Gas Mixing System for Tube furnace Operation Manual MTI Corporation

Similar documents
Service manual. Website: CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.

Oil and Coolant Circulating Heating System. Model - OCSM

Portable Air Conditioner

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

NewAir AC-10000E, AC-10000H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

Eurovacuum EV Series. Single Stage Oil Sealed Rotary Vane Pump

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

EVANS ELECTRONIC TEMPERATURE CONTROL TROUBLESHOOTING GUIDE for systems equipped with electric coolant valve and external PC board.

In-Line Electronic Flow Switches

NewAir AC-14100E / AC-14100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

MOLECULAR DRAG PUMPS MDP SERIES

Rules for Safe Operation

Electronic Flow Switches

B Issue B Original. Instruction Manual. EXPT Pumping Station

Operation Instructions. KleeBlower Compressor/Vacuum pumps. Models: KB129 KB8415

Convection Ovens. BX Classic. Models BX4 / FG 189C, BX / FG 158C, BX10 / FG 180C. Operator's Manual

Class 5 to 7 Truck and Bus Hydraulic Brake System

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp.

ACCUMULATOR INSTALLATION

Section 7 Adjustment, Repair and Replacement

Boiler and Burner Cleaning and Servicing Specifications

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

CW-5000/ 5200,1'8675,$/ &+,//(5 86(5 0$18$/

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

GF SERIES 1-TANK/2-TANK ELECTRIC FRYER USER S MANUAL

Reverse Cycle Inverter Split System Air Conditioner

ALL IN ONE. Heat Pump Water Heater

FLR 1000 & 1000-BR Series Flow Sensors & Meters For Gases

SELECTION, APPLICATION AND MAINTENANCE

Oil - kerosene burners

Factory owners must ensure the boiler is:

In-Line Electronic Flow Switches

Operation Manual For NDJ-8S Digital Rotary Viscometer

Please keep these operating instructions in a safe place.

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Model 1210C Battery Powered Pump Shown. Description

How To Fix A Car With A Carbide Engine

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

Economy Combo Heat Press Manual Model No.: ECH-800

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

OPL BASIC. Dosing System for Professional Laundry machines. Contents

Machine needle shut-off nozzle type HP

Cooking at the Speed of light!

Example. Fluid Power. Circuits

Operation Manual. 150 Watt Halogen Light Source for Endoscopy Model # s ESS-150, ESS-150A ESS-220, ESS-220A

BC & BCH SERIES INDOOR / OUTDOOR INSTALLATION

SERVICE MANUAL Order No.WH0911S001V0

Operating Instructions Drill rig DRU160

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model GENUS PREMIUM FS CUENOD. R EN - Edition 01-26/10/2009

CONTENTS 1. IMPORTANT NOTICE 2 2. TECHNICAL SPECIFICATION 3 3. OPERATION DETAILS 4 4. ELECTRICAL SCHEMATIC DIAGRAM EXPLOSION VIEW 16 6

Bench Autoclave. Standard Operating Procedure. For Installation, Use and Maintenance

VCR Ion Beam Sputter Coater

300 Series PA Pump and Cooler Assemblies

SunMaxx Solar Filling Station Operating Instructions

Overheating limit control

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

SF15K SF05KSS, SF10KSS

Wilo SP Series Submersible Sump Pumps ECS. ECS ECS ECS Installation and operating instructions

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

Split-type Air-Conditioner INSTALLATION MANUAL CONTENTS FOR INSTALLER MXZ-3A30NA MXZ-4A36NA ATTENTION. English. Français. Español

SERVICE SERVICE COMPACT MANUAL. Mod X Mod X Mod X. Part 2

US VACUUM CP SERIES MANUAL. Oil Lubricated, Rotary Vane Vacuum Pumps INSTALLATION OPERATION. Models CPS-5B & CPS-8B WARNING

Water Pump Replacement

NewAir AC-10100E / AC-10100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

MODEL INSTALLATION INSTRUCTIONS

EASIDEW PORTABLE HYGROMETER INSTALLATION, OPERATION AND MAINTENANCE MANUAL

SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS

How To Use A Power Supply Unit (Upu)

CONTENTS 1. IMPORTANT NOTICE 2 2. TECHNICAL SPECIFICATION 3 3. OPERATION DETAILS 4 4. WIRING DIAGRAM EXPLOSION VIEW 12 6.

M A N U A L

understanding medium frequency induction melting furnace and its components

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

APPLIED PNEUMATICS AND HYDRAULICS H TUTORIAL HYDRAULIC AND PNEUMATIC CYLINDERS. This work covers part of outcome 2 of the standard Edexcel module.

Hydraulic Trouble Shooting

Thermo Top - Troubleshooting Tree

ELECTRONIC THERMOSTAT AND THERMOMETER With SPEED CONTROL

Universal Adjustable Fuel Pressure Regulator

CARING FOR YOUR WATER HEATER

Vacuum drying oven for non-flammable solvents

Unit 24: Applications of Pneumatics and Hydraulics

NÜVE SANAYİ MALZEMELERİ İMALAT VE TİCARET A.Ş. OT 020 BENCH TOP STEAM STERILIZER USER S MANUAL

JOB or CUSTOMER: ENGINEER: CONTRACTOR: SUBMITTED BY: SPECIFICATION REF: QUANTITY TAG NO. MODEL NO. GPM FEET LEAD LENGTH COMMENTS.

Propane Conversion Kit PROPANE CONVERSION KIT INSTALLATION MANUAL

Local Dealer:

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

National- Spencer Inc.

Medical Air Systems: Scroll

Please read operating instructions carefully before use and keep for further reference.

Standard Specifications Model. How to Order. Mist spray unit. Recommended Equipment. Mixing valve

Peasouper Operator s Manual

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Gas Oven Repair Guide

1 DESCRIPTION OF THE APPLIANCE

Stereoscopic 3D Digital Theater System. Operator Manual (MI-2100)

MEMBRANE VACUUM MINI PUMPS

PORTABLE AIR CONDITIONER

Transcription:

Gas Mixing System for Tube furnace Operation Manual MTI Corporation 860 S 19 th Street, Richmond, CA 94804, USA Tel: 510-525-3070 Fax: 510-525-4705 E-mail: info@mtixtl.com Web site: www.mtixtl.com

Introduction 1. This mixer is specified for mixing 3 gases or continuously supplies one gas under small gas flowing rate and low pressure. The air can not get in whenever you switch the different gases into use. 2. Gas flowing rate and pressure can be exactly displayed in one screen for an efficient control. 3. Easy installation and repair of the valve and meter because of dual-union-adapter between them. Specification Float flowing meter: 10~100ml/min, 16~160ml/min. 25~250ml/min. (optional) Gas mixing tank: Φ80X120mm Stop valve: 160P stainless steel needle valve, Φ1/4 Connection pipe: PTFE (Teflon)or stainless steel, Φ1/4 Vacuum gauge: (Φ60) -0.1~0.15Mpa, accuracy 0.01Mpa. Working Voltage: 220V+/-10% 50~60Hz Power: 1KW System Final Vacuum: 4.3 10-3 Pa Illustration

Installation 1. Assemble vacuum fittings and connect them with the quartz tube in furnace. (Detail process please read the OTF-1200X-III Split Three-Zone Tube Furnace operational manual) SS deflation valve SS vacuum flange to quartz tube. (Double Hi-temp silicone O-ring) Vacuum valve Flange Pipe orifice Piranigauge (Vacuum pressure sensor) 2. When first open the door on Mixer. Such scene appears as the following picture shows. Ionization gauge Turbo molecular pump Rotary Vane Vacuum Pump

Outlet port Exhaust gases during vacuuming Ionization gauge (Already installed) Molecular pump release valve Piranigauge socket (Connect with Piranigauge manually)

2. Connect Mixer with furnace by vacuum pipe (KF D-40) and clamp tightly by quick clamp. (KF D-40). You will see a pair of yellow lids. One is on the vacuum valve which connected with flange, and the other is in Mixer as the following figure illustrates. Right hand side of Mixer 3. Connect pirani gauge. 4. Finish installation.

Operation 1. Power on the machine (AC220V/50HZ, 1KW); 2. Turn on the valve TV5 clockwise and then open the power of mechanical pump (fore pump) to vacuum. 3. When the pressure of the system reaches to 10 Pa, the powers of molecular pumps will startup automatically with the High Speed, Rotation Speed indicating light on. Press down the working button, working indicating light will be on which means the molecular pump starts to work. As the speedup of the pump s rotation, number displayed on LED possessing 4 digits increases until at 704±10Hz, when the pump enters stable rotation state. During this process, the customer can freely adjust the value of rotation speed, current and voltage by operating the button on panel. 4. Turn off the valve TV5 after vacuuming to the ideal state (normally, 10x10-3 Pa after 2 hours); Press down the working button again, the working indicating light will be off, and then, cut off the power of molecular pump to cease it. In order to extend the durability of this molecular pump, please turn on the valve TV6 used for inching adjustment of exhaust before the pump speed decreases to the half of rated rotation speed to make the molecular pump get through the resonance point. Meanwhile, this operation can farthest prevent the forepump oil from reverse diffusion. When exhausting, please be advised to let the pressure in the molecular pump gradually increase to 40000 Pa, then to atmospheric pressure, also, shut down the mechanical pump. 5. Turn on valve TV4 to put the protect gas in, and out from TV7. 6. High polluting, corrosive and explosive gas is forbidden to use for this system. Note: When operating the pump, please open the front panel so that the system can get good heat dissipation. Rotary Vane Vacuum Pump This rotary vane vacuum pump features: 1. High ultimate vacuum degree 2. Low noise 3. No oil leaking or spurting 4. Convenient pressure control Maintenance 1. Oil Check: Oil level should be in the domain of level mark when pump working. 2. Keep oil clean and proper amount: Normal oil should be fair and clear, please change the oil regularly or whenever it is dark. 3. Shut down the pump and change the oil in a warm environment: Firstly, open the oil outlet to release the polluted oil into a tank. Secondly, open the gas inlet, fill some clean oil in, and then run

the pump less than 10 seconds to expel the remnant. Finally, open the oil inlet to fill the clean oil in and then tighten the cap (Specific pump oil like MR-200 or PV-200 is advised) Turbo Molecular Pump 1. Cooling: The bearing and motor of molecular pump should be cooled when it is working because of frictional heat by bearing, dissipation of heater and lower natural cooling rate in vacuum. Air cooling is for a general use when the ambient temperature is lower than 32 C and, water cooling is preferable if the temperature is high and long time operating the machine (4 hours or more), remember that the flowing rate of water (no more than 25 C) should be higher than 1L/minute and the inner diameter of the hose matching with the nozzle on the pump, is 10mm. 2. Lubricant Change the lube every 3000 working hours of the pump (lube is enough for the first time use since we had it full before shipping), which means the customer can change it every one year and a half if for general use. However, please increase the change frequency if use the machine too often. Follow the instruction below to change the lube: a. Accordingly, loosen off two screws on the oil inlet (upper) and oil outlet (lower) which on the upper bearing and then, the two on the lower. b. Remove the pump from the whole system and horizontally place it on a flat to ensure the inlet face up, and then, inject the lube into the two inlets and dispose the oil from another side, tighten the four M5 screws when done. Note: 1.When tightens the screws please well seal the black o-ring to avoid air leakage. 2. Do not use any substitute of the specific lubricant, otherwise, it may damage your pump. 3. Startup When the system pressure reaches to 10 Pa, you can start this pump. 4. Speed up Generally, the molecular pump should go to 700 Hz within 2 minutes, if it can not approach 400 Hz within 3 minutes, the power will cut off the power. 5. Baking To bake the pump and vacuum system to get an ultimate pressure, please plug the power cable to the socket supplying single phase 220v. Note: 1. Baking temperature for pump should be lower than 100 C, for flange connecting to pump lower 120 C, for vacuum system lower than 300 C. 2. To obtain vacuum with 10-3 Pa, no need to bake, if 10-4 Pa bake the system, and higher to bake both system and pump. 6. Shut down: Power off the pump and the pump gradually decelerate until stop, please release the pump no late than the decelerating speed to the half of rate speed (make the pump quickly pass the resonate point to prolong the pump s life). When release the pump, please strictly follow the releasing rule, otherwise, it may cause danger! Do not let the pump in a long time vacuum state; the oil pump

steam may diffuse into this pump from fore-pump. Please stop water cooling after shutting down the pump. 7. Cleaning Contact MTI for a cleaning service. 8. Troubleshooting Problem Description Possible Reason Solution Pump can not start 1. Cable broken or not contact well 2. Other reason Pump can not reach to the rate speed after a long time running Big noise or abnormal vibration when operating Lowe vacuum degree System can not reach the desired vacuum degree after a baking 1. Vacuum system leakage 2. Oil pollution or Lube lack 3. Bearing broken 1. Lube lack 2. Pump works in resonate range 3. Bearing broken 1. Fore vacuum leakage 2. High vacuum leakage 3. Fore pump works abnormally 1. Fore pressure is high 2. Pump pollution 1. Change one or contact well 2. Inform us 1. Eliminate the leakage and the fore pressure should be lower than 5 Pa. 2. Change lube 3. Change bearing 1. Fill lube 2. Change connection position and size, and fix the moving part and add damping O-ring 3. Change bearing 1. Seal the fore vacuum 2. Repair and seal the system 3. Check and repair the pump 1. Fore pressure should be lower than 5 Pa 2. Contact us to clean 9. To derive the ultimate vacuum, please bake the pump and testing hood for more than 48 hours, and pump the hood to get the lowest pressure in the testing hood, which is the total air pressure remain in the hood. Molecular Pump Controlling Power 1. Pump startup: When fore pump get a pressure lower than 10 Pa, the system will automatically power on with High Speed and Rotation on the front panel brightens up, press Working button to start the pump. The pump will accelerate the rotating speed with the number on 4-digit LED increasing until pump stays at 704HZ±10. Customer can use keypad to change the rotation speed, current, voltage, low speed and high speed. 2. Pump Stop: Press Working button again, the working indication light will get off with the rotation speed decelerating to 0000 on the panel. When the system pressure is higher than 60 Pa, pump will be shut down automatically.

3. Troubleshooting Problem Possible Reason Solution Overtime indicating light is on, Buzzer is on. Air pressure is too high, P 1mbar,the system can not reach to 400 Hz when the acceleration time is over 3 minutes, or, the four-terminal output is damaged. Check the fore pump, system leakage and the four tubes IRFP460 in the power box, change them if needed. Overheating indicating light is on, and the buzzer is on Overheating indicating light is on, and the buzzer is on Both overtime and overcurrent indicating light are on, buzzer is on. No indication after power on the machine Both rotating speed and switch voltage maintain the value 0000 when press working button Rotating speed is small but no Increase but with the switch voltage Motor is overheated, no air or water cooling for the pump System decreases to 400 Hz but with normal power, fourterminal output tube or core power circuit is damaged. System leakage No power Output stage is open circuit or core power is damaged. Sensor (Hall element) is damaged. Check the cooling system Check four tubes IRFP460 or send back to the manufactory for mending Check the leakage Check the 3A fuse in the power box. Check the 7A fuse on the power board which is in the power box or send back for mending. Send the molecular pump back for mending Compound vacuum gauge with digital display 1. Introduction ZDF-III-LED compound vacuum gauge consists of ZJ-52T pirani gauge and ZJ-27 ionization gauge which could accordingly measure the low vacuum (10 5 ~10-1 pa) and high vacuum (100~ 10-5 pa). This device will automatically measure the vacuum degree when the system is powered on. 2. Pirani gauge (on the left): 2-1. Pirani gauge is used for measuring low vacuum (higher than 10-1 pa). 2-2. Calibrate this gauge when first time use: Set the device as Manual, press Open ionization to monitor the system vacuum degree, calibrate potentiometer to ZERO to display 1.0E-1 when the system vacuum is about 1.0X10-1, and adjust it to F.S when at atmosphere to display 1.0E5. 2-3. When the gauge is broken, the unit will display ------ and enter the state of manual. 3. Ionization gauge 3-1. Continuous measurement 3-1-1. Make sure the both pirani gauge and ionization gauge are to measure the same system. 3-1-1. The pirani gauge will automatically measure the vacuum degree after system starts, and when the vacuum is higher than 200 pa, ionization gauge will be on.

3-2. Separate measurement 3-2-1. Press auto button to disable auto function (the auto LED will be off). 3-2-2. Press Ionization button until the Ionization LED is on to enable the ionization gauge. 3-2-3. Again press down Ionization button to check the emit current and release the button to display vacuum degree. If the current is -----, please check if the vacuum is too low or change a new gauge to measure. 3-2-4. Air release for 3~5 minutes to decrease the measurement error, when the vacuum is higher than 10-2 Pa, press release to release the air and the unit will display the time for releasing, press ionization to stop 3-2-5. When the vacuum is lower than 10 Pa, the system will go to self-protection and displays ----, the ionization measurement will recover after the vacuum is higher than 10 Pa. 4. Controlling and setting: This function is used for setting the upper and lower limit for the system. 4-1. Hold set 1 and the upper limit LED is on, release the button until to your target. 4-2. Again hold set 1 and the lower limit LED is on, release the button until to your target. 5. Notice 5-1. Auto-self-lock function will forbid system releasing the air when the vacuum is lower than 10-2. 5-2. Data protection can save the setting for next time use. 5-3. A measurement drift may happen at 10 5 but does nothing to the accuracy when lower than 10 3. If any questions please contact us 1-510-525-3070 or email info@mtixtl.com, we will help you out within 24 hours.