GASCOYNE RESOURCES LIMITED

Similar documents
HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

For personal use only

For personal use only

ALCYONE REPORTS JORC SILVER RESOURCES

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

Positioned for Production: Exploring for Growth

For personal use only

CORPORATE DIRECTORY. Directors. Australian Business Number

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

INVESTOR PRESENTATION JULY 2013

Resources Rising Stars

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

Savannah North Scoping Study Looking into the future 3 February 2016

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Update on Heap Leach potential of the Murchison gold project

Pathway to Production

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

For personal use only

DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES

FOCUS MINERALS LIMITED

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

Cannon Big Pit Given the Green Light

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014

Cummins Range Rare Earths Project

How To Mine And Treat Ore From Castle Hill Stage 1

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target

For personal use only

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

For personal use only. MRV Metals Launch February 2016

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Quarterly Activities Report - for the period ended 31 December 2015

Fraser Range Acquisition

Punching Above Its Weight

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

Exploration and Development Activity

RED 5 Limited The next gold producer

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

For personal use only

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Australia s next mid-tier gold producer

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

C R A D L E / T R E M O N T J V A C Q U I R E S % O F P A N D A H I L L L I C E N C E S

REVISED INVESTOR PRESENTATION

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

COMPANY PRESENTATION. Cape Town 2016

Press Release 30 th October 2015

Interim Financial Report for the half-year ended 31 December 2011

Shaw River Manganese Ltd January 2012 Update. Vincent Algar - Managing Director

HORSE WELL GOLD PROJECT W.A

HALF-YEAR REPORT TO 30 JUNE 2003

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

For personal use only

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012

Detour Gold Provides New Life of Mine Plan for Detour Lake

Endeavour Management Presentation

Corporate Presentation October 2015

For personal use only

Presentation to Analysts and Investors, Leonora Operations

Focusing on Near Term Production and Exploration in Quebec

ANNUAL GENERAL MEETING November 2015

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

INVESTOR PRESENTATION

Ironbark Zinc Limited

MAXIMUS RESOURCES LIMITED QUARTERLY REPORT

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

Press Release 29 th January 2016

JUNE 2015 QUARTERLY REPORT

For personal use only

For personal use only

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION

EXPLORING WORLD CLASS MINERAL FRONTIERS

Sorby Hills Silver Lead Project

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Leading Mining Resurgence in France July 2016

New technology and new approach uncovers new opportunities in WA s Fraser Range

For personal use only

Quarterly Activities Report

Merlin Diamonds Limited

For personal use only

Mt Carrington Gold Silver Project Positive Scoping Study

Annual Financial Report

For personal use only

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

September 2015 Quarterly Activities Report

BAUXITE RESOURCES LIMITED

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

Chalice advances gold exploration initiatives in Australia and Canada

Transcription:

GASCOYNE RESOURCES LIMITED A Western Australian Focused Gold Company JUNE 2013

Overview and 2013 Activities Update Three Gold Projects in Western Australia with Resource Base of 1.4 Moz 100% of the 1.0 million ounce Glenburgh Gold Project 100% of the High Grade Egerton project (under option) 80% of the 380,000 ounce Dalgaranga Gold project Glenburgh Gascoyne Region 25% increase in Resource Grade (21.1Mt @ 1.5g/t for 1.0 million Ounces) High Grade Zones identified including 520,000t @ 6.3 g/t gold for ~107,000 oz at Zone 126 Near Deposit extensions including 17m @ 4.2 g/t gold from Shelby Glenburgh Feasibility Study Well Advanced Egerton Gascoyne Region (secured under option ) Shallow High Grade deposit 116Kt @ 6.4 g/t gold for 24,000 oz within 50m of surface Granted Mining Leases Potential to truck ore to Glenburgh Project Dalgaranga Murchison Region Purchase Completed in April First RC drill program completed results include 36m @ 7.7 g/t gold (inc 8m @ 29.1g/t) from 36m downhole at Golden Wings Prospect. 2

SNAPSHOT OF GASCOYNE RESOURCES (GCY) GCY Ordinary Shares 158 Million BOARD OF DIRECTORS Unlisted Options 2.8 Million (40c) Mike Joyce Non Exec Chairman Mike Dunbar Managing Director Current Share Price (30/05/13) A$0.185 Directors: Market Capitalisation A$29M Graham Riley John den Dryver Cash (March 2013) A$3.4 M Gordon Dunbar Stan Macdonald JORC Gold Resources 1,400,000oz (Measured, Indicated and Inferred) EV / Resource Ounce <A$ 18 MANAGEMENT / TECHNICAL TEAM Julian Goldsworthy GM Business Development Eva O Malley Di Tily Laurie Company Sec / CFO Exploration Manager Share Price last 12 months (high 35c, low 16c) Major Shareholders Board and Management 30 % HSBC Custody Nominees 9.7 % JP Morgan 5.3 % National Nominees 3.9 % Atlas Iron 3.2 % Yandal Investments 1.6 % TOP 30 >70 % 3

Gascoyne Resources Limited Project Locations Paulsens Gold Field Glenburgh Gold Project 1.04 milllion oz resource Carnarvon Egerton Gold Project Peak Hill Gold Field Plutonic Gold Field Dalgaranga Gold Project +380,000 oz resource Mount Magnet Gold Field PERTH Yilgarn Craton Nova Ni Discovery (SIR) Tropicana Tectonic Zone +8.0 Moz resource Western Australian Geological Map 4

The Gascoyne A Forgotten Goldfield +7.0 Moz of Recent Production and Resources of +5.3 Moz

EGERTON PROJECT

EGERTON PROJECT

Gascoyne Projects 8

GLENBURGH Site Layout B North Eastern Resource Area 300,000oz of Gold Central Resource Area 620,000oz of Gold A South West Resource Area 80,000oz of Gold Glenburgh Homestead 9

A GLENBURGH Long Section 17km of strike length remains open along strike Very little drilling >150m New high grade shoots discovered (zone 126) with others to be tested ~17km The Deposits Outcrop little or no pre strip South West Target zone discovered Potential for deposits to join up Large gaps of no drilling along the gold trend B South West Resource Area Central Resource Area NE Resource Area SW Resource Torino Deposit 3.5 km 2.5 km 5.0 km Extension Discovered 2.0 km Apollo Cross Section Zone 126 Cross Section Tuxedo Mustang Icon Deposit 330,000 oz Apollo Deposit 150,000 oz Shelby Hurricane Zone 102 Deposit 105,000 oz Zone 126 Deposit 165,000 oz NE3 10

GLENBURGH Resource Achievements 25% increase in the Global Resource Grade Higher grade core of 12.3Mt @ 2.0 g/t gold for 791,000oz (1.0g/t cutoff) High Grade Zones defined including: 523,000t @ 6.3 g/t gold for 107,000 oz (within the Zone 126 Deposit) 139,000t @ 7.9 g/t gold for 35,000 oz (within the Apollo Deposit) Table 1: Glenburgh Deposits April 2013 Mineral Resource Estimate (0.5g/t Au Cut-off) Indicated Inferred Total Type Tonnes Au Au Tonnes Au Au Tonnes Au Au Mt g/t Ounces Mt g/t Ounces Mt g/t Ounces Transitional 0.5 1.4 22,000 1.4 1.2 53,000 1.9 1.2 80,000 Fresh 6.4 1.8 360,000 12.8 1.4 561,000 19.2 1.5 920,000 Total 6.9 1.7 382,000 14.2 1.3 613,500 21.1 1.5 1,000,000

Apollo Cross Section Outcrop of the Apollo Deposit 8.3g/t at Surface 12

Zone 126 Cross Section 13

Cross Section 130m 14

GLENBURGH Feasibility Study Well Advanced 75,000 metres of drilling completed since listing Mining and Miscellaneous Leases Pegged Excellent metallurgical recoveries +95% (up to 78% gravity gold) Test work program indicates simple flow sheet Aquifer for process water discovered and tested ~ 10km from proposed process facility Potable water bore drilled and tested at the proposed accommodation village Geotechnical drill holes indicate competent rock extends near to surface, supporting relatively steep pit wall angles, reducing strip ratios (~ 7:1) Environmental baseline studies completed no issues identified

GLENBURGH Feasibility Aims 1.2 1.5 Mtpa CIL Processing Plant with simple flow sheet Open Pit Operation (potential for underground) Free Milling with plant recoveries + 93 % Initial Project Life +5 years Initial Annual production Target ~70,000oz New Plant Capital Cost ~ $67 million (total ~ $85M) Second Hand Plant Cost ~$45 million (total ~ 60M) Potential for Rapid Development Possible as EIS not required for project Permitting being done ahead of critical path simple free milling metallurgy and flow sheet Mining lease application lodged with WA Mines Department Native title negotiations progressing

DALGARANGA GOLD PROJECT Recently purchased 80% of the Project Potential to increase holding to 100% Measured and Indicated Resources total over 380,000 ounces Excellent potential for a standalone operation, toll Treatment Tenement package of ~ 850km 2 with little or no exploration in the last 12 years Significant exploration upside at Golden Wings including: 36m @ 7.7 g/t gold, 22m @ 6.0 g/t gold, 6m @ 10.2 g/t gold

DALGARANGA GOLD PROJECT Well Drilled? All Historical Drilling Drilling >100m Gilbey s North 7m @ 10.8g/t Au Golden Wings 22m @ 6g/t Au Inc 6m @ 19g/t

DALGARANGA GOLD PROJECT Initial 2013 Drilling 200m

GOLDEN WINGS PROSPECT : Shear Zone Long Section 9 m @ 4.8 g/t gold 10 m @ 8.2 g/t gold EOH 1m@33.5g/t 36m @ 7.7 g/t gold inc 8m @ 29.1 g/t gold Base of Oxidation 22m @ 6.0 g/t gold 6m @ 10.2 g/t gold Gram X Metres > 100 50-100 50m 20-50 10-20

DALGARANGA PROJECT Gilbeys Cross Section

GASCOYNE SUMMARY Advanced Gold Projects in Western Australia with 1.4 Moz of gold Glenburgh Egerton Dalgaranga High Grade Zones identified in the 1.0Moz Glenburgh resource High Grade extensions to the Shelby Deposit including 17m @ 4.2g/t gold from 42m Glenburgh Feasibility Study nearing completion High Grade JORC resource 24,000oz @ 6.4 g/t gold (Measured, Indicated and Inferred) Under explored Egerton Inlier similar to the Peak Hill goldfield Potential to truck ore to Glenburgh Initial RC drilling at Dalgaranga identifies a shallow high grade shoot at Golden Wings Potential for low capital development Follow Up Drilling has commenced 22

Appendix: GLENBURGH Resource Table 1: Glenburgh Deposits April 2013 Mineral Resource Estimate (0.5g/t Au Cut-off) Indicated Inferred Total Type Tonnes Au Au Tonnes Au Au Tonnes Au Au Mt g/t Ounces Mt g/t Ounces Mt g/t Ounces Transitional 0.5 1.4 22,000 1.4 1.2 53,000 1.9 1.2 80,000 Fresh 6.4 1.8 360,000 12.8 1.4 561,000 19.2 1.5 920,000 Total 6.9 1.7 382,000 14.2 1.3 613,500 21.1 1.5 1,000,000 Table 2: Glenburgh Deposits - Deposit Summary Indicated Inferred Total Deposit Tonnes Au Au Tonnes Au Au Tonnes Au Au Mt g/t Ounces Mt g/t Ounces Mt g/t Ounces Icon 3.5 1.4 160,400 4.1 1.3 168,000 7.6 1.3 328,400 Apollo 1.2 2.1 81,100 1.6 1.3 69,100 2.8 1.6 150,200 Tuxedo 0.6 1.1 21,800 1.2 1.1 41,300 1.8 1.1 63,100 Mustang 1.0 1.2 40,300 1.0 1.2 40,300 Shelby 0.9 1.2 34,600 0.9 1.2 34,600 Hurricane 0.5 1.3 18,500 0.5 1.3 18,500 Zone 102 0.9 1.9 56,500 1.2 1.3 49,100 2.1 1.6 105,600 Zone 126 0.6 3.2 62,200 1.4 2.2 102,700 2.1 2.5 164,900 NE3 0.2 1.5 11,300 0.2 1.5 11,300 Torino 1.6 1.3 65,700 1.6 1.3 65,700 SW Area 0.4 1.1 12,800 0.4 1.1 12,800 Total 6.9 1.7 382,000 14.2 1.3 613,500 21.1 1.5 1,000,000

DALGARANGA PROJECT Resources JORC Measured & Indicated Resources 382,300 oz Gold Dalgaranga Gold Resources Inventory (+0.7g/t cutoff) Deposit Measured Indicated Total Tonnes g/t Ounces Tonnes g/t Ounces Tonnes g/t Ounces Gilbeys 598,000 1.4 26,700 6,888,000 1.6 354,000 7,486,000 1.6 380,700 Laterite (golden wings and Vickers) 55,000 0.9 1,600 55,000 0.9 1,600 Total Dalgaranga 653,000 1.3 28,300 6,888,000 1.6 354,000 7,541,000 1.6 382,300 EGERTON PROJECT Resources JORC Measured, Indicated & Inferred Egerton Gold Resource Inventory (+2.0g/t cutoff) Deposit Measured Indicated Inferred Total Tonnes g/t Ounces Tonnes g/t Ounces Tonnes g/t Ounces Tonnes g/t Ounces Hibernian 32,100 9.5 9,801 46,400 5.3 7,841 37,800 5.1 6,169 116,400 6.4 23,811 24

DISCLAIMER & COMPETENT PERSON STATEMENT This presentation contains forward looking statements that are subject to risk factors associated with resources businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to: price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates. The current Glenburgh JORC resource is classified as Indicated and Inferred and as a result, is not sufficiently defined to allow conversion to an ore reserve; the financial analysis in the Scoping Study and in this presentation is conceptual in nature and should not be used as a guide for investment. It is uncertain if additional exploration will allow conversion of the Inferred resource to a higher confidence resource (Indicated or Measured) and hence if a reserve could be determined for the project in the future. Exploration, Production targets and the resulting mineral inventory referred to in the Scoping Study and in this presentation are conceptual in nature and include areas where there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. The Dalgaranga Resource estimate has been sourced from Equigold NL annual reports and other publicly available reports which have undergone a number of peer reviews by qualified consultants, that conclude that the resources comply with the JORC code and are suitable for public reporting. The Egerton Resource estimate has been sourced from Exterra Resources annual reports and other publicly available reports which have undergone a number of peer reviews by qualified consultants, that conclude that the resources comply with the JORC code and are suitable for public reporting. All references to dollars, cents or $ in this presentation are to AUS$ currency, unless otherwise stated. Information in this presentation relating to mineral resources and exploration results is based on data compiled by Gascoyne s Managing Director Mr Mike Dunbar and who is a member of The Australasian Institute of Mining and Metallurgy. Mr Dunbar has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as Competent Persons under the 2004 Edition of the Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Dunbar consents to the inclusion of the data in the form and context in which it appears. 25