Integrated Automation Assessments (IAA) Identify Opportunities to Improve Efficiency, Reliability and Safety



Similar documents
Lifecycle Solutions & Services

Protecting and Enhancing Your Investment in Honeywell Systems

TPS Virtualization and Future Virtual Developments. Paul Hodge

Loop Scout. Loop and Alarm Performance Management Service

Process Solutions. Uniformance Process History Database (PHD) Product Information Note

Experion PKS. The Next Frontier What is in the next release of Experion PKS? Honeywell Proprietary Honeywell Users Group Asia Pacific

Sustain.Ability Honeywell Users Group EMEA. Virtualization Solutions: Improving Efficiency, Availability and Performance

Remote Services. Managing Open Systems with Remote Services

New BGP Performa Service for Advanced Software

Process Solutions. Lifecycle Services Catalog

Turbine Controls Update

N.K. Srivastava GM-R&M-Engg.Services NTPC- CC/Noida

Honeywell Industrial Cyber Security Overview and Managed Industrial Cyber Security Services Honeywell Process Solutions (HPS) June 4, 2014

Course Outline. ttttttt

Borregaard s Automation Migration: Strategic Tool for Business Improvement. Dag Skjeltorp, Chief Engineer, Borregaard, Ind. Ltd.

Software Change Notice

IT Security and OT Security. Understanding the Challenges

How To Integrate Software And Systems

Security Solutions to Meet NERC-CIP Requirements. Kevin Staggs, Honeywell Process Solutions

Connecticut Justice Information System Security Compliance Assessment Form

Field Products. Experion LX. Proven, Easy to Use and Purpose-built Distributed Control System

DeltaV and AMS Device PlantWeb Alerts Integration. DeltaV and AMS Device PlantWeb Alerts Integration

Cyber Security nei prodotti di automazione

THREAT VISIBILITY & VULNERABILITY ASSESSMENT

Cyber Risk Mitigation via Security Monitoring. Enhanced by Managed Services

The Next generation Network Management solution

Administering and Maintaining Windows 7 Course 50292C; 5 Days, Instructor-led

Process Control Networks Secure Architecture Design

Hillstone Customer Service Overview

Honeywell Automation India Limited

Table of Contents. Introduction. Audience. At Course Completion

Technology Overview & New Innovations. Ignace Verhamme, Rudi Bott Customer Marketing Honeywell Process Solutions

Experion MX. Improve QCS Performance and Reduce Lifecycle Costs Honeywell Users Group Americas. Honeywell.com. 1 Document control number

VMware vsphere 5.0 Boot Camp

Successful Offline Experion PKS R310 Migration. Michael D. Weldon, I&C Engineering Specialist, Luminant Power

Sus tain.ability Honeywell Users Group Asia Pacific. Annemarie Diepenbroek, Greg Belcher Experion Overview and New Solutions

Improving. Summary. gathered from. research, and. Burnout of. Whitepaper

Course Outline. Course Details Course code: 20246D Duration: 5 days Starting time: 9am Finishing time: 4.30pm Lunch and refreshments are provided.

Migrating Your Legacy DCS to PlantPAx

Lifecycle Solutions & Services. Managed Industrial Cyber Security Services

Exhibit to Data Center Services Service Component Provider Master Services Agreement

MS-50292: Administering and Maintaining Windows 7. Course Objectives. Required Exam(s) Price. Duration. Methods of Delivery.

JOB TITLE: CURRENT CLASSIFICATION/GRID POSITION # IT Tech III AD Grid Level 5(e) #121 Database Administrator

IT Best Practices Audit TCS offers a wide range of IT Best Practices Audit content covering 15 subjects and over 2200 topics, including:

Is there any alternative to Exadata X5? March 2015

Boost your VDI Confidence with Monitoring and Load Testing

Industrial Security for Process Automation

Local Patch Management Update Service

PCN Cyber-security Considerations for Manufacturers. Based on Chevron Phillips Chemical Company PCN Architecture Design and Philosophy

Expanding Uniformance. Driving Digital Intelligence through Unified Data, Analytics, and Visualization

Lenovo White Paper. Automated Windows 7 Migration No Desk-side Technicians Required

Automation Sentinel Life Cycle Management Program for Control Systems

MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration. Chapter 11 Managing and Monitoring a Windows Server 2008 Network

GE Measurement & Control. Cyber Security for NEI 08-09

Planning and Administering Windows Server 2008 Servers

ensurcloud Service Level Agreement (SLA)

Proactive IT Solutions More Reliable Networks Are Our Business

MSP Service Matrix. Servers

SCADA Compliance Tools For NERC-CIP. The Right Tools for Bringing Your Organization in Line with the Latest Standards

Symphony Plus Cyber security for the power and water industries

The Value of Vulnerability Management*

Enterprise IT is complex. Today, IT infrastructure spans the physical, the virtual and applications, and crosses public, private and hybrid clouds.

Cisco Network Optimization Service

Vistara Lifecycle Management

Release & Deployment Management

North Dakota 2013 IT Security Audit Vulnerability Assessment & Penetration Test Project Briefing

Expert Reference Series of White Papers. Visions of My Datacenter Virtualized

Process Solutions. Mitigating Cyber Security Risks in Legacy Process Control Systems. White Paper

המרכז ללימודי חוץ המכללה האקדמית ספיר. ד.נ חוף אשקלון טל' פקס בשיתוף עם מכללת הנגב ע"ש ספיר

Experion HS. Quick Builder Patch 3 R410. Software Change Notice

Implications for the Honeywell Enterprise Buildings Integrator User Community

Remote MasterMind 3.0. Mobile Device & Bar Code Scanner Management Solution

Automated Patch Management Service

Combined Cycle Control Overview

Integrating Control and Safety with Secure System Segregation

Management of Change: Addressing Today s Challenge on Documenting the Changes

Information Technology Cluster

PCI DSS. Get Compliant, Stay Compliant Seminar

Virtualized System Reduces Client s Capital and Maintenance Costs

ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM

Creating Added Value for the IT Service Management Practice. How ConsoleWorks Creates Value for ITSM Best Practices

RSA SecurID Ready Implementation Guide

CompTIA Cloud+ Course Content. Length: 5 Days. Who Should Attend:

Alain Nifenecker - General Electric Manager Controls Engineering

Managing R12 EBS using OEM with the Application Management and Application Change Management Packs

Contents UNIFIED COMPUTING DATA SHEET. Virtual Data Centre Support.

Kevin Kochirka, ABB Turbine Automation, June 29, Flexible turbine control retrofits Webinar

ABB Process Automation Service Services that add life to your systems and processes

Decrease your HMI/SCADA risk

Honeywell HPS Virtualization FAQ

Information Technology Services

Network Detective. Network Assessment Module Using the New Network Detective User Interface Quick Start Guide

Oracle Database 11g: New Features for Administrators

Transcription:

Integrated Automation Assessments (IAA) Identify Opportunities to Improve Efficiency, Reliability and Safety

Know Where You Stand Assess your control system Assess your control performance

Assessing Your Control System Executive Summary LCN Network Health System Performance Baseline for Company ABC Network Health Caution Healthy Poor Security Security Patches Antivirus Signatures Performance Baseline Performance Track Conditions Configuration Check Against Best Practices Lifecycle Status & Path Forward Supportability Status Risk to Plant Operations Cost to Maintain & Support Technology Refresh Comprehensive System Health Assessment With Recommendations

Covering Control System Aspects Experion System CONFIGURATION Assessment FTE Netw ork Configuration Experion Controller Configuration Experion Client Server Configuration HMI Display Configuration Back Up and Recovery Configuration SECURITY Assessment Security Configuration Anti-Virus Status Microsoft Security Updates Installed Softw are Analyzed by Global TAC Analyzed by Global TAC TPS Integration CONFIGURATION Assessment Experion System PERFORMANCE Assessment PC Performance Server Communications Performance Sw itch Performance Controller Performance Reviewed by Certified Engineers Experion / TPS Integration Configuration TPS System PERFORMANCE Assessment Overall LCN Loading Overall UCN Loading LCN Node Statistics UCN Node Statistics Nodes Exceeding Recommended Guidelines Node Type Specific Reports Reviewed by Certified Engineers

Lifecycle Status & Path Forward Detailed Migration, Upgrades Options & Recommendations TECHNOLOGY REFRESH OPTION: The GUS stations are under Windows XP, which is after April 8, 2014, discontinued from Microsoft. This means that while the operating system may continue to operate beyond the end of life date, Microsoft will not release new security updates, security hot fixes, provide technical phone support, or online technical content updates. Without this support, the XP operating system could become increasingly vulnerable to cyber security threats. Honeywell recommendation is to upgrade GUS to ES-Ts Obsolescence Chart - Technology Refresh Option is also recommended to upgrade APMs to EHPMs BENEFITS: The ES-Ts will run on R410 and R430 under Windows 7 Operating System with full support from Microsoft and Honeywell and will add the Experion console station functionality to the Native Window functionality. This new Experion functionality can be implemented on process, on a self paced schedule. - EHPM migration will retain all IP as well as using existing PM I/O in its CPU Racks Detailed Assessment of the Supportability Status for Each Module & Controller IB Life Cycle Management traffic light 2 D at e run: 0 5/ 0 2 / 2 0 10 Account Name Site Name Master Asset SID Last Audit Date AM AM-R (EAMR) AMC AMX APM APM-R APP CUSTOMER01 16/10/2009 2 0 0 0 0 1 4 Customer Madrid CUSTOMER08 16/10/2009 0 0 0 0 0 0 2 Grand Total 2 0 0 0 0 1 6 Account Name Site Name Master Asset SID Last Audit Date HG HLPIU HMON HPM HPM-R LEPIU LLPIU CUSTOMER01 16/10/2009 6 0 4 0 19 5 0 Customer Madrid CUSTOMER08 16/10/2009 5 4 3 0 11 2 0 Grand Total 11 4 7 0 30 7 0

Assess Your Control Performance Control Performance Poor performing loop prioritization Energy efficiency assessment in Fired Heaters Units Alarm Performance Alarm chatter identification

LOOPS REPORT Assessing Control Performance Tagname DCSUnit ProcArea Description LoopType Performance Criticality CritAreaOpportunity ValveStictionProbability OscillationPeriod CPI COV CHFC_007 CH ENERGIA CONTROL H2 CARGA flow R-1 poor 3 4 40 56 1m 50s 0.45 4.28 CHFC_008 CH ENERGIA CONTROL H2 LECHOS flow R-1 poor 3 4 40 34 0m 8s 0.23 24.83 CHFC_014 CH ENERGIA LLCN A TANQUE flow poor 3 4 40 1 0m 25s 0.48 0.47 CHLC_002 CH ENERGIA NIV BOTELL CARG level HN-V-1 acceptable 3 4 8 N/A 200m 6s 0.03 10.61 CHLC_024 CH ENERGIA CONTROL NIVEL level HN-V6 fair 3 4 32 N/A 502m 18s 0.04 7.57 CHLC_034 CH ENERGIA NIVEL ESTABILZADORA level HNV8acceptable 3 4 8 N/A 983m 33s 0.27 11.21 CHLC_037 CH ENERGIA DEPOSIT CONDENSADO level HNV10 fair 3 4 32 N/A 500m 0s 0.09 4.58 CHTC_005 CH ENERGIA CTROL TEMP ENTRADA temperature SHU fair 3 4 32 N/A 999m 60s 0.3 38.31 CHTC_044 CH ENERGIA TEMP A SALIDA temperature DE HNE8 fair 3 4 32 N/A 1000m 0s 0.01 11.66 CHTC_049 CH ENERGIA ENTRADA A REACTOR temperature HNR2 fair 3 4 32 N/A 999m 60s 0.02 22.15 CHTC_083 CH ENERGIA ENTRADA REACT temperature SHDS HNR3fair 3 4 32 N/A 1000m 0s 0.12 19.37 CHFC006A CH ENERGIA CTROL CARGA flow HC AL REACTOinactive none 1 none 1 3m 20s N/A 0 CHFC035A CH ENERGIA SALIDA ENFRIADOR flow HNE15B inactive none 1 none 1 none N/A 0 CHFC040A CH ENERGIA NAFTA INERTE flow HNV11 HNV1 inactive none 1 none 1 none N/A 0 CHFC_001 CH ENERGIA HCN DE FCC - CARGA flow HDT inactive none 1 none 1 33m 20s N/A 0 CHFC_002 CH ENERGIA LCN DE FCC - CARGA flow V-1 inactive none 1 none 1 0m 32s N/A 0 CHFC_004 CH ENERGIA MINIMO FLUJO flow HN-P-1A/B saturated none 1 none 1 none N/A 0.68 CHFC_006 CH ENERGIA CONTROL CARGA flowr-1 fair none 1 none 14 3m 47s 0.44 0.55 CHFC_013 CH ENERGIA REFLUJO A SPLITTER flow V-2 inactive none 1 none 9 0m 18s N/A 0.51 CHFC_015 CH ENERGIA MINIMO FLUJO flow HN-P-4A/B acceptable none 1 none 7 1m 34s 0.27 0.45 CHFC_016 CH ENERGIA COND. MEDIA flow CALENT E-8 acceptable none 1 none 1 5m 39s 0.77 0.56 CHFC_018 CH ENERGIA CARGA A R-2 LECHO flow N? 1 excellent none 1 none 1 0m 31s 0.61 0.36 CHFC_019 CH ENERGIA CARGA A R-2 BY-PASS flow E-9 excellent none 1 none 1 0m 6s 0.63 0.42 Detailed Status Of All The Loops With Each Unit, With Direct Identification Of Oscillation Interactions And Sticky Valves

Alarm Performance EEMUA Benchmark Rank Shown Several Alarm Activity Benchmarks Displayed

IAA Process Get Site Data Non-invasive collectors gather a comprehensive data sample for diagnostics. Checklists employed for additional data collection Data Security Data is encrypted and bundled then sent to Honeywell expert team for analysis and report generation SME Inputs Report is generated to summarize performance and highlight issues Engagement The report is presented in a consultative face-to-face environment with customer 3 days at site 8 days at back office

Deliverables Standard Enhanced 1. Control System Update & Performance Audits X X - FTE Network Installation and Configuration x x - Security Updates and Antivirus Verification x x - Operating System Performance x x - EPKS Client Server Configuration x x - Verification of Graphics Performance x x - Back Up and Recovery Assessment x x 2. Technology Integration X X - TPS Audit x x - System Performance Baseline x x 3. Lifecycle Optima Evolution Path X X - Update on the Status of the Installed Base x x 4. Process Control Performance Audit X 5. Alarm Benchmark X "Standard" IAA Pricing: EPKS TPS Price Per System: Customers with existing SPB options in contracts: "Enhanced" IAA Pricing: EPKS TPS Price Per System: Customers with existing SPB options in contracts: Optional: Integrated Automation Assessment - IAA

Performance Proactive Maintenance Model CORRECTIVE TIME BASED PERFORMANCE-BASED BEST PRACTICES Reactive Time based Audits Best Practices - MTTR Driven Linked to immediate qualified labor response maintenance Hot Fix Updates Test Protocols On condition monitoring Performance Indicators Lifecycle Management Performance Continued Improvement Availability of Spares P1 & p2 24/7 Availability AV updates Loop Diagnosis Valve Diagnostics

Recommending the Right Solutions IAA LSS Solution Sustained Benefits Best Practices Set Up & Configuration System Performance Supportability Process Control Alarm Benchmark Proactive Maintenance K&E and LSS Services SESP & Tech Refresh CPM and Tuning Services Alarm Management FSC/SM K&E and Services Optimum Reliability Best Performance Lowest Cost to Own Best Efficiency Operational Safety Safety in Control KPIs Management: Reliability Improvement Efficiency Increase Lifecycle Cost Reduction Safety Typical Benefits: 50% Failure Rate Reduction 2% Efficiency 5% of Installed Base Cost 0.1% Production Systematic Measureable And Continuous Improvement Of Customer Kpis

Thank You