RISK ANALYSIS MODULE 3, READING 2. Flood Vulnerability Analysis By Dr. Heiko Apel

Similar documents
Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flood Risk Management

Flood Risk Management

Creating Green Jobs within the Environment and Culture sector.

The subjects are addressed in the order in which they appear in the Directive.

BEST PRACTICE GUIDELINES FOR FLOOD RISK ASSESSMENT IN THE LOWER MEKONG RIVER BASIN

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

11.4 Voluntary Purchase House Raising and Flood Proofing

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

Disaster Risk Assessment:

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists

METHODS FOR THE EVALUATION OF DIRECT AND INDIRECT FLOOD LOSSES

Vulnerability analysis

Guideline for Stress Testing the Climate Resilience of Urban Areas

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Estimating Flood Impacts: A Status Report

Key programs and relevant studies

Part B Integrated Monitoring Design for Comprehensive Assessment and Identification of Impaired Waters Contents

Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Contact Points on Government Procurement as of January 1, 2005

7th Framework Programme Theme 6 Environment (including climate change)

Origins and causes of river basin sediment degradation and available remediation and mitigation options. Feedback from the Riskbase workshop

Lake Dauphin Emergency Flood Protection Program (LDEFPP) Terms and Conditions

Preparedness in the Southwest

SoCo: European Overview on soil degradation processes related to agriculture

Annex 6 Recommendation on Safety Requirements for Contaminated Sites in Flood Risk Areas

Flood Emergency Management at Morava River

Floodplain Development Land Use Review

FLOOD DAMAGE PREVENTION ORDINANCE

Flood damage assessment for urban growth scenarios. A. S. Chen, M. J. Hammond, S. Djordjević, D. Butler

Floods Module 2. - Mitigation Definition- Mitigation includes activities that: Prevent Reduce Lessen NORTHERN ILLINOIS UNIVERSITY COPYRIGHT 2007

The development of a flood damage assessment tool for urban areas

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

TITLE 29: EMERGENCY SERVICES, DISASTERS, AND CIVIL DEFENSE CHAPTER I: EMERGENCY MANAGEMENT AGENCY SUBCHAPTER d: STATE EMERGENCY RESPONSE

ESTIMATING THE COSTS OF EMERGENCY SERVICES DURING FLOOD EVENTS

Student Seminar Building climate resilient cities: Exploring theories, practices and prospects Feb 2015

Training Program on Urban Climate Change Resilience April, 2015 Database Management System for coastal cities

How can we defend ourselves from the hazard of Nature in the modern society?

PLANNING APPLICATION: 12/00056/APP

Flood Damage Estimation based on Flood Simulation Scenarios and a GIS Platform

QBE PROFESSIONAL INDEMNITY CONSTRUCTION CONSULTANTS PROPOSAL FORM

Financing sustainable and resilient water and sanitation infrastructure in African cities

Iowa Smart Planning. Legislative Guide March 2011

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI

SYLLABUS FOR RECRUITMENT TEST FOR THE POST OF ASSISTANT TOWN PLANNER (GROUP-A) IN TOWN & COUNTRY PLANNING DEPARTMENT, HARYANA

Revised April (May) 2015

ENVIRONMENTAL SCIENCE MANAGEMENT

Agricultural and Forestry Activities

Appendix J Online Questionnaire

Groundwater Flooding: a UK Perspective

Implementing a Coastal Settlement Boundary

Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

Baseline data: RCI Economic Development Committee

What is a Contracting Authority?

Kristina Veidemane, Baltic Environmental Forum Panevezys,

Monitoring & Recording Hazardous & Non-Hazardous Waste

Extreme Events in the Atmosphere

Bushfire Risk Management Planning. Guidelines for Preparing a Bushfire Risk Management Plan

Assessment of Economic Loss Caused by Flood Damaged Transportation Network

Strategy for 2012 to An active player from rural areas to the metropolis

would your business stay afloat? A guide to preparing your business for flooding

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION

Review article Assessment of economic flood damage

PHASE 1: Pest Management Plan Development

APPENDIX I (See Paragraph -6) FORM I

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Professional Indemnity Proposal ADDENDUMS

Freshwater Resources and Water Pollution

INDONESIA - LAW ON WATER RESOURCES,

Basics of Sustainability. Environmental Impact Assessments (EIA)

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

New environmental liabilities for EU companies

Flood damage assessment and estimation of flood resilience indexes

ADVANTAGES AND DISADVANTAGES OF ENERGY SOURCES. Prepared by Sandra Vasa-Sideris, PhD, Southern Polytechnic State University, for use by students

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

Bystrzyca Kłodzka District. Investment Offer

Sediment and Dredged Material Management - Relevance and Objectives 18 September 2003

Standard Operating Procedures for Flood Preparation and Response

Looking to the Future: 4 Danish scenarios for future farming

Office of Climate Change, Energy Efficiency and Emissions Trading. Business Plan

WEED MANAGEMENT PLAN FOR. (NAME of PROPERTY or MANAGED AREA) (TOWN or COUNTY, STATE) (TIME PERIOD; e.g )

Regional and territorial modelling for urban planning. A tool to foster cohesion in Europe

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and

GENERAL INFORMATION FORM -- AUTHORIZATION APPLICATION NAICS CODES GENERAL INFORMATION

Results from a Survey on Household Flood Risk Reduction in the Czech Republic Running head (shortened title): Household Flood Risk Reduction

The Role of Land Use and Transportation in Building Successful Sustainable Cities City of Vancouver

Hazardous Material Waller County ARES training material used with permission from Christine Smith, N5CAS.

Flood Protection Tips

This Food Safety Plan was developed in New York as an example for growers. Each grower must develop their own plan which fits their operation.

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

CROSS-REFERENCE FOR COMPREHENSIVE EMERGENCY MANAGEMENT PLAN RESIDENTIAL TREATMENT CENTERS FOR CHILDREN AND ADOLESCENTS

United States Army Corps of Engineers, Civil Works

Chubb Group of Insurance Companies 15 Mountain View Road, Warren, NJ 07059

Recovery of full cost and pricing of water in the Water Framework Directive

Transcription:

RISK ANALYSIS MODULE 3, READING 2 Flood Vulnerability Analysis By Dr. Heiko Apel This document is meant to supplement the contents of session 2 Flood Vulnerability Analysis of the Flood Risk Analysis module. In this reading the important step of collection of data on the elements at risk and their mapping is treated (i.e. the exposure), as well as basics for the establishment of loss models (i.e. the susceptibility), the second important step in vulnerability analysis. The reading is based on experiences collected within the European Union and published by the European Exchange Circle on flood Mapping (EXCIMAP) in the Handbook on good practices for flood mapping in Europe. Contents 1 Mapping the elements at risk...1 1.1 Map s contents...1 1.2 Map use...2 1.3 Scale considerations...3 2 Estimating susceptibility to floods flood loss models...3 2.1 Loss data collection...3 2.2 Derivation of loss models...4 3 Further recommended readings/resources...6 1 Mapping the elements at risk Mapping the elements at risk means to provide spatial information (vulnerability parameters) such as population, assets and economic activity, and environmental issues, potentially affected by a flood. By the mapping procedure the assessment of the exposure of the elements to floods can by assessed in GIS framework. 1.1 Map s contents Population Distribution of population (either people per municipality, postal code or address/building, or average number of people per building/property depending on the scale of the analysis) Distribution of particular vulnerable groups (homes for the elderly, location of schools, hospitals, sports facilities, other infrastructure with concentration of people; concentration of tourists) Distribution and type of buildings (as indicator for population affected, for micro-scale studies) Social vulnerability. Just recently used in flood risk assessments and to be determined for each region. An Example from England: Here the social vulnerability is expressed using a Social Flood Vulnerability Index (SFVI) based on three social groups (long-term sick, single parents, elderly) and four indicators for economic conditions (unemployment, overcrowding, non-car ownership, nonhome ownership). Social vulnerability is given in four classes: very high, high, medium, low. 1

Any other vulnerable group that might be of interest for particular states. Assets and economic activity Criteria may help identify the economic activities Land use: - Susceptibility to direct flood damage type of industry, products, storage - Impact of damage on economy production interruption, trade interruption, potential (temporary) unemployment - Agriculture: fresh water or saline flooding, susceptibility of major crops to inundation duration and depth, seasonality, locations of large livestock production (for livestock evacuation plans and assessment of potential ecological damage) - residential areas: metropolitan, urban, rural, recreation - essential services and infrastructure: roads, electricity, telephone, gas, sewer, water supply, hospitals, schools, fire brigade, railway, airport, harbors, cultural heritages, sports facilities - special economic zones: industrial, commercial service - agricultural land, forest, mangroves, protected areas Potentially affected installations causing pollution A non-exhaustive list of installations of interest in this regard are: Chemical industry and respective warehouses Petroleum industry and storage facilities for oil products Thermo-electric power stations: oil, gas, coal, nuclear Fuel/gas stations Agricultural warehouses for fertilizers, herbicides, pesticides, poisonous substances, nutrients Special dump sites for chemical or industrial waste Waste water treatment plants Not to forget are the potential impacts of flooded installations on particular environmental assets, such as: Environmental assets 1.2 Map use Potential damage to habitat and wildlife Uniqueness of the habitat and rarity of wildlife National parks and other protected areas like wetlands, virgin forest, etc. 2

Basic product to determine damage and risks Emergency management Flood expert (planning of flood defense measures) Land-use planning and land management On small scale (large areas): priority setting Insurance industry (insurance policy calculation, potential maximum loss estimations) 1.3 Scale considerations Overview information on village and town level. On large areas only the approximate population per municipality, village, or town can be represented. Scale is of the order of 1:100,000 to 1:500,000. Appropriate for large flood plains. Broad-scale infrastructure like road or rail network, or agriculture and forestry may use small to medium scales (1:100,000 to 1:250,000) Detailed information about individual buildings, social structures or social groups or about individual facilities require maps with a large scale (1:5,000 to 1:25,000; city or village plan). 2 Estimating susceptibility to floods flood loss models Estimating the susceptibility to floods for the elements at risk is a vital aspect in flood risk assessment. However, it is also the most difficult, resp. uncertain task. This is caused by the multitude of elements at risk all differently susceptible, the lack of loss data to base the assessment on, the lack of appropriate loss models, and the region specific character of the both the elements at risk and their susceptibility. While the first and the last aspect are unavoidable, efforts can and should be undertaken to establish a sound database on flood losses and appropriate loss models. 2.1 Loss data collection Loss data can only be collected after a flood event. This is the main reason why they are hardly available: significant flood events are rare and in the aftermath of such an event the disaster management usually consumes all resources. However, a reliable data base on flood damages is the basic prerequisite for assessing susceptibility to floods. Therefore some basic guidelines on the collection of flood loss data are given in the following: Loss data collection can be done either directly by inspection at the damage location or indirectly by telephone or internet questionnaires. In both cases details about the data collection have to be collected in a Meta-database associated to the loss data. The actual loss data should meet the following criteria in order to ensure usability and comparability of the data: Information on the event Information on the damage (sector specific) Information on the object, i.e. element at risk (sector specific) Information on damage reducing measures (sector specific) Information on the event minimum requirements Begin and end of the event 3

Duration of flood impact on object Timing of flood warning, if any Inundation type (according to flood types listed in flood hazard assessment session) Name of the stream/water body causing inundation Specific damage influencing circumstances (dike breaches, backwater effects by bridge congestion or ice accumulation, etc.) Water level at object, affected storeys Contaminations Information on the damage / Information on object minimum requirements Damage information has to be collected according to the elements at risk. Therefore they are listed here in combination, as well as they are collected in combination in practice. Within each class of risk elements usually different sectors have to be distinguished. For example, damage to buildings has to be separated into damage to residential buildings, industrial and commercial buildings, public buildings etc. In the following the minimum criteria for residential buildings as the most frequent buildings are given: Value of the whole building (reconstruction costs, or market value depending on aim of analysis or if differing considerably) Monetary damage of the building OR structural damage degree Value of whole building contents (replacement costs) Monetary damage of contents OR degree of content damage Location of object Building type (deducted from usage, construction, floor area, number of storeys, cellar, building year/period) Standard of content (poor to luxury) Usage of cellar, if any Information on damage reducing measures minimum requirements Measures taken (permanent, temporary, other) If taken, efficiency of the measures Reaction time after waning/flood perception This list encompasses the minimum requirements for a standardized data collection for residential buildings. Meeting these criteria will ensure usefulness and comparability. The list, however, can, and in some cases must, be extended according to the problem at hand. Different criteria have to be met in case of different elements at risk. Only the event criteria remain the same. 2.2 Derivation of loss models On the basis of a flood loss data set collected according to the criteria above loss models describing the susceptibility can be derived. Loss models can be fundamentally distinguished between absolute loss models and relative loss models. Absolute loss models estimate the loss from a given impact directly in monetary or other tangible terms. On the contrast relative damage models estimate the degree of damage. The actual damage value is derived in a second step by combining the relative damage with the value of the object. In general relative loss models are to be preferred, because they are more flexible, easier to adjust to economic/value developments and transferable to regions with comparative types of risk elements, but different values. For developing relative loss models the relative damage has to be recorded, see below. Damage influencing factors 4

The first step in the development of a loss model is the determination of the damage influencing factors. This is typically done by correlation analysis and other multivariate statistical methods of the collected loss data. For this purpose a classification or encoding of the impact factors may be required. E.g. inundation depth can be classified according to damage thresholds, or the standard of building contents has to be coded from poor and luxury to 0 and 5 respectively. An example for this procedure is the loss model FLEMO (Flood Loss Estimation MOdel) developed by the GFZ, the German Research Centre for Geoscience. Here, amongst others, loss data of residential buildings from several flood events mostly in low lying areas in Germany were analyzed. The most damage influencing factor was, as expected, the inundation depth, but also contamination (usually by oil tanks installed in the basement) and precautionary measures proved to have significant impacts on the flood loss. Damage model After the identification of the influencing factors, a damage model can be established. There are several ways to do this. The most common way are damage functions relating the most important impact factor to absolute or relative damages. If several impact factors were identified, as in the example above, multivariate damage functions have to be created. This can be difficult, because many of the impact factors are not continuous but discrete. In this case rule based approaches as FLEMO are more appropriate. Rule based models are easier to establish and more suitable for considering the many possible combinations of impact factors. For example, FLEMO estimates losses in a two-tier approach: first the relative loss is determined by the inundation depth. In a second step, the loss degree is modified according to potential contamination and precautionary measures taken. Figure 1 gives an example of different damage functions relating damage to inundation depths developed in Germany compared to FLEMO. The rule based approach and the classification of inundation depths yields a step-function. The wide range of damage degrees predicted for a single water level illustrates the uncertainties in the damage estimation and thus the risk assessment. Therefore it has to be strongly emphasized to base the risk assessment on a sound damage data base and a calibrated and validated loss model. Figure 1: Different damage function in use in Germany (MURL, ICPR, Hydrotec) and the rule based damage model FLEMO. The two back lines for FLEMO show the upper and lower range for different 5

building types with inundation depth as the only impact factor. The dotted FLEMO+ lines show the upper and lower range considering contamination and precaution additionally. 3 Further recommended readings/resources This reading is based on the Handbook of good practices for flood mapping in Europe developed by the European exchange circle on flood mapping (EXCIMAP). The handbook and the Annexes contain some additional information than presented here and can be accessed at: http://ec.europa.eu/environment/water/flood_risk/flood_atlas/ ISDR (2009) Guidelines for reducing flood losses, UNESCO International Strategy for Disaster Reduction, Geneva. (http://www.unisdr.org/eng/library/literature/8689.pdf) Penning-Rowsell, E., Floyd, P., Ramsbottom, D. and Surendran, S. (2005) Estimating Injury and Loss of Life in Floods: A Deterministic Framework. Natural Hazards, 36(1-2): 43-64 Penning-Rowsell, E., Johnson, C. and Tunstall, S. (2005) The benefits of flood and coastal risk management - a handbook of assessment techniques. ISBN 1-904750-51-6, Flood Hazard Research Centre, Middlesex Univ. Press, London. Thieken, A.H., Seifert, I. and Merz, B. (2009) Hochwasserschäden - Erfassung, Abschätzung und Vermeidung. oekom, München, 301 pp. (Flood damages collection, assessment and prevention, in German) http://www.floodsite.net Results and guidance to various flood risk aspects developed in the EU FP6 funded project FloodSITE 6