial Statements for. Southern California Public Power Authority

Applicability and Eligibility

Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders

145 FERC 61,172 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Network Upgrades andSIAs Under California Tariff Clarifications

San Diego Gas & Electric Company ) Docket No. ER MOTION TO INTERVENE AND PROTEST OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

ARIZONA PUBLIC SERVICE COMPANY ORDER NO. EA-134

How To Answer The Six Cities' Protest Against The Power Line Project

Tehachapi Wind Energy Storage Project (TSP)

NV Energy ISO Energy Imbalance Market Economic Assessment

Responses to this RFP are due on or before 4 p.m. PDT August 1, 2016 as described below in Sections III and V.

NERC Cyber Security Standards

PACIFIC GAS AND ELECTRIC COMPANY Transmission Owner Tariff (TO Tariff) FERC Electric Tariff Volume No. 5

TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES January 16, 2014 Meeting from ISO Headquarters Folsom, California

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

DRAFT STAFF REPORT STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES 2005 TO 2018 CALIFORNIA ENERGY COMMISSION JUNE 2007 CEC SD

Syed Ahmed Richard Krause Southern California Edison

California s Energy Future

ATTACHMENT G. Network Operating Agreement

151 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued May 11, 2015)

An Analysis of Siting Opportunities for Concentrating Solar Power Plants in the Southwestern United States

145 FERC 61,151 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Understanding Today's Electricity Business

September 29, Docket No. ER Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review

Affidavit Of Charles A. Smart

DQI WHITE PAPER UPDATE CPUC RECOMMENDATION #1. Continuing effort on DQI issues by a new DQI Subteam of the OCC

Updated November 20, Director, System Planning

March 14, Subject: Southern California Edison 2014 Annual Progress Report

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Generation and Transmission Interconnection Process

Southern California Plug-in Electric Vehicle Readiness Plan. Prepared for the Southern California Association of Governments

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY Request for Proposals for Software Products and Services for the Magnolia Power Project

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

August 27, 2007 Advice Letter 2146-E. Advice Letter 2146-E is effective August 31, Thank you for your time.

Intentionally left blank

At the time of notification, the QF or OSGF shall provide the Company with the following information:

New York State Department of Taxation and Finance Taxpayer Services Division Technical Services Bureau. TSB-A-96 (10) C Corporation Tax March 25, 1996

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. ER Operator Corporation )

Opportunities for Biogas Digesters

APPENDIX VIII FORMULA FOR CALCULATING ANNUAL BASE TRANSMISSION REVENUE REQUIREMENTS UNDER SDG&E S TRANSMISSION OWNER TARIFF

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Section 1: Executive Summary

GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY INADVERTENT-EXPORTING) FORM

Appendix A. Glossary. For Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

LEGEND. Corp 1 = Corp 2 = Corp 3 = Corp 4 = Corp 5 = Corp 6 =

Appendix A Glossary For 2011 Western Region Request For Proposals (RFP) for Long-Term Supply Side Resources

CAISO Resource Adequacy Deliverability for Distributed Generation

Diverse Business Enterprises ( DBE ) Readiness Checklist to Sell Wholesale Power to SCE June 25, 2013

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

PJM LMP Market Overview

CIP Physical Security. Nate Roberts CIP Security Auditor I

Mexico s Guidelines for Clean Energy Certificates Will Support Renewable Energy Development

-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW

Managing Electrical Demand through Difficult Periods: California s Experience with Demand Response

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

CIP Cyber Security Security Management Controls

AURORA Vulnerability Background

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No.

TRANSMISSION OPERATIONS (August 5, 2010)

Electric Operations Manager

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, N. W. Washington, DC Fax: July 11, 2007

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BPA Policy Contract Lifecycle Management

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

How To Get A Refund From The Utilities Commission

Stakeholder Process: Integrated Balancing Authority Area (IBAA)

UNITED STATES OF AMERICA 151 FERC 62,146 FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 69 As of July 9, 2009 Disposition: Accepted Effective Date:

KERALA STATE ELECTRICITY REGULATORY COMMISSION

CARMEN A. TRUTANICH City Attorney REPORT NO. R NOV

Schedule TOU-GS-1-RTP Sheet 1 GENERAL SERVICE - SMALL REAL TIME PRICING

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

HVDC Transmission Line Project for Moving ERCOT Wind Into SERC

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 157 As of September 29, Disposition: Effective Date: Accepted

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, Electric Grid Operations

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

Errata to BPA POWER PRODUCTS CATALOG September Factoring Product Availability section remove second sentence. See attached replacement page.

Consolidated Edison Company of New York, Inc.

ORDER ACCEPTING FOR FILING AND SUSPENDING PROPOSED RATES, AND ESTABLISHING HEARING PROCEDURES. (Issued March 12, 2003)

Effective: Page 1 of 7

Joint Powers Authority Bond Counsel and Tax Counsel Legal Services

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, Electric Grid Operations

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 101. (Docket No. RM ; Order No. 668)

Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI

White Paper. Understanding California s Electricity Prices

CITY OF GLENDALE INTERDEPARTMENTAL COMMUNICATION. Matt Doyle, Director of Human Resources By: Marina Cline, Human Resources Analyst II

Comments and Responses of North Baja Pipeline

Summary of CIP Version 5 Standards

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

United Electric Cooperative Services, Inc.

Transcription:

CITY OF COLTON APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS June 22, 2012

TABLE OF CONTENTS Page No. 1. DESCRIPTION OF COLTON S TRANSMISSION LINES AND FACILITIES... 1 2. DESCRIPTION OF COLTON S TRANSMISSION ENTITLEMENTS... 1 3. ENCUMBRANCES... 3 4. TRANSMISSION LINES AND FACILITIES TO BE PLACED UNDER ISO S OPERATIONAL CONTROL... 3 5. RELIABILITY CRITERIA... 3 6. MAINTENANCE PRACTICES... 3 7. TEMPORARY WAIVERS... 3 8. PROPOSED TRANSMISSION OWNER (TO) TARIFF... 3 9. COLTON S TRR... 3 10. ADDRESS AND CONTACT NAMES... 4 11. SETTLEMENT ACCOUNT... 4 12. COLTON S MWH DEMAND IN 2011... 4 13. INSTRUCTIONS FOR ENCUMBRANCES AND ENTITLEMENTS... 4 14. LIST OF SUPPORTING AGREEMENTS ATTACHED... 5 APPENDIX A - COLTON S TRANSMISSION ENTITLEMENTS APPENDIX B - COLTON S TRANSMISSION ENCUMBRANCES i

CITY OF COLTON APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS 1. Description of Colton s Transmission Lines and Facilities The City of Colton does not have legal title to any transmission lines or facilities. The City of Colton receives access to the ISO Controlled Grid by virtue of a Wholesale Distribution Access Tariff ( WDAT ) with the Southern California Edison Company ( SCE ). The WDAT governs SCE s provision of wholesale distribution service between Colton s system and the ISO Controlled Grid. Such service is provided from the point where the 69 kv conductors of SCE and Colton connect at the Colton Substation, to the point at SCE s 230/115/69 kv Vista Substation where SCE s 230 kv facilities interconnect with the ISO Controlled Grid. 2. Description of Colton s Transmission Entitlements The City of Colton has the following entitlements to transmission service on High Voltage Transmission Facilities (see also Appendix A and Figure 1 attached thereto): 2.1 Mead-Adelanto Project The Mead-Adelanto Transmission Project is comprised of a 500 kv alternating current transmission line extending between the Marketplace and Adelanto Switching Stations. The City of Colton is entitled to firm bidirectional service equaling 1.75% of the facility s 1,291 MW rated capability, or 23 MW. 2.2 Mead-Phoenix Project The Mead-Phoenix Transmission Project is comprised of: A 500 kv alternating current transmission line extending between Westwing and Perkins Substations. With regard to this component, the City of Colton is entitled to firm bidirectional service equaling 0.2308% of the facility s 1,923 MW rated capability, or 4 MW. A 500 kv alternating current transmission line extending between Perkins and Mead Substations. With regard to this component, the City of Colton is entitled to firm bidirectional service equaling 0.2308% of the facility s 1,923 MW rated capability, or 4 MW. A 500 kv alternating current transmission line extending between Mead Substation and Marketplace Switching Station. The City of Colton is entitled to firm bidirectional service equaling 0.1620% of the facility s 2,600 MW rated capability, or 4 MW. 500/230 kv transformation between the Mead Substation 500 kv bus and the Mead Substation 230 kv bus. The City of Colton holds no entitlement to these transformation facilities. 1

2.3 Marketplace-McCullough Transmission Line The Marketplace-McCullough transmission line is a 500 kv alternating current transmission line extending between the Marketplace and McCullough Switching Stations. This facility s rated capability is 3,475 MW. As part of both the Mead-Adelanto and Mead-Phoenix Transmission Projects, the City of Colton is entitled to firm bidirectional service equaling 33 MW. 2.4 Adelanto-Lugo/Victorville The Adelanto-Lugo/Victorville path is comprised of 500 kv alternating current transmission facilities extending between the Adelanto Switching Station, the Victorville Switching Station, and the midpoint of the Lugo-Victorville 500 kv line. The City of Colton is entitled to firm bidirectional service over this path in an amount up to its transmission service entitlement in the Mead-Adelanto Project (i.e., 23 MW). 2.5 Lugo/Victorville 500 kv to Vista 230 kv Colton s 21 MW entitlement to firm unidirectional network service from the midpoint of the Lugo/Victorville 500 kv line to the Vista Substation 230 kv Substation is derived from two separate agreements with the Southern California Edison Company: One agreement providing for 3 MW of service. One agreement providing for 18 MW of service. 2.6 Mead 230 kv to Vista 230 kv Colton s 3 MW entitlement to firm unidirectional network service from the Mead Substation 230 kv bus to the Vista Substation 230 kv bus is derived from a firm transmission service agreement with the Southern California Edison Company. 2.7 Devers Substation to Vista 230 kv Colton s 14.043 MW entitlement to firm unidirectional network service from the Devers Substation to the Vista Substation 230 kv bus is derived from a firm transmission service agreement with the Southern California Edison Company. The entitlements described in Sections 2.1, 2.2, and 2.3 above are derived from contractual agreements among the Southern California Public Power Authority ( SCPPA ), a California joint powers authority of which Colton is a member, certain SCPPA members (including Colton), and other joint project owners. The City of Colton does not have entitlements to transmission service over any Low Voltage Transmission Facilities. 2

3. Encumbrances There will be no encumbrances on the City of Colton s transmission service entitlements at the time Colton places its entitlements under the ISO's Operational Control. 4. Transmission Lines and Facilities to be placed under ISO s Operational Control The City of Colton intends to place under the ISO s Operational Control all of its transmission entitlements listed in Section 2 above. 5. Reliability Criteria The City of Colton does not have any specific Local Reliability Criteria that are applied to the entitlements identified in Section 2 above. The transmission providers or the operating agents for the transmission projects to which Colton has transmission service entitlements are responsible for compliance with applicable Reliability Standards developed and enforced by the North American Electric Reliability Corporation and the Western Electricity Coordinating Council and generally adhering to good utility practice in conducting their operational activities. 6. Maintenance Practices The City of Colton does not operate or maintain any of the transmission facilities related to its transmission service entitlements. The operating agreements for the SCPPA transmission projects (described in Sections 2.1, 2.2, and 2.3 above) require that the operating managers perform operating and maintenance work according to Prudent Utility Practice, the respective agreements and applicable guidelines. 7. Temporary Waivers Not applicable. 8. Proposed Transmission Owner (TO) Tariff A draft of Colton s Transmission Owner Tariff ( TO Tariff ) is attached. The City of Colton will file the final version of its TO Tariff, including its proposed Transmission Revenue Requirement ( TRR ), with the Federal Energy Regulatory Commission ( FERC ) under applicable FERC rules and procedures. 9. Colton s TRR The City of Colton will file its TRR as part of the filing noted in Section 8 above. 3

10. Address and Contact Names Mr. David X. Kolk, Ph.D. Ms. Bonnie S. Blair Electric Utility Director Thompson Coburn LLP City of Colton 1909 K Street N.W., Suite 600 650 N. La Cadena Drive Washington, D.C. 20006-1167 Colton, CA 92324 Email: dkolk@ci.colton.ca.us Email: bblair@thompsoncoburn.com Telephone: (909) 370-6196 Telephone: (202) 585-6905 Fax: (909) 370-5132 Fax: (202) 585-6969 11. Settlement Account [To be provided under separate cover] 12. Colton s Monthly MWh Demands MWh Demand Per Month Calendar Year 2011 Month MWh January 26,984 February 26,903 March 25,645 April 26,205 May 26,262 June 26,347 July 26,454 August 39,921 September 34,779 October 29,386 November 26,172 December 24,408 Total 339,466 13. Instructions for Encumbrances and Entitlements Because no encumbrances exist with respect to Colton s transmission service entitlements, the development of instructions related to encumbrances is unnecessary. Instructions related to Colton s transmission service entitlements, if necessary, will be developed jointly with the ISO and the operating agents/transmission providers. The City of Colton anticipates that any such instructions will be identical to the existing instructions applicable to similar entitlements placed under the ISO s Operational Control by the Cities of Anaheim, Riverside, Azusa, Banning and Pasadena. 4

14. List of Supporting Agreements Attached - Mead-Adelanto Project Agreements Operation Agreement Transmission Service Contract Joint Ownership Agreement - Marketplace Substation Participation Agreement - Mead-Phoenix Project Agreements - SCE Agreements Operation Agreement Transmission Service Contract Joint Ownership Agreement Restructuring Agreement Hoover Firm Transmission Service Agreement Pasadena Firm Transmission Service Agreement 1995 San Juan Unit 3 Firm Transmission Service Agreement Palo Verde Nuclear Generating Station Firm Transmission Service Agreement - Los Angeles Department of Water and Power Agreement Adelanto-Lugo/Victorville Firm Transmission Service Agreement 5

APPENDIX A CITY OF COLTON TRANSMISSION SERVICE ENTITLEMENTS FERC Contract Contract Point of Receipt-Delivery Parties Direction Contract Title No. Termination Amount 1. Marketplace-Adelanto Colton-SCPPA Bi-directional Mead-Adelanto Project Transmission Service Contract None See note 1 23 MW 2. Westwing-Mead-Marketplace Colton-SCPPA Bi-directional Mead-Phoenix Project Transmission Service Contract None See note 2 4 MW 3. Marketplace-McCullough Colton-SCPPA Bi-directional Mead-Adelanto Project Transmission Service Contract None See note 3 33 MW Mead-Phoenix Project Transmission Service Contract 4. Adelanto-Lugo/Victorville Colton-LADWP Bi-directional Adelanto-Lugo/Victorville Firm Transmission Service None See Note 4 23 MW Agreement 5. Devers-Vista Colton-SCE To Vista 1995 San Juan Unit 3 Firm Transmission Service 365 See Note 5 14.043 MW Agreement 6. Mead-Vista Colton-SCE To Vista Hoover Firm Transmission Service Agreement 361 See Note 6 3 MW 7. Lugo/Victorville-Vista Colton-SCE To Vista Pasadena Firm Transmission Service Agreement 363 See Note 7 18 MW 8. Lugo/Victorville-Vista Colton-SCE To Vista Palo Verde Nuclear Generating Station Firm Transmission Service Agreement 362 See Note 8 3 MW Notes: 1. Agreement terminates on: (i) October 31, 2030; or (ii) such later date as all bonds used to finance the project have been paid or provisions for their payment have been made. 2. Agreement terminates on: (i) October 31, 2030; or (ii) such later date as all bonds used to finance the project have been paid or provisions for such payment has been made. 3. Agreement terminates concurrent with termination of the agreements referred to in notes 1 and 2 above. 4. Agreement terminates on: (i) four year notice by either party; (ii) the date of retirement of the Mead-Adelanto Project; (iii) the date the Lugo-Victorville point of interconnection is permanently removed from service; (iv) the in-service date of a new transmission line interconnecting LADWP s Adelanto Switching Station and SCE s Lugo Substation; or (v) upon 30 days notice if Colton elects to terminate the agreement following a change in the rate for transmission service charged by LADWP. 5. Agreement terminates on: (i) one year notice by Colton; (ii) termination of Colton's interest in San Juan Generating Station Unit 3; or (iii) unacceptable FERC modification. 6. Agreement terminates on: (i) one year notice by Colton; (ii) termination of Electric Service Contract providing for Colton's interest in the Boulder Canyon Project (Hoover); or (iii) unacceptable FERC modification. 7. Agreement terminates on: (i) one year notice by Colton; (ii) termination of Colton's interest in San Juan Generating Station Unit 3; or (iii) unacceptable FERC modification. 8. Agreement terminates on: (i) one year notice by Colton; (ii) termination of Colton's interest in the Palo Verde Nuclear Generating Station; (iii) termination of the Arizona Nuclear Power Project Participation Agreement; or (iv) unacceptable FERC modification. A - 1

APPENDIX A FIGURE 1 CITY OF COLTON TRANSMISSION SERVICE ENTITLEMENTS PATH / DIRECTION AMOUNT (MW) Westwing Mead 500 KV 4 Mead 500 KV Marketplace 4 Marketplace McCullough 33 Marketplace Adelanto 23 Adelanto Lugo/Victorville* 23 Lugo/Victorville Vista 21 Devers Vista 14.043 Mead 230 KV Vista 3 Marketplace McCullough Mead 500 KV Mead 230 KV Victorville Adelanto Lugo Vista (Colton) Devers Westwing * Lugo/Victorville refers to the midpoint of the Lugo-Victorville 500 KV line A - 2

APPENDIX B CITY OF COLTON TRANSMISSION ENTITLEMENT ENCUMBRANCES None Point of Receipt-Delivery Parties Direction Contract Title FERC No. Contract Start Date Contract Termination Contract Amount B - 1