DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields. Evaluation of Underground Storage Tank (UST) Liners

Similar documents
UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM

Frequent Mishaps and Solutions with Regulated Aboveground Storage Tanks in Pennsylvania

UPDATE ON MAINE'S UNDERGROUND TANK LAWS

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

Pressure Vessel Assessment Report

Underground Storage Tanks

Waste Oil Collection / Storage

Contingency Plan. Facility Name

Spill Containment Device and Containment Sump Testing Protocols. Introduction

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

Steel Tank Institute AST Inspections. Dana Schmidt, PE STI/SPFA

FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

The Fuel Storage Tank Regulations 2009

Storage Tank Guidance for Real Estate Professionals

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Petroleum Storage Tank Compliance 101

UST Site Inspection Guidance Document

UST RULES CHANGES. Heather Peters, Environmental Specialist

This page left intentionally blank

Storage Tank Systems for Petroleum products and allied petroleum products regulations

Underground Storage Tank Operational Compliance Field Guide

Spill Control Prevention Plan (SCPP)

Spill Prevention, Control and Countermeasure Plan (SPCC) Program

Contingency Plan. Community College of Denver - Auraria Campus Facility Name

DRAFT REVISED Musts For USTs DRAFT. Printed on Recycled Paper. Updated June 2015

Alabama Air and Waste Regulatory Update

Bulk Storage Program. Cornell University 8/22/2014

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Container Management for Hazardous Waste Generators Technical Guidance Document HW-2005-G1

Regulated Waste Storage

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

CHAPTER PETROLEUM CONTACT WATER

APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS

Used Oil Guidance. Tank and Secondary Containment Requirements For Used Oil Processors

Northern Region. Underground Storage Tank

How To Safely Handle A Spill

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

List of Frequently Utilized Storage Tank Standards and Practices

SECTION 1 GENERAL REQUIREMENTS

Rutgers Environmental Health and Safety

Notes. Material 1. Appropriate Flammable Liquids

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Waste Management

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

Straight Talk On Tanks Leak Detection Methods For Petroleum Underground Storage Tanks And Piping

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

G SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

Installation of Underground LP-Gas Systems

Petroleum Tanks at Municipal Facilities

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

OIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS. Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040

The Pipelines Regulations, 2000

Pee Dee Empty Oil Storage Tank at

WESTFIELD WATER RESOURCES DEPARTMENT

The following definitions apply with regard to requirements specified in this document:

Fuels Safety Program. Liquid Fuels Handling Code Adoption Document Amendment

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

Inventory Control for Underground Storage Tanks

Dollars And Sense Financial Responsibility Requirements For UndergroundStorage Tanks

Compressed Gas Cylinder Program

ADMINISTRATIVE SERVICES MANUAL

Spill Prevention, Control and Countermeasure (SPCC) Rule

NDEP Bureau of Corrective Actions Secondary Containment Regulations Guidance Document April 7, 2010 (Revision)

Satellite Accumulation Areas Large Quantity Generators June 2009

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal


MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)

SCBA Frequently Asked Questions

Monitoring an Underground Storage Tank Facility

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

Secondary Containment Options for Aboveground and Underground Tanks. Wayne Geyer Steel Tank Institute

Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

OIL POLLUTION PREVENTION REGULATIONS

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

PETROLEUM STORAGE TANK SYSTEM UNDERGROUND AND/OR ABOVEGROUND REMOVAL REPORT

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF COMPLIANCE & INSPECTION

CHECKLIST FOR INSTALLING OR CONVERTING EQUIPMENT TO DISPENSE E15, E30 E85 AND OTHER BLENDS OF ETHANOL General Information:

The following definitions apply with regard to requirements specified in this document:

FUELING AND FUEL STORAGE

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

Underground Storage Tank Cathodic Protection Checklist

COMPLIANCE MANAGEMENT STRATEGIES. Presented by: Megan Kazmierczak, ECS Eclipse

FIRE EXTINGUSIHER INSPECTION, MAINTENANCE, AND TESTING PROCEDURES

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

Doing Inventory Control Right For Underground Storage Tanks

CHAPTER 7 BUILDING ARTICLE 7-1 UNIFORM CODES Adoption. Board of Appeals. Annual Review

Tank Environmental Regulations. Aisha Beaty Barr Engineering Company

DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Transcription:

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields DOCUMENT NUMBER: 263-3120-001 TITLE: Evaluation of Underground Storage Tank (UST) Liners EFFECTIVE DATE: September 8, 2012 AUTHORITY: POLICY: PURPOSE: The Storage Tank and Spill Prevention Act, P.L.169, No. 32 of 1989, as amended (Tank Act), and 25 Pa. Code, Chapter 245 (Storage Tank Regulations). This policy describes the procedures and documenting requirements that the Department of Environmental Protection (DEP) believes are necessary to carry out the provisions of the Tank Act and related Storage Tank Regulations for periodic evaluation of UST liners. Steel USTs that have been internally lined in accordance with Chapter 245.422, and have not been properly cathodically protected, must be internally evaluated within ten years after lining installation, and every five years thereafter, and must be determined to be structurally sound with the lining still performing in accordance with original design specifications. This document provides guidance for conducting periodic UST lining evaluations, and provides for consistent documentation and reporting of the evaluation results. APPLICABILITY: DISCLAIMER: This guidance applies to owners and operators of internally lined USTs and industry professionals who conduct periodic evaluations of these USTs. The policies and procedures outlined in this guidance are intended to supplement existing requirements. Nothing in the policies or procedures shall affect regulatory requirements. The policies and procedures herein are not an adjudication or a regulation. There is no intent on the part of DEP to give the rules in these policies that weight or deference. This document establishes the framework within which DEP will exercise its administrative discretion in the future. DEP reserves the discretion to deviate from this policy statement if circumstances warrant. PAGE LENGTH: 14 pages 263-3120-001 / September 8, 2012 / Page i

UNDERGROUND STORAGE TANK LINING EVALUATION General The initial ten-year and periodic five-year internal evaluation (inspection) of a lined UST requires a manual tank entry, an internal examination of the lined tank, a thorough understanding of applicable industry standards, and a thorough knowledge of the tank lining process. For this reason, only DEP Certified Storage Tank Liners (TL) or Professional Engineers (PE), knowledgeable in tank lining and experienced in lining examinations, are qualified to conduct the tank lining evaluation (see 245.432(d)). Where a qualified Professional Engineer does not hold the TL or the UST installer (UMX) certification, the tank handling activities, including digging to the tank top and opening the top of the tank, tank cleaning, and closing the tank top, must be done under the supervision of a certified tank handler holding the TL or UMX certification. A checklist is provided in Appendix A to aid the evaluator in completing and submitting the lining evaluation. Upon completion of the tank lining evaluation process, the findings must be documented on the Underground Storage Tank (UST) Lining Evaluation Certification (Appendix B), and the tank lining evaluator must certify that the tank and lining passes, or fails, the required industry standards. The completed Underground Storage Tank (UST) Lining Evaluation Certification documentation must be provided to the tank owner and to DEP. Equipment used for lining evaluations should be maintained, calibrated and operated in accordance with the manufacturer s technical instructions and guidance. Thickness-measuring instruments must be capable of measuring thickness to within 0.001 inch (1 mil, or 0.05 mm) at the expected thickness of the metal shell and lining. Measurements should be documented within this tolerance limit. Reporting Suspected or Confirmed Contamination Any indication of a release, such as a hole in the tank, found during the lining evaluation requires the certified individual to notify the appropriate DEP regional office on a form provided by the DEP within 48 hours. If the notification is being submitted because of a failed tank tightness test, provide a copy of the test results with the form. UST Lining Evaluation Requirements When conducting the UST lining evaluation, use the latest edition of the American Petroleum Institute (API) Standard 1631, Interior Lining and Periodic Inspection of Underground Storage Tanks, (currently June 2001, 5th Edition). Where available, the 1991 version, National Leak Prevention Association (NLPA) Standard 631, Entry, Cleaning, Interior Inspection, Repair, and Lining of Underground Storage Tanks, may be substituted and followed for this evaluation. Pay particular attention to safety, handling of wastes, and the evaluation procedural methods in NLPA Standard 631, Chapters A, B, and C. Prior to tank entry, any digging or cutting to gain entry into the tank must be accomplished by a certified installer. Consult Guidance Document 263-0900-011, Modification and Maintenance Issues. Tank cleaning activities should follow all procedures in Guidance Document 263-0900-012, Storage Tank Cleaning Activities. It is particularly important that all products and wastes removed from the tank during the cleaning process be properly handled and disposed of at a facility permitted to accept these wastes. 263-3120-001 / September 8, 2012 / Page 1

An inserted video camera may only be used by a qualified inspector using a National Fire Protection Association approved, intrinsically safe video camera, initially as a cost savings approach, to identify obvious lining failures. An invasive examination by the evaluator must be completed to make the final determination that the tank meets the industry standards. I. Tank Entry If no manway entry to the tank exists, an opening, at least 18 inches by 18 inches, shall be cut into the tank top using non-sparking equipment adhering to API 1631, Section 3.1 Opening the Tank, after explicitly adhering to API 1631 Section 2 Preparation For Opening The Tank and the portions of NLPA 631, Chapter A that relate to safety and tank entry. In all tank entries, the purging, air ventilation, and testing of the internal tank atmosphere must continue throughout the entire lining evaluation procedure to ensure that the atmosphere remains below ten percent (10%) of the lower flammable limit. The procedures in API Publications 2217 and 2015, ANSI Z117.1, NIOSH 80-106, applicable sections of 29 Code of Federal Regulations Part 1910, NFPA 326, and NFPA 77 must be followed to ensure safety. II. Preparation of the Tank Interior So that the evaluator can accurately determine the tank lining condition, the sludge accumulation on the bottom of the tank must be removed with non-sparking equipment and collected for disposal. Next, petroleum absorbent materials should be spread on the entire tank bottom to remove all traces of liquids. These steps must be completed in keeping with API 1631 Section 4.1-4.2, or NLPA 631 Section A8.0-A8.5. A hazardous waste determination must be made on the sludge and spent absorbent materials in accordance with 40 CFR 262a.11. The sludge and spent absorbent materials shall be packaged to meet the requirements of 40 CFR 262, Subpart C, as incorporated by reference in 25 Pa. Code 262a.10, as modified by 262a.34, or 25 Pa. Code Chapter 299, whichever is applicable. III. Tank Evaluation Begin by completing the tables labeled as Facility Information, Qualified Tank Lining Evaluator, and Tank Information in the Underground Storage Tank Lining Evaluation Certification Appendix B. During the internal tank evaluation, the entire interior surface of the tank must be examined using a light fixture that meets the requirement of NFPA 70 (Class I, Division I, Group D). Initially, the evaluator shall visually inspect the lining for evidence of peeling, blistering, wrinkled surface or surface roughening of the lining material. In addition, the evaluator shall look for pitting, rusting, physical damage, water leakage, cracks, streaking, discoloration or other signs of structural instability. These initial observations should be documented in the comment section. Whether some measurements pass or fail depends on the original manufacturer of the lining material. Every effort should be made to determine the manufacturer and their related specifications. Ensure this information is recorded in the Tank Information section. If the manufacturer cannot be determined, as a minimum, record the lining material s color and manufacturer unknown. 263-3120-001 / September 8, 2012 / Page 2

After the initial survey, using the general layout of Appendix C as a guide, the internal cylinder wall shall be divided into three-foot by three-foot sections starting at the bottom of the tank on the fill end (see Appendix B). Indicate on the center section drawing where the opening exists or was made for tank entry. Where one of the end designations falls in the middle of the tank, use the other designator to establish the report orientation. Each tank end (head) shall be divided into four equal quadrants and each quadrant should be further divided into three-foot by three-foot sections. Each remaining smaller tank end area shall be considered an additional section. The center of each section shall be identified and the following tests shall be taken: 1. Lining Test. The lining shall be tested at all sections, as described below, adhering to Lining Testing, API 1631, and NLPA 631 to insure that it meets the manufacturer s original specifications for thickness and hardness. If the original lining material specification cannot be found, the lining must achieve a Barcol hardness of at least 40; note this as the specification used on the comment page. a. Ultrasonically (or other approved industry method) measure the lining thickness at the center of each section and record measurements on the forms provided in Appendix B. National standards specify a minimum lining thickness of 100 mils (0.100 inch, or 2.54 mm). Lining thickness is particularly difficult to control near the top of the tank. Close attention should be given to this area during a lining evaluation. When measuring lining thickness, averages are not acceptable; record the actual reading at each section center. b. Use a Barcol Hardness Tester or other acceptable instrument to determine that the lining continues to meet the manufacturer s specifications for hardness. All hardness readings should be taken in the lower half of the tank. At least two readings on each end (head), and one reading each five linear feet on the clockwise and counter clockwise sides of the bottom center line must be taken and recorded on the forms provided in Appendix A. Circle the hardness readings to distinguish them from thickness readings. c. Check the entire tank lining with a Holiday detector to ensure the absence of air pockets, leaks, and pinholes in the lining. Record the results of the holiday test in the comment section of the evaluation report contained in the guidance document. A detected anomaly is a lining failure. d. Any lined tank that fails this part of the evaluation shall promptly be closed in accordance with 245.422(b)(1)(iii) following the Closure Requirements for Underground Storage Tank Systems in DEP Guidance Document 263-0900-012. 2. Shell Thickness Test. Gauge the metallic tank shell thickness (ultrasonic or other approved industry method), as specified in API 1631 or NLPA 631, at all section centers on the interior cylinder wall and tank end areas. All thickness readings shall be documented on the forms provided in Appendix B. For comparison purposes, the original tank metal thickness shall be obtained either from the tank manufacturer or established in accordance with the requirements of UL Standard 58, Eighth (1986) Edition (see Appendix D). Also record the 75% and 85% shell thickness limits. Any 263-3120-001 / September 8, 2012 / Page 3

section where a thickness reading is less than 75% of the original metal thickness is referred to as a Thin Wall Area. These Thin Wall Areas shall be further subdivided into nine (for a full three-foot by three-foot section) smaller one-foot by one-foot subsections. A thickness gauging measurement must be taken at the center of each subsection and documented in the evaluation report, on the form provided in Appendix B. Determine the average thickness for each Thin Wall Area section (average of the nine subsection measurements), and record on the provided form. The average tank metal thickness for all measured sections (interior cylinder wall and tank end areas), including the average thickness of designated Thin Wall Areas (computed from the subsection of nine measurements), must be at least 75% of the original tank metal thickness to meet required thickness standards. a. Tanks not meeting the average wall thickness requirement of at least 75% shall immediately be taken out of service, and promptly closed. Follow procedures in the Closure Requirements for Underground Storage Tank Systems guidance document. b. If the average metal thickness is determined to be between 75% and 85% of the original metal thickness, as per API 1631, Section 10.5 and the tank shell has not been repaired with boiler plugs or fiberglass patches and the lining passed the tests in paragraph 1 above, a cathodic protection (CP) system shall be installed within six months of the evaluation. The tank shall remain empty and be placed into Temporary Closure until the CP system is installed. If not upgraded with CP within the six-month period, the tank must be permanently closed within one-year of the evaluation (see 245.451(g)). c. If the average tank shell metal thickness is determined to be greater than 85% and the lining passes the evaluation in paragraph 1, the tank may be returned to service following paragraph 3 and the lining evaluated within the next five years. 3. Tightness Testing. At the completion of the tank lining evaluation and before backfilling the excavation, a tank meeting standards for continued use shall have the tank manway entry or opening in the tank top resealed and the seal tested in accordance with NLPA 631, Chapter A or a precision tightness test shall be performed in accordance with API 1631. A tightness test shall comply with DEP regulatory requirements at 245.31 (relating to underground storage tank tightness testing requirements), which may require the test to be performed by an underground tank installer/tightness tester certified in the UTT category, and test performance standards at 245.444(3) (relating to methods of release detection for tanks). The tank must pass the seal test in order to be certified for return to service or use. IV. Certification and Documentation of Results At the completion of the tank lining evaluation the Underground Storage Tank Lining Evaluation Certification must be completed for each tank evaluated, and signed by the qualified person that performed the evaluation. This certification must clearly document that the tank either meets and complies with API Standard 1631, or NLPA Standard 631 following the invasive examination, or fails to comply. The owner should also sign the Certification; if the owner refuses to sign, note this in the comment section. A copy of the Certification, including 263-3120-001 / September 8, 2012 / Page 4

all associated documentation, shall be provided to the appropriate DEP regional office and the storage tank facility owner following the completion of the evaluation. The original shall be submitted to the Division of Storage Tanks, Rachel Carson State Office Building, P.O. Box 8763, Harrisburg, PA 17105-8763. The qualified evaluator should also retain a copy for at least ten years. V. Next Lining Evaluation (Periodic re-evaluation) Tanks passing a lining evaluation, including average shell thickness (greater than 85% of original metal thickness) must have the lining re-evaluated within five years of the current evaluation. If the next evaluation is not conducted within the required time frame, the tank must be properly closed. VI. Tanks that Fail In cases where a signed certification cannot be produced to show the tank passed and met the API Standard 1631 or NLPA Standard 631 for tank lining evaluations, at the frequency required by the Storage Tank Regulations, including the tank shell wall thickness standard, the tank shall be kept empty and placed into temporary closure until the tank system is properly closed. Owners of failed tank systems must, within one year of temporary closure, bring the tank system into permanent closure by either closure in place or removal. Permanent closure should be completed by following the Closure Requirements for Underground Storage Tank Systems guidance document. 263-3120-001 / September 8, 2012 / Page 5

Appendix A Tank Lining Inspection Checklist TL certified individual or qualified Professional Engineer with TL or UMX certified individual on-site. Lining tested for holidays and results documented. Original lining material and shell thickness specifications obtained. Lining hardness test performed and documented. Lining Thickness Readings taken at all section centers and documented. Tank metal thickness readings taken at all section centers and documented. Thin wall areas (less than 75%) found, further subdivided and measured. Tank opening sealed and seal tested satisfactory. Excavation backfilled. Completed report compiled, including: Underground Storage Tank (UST) Lining Evaluation Certification Comment page Tank metal thickness data Lining material thickness and hardness data Completed evaluation provided to facility owner and mailed to: Division of Storage Tanks Rachel Carson State Office Building P.O. Box 8763 Harrisburg, PA 17105-8763 263-3120-001 / September 8, 2012 / Page 6

Appendix B DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF ENVIRONMENTAL CLEANUP AND BROWNFIELDS UNDERGROUND STORAGE TANK (UST) LINING EVALUATION CERTIFICATION FACILITY INFORMATION QUALIFIED TANK LINING EVALUATOR Facility ID # - Facility Name Address TANK INFORMATION Name TL Cert. # or PE # Company Name Address Telephone # Email Address Evaluated UST ID # Date Tank Lined Tank Diameter Original Thickness: Tank Head 75%: 85% Lining Manufacturer Gallons Capacity Product Stored Tank Length Center Section 75%: 85% I, (Evaluator s Name), the undersigned, hereby certify that I am trained and qualified in accordance with the requirements of API Standard 1631 or NLPA Standard 631 to perform the evaluation (inspection) of the above designated tank. The entire interior of the tank was physically evaluated (date or dates) in accordance with API Standard 1631, or NLPA Standard 631, as follows: # Y N INITIAL EITHER Y (Yes) OR N (No) BLOCK AS APPROPRIATE 1 At least 98% of the lining was visible for inspection. 2 The tank was found to be structurally sound. There was no evidence of pitting, rusting, physical damage, water leakage, cracks, streaking, discoloration or other sign of structural instability. 3 A physical examination of the tank lining was conducted. There was no evidence of lining peeling, blistering, wrinkled surface, or surface roughening. 4 The lining is free of holidays (pinholes) in accordance with API standard 1631, or NLPA 631, Chapter A, section A13.1.3. 5 The lining meets or exceeds minimum thickness specifications (NLPA 631, A12.3). Minimum lining thickness measured: 6 The hardness test of the lining meets the lining manufacturer s hardness specifications, and testing was performed in accordance with the requirements of API Standard 1631, or NLPA 631, Chapter A, section A13.1.2. (Barcol test GYZJ 935 or equivalent instrument.) Minimum Barcol measurement: 263-3120-001 / September 8, 2012 / Page 7

Appendix B # Y N INITIAL EITHER Y (Yes) OR N (No) BLOCK AS APPROPRIATE 7 The metal thickness of the tank shell was determined to meet the requirements of API 1631. The average metal thickness for all sections (cylinder wall, heads, full and partial), including the average thickness of designated thin wall areas is at least 75% of the original tank metal thickness. Average of all sections: 8 A test of the access opening seal has been completed successfully in accordance with NLPA 631 or a precision tightness test, in accordance with API 1631. Note: The test must be conducted after the tank opening was sealed and prior to backfilling the excavation. Attach the tightness test results or describe the test in the comments. Initial only one applicable statement below: Tank meets above standards, metal thickness average greater than 85% of original thickness, and the tank may be returned to unrestricted operational service. OR Tank meets above standards, metal thickness average is greater than 75% of original thickness, the tank shell is unpatched, and must have a Corrosion Protection System installed within six months to continue operational service. OR Tank fails to meet the above standards and must remain closed. Signature of Qualified Tank Lining Evaluator Date Signature of Tank Owner or Operator Date The above signatories certify under penalty of law as provided in 18 PA C. S. A. 4904 (relating to unsworn falsification to authorities) that the information provided herein is true, accurate and complete to the best of their knowledge and belief. Comments Lining description; conditions observed, evaluation findings, results of physical measurements taken and recommendation provided to the tank owner/operator. Attach additional sheets as necessary with Facility ID, tank number and date of inspection in the heading. 263-3120-001 / September 8, 2012 / Page 8

Appendix B Fill End Piping/Pump End 6 foot diameter or less Greater than 6 feet, and less than or equal to 8.4 feet Greater than 8.4 feet, and less than or equal to 12 feet 263-3120-001 / September 8, 2012 / Page 9

Bottom 3 feet long 6 9 12 15 18 21 24 27 30 33 36 39 Appendix B 12 10 8 6 feet diameter Fill End clockwise counter clockwise 263-3120-001 / September 8, 2012 / Page 10

Appendix B Thin Wall Areas Area designated number Area designated number Initial thin wall reading Average of above readings Area designated number Initial thin wall reading Average of above readings Area designated number Initial thin wall reading Average of above readings Area designated number Initial thin wall reading Average of above readings Area designated number Initial thin wall reading Average of above readings Initial thin wall reading Average of above readings 263-3120-001 / September 8, 2012 / Page 11

Bottom Appendix C General Tank Measurement Layout Fill End Clockwise to top Counter clockwise to top Piping / Pump End 263-3120-001 / September 8, 2012 / Page 12

Tank Capacity (US Gallons) Original Steel thickness (inches) Appendix C Tank Section Thickness Uncoated, Carbon Steel Minimum UL thickness (inches) 85% limit (inches/mm) 75% limit (inches/mm) 285 15 gauge, 0.070 0.067 0.060 / 1.50 0.052 / 1.35 286 to 560 13 gauge, 0.094 0.093 0.080 / 2.05 0.071 / 1.80 561 to 1100 11 gauge, 0.125 0.123 0.106 / 2.70 0.094 / 2.40 1101 to 4000 8 gauge, 0.172 0.167 0.146 / 3.70 0.129 / 3.30 4001 to 12000 1/4, 0.250 0.240 0.212 / 5.40 0.188 / 4.75 12001 to 20000 5/16, 0.312 0.302 0.266 / 6.75 0.234 / 6.00 20001 to 50000 3/8, 0.375 0.365 0.319 / 8.10 0.281 / 7.15 U.S. Steel Plate Standard Gauge Number Fractional Nominal (inch) 0000000 1/2 0.500 000000 15/32 0.469 00000 7/16 0.438 0000 13/32 0.406 000 3/8 0.375 00 11/32 0.344 0 5/16 0.312 1 9/32 0.281 2 17/64 0.266 3 1/4 0.250 4 15/64 0.234 5 7/32 0.219 6 13/64 0.203 7 3/16 0.188 8 11/64 0.172 9 5/32 0.156 10 9/64 0.141 11 1/8 0.125 12 7/64 0.109 13 3/32 0.094 14 5/64 0.078 15 9/128 0.070 16 1/16 0.062 263-3120-001 / September 8, 2012 / Page 13