MECHANICAL PERMIT Information, Application, Checklist Building & Fire Safety Division Yakima County Public Services

Similar documents
City of Elk River BASEMENT Office Use Only

RESIDENTIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Building Permit Application

Town of Clinton MECHANICAL/SHEET METAL PERMIT 242 Church Street, Clinton MA Tel: (978) Fax: (978)

WHEN IS A PERMIT REQUIRED?

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

Marion County Board of County Commissioners

Building Permit, Fire Inspection and Operating Permit Fee Schedule

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

SECTION 105 PERMITS. Gas:

APPLICATION FOR NEW CONSTRUCTION

Arkansas HVAC/R Law. Act 277, Amended by: Act 112 of 1993; Act 442 of 1995; Act 344, 1997; Act 465 of 1999; Act 1563 of 2001 & Act 1712 of 2003

ORDINANCE NO AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

CITY OF AVENTURA PERMIT APPLICATION W Country Club Drive 4 th Floor Aventura, FL Tel (305) Fax (305)

Botetourt County, Virginia. Frequently Asked Questions

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

BUILDING DIVISION CONSTRUCTION PERMIT FEES

Special Inspection/Re Inspection, all Divisions $ per hour, one hour minimum

Furnace/Air Conditioner Permit by FAX or Mail

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

Single Family Residential Basement Finish

Applications for building permits will not be reviewed until all of the required information has been submitted.

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

ATTENTION HOMEOWNERS

2014 Mechanical, Gas Piping, and Accessory Licensing Application

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

2014 Limited Plan Submittal Checklist

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

BUILDING PERMITS. Santa Rosa County Building Inspection

a. A person whose sole function in the work is to perform labor under the supervision or direction of a building contractor.

Heating Load HERS: Calcs Duct Seal and Test (h), (m)1-3 & 11

dpd Seattle Permits Tip Small Business: Getting Your Use and Building Permit from DPD RESEARCH RESOURCES

City of Miramar Building Division

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

How To Get A Building Permit In Florida

Shed Application Package

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

EXPRESS PERMITS (No Plan Check Required)

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Bureau Veritas Contact Information

An Applicant s Guide to Residential Building Permits

Notice to Property Owners

City of Miramar ELECTRICAL GENERATOR APPLICATION PACKAGE. Who Can Apply

RULES AND REGULATIONS PERTAINING TO THE LICENSING OF HEATING, VENTILATION, AIR CONDITIONING AND REFRIGERATION CONTRACTORS

PRE-OWNED MOBILE / MANUFACTURED HOME PRE-INSPECTION

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

SCC NO AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

CHAPTER MECHANICAL CODE HEATING, AIR CONDITIONING, VENTILATING AND REFRIGERATION DIVISION 2 - APPEALS

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

(See application for a list of work exempted from mechanical licensing) Revised February, 2011

Contractor Information 2011

CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES

HOMEOWNER S PERMIT GUIDE

RESIDENTIAL REWARDS PROGRAM APPLICATION THIS APPLICATION IS FOR EXISTING SITES ONLY.

MECHANICAL ADMINISTRATOR LICENSE APPLICATION

Province of Alberta SAFETY CODES ACT PERMIT REGULATION. Alberta Regulation 204/2007. With amendments up to and including Alberta Regulation 99/2016

CHARLOTTE COUNTY Community Development Department

Year 2015 Contractor License Packet

HERNANDO COUNTY FIRE ALARM GUIDELINES

2013 BUILDING ENERGY EFFICIENCY STANDARDS

CHAPTER 26 HEATING, AIR CONDITIONING AND REFRIGERATION COMMISSION AND CONTRACTORS

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 H 1 HOUSE BILL 255. Short Title: Building Code Reg. Reform. (Public)

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

Who Can Apply (A or B)

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

Commercial Building Permit Application & Submittal Guidelines

Manchester Township 1 Colonial Drive Manchester, New Jersey Filling Out Your Building Permit

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

CITY OF CRESTVIEW. TRADES PERMIT APPLICATION (Mechanical, Electrical, Plumbing, Irrigation, Fire Alarm & Gas Permits)

Ordinance Number 564 Page 2

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

BEFORE YOU BUILD GUIDE

REFRIGERATION AND AIR CONDITIONING MECHANIC TRADE REGULATION

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

Flood Risk Considerations

City of Houston Mechanical Code

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Boulder County Building Code Amendments. Resolution : Amendments to Boulder County Building Code Effective January 1, 2013

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

RESIDENTIAL UTILITY PERMITS APPLICATION PACKET

C I T Y O F P E A R S A L L

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

LICENSE CATEGORIES. (2) A demolition contractor class II may demolish any building not more than three stories in height.

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

CONTRACTOR REGISTRATION

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

Arapahoe County Residential Water Heater Installation and Inspection Guide

Chapter EDITION. Plumbers Insurance required of certain providers of low-flow showerheads or faucet aerators

SECTION THREE CONSTRUCTION CODES

Transcription:

MECHANICAL PERMIT Information, Application, Checklist Building & Fire Safety Division Yakima County Public Services This Brochure provides information about the mechanical permit process for typical residential projects. Permits are required prior to installation of mechanical equipment or appliance whether it is new, replacement, relocated, alteration, or change-out. Other permits may be required depending on the scope of work for your project. Permits pertaining to Manufactured Homes are under the jurisdiction of Washington State Department of Labor and Industries (509) 454-3760. Yakima County has adopted the various *International Codes which are updated every three years. (Please contact our office to verify which code cycle is applicable to your project). International Building Code (IBC 101.3 Intent) The purpose of the codes are to establish the minimum requirements to safeguard the public health, safety and general welfare through structural strength, means of egress, facilities, stability, sanitation, adequate light and ventilation, energy conservation, and safety to life and property from fire and other hazards attributed to the built environment and to provide safety to fire fighters and emergency responders during emergency operations.. To apply for your permit, please provide: 1. General Application for Construction (Building Permit). 2. Floor plan showing room uses, location of mechanical equipment (include plumbing fixtures if applicable). 3. Equipment schedule: How many and what type of equipment will be installed. Fuel source (Electric, *Natural Gas, *LPG Gas). Size of equipment (Specify: horsepower, ton, Btu, cfm) *LPG gas equipment or appliance may require an additional permit for a propane tank. Before issuance of your mechanical permit, a Fire Code Permit is required for the tank. If you have an existing tank, please provide your permit number to confirm that a permit has been issued and a final approved inspection was completed, otherwise, a new permit for the tank is required. Both permits can be issued simultaneously. The equipment and appliances shall be installed according to the manufacturer s installation instructions and shall be made available to the inspector at the time of your inspection. For *gas appliances, a pressure test card must be completed and made available to the inspector. The staff at Yakima County Building and Fire Safety Division are here to assist you. Please contact our office if you have any questions at (509) 574-2300. Project Coordinators can assist you regarding your application submittal. Plans Examiner or Building Inspector can assist you with technical questions. Yakima County Public Services 128 N. 2 nd Street, 4 th Floor Yakima, WA 98901 Phone (509) 574-2300 FAX (509) 574-2301 Mechanical Permit Brochure Revised: 2/23/2015

Answers To Frequently Asked Questions Q: When is a Mechanical Permit Required? A: Permits are required prior to installation of mechanical equipment or appliance whether it is new, replacement, relocated, alteration, or change-out. Other permits may be required depending on the scope of work for your project. Q: What information do I need to apply for a mechanical permit? A: Forms are available in our office or on the Yakima County Public Services Website. http://www.yakimacounty.us/publicservices/forms.htm 1. Complete the General Application for Construction and the Mechanical Equipment Checklist. Typical information required is as follows: a. How many and what type of equipment will be installed. b. Fuel source (Electric, Natural Gas,*LPG Gas). c. Size of equipment (Specify: horsepower, ton, Btu, cfm) 2. Two sets of floor plans showing interior location of equipment to be installed. *LPG gas equipment or appliance may require an additional permit for a propane tank. Before issuance of your mechanical permit, a Fire Code Permit is required for the tank. If you have an existing tank, please provide your permit number to confirm that a permit has been issued and a final approved inspection was completed, otherwise, a new permit for the tank is required. Both permits can be issued simultaneously. Q: Can I turn in an incomplete application? A: No. Incomplete applications will not be accepted. Due to the high volume of applications received by this Department, incomplete applications cannot be accepted. Q: *Where can I get a Mechanical Permit? A: Customers may obtain a mechanical permit at the Yakima County Public Services Department, Building and Fire Safety Division. Yakima County Courthouse 128 N 2 nd Street, 4 th floor, Yakima WA 98901 * Permits pertaining to Manufactured Homes or Mobile Homes are under the jurisdiction of the Washington State Department of Labor and Industries (local office) (509) 454-3760. 15 West Yakima Avenue, Yakima WA Yakima County Public Services 128 N. 2 nd Street, 4 th Floor Yakima, WA 98901 Phone (509) 574-2300 FAX (509) 574-2301 Mechanical Permit Brochure Revised: 2/20/2015

Mechanical Permit Intake Checklist Instruction Sheet (~Required information) ~Complete the GENERAL APPLICATION FOR CONSTRUCTION ~Tax Parcel number: A tax parcel number is required for all permits that are applied for at Yakima County Building & Fire Safety Division. The tax parcel number consists of the Range, Township and Section number along with the 5 digits pertaining to your individual parcel. (example: 23 12 05-12345; Total 11 digits) Your parcel number can be found several ways. It is on your deed, tax statement or receipt, and also can be found on the Yakima County Website and yakimap.com/ ~Job site address: If an address has not been assigned, describe the location of structure. ~Project Description Describe the proposed work for your project. ~Property Owner information This can be completed by the owner or agent of the owner. (Only 1 signature is required; typically by the person applying which can be Owner, Agent, Contractor, etc.). ~Name, address and phone number ~As applicable include Applicant, Contractor (and license information), Agent, etc. ~Check 1 box of the main contact person ~Floor plan Floor plan of the structure - Provide (and label) fixture and equipment locations. For Remodel, Change out, Alterations, show existing floor plan and proposed floor plan as applicable to your project. ~ Mechanical Equipment Checklist Complete the owner and address information. Specify how many of each type of equipment and the size (include BTU, Ton, CFM, or Horsepower). If the equipment is not listed, please write in the equipment as indicated at the bottom of the checklist.

Application for Construction (Building Permit Application) Building & Fire Safety Division Yakima County Public Services Form # BFS0002 A Revised: 8/21/15 Tax Parcel Number: (11 digits) Office Use Only: DATE: (Reference WWW.YAKIMAP.COM for assistance) Range - Township - Section - xxxxx Project: PRJ Case # BLD Example: 18 13 23-1 2 3 4 5 ~ ~ Land Use/Zoning: b UGA Subdivision or Short Plat: b CAO / Shoreline Lot # Overlay:b Airport, b Greenway, b Floodplain PC: Job site address : City : Provide a detailed description of the Project / Scope of Work: Construction Valuation (Contractor Estimate) $ Fill in ALL sections with people that are associated with this project and Check Only One Box Below To Designate The Main Contact Person; The property owner(s) or agent, by signing this form, hereby certify to the best of their knowledge and under penalty of perjury that they are the legal owners of the property, have reviewed the proposal as presented in the application, validate that it depicts an accurate and true description of the project proposed and wish to pursue the described project. Any change to the intent of the proposal project description must be submitted and reviewed prior to project issuance. Property Owner: CHECK IF YOU ARE ACTING AS YOUR OWN CONTRACTOR (Signature required at declaration at bottom of second page) Mailing Address: City, State, ZIP: Owners Signature: Contractor Name: Company Name: Mailing Address: City, State, ZIP: Contractor License #: Signature: Expiration Yakima County Public Services 128 N. 2 nd Street, 4 th Floor Yakima, WA 98901 Phone (509) 574-2300 FAX (509) 574-2301 Application for Construction Page 1 of 2 Form # BFS0002 A Printed: 8/21/15

Application for Construction Continued Architect / Engineer / Surveyor: Company Name (if any): Address, City, State, ZIP: Professional License No.: Signature: Applicant / Agent / Consultant: Company Name (if any): Address, City, State, ZIP: Signature: Expiration This Section To Be Completed For Construction Permits Only Pursuant to RCW 19.27.095 (2)(i-ii) The requirements for a fully completed construction application shall include: i. The name, address, and phone number of the office of the lender administering the interim construction financing, if any: OR ii. The name and address of the firm that has issued a payment bond, if any, on behalf of the prime contractor for the protection of the owner, if the bond is for an amount not less than 50% of the total amount of the construction project. If for any reason the information requested below is not available at the time of application, the applicant shall provide the information as soon as it can be reasonably be obtained. Lending Agency Name: Phone: Mailing Address: City: State: ZIP: I acknowledge by checking this box that this project has no lending agency for construction financing. Bonding Agency Name: Phone: Mailing Address: City: State: ZIP I acknowledge by checking this box that this project has no bonding agency. If you are the Owner and Acting As Your Own Contractor, please complete the following declaration: I acknowledge that I am applying for a construction permit thru the Yakima County Public Services Department. I also acknowledge that I am not a licensed contractor, specialty or general, or that I am not acting as a contractor and wish to be exempt from the requirements of the Washington State Contractor s Act, per RCW 18.27.090, and will abide by all provisions and conditions of the exemption as stated. I agree that if I use the assistance of any person(s) to provide labor and/or assistance, I will retain only contractors registered and currently licensed as required under the laws of the State of Washington. I (print name) certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Owner Signature Yakima County Public Services 128 N. 2 nd Street, 4 th Floor Yakima, WA 98901 Phone (509) 574-2300 FAX (509) 574-2301 Application for Construction Page 2 of 2 Form # BFS0002 A Printed: 8/21/15

MECHANICAL EQUIPMENT CHECKLIST Owner Name: Job site address: Occupancy of structure: Commercial Industrial EQUIPMENT: New Alteration Changeout Residence Garage (Residential Use) Residential Accessory Structure FUEL SOURCE: Electric Natural Gas MEC Agricultural / Farm Building Other: (describe below) LP Gas (check LP tank requirement below) New LP tank Existing LP tank *Size of Equipment (as applicable) please include BTU, Ton, CFM, Horsepower, etc. # of Type of Equipment Equip. AIR HANDLERS Air-handling unit (including ducts attached thereto) ALTERATION, ADDITION, REPAIRS For the repair of, alteration of, or addition to each of the following (including installation of controls regulated by this code.) Heating appliance Refrigeration unit Cooling unit Absorption unit *Size Type of Equipment # of Equip. MISCELLANEOUS Appliance or piece of equipment but not classed in other appliance categories Gas piping (Fuel) Hazardous process piping system (HPP) of one to four outlets Nonhazardous process piping system(npp) Wood stove / Pellet Stove (Freestanding or Insert) *Size BOILERS, COMPRESSORS AND ABSORPTION SYSTEMS Boiler Compressor Absorption system EVAPORATIVE COOLERS Evaporative cooler other than portable type (per unit) FURNACES Forced-air or gravity-type furnace or burner Floor furnace, (including vent) Suspended heater Recessed wall heater Floor-mounted unit heater VENTILATION AND EXHAUST Ventilation fan connected to a single duct Ventilation system which is not a portion of any heating or airconditioning system authorized by a permit For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood Kitchen range hood or downdraft FILL IN EQUIPMENT NOT LISTED ABOVE INCINERATORS Domestic Commercial or Industrial