EIA and Sustainable Buildings

Similar documents
Legislative Brief The Real Estate (Regulation and Development) Bill, 2013

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

IDBI Green Bond Framework

Water Use in Indian Industry Survey

ITC Infotech s SAP Sustainability offerings for Metals and Mining industry

The world s largest telecom tower company Gives a voice to a billion hopes

Sustainability policy for Commercial Real Estate

How To Conduct An Environmental Impact Assessment

Water Resource. 1 Initiating and Sustaining Water Sector Reforms : A Synthesis World Bank in collaboration with the Government of India, Ministry of

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Environmental and Social Monitoring Report

1 Jones Lang LaSalle A tale of two buildings Are EPCs a true indicator of energy efficiency?

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Data governance in the connected enterprise Simon Wright. Star Wars: The Empire Strikes Back

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI

Water Conservation: A Guide to Promoting Public Awareness

ENERGY CONSERVATION: SMART METERS AND BIG DATA ANALYTICS TO THE RESCUE. A White Paper May 2014

ACR+ position paper on the Circular Economy Package 2.0

SOURCE SEGREGATION & COMMUNITY PARTICIPATION FOR MUNICIPAL SOLID WASTE MANAGEMENT

Background paper for Sustainable Buildings and Construction for India: Policies, Practices and Performance

CITIZENS' LABOR RIGHTS PROTECTION LEAGUE N.Narimanov street, 11 \ 16, Baku AZ1006, Azerbaijan

Asset Management. Enabling effective estates strategies >

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

Environmental Policy In India. in Imparting Environmental Justice

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

Bringing Transparency in Electoral Funding in India

A Critical Review of Long Term Water Energy Nexus in India

New licensing framework. for the. Republic of Namibia

FRESHWATER COUNTRY PROFILE NORWAY

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

National Seminar on Secretarial Audit

Long Term Electricity Scenario and Water Use A case study on India

SUSTAINABILITY REPORT 2010

Business Responsibility Reports - Frequently Asked Questions (FAQs)

PROPOSED TERMS OF REFERENCE

ANALYSIS OF ENERGY SAVING OPPORTUNITIES IN CEMENT SECTOR

Cost Management for Sustainable Project Success

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP

APHA Response to the Draft Report (Sept 2014) The Competition Policy Review Australian Private Hospitals Association ABN

Dr S.K. GUPTA Scientist D Central Ground Water Board. 25 th FEB. 2014

ST ANDREWS COMMUNITY HOSPITAL AND HEALTH CENTRE PROJECT MANAGEMENT AND MONITORING THE BOARD S OBLIGATIONS

At a Glance. Constructed Over 3.0 million sq. ft. in Retail, Entertainment, Commercial, Parking & Residential Assets. Planned (next 3 years)

ENERGY CERTIFICATE, DISPLAY, LAKCÍMKE HOW CAN WE USE THE INFORMATION TOOLS SERVING

Welcome to Apollo Munich Health Insurance Co. Ltd.

Welcome to Apollo Munich Health Insurance Co. Ltd.

The National standardization and Current status of Eurocodes in Turkey

SALES TRAINING INTERNATIONAL LTD FACT SHEET. Six Sigma

Water Resources Development and Management in India - An Overview

DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI

United Kingdom Nirex Limited CONTEXT NOTE. 4.5: Security. September 2005 Number:

Background paper: Climate Action Programme 2020

Smart Cities AECOM INDIA. National Real Estate Development Council. The Way Forward for Gurgaon-Manesar & NOIDA-Greater NOIDA

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION

United States-Peru Environmental Cooperation Work Program

DANISH DISTRICT ENERGY PLANNING EXPERIENCE

Green paper on the management of biowaste in the European Union

REGULATORY CHANGES: IMPACT ON DISTRIBUTION. Author s Name: Srinivasan Varadharajan & Neelesh Patni

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

Towards a Green and Sustainable IIT Kanpur

Egypt & Climate Change

Chapter 40B - Frequently Asked Questions

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

Internal Loss Data Collection in a Global Banking Organisation

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE

India Solid Waste Management Vehicles Market Forecast and Opportunities, 2019

Improving the ACT Building Regulatory System

Reporting criteria for selected key performance indicators in the 2014 Responsible Business Report

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

The Public Participation Process in Cyprus

SERVICES OVERVIEW. Integrating Risk, Technology, People and Process for a sustainable Future CONTACT US. About Us. Our Business Philosophy

Mongolian power sector:

183/2006 Coll. ACT of 14 th March on town and country planning and building code (Building Act)

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

FIRST ANNOUNCEMENT AND CALL FOR ABSTRACTS. 7th International Conference on Energy Efficiency in Domestic Appliances and Lighting (EEDAL 13)

Sustainable city development through smart urban planning

Presentation from the 2014 World Water Week in Stockholm

Global water resources under increasing pressure from rapidly growing demands and climate change, according to new UN World Water Development Report

Frequently Asked Questions (FAQs) on Hydropower

Operational Audit and. Asset Management System Review. Shire of Coolgardie

Building energy audits project

PRE- FEASIBILITY STUDY REPORT

Encouraging new business models: proposal to amend the Estate Agents Act 1979

Township of T Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019

NAPCS Product List for NAICS 54162: Environmental Consulting Services

Directive EC 2008/92 on Gas and Electricity Prices Kyiv, 7 October 2014 Damir Pešut, Senior Expert

Referral fees, referral arrangements and fee sharing

Coal in China: Environment Risks and It s future Qingwei Sun, Greenpeace Woodrow Wilson May 3, 2013

Submission on the Gas Industry Company consultation on Current Issues for Domestic and Small Business Gas Consumers

About Dogma. Vision. Mission. Core Values OUR BELIEFS DOGMA ISO PROPOSAL

We Believe in the environment. Environmental and sustainable development Health and safety

Status of China s regional trading programs: progress and challenge

Energy Audits and Retro-commissioning Background Report

Transcription:

EIA and Sustainable Buildings What Ails EIA for Building and Construction Projects? Sakshi C. Dasgupta Sustainable Building Programme, CSE source: www.visualphotos.com

Buildings and Construction Projects Discussion on EIA and Buildings is Unique Environment Impact Assessment (EIA) is generally associated with industries, mining, hydropower, thermal plants etc. They are the more visible sectors in EIA The debate on EIA rarely features building projects and is generally the odd one out

Buildings Sector less Visible because Regulatory Approach reflects this attitude Civil society still take up Building sector Issues For other sectors NGOs, people s organizations are actively Campaigning But there is little understanding about building sector impacts and pressures

Realization is Setting in We are beginning to see the reactions and voices by the neighborhoods and communities People are now up in arms against projects that threaten their land, resources and existence E.g. Lavasa, Commonwealth Games Village, greater Noida (Bhatta parsaul), Vasant Kunj Ridge Malls, Mangar Bani That is the reason CSE s Sustainable Building Unit decided to take this up

What Buildings have done to our Cities?

Google Earth Gurgaon

Google Earth Bengaluru

Google Earth Hyderabad Cities are becoming Dense!

http://www.flickr.com/photos/85296574@n00/185514559/sizes/o/in/set-72157594199106864/ Cities are going Vertical!

Urban Growth in Jaipur 1975 Cities are Expanding! Source: http://sapiens.revues.org/932 2008

Buildings Vikas Community, Auroville Source: CSE Buildings DLF city Gateway tower, Gurgaon Source: 24x7bangalore.blogspot.com Cities are changing Construction Styles!

Buildings are a BIG Concern They consume more than 30% of Energy About 20% of Water Responsible for 30 % of Waste Generation Consume about 30% of Raw Material Responsible for about 40% of CO2 Emissions Source: Tara Nirman Kendra, 2008

Majority Building Stock Yet to Come Source: Environmental Design solutions 2010/CW

Therefore EIA becomes Crucial, but We seriously need to see whether EIA is working and delivering? Environmental Clearance for building sector is for Namesake, Weak and Ineffective Mere Formality of form 1 and 1A No Detailed Study, Assessment or Real Post Project Monitoring Implementation issues common to other sectors for which EIA is required

But some Specific Issues Site Selection Site Location and Sensitivity Criteria not part of EC Review Post Facto clearances: Projects that never took clearance being granted post facto EC after construction and even operation Build without consent: There are no effective mechanisms to ascertain whether actual construction has started prior to the EC Loophole in Project Classification: MoEF yet to issue guidelines for townships projects detailed EIA Master plans need to have an EIA but not the Case e.gmangarbani

Specific Issues Public Consultations: MoEF s 2005 draft notification had public hearing clause, but was never incorporated in the 2006 Notification. Subjective and Futile Rating for Proposal Documents: Committees accorded ratings like gold, silver etc. to the reports; could be used by proponents for their projects promotion. No Benchmarking Water, Energy allocation is not against benchmarks. So monitoring against what?

Specific Issues Prior approvals without consent: EC has been accorded to projects even prior to them receiving NOCs from local authorities Environmental Clearance beyond area s Carrying Capacity Inconsistent and Contradictory Information Error in Estimation Cosmetic Conservation COPY PASTE Job by Consultants Non Compliance in Critical EC Conditions Metering for Monitoring Missing Alignment with other building regulations ECBC, NBC??? EC letters, Compliance Reports not Public on MoEF website

NO BENCHMARK CSE reviewed 51 Minutes of the Meetings Haryana s SEAC, 2008 2009 2%of the total residential projects had actually stated 135 lpcd (CPHEEO) 22% projects had per capita water consumption >150 lpcd Variation 48 226 lpcd 47% have lpcd 50 100 Either these buildings are highly water efficient or these are unsubstantiated estimates COPY PASTE 3 meeting of Haryana SEAC had absolute similar water requirements and wastewater generation. EC conditions were exactly similar. But their built up areas are different, ranging from 19,000 1,48,000 sq mt ECs IN WATER STRESSED AREAS 5th meeting of the Haryana SEAC held in March 2009 have granted EC to 3 projects from DLF despite recognizing water scarcity in the area Project falls in the 24 villages notified by the CGWA CGWA bans exploitation of groundwater in such areas HUDA will not be able to supply water to this project in 3 years

Mockery of EC Proposed Residential colony estate one Ludhiana Punjab Contradictions. Form 1 states the total domestic water requirement as 902 KLD Project water requirement has three different values in form 1 and 1A Bestech India s proposed IT Complex, Parkview Business Tower, Gurgaon. Water requirement stated 1048 KLD Wastewater generated 330 KLD (only 30% will be wastewater generated) STP capacity 400 KLD Thumb rule of 80 % WW should be around 838 KLD, STP very low capacity Aditya Infracon in Jasola Delhi Claimed built up area was 19,991 sq mt. Inspections revealed built up area was 20,323 sq mt. Consent for withdrawal 120 KLD, withdrawing 230 KLD

Visible Non Compliance to EC Conditions Green belt??? Not more than 40% glass in buildings No Surface Parking

Problem Mindset??? MoEF s EIA process views that as opposed to other Project Categories buildings should be cleared on the basis of form 1/ 1A and don't require detailed EIA Process because their impact on the environment is low. But really, Buildings are waste creators as well as waste wasters!

What is the stand of Real Estate industry? The Confederation of Real Estate Developers Association of India (CREDAI) proclaims Real Estate Industry sees themselves as VICTIMS! The only waste produced by purely residential, commercial retail projects is human waste Environmental clearance process is tedious and herculean process; needs to be discontinued with immediate effect Further leniency in the EIA process for building projects Supported MoEF s proposal to relax the area criteria from 20,000 to 50,000 sqm Wants EC s monitoring reports to be removed as it doesn t serve any purpose Wants clearances by the planning authority at the planning approval stage, thus urban local bodies to provide clearances

MoEF Clueless on EC of Building and Construction projects Information shared by MoEF with CSE under RTI is minimal and partial. Further it took MoEF far more than a month to respond to the two RTIs filed by CSE. It makes mockery of the appraisal process as evident in the wide gap between information. See the RTIs filed by CSE and their responses by the MoEF on CSE website, Conspiracy of Silence (http://cseindia.org/content/conspiracy silence)

What CSE asked from MoEF? List of Building 8(a) and Township 8(b) Projects reviewed and Cleared under the EIA Notification 2006 List of projects that applied for EC List of projects that got EC with location, Project Proponent, year of clearance, built up area, stated water and energy consumption Status of Compliance reports Regularity List of Post Facto Clearances

What MoEF replied No compilation of such information is readily available with the Ministry. Not possible to provide this information as it is spread out and any effort in this regard would disproportionately divert the resources of public authority The question is whether the compilation of building projects cleared by MoEF along with their basic details is wastage of public funds? If MoEF which is responsible for EC to projects does not have the information then who has it?

MoEF s Response to CSE s RTI S. No Year Projects that Applied for EC to MoEF 1 2006 785 2 2007 1235 3 2008 393 4 2009 53 5 2010 67 6 2011 181 S. No Year Projects Cleared by MoEF 1 2006 175 2 2007 640 3 2008 487 4 2009 101 5 2010 59 Conspiracy of Silence It seems that MoEF has grossly underestimated the building projects that have applied or have been granted EC since 2006. Partial data available only for a few states indicate that the buildings that come for EC runs into thousands a year with huge area coverage. But, only in one state of Haryana, about 927 building projects have been reviewed for environmental clearance between 2008 2011 6 2011 52

So what are we saying then? Master plans/zonal plans to have rigorous EIA Public consultation to be included for high impact projects like townships, area development projects Regular and Stringent Post Construction Monitoring Absolutely NO Post Facto Clearances Selection of Site to be considered in the EIA process Improve Quality of Information, transparency and Public disclosure Issue guidelines for EIA for township projects to have detailed EIA Energy and Water Audits mandatory post operation

So what are we saying then? Enhance Capacity and promote coordination Introduce benchmarking of resource consumption Availability to determine Allocation Carrying Capacity Harmonise Environmental Clearance with ECBC and National Building Code

Thanks