6.2 Global and Regional Performance Based Air Navigation Implementation Plans

Similar documents
Regional References on solution/ mitigation of FPL problems. (Presented by Secretariat) EXECUTIVE SUMMARY

International Civil Aviation Organization

TRANSITION TO THE NEW ORGANISATION OF GREPECAS. (Presented by the Secretariat)

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

Performance management Identification of metrics

Block 0: Capabilities within our Grasp

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

INTERNATIONAL CIVIL AVIATION ORGANIZATION. Meeting/workshop of Air Traffic Management (ATM) Authorities and Planners (Lima, Peru, 18 to 21 July 2000)

Key Points from CMAC/FUA Related Seminar/Workshop

(Presented by the MEVA/TMG Coordinator)

Traffic Flow Management. December 2010

DRAFT TERMS OF REFERENCE. (Presented by the Secretariat) SUMMARY

FAA International Strategies 2010 to 2014 Western Hemisphere Region

Doc 9965 AN/483. Manual on Flight and Flow Information for a Collaborative Environment

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

DRAFT WHITE PAPER ON CIVIL AVIATION CRAFTING NEW POLICY FOR SA AVIATION

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, November 2011

Cooperation Agreements for SAR Service and COSPAS-SARSAT STATUS OF SAR AGREEMENTS IN THE NAM/CAR/SAM REGIONS. (Presented by the Secretariat) Summary

International Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3)

International Civil Aviation Organization ASSEMBLY 38TH SESSION EXECUTIVE COMMITTEE

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GREPECAS AIR NAVIGATION DEFICIENCIES DATABASE (GANDD) USER GUIDE CAR/SAM REGIONS

GUIDE TO SUPPORT THE IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM AERONAUTICAL METEOROLOGY SERVICES (MET/QMS) IN THE CAR/SAM REGIONS.

Air Traffic Management Services Plan

CNS/ATM SYSTEMS IN INDIA

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

Safety Management 1st edition

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Area Navigation (RNAV) and Required Navigation Performance (RNP)

How To Participate In An International Workshop On Air Traffic Control

Global Air Traffic Management Operational Concept

Federal Aviation Administration. Air Traffic. Flow Management. Presented to: MIT By: Date: FAA Command Center October 5, 2006

PBN Aeronautical Charts and Procedure Design

02/04/2013 REGION. Agenda. Item 3: SUMMARY. This. follow-up actions. taken. INTRODUCTION DISCUSSION 2.1. A follow-up action plan on 2.

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

How To Improve The Performance Of Anatm

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

Benefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel

Regulation of Air Traffic Service SMS and. Air Traffic Service Units/Facilities SMS

ICAO State Safety Programme (SSP) Introduction

18/01/2012. This working MIDAD. The. Action by the - AIS/MAP. TF/6 Report Report. 1.1 The. Recovery, paper is based SUMMARY REFERENCES

Future Air Navigation Systems Interoperability Team-Asia (FIT-ASIA)

Doc 9750 DRAFT Triennium Edition

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

USE OF GROUND BASED WEATHER RADAR DATA IN AIR TRAFFIC MANAGEMENT PROCEDURES


Pricing Framework July 2012

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

TABLE OF CONTENTS. (2007 and planned).. 9

CAPACITY AND EFFICIENCY Global Air Navigation Plan

Central Route Charges Office

ICAO HEALTH-RELATED DOCUMENTS Index

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013

ESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM

Assessment of changes to functional systems in ATM/ANS and the oversight thereof

EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone

Air Traffic Service Providers Entry Control Procedures Manual 2. Approval Procedures for ATS Providers

FOLLOW-UP OF SADISOPSG/14 CONCLUSIONS. Status on 26 March = completed. Ҳ = action pending

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

Caribbean/South American Air Traffic Flow Management Concept of Operation

BSBMKG609 Develop a marketing plan

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

Action Plan of the Bolivarian Republic of Venezuela for the activities to reduce CO2 emissions

ICAO Training Policy &

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

First Edition 2009 International Civil Aviation Organization

Module B0-DATM: Service Improvement through Digital Aeronautical Information Management

Air Navigation Charges Services EUROCONTROL can provide

AIM TRAINING DEVELOPMENT MANUAL

SUMMARY AUDIT REPORT DIRECTORATE OF CIVIL AVIATION OF MOROCCO

How To Design An Airspace Structure

Ref.: AN 13/2.5-09/45 19 June 2009

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/1.1-12/19 10 April 2012

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

GUIDANCE ON ORGANISATIONAL STRUCTURES

Kenyan Case Ephantus M.Kamau

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft COMMISSION DECISION

Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region

EUROCONTROL Training Activities 2013

A Strategic Vision of Air Traffic Management in New Zealand to 2025

Follow-up to the activities of Project D2 - Ground-ground and air-ground applications in the SAM Region. (Presented by the Coordinator) SUMMARY

CS5 EAIMS Call For Interest Technical annexe

MODEL REGULATION SAFETY MANAGEMENT SYSTEM REGULATION. International Civil Aviation Organisation

AUDIT SUMMARY REPORT OF THE DEPARTMENT OF CIVIL AVIATION MAURITIUS

SESAR Studies & Demonstration Projects on RPAS & Cyber-Security

Safety Management Systems (SMS) guidance for organisations

Quality Management System: 1, 2, 3

International civil aviation organization. COM CO-ORDINATION MEETING (Afghanistan, Islamic Republic of Iran and Pakistan)

EUROCONTROL AT THE WORLD ATM CONGRESS

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

THE UNIVERSAL SECURITY AUDIT PROGRAMME (USAP)

Safety Oversight Audit Section

Transcription:

International Civil Aviation Organization 03/08/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand Cayman, Cayman Islands, 18 to 21 August 2009 Agenda Item 6: Air Navigation Matters 6.2 Global and Regional Performance Based Air Navigation Implementation Plans PERFORMANCE BASED AIR NAVIGATION IMPLEMENTATION IN THE CAR REGION REPOSITIONING OF THE PROPOSED ICAO TECHNICAL COOPERATION PROJECT (RLA/09/801 PREVIOUSLY RLA/08/000) (Presented by the Secretariat) SUMMARY Further to consideration of a proposed regional ICAO Technical Cooperation project by the NACC/DCA/3 meeting in September 2008, this project is being repositioned in view of recent developments and adoption of performance based air navigation planning by GREPECAS/15 in October 2008. Consequently, this working paper revisits the project document and suggests a performance based approach in enhancing the air navigation infrastructure in the CAR region. The performance approach captures strategic operational improvements needed and facilitates States and Territories to build on to what is already existing and choose only what is required to be enhanced. Action by the meeting is in paragraph 5. References GREPECAS/15 Meeting Report NACC/DCA/3 Meeting Report and WP/19 (Project Document) Global Air Traffic Management Operational Concept (Doc 9854) Manual on Global Performance of the Air Navigation System (Doc 9883) Global Air Navigation Plan (Doc 9750) NAM/CAR Regional Performance Based Air Navigation Implementation Plan (WP/14) Strategic Objectives THIS WORKING PAPER IS RELATED TO STRATEGIC OBJECTIVES A: Safety Enhance global civil aviation safety C: Environmental Protection Minimize the adverse effect of global civil aviation on the environment D: Efficiency Enhance the efficiency of aviation operations E: Continuity Maintain the continuity of aviation operations

2 1. Background 1.1 Review by NACC/DCA/3 meeting: The Third meeting of North American, Central American and Caribbean Directors of Civil Aviation (NACC/DAC/3) held in September 2008 in Punta Cana, Dominican Republic reviewed a proposal for a Regional ICAO Technical Cooperation (TC) project aimed at establishing a mechanism for the States/Territories for the implementation of harmonized air navigation systems leading to a seamless Global ATM system. Subsequently, the meeting agreed that a CAR regional project be developed and determine the requirements and priorities for each of CAR region State/Territories, and the Meeting adopted the following conclusion: CONCLUSION NACC/DCA/3/1 TECHNICAL CO-OPERATION PROJECT FOR THE CAR REGION (RLA/08/000) That, based on the need to establish an effective instrument to achieve efficient, cost effective and harmonized implementation of new systems for international civil aviation, the Meeting approved: a) a CAR Regional Project be developed through the ICAO Technical Co-operation Programme; b) the establishment of a CAR Regional Project Steering Committee to develop the first phase of the project, which will determine the requirements and priorities for each CAR Region State/Territory/International Organization; and c) a meeting of the CAR Regional Project Steering Committee* to be held at the ICAO NACC Office in Mexico City in January 2009. * Dominican Republic, United States, COCESNA, RASOS/CASSOS have committed representatives to the Steering Committee. 2. Performance framework for air navigation systems 2.1 ATM Community approach: As the aviation industry evolved into a less regulated and more corporatized environment with greater accountabilities, the advantages of transitioning from systems based to performance-based planning were apparent. To facilitate the realization of a performance based air navigation planning and implementation, ICAO has made significant progress in the development of relevant guidance material. The documents include: a) Global Air Traffic Management Operational Concept (Doc 9854); b) Air Traffic Management System Requirements (Doc 9882); c) Manual on Global Performance of the Air Navigation System (Doc 9883); and d) Global Air Navigation Plan (Doc 9750).

3 C/CAR/DCA/10 WP/22 2.2 Outcome of GREPECAS 15: The GREPECAS 15 meeting held in Rio de Janeiro, Brazil from 13 to 17 October 2008, while adopting a regional performance framework (Conclusion 15/1 refers), invited States to implement a national performance framework on the basis of ICAO guidance material and aligned with the regional performance objectives, the regional air navigation plan and the Global ATM Operational Concept. As a follow-up to the GREPECAS 15/1 conclusion, the Secretary General, in January 2009, established under Special Implementation Project mechanism two workshops for the CAR region. The first workshop on performance planning was conducted in Mexico City from 6 to 10 July 2009. The second workshop dealing with business case methodology is scheduled for 28 September to 2 October 2009 in Antigua and Barbuda. 3. Repositioning of the proposed TC project for the CAR region 3.1 Approach: As a result of recent developments and adoption of performance based planning by GREPECAS, ICAO is repositioning the TC project proposal which is based on four basic principles: focus on operational improvements; build on existing infrastructure; take advantage of existing airframes capabilities; and enhance only what is needed using a menu of projects. The project proposes 5 strategic operational improvements (SOIs) consisting of a) enhance airspace capacity and efficiency of enroute airspace; b) enhance airspace capacity and efficiency of terminal airspace; c) enhance aerodrome operations; d) improve flexibility of operations in enroute and TMA airspace; and e) enhance aviation safety. 3.2 Implementation: The States (or group of States on the basis of Homogenous ATM areas), depending on current and future scenarios will decide which of the five SOIs are applicable to its situation. An example of the Performance Framework Form (PFF) for a SOI enhance airspace capacity and efficiency of enroute airspace is illustrated in Appendix A hereto. The formulation of the airspace concept and determining requirements (an initial step in implementation), calls for multidisciplinary team and includes factors such as airspace organization and management, assessing existing fleet capability and available CNS infrastructure, listing airworthiness and operational approvals, etc. 3.3 Project timelines: The estimated timeframe for the ICAO and States planning and implementation process is reflected in Appendix B hereto. It is expected that States will receive the detailed project proposal for air navigation systems by 28 February 2010 with a planned completion of the entire project by June 2013. 3.4 It is proposed that the project resources be composed of a Project Coordinator with an upto-date performance based air navigation (CNS/ATM) background in the region, supported by the ICAO NACC Regional Officers, short term experts and experts on loan from the States, the latter being the same persons that contribute to the sub-regional air navigation working groups and GREPECAS sub-groups and task forces. The use of the project budget can then be maximised by utilising it for mission expenses rather than salaries, except in the case of the project coordinator and the short-term experts.

4 4. Conclusion 4.1 Evolutionary approach: Existing and emerging systems/technologies are providing options to support both tactical and strategic management of air traffic services. However, technology by itself will not be able to provide the ideal solution for both airspace and airframe efficiencies. Service delivery management, as defined in ATM Operational Concept document, will be the future integrated approach. While safety case addresses any operational changes, investment decision in air navigation infrastructure has to be justified by business case analysis. The future Global ATM system calls for a shift from tactical control to strategic management and would facilitate all members of ATM community, more so the airspace users, to participate in decision making process for a safe and efficient air transport operations. 4.2 Recommendation: Recognizing the need to have a clearly defined strategy to implement performance based air navigation systems in the CAR region, the meeting is invited to adopt the following conclusion: DRAFT CONCLUSION C/CAR/DCA/10/XX PERFORMANCE BASED ICAO TECHNICAL COOPERATION PROJECT (RLA/09/801) FOR THE CAR REGION a) States/Territories of the C/CAR region support repositioning of the ICAO TC Project for the CAR region on the basis of the performance based approach; b) ICAO send its repositioned TC project document along with proposed timelines to States/Territories of the CAR region by 30 October 2009, for review and comment; c) ICAO finalize the detailed performance based air navigation project document and disseminate to all CAR States by 28 February 2010 for their participation; and d) States/Territories of the C/CAR region are urged to participate in this performance based regional ICAO TC project leading to a seamless and cost effective global ATM system. 5. Action by the Meeting 5.1 The meeting is invited to review the content of this paper and consider adopting the draft conclusion at paragraph 4.2 above.

Appendix A PERFORMANCE FRAMEWORK FORM (For illustration purpose only) STRATEGIC OPERATIONAL IMPROVEMENT/ NATIONAL PERFORMANCE OBJECTIVE Environment Efficiency ENHANCE ENROUTE AIRSPACE CAPACITY AND EFFICIENCY Benefits reductions in fuel consumption; ability of aircraft to conduct flight more closely to preferred trajectories; increase in airspace capacity; facilitate utilization of advanced technologies (e.g., FMS based arrivals) and ATC decision support tools (e.g., metering and sequencing), thereby increasing efficiency. Metrics ATM Operational Concept Components Airspace organization and management (AOM) Linkage to GPIs Measurement number of PBN routes implemented; Percent difference between optimal and actual route Number of aircraft entering a specified volume of airspace/hr Pounds of fuel burn per operations PROJECTS/TASKS formulate airspace concept and determine requirements Strategy Medium term (2010-2013) TIMEFRAME START-END May 2010 - October 2010 RESPONSIBILITY CAA/Country X STATUS (as of.) Database under preparation analyze the en-route ATS route structure and implement all identifiable improvements; reduce horizontal separation between aircraft implement PBN migration to WGS- 84/eAIP/AIXM transition to new flight plan improve data and voice communications and enhance situational awareness enhance meteorological forecast systems GPI/5: performance-based navigation; GPI/7: dynamic and flexible ATS route management; GPI/8: collaborative airspace design and management; GPI/9: situational awareness; GPI/12: FMS-based arrival procedures; GPI/17 Data link applications; GPI/18 Aeronautical information; GPI/19 Meteorological systems; GPI/20 WGS-84; GPI/21 Navigation systems; and GPI/22 Communication infrastructure.

C/CAR/DCA/10-WP/22 APPENDIX B ICAO Technical Cooperation Project (RLA/09/801) for the CAR Region Performance-based air navigation systems implementation ICAO PLANNING PHASE PHASE I Timescale PROJECT/TASK MILESTONE 1. Initial presentation of the TC project August 2008 Completed 2. NACC/DCA/3 endorsement of the NAM/CAR Regional September 2008 Completed Implementation Plan and Technical Cooperation Project for the CAR Region 3. Adoption of performance framework by GREPECAS/15 October 2008 Completed 4. Project Document Revision March 2009 Completed 5. Project Objectives Review May 2009 Completed 6. Conduct of performance framework workshop July 2009 Completed 7. Repositioning of TC project August October 2009 Ongoing 8. Conduct of Business case workshop 28 September - 2 October 2009 9. Send repositioned draft TC project document along with 30 October 2009 proposed timelines, work plan, schedule, budget and mechanism for financial contributions to all CAR States for review and comment 10. CAR Regional Project Steering Committee Meeting January 2010 11. Develop and send final performance based TC project 28 February 2010 document to States for their participation 12. States confirm participation in the project 31 March 2010 13. Deposit of initial funds by States 30 April 2010 14. Project Commencement 1 May 2010 15. Establishment of an on-line host infrastructure in the 30 June 2010 ICAO NACC Regional office to facilitate project monitoring along with supporting electronic air navigation planning tools.

C/CAR/DCA/10-WP/22 -B 2- ICAO Technical Cooperation Project (RLA/09/801) for the CAR Region Performance-based air navigation systems implementation STATES PLANNING AND IMPLEMENTATION PHASE PHASE II Timescale PROJECT/TASK MILESTONE 1. Develop operational scenario: - current traffic density - traffic forecast 2020 - deficiencies and metrics - gap analysis 2. Analysis of airspace concept and determining requirements: It calls for multidisciplinary team and includes factors such as airspace organization and management, assessing existing fleet capability and available CNS infrastructure, listing airworthiness and operational approvals etc. 3. a) Identification of enablers in the field of ATM/CNS/AIM/MET/AGA through technical audit and economic analysis using GANP (for SOIs 1 to 4) b) Identification systems and procedures through GASP analysis (for SOI 5) 4. Agreement by States for an implementation plan Determine the appropriate Strategic Operational Improvement/national performance objective July 2010 Formulation of airspace concept and finalizing the requirements October 2010 Determination of projects that meets SOIs 1 to 5 February 2011 February 2011 April 2011 5. Deposit of funds by States May 2011 6. Procurement /installation/ Commissioning of May 2013 air navigation systems/procedures 7. Completion report of the CAR project June 2013 (tentative to be determined on the basis of the final project still to be defined) END