WORTLEY GOLF CLUB COURSE MANAGEMENT POLICY DOCUMENT. Approved by the Management Committee

Similar documents
DIDSBURY GOLF CLUB GOLF COURSE POLICY DOCUMENT

Service level agreement

FULFORD HEATH GOLF CLUB - Ride on Buggy Policy

Manchester Golf Club. Course Policy Document (Reviewed and approved by Council 6 th October 2014) With effect from 1st 7 th October 2014

Appendix To Operational Review and Recommendations For Juniper Golf Course

GOLF COURSE MAINTENANCE PLAN

November General Notes. Tree Protection. Tree Protection and New Development Guidance Note

Application for Tree Works: Works to Trees Subject to a Tree Preservation Order (TPO)

Electronic Communication. 1/2. Applicant s And Agent s Names And Addresses. 3. Tree Location. 4. Tree Ownership

Golf Guidelines and Standards

Rules of Golf Test (Answers at Bottom of File)

Phone: x 304 Caro MI URL: aslagh@tisd.k12.mi.us

REQUEST FOR PROPOSAL LANDSCAPING AND LAWN MAINTENANCE FIRE DISTRICT NO. 3 TOWNSHIP OF HAMILTON MERCER COUNTY

Excavation & Trenching Procedure

RISK ASSESSMENT BEDFORDSHIRE GOLF CLUB 18 HOLE GOLF COURSES Full Edition

A Golf Clubs Guide to Course Rating & Standard Scratch Scores

GOLF COMPETITIONS AND HOW THEY ARE PLAYED Golf Australia Advice (Version 20 February 2013)

DESIGNING YOUR LANDSCAPE

It was my assignment to physically inspect the 8 trees on site near the proposed construction,

SCOPE OF WORK Specifications for Landscaping, Lawn Maintenance & Pest Control

NORTH COUNTY TRANSFER CENTER METRO Contract Numbers 01756/ % - DESIGN DEVELOPMENT SECTION NEW PLANTING MAINTENANCE

Writing a Successful Exterior Landscape Maintenance RFP

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

Team Skills Challenge Event # 1 Plant Layout Score Sheet

Virginia s Turfgrass Industry

Broadmoor Public Golf Course TREE MANAGEMENT GUIDE

4 Quality Standards - Human Resources. Contents. 4.0 Introduction. 4.1 Management Structure and Staffing Levels

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot

B. Improve the appearance and character of areas surrounding new development.

GENERAL WATERING & CARE GUIDE

2015 Distance Report. A Review of Driving Distance Introduction

Muhlenberg College Integrated Pest Management Plan

Planting and Tree Care for Roxborough Park. Keith Worley, Forester ISA Certified Arborist

Standing Rules of Membership

Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.

TEXAS SMARTSCAPE Landscape Design

Waterwise Landscaping: Designing a Drought-tolerant (and deer-resistant) Landscape and Garden

Food Safety Enforcement Policy

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

Health and Safety Policy and Procedures

Corporate Governance in D/S NORDEN

HANDICAP SYSTEM

Empire Landscaping Company, Plano Texas

LANDSCAPE MAINTENANCE SERVICES

WORK HEALTH AND SAFETY

Bawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job

horseshoe bay resort golf

Guidelines to Green Roofing

How To Manage A Property In Scotland

Community Greenscapes & Trails

Roof Maintenance Scope of Work

Tree Preservation Orders A Guide to Protected Trees

Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C

Sometimes a decision can take a long time. Changing Turfgrasses for Changing Times

This leaflet gives advice on sensible precautions to help avoid the problem and the first steps to take if damage still occurs.

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES

The ground reinforcement system for golf courses

BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. AUDIT COMMITTEE CHARTER

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

POSITION DESCRIPTION Number: PD:

Service Level Agreement (SLA)

First, determine the scope of your. Second, determine who will provide. An attractive landscape can add considerable value to a home.

Integrated Pest Management At Boise State University

COAL CREEK GOLF COURSE

Appendix 15 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT

CHICAGO Golfweek Amateur Tour 2016 Local Tour Policies

Koninklijke Belgische Golf Federatie. Fédération Royale Belge de Golf EGA. Handicap System. Amended Edition, 1 January 2013

PREVENTING PEST DAMAGE IN HOME LAWNS

GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY. 1. Occupational Health and Safety Policy Statement 1

CITY OF UKIAH TREE MANAGEMENT GUIDELINES TREE MANAGEMENT POLICIES FOR THE PROTECTION, OPERATION AND MAINTENANCE OF CITY PROPERTY

JOB DESCRIPTION: DIRECTORATE MANAGER LEVEL 3. Job Description

A guide to preventing structural damage

Garden Project Proposal

RULE 1. The Field of Play

as approved by R&A Rules Limited and The United States Golf Association

Report of External Evaluation and Review

Revised Scheme of Service for Occupational Health and Safety Personnel

Oak Trees BASIC GROWING REQUIREMENTS FOR YOUR

REPORT 4 FOR DECISION. This report will be considered in public

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors

Factsheet on the use of Compost for Golf Course and Sports Turf

Queensland Parks and Wildlife Service PEST MANAGEMENT PLAN

2013 / City of London MUNICIPAL GOLF BUSINESS PLAN

GLOBALGAP Risk Assessment on Social Practices (GRASP)

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

A Quick Guide to the Rules of Golf

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE

Health and Safety Policy Part 1 Policy and organisation

PART 4 NON-TEACHING STAFF PAY AND CONDITIONS OF EMPLOYMENT 1. INTRODUCTION

Chapter D9. Irrigation scheduling

Tree Pits Operation & Maintenance Guide

When I first came to Sumner

Welcome to The First Tee

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

MENTAL HEALTH TRIBUNAL FOR SCOTLAND: RECORDS MANAGEMENT POLICY. Ensuring Information is Accurate and Fit for Purpose

SAMPLE INTEGRATED PEST MANAGEMENT (IPM) BID SPECIFICATIONS FOR COMMERCIAL PEST CONTROL SERVICES

WHAT IS WRONG WITH MY LAWN?

HEALTH AND SAFETY POLICY LEWIS & RABY ENGINEERS LTD

Transcription:

WORTLEY GOLF CLUB COURSE MANAGEMENT POLICY DOCUMENT Approved by the Management Committee October 2012

INDEX Item Page No 1. Introduction 1 1.1 General 1 1.2 Aim 1 1.3 Objective 1 2. Roles and responsibilities 2 2.1 The Management Committee 2 2.2 The Green Committee 2 2.3 The Course Manager 2 & 3 2.4 Professional adviser 4 3. Course Standards 4 3.1 Tees 4 3.2 Fairways 4 3.3 Green surrounds, aprons and collars 4 3.4 Greens 4 3.5 Temporary greens 5 3.6 Primary rough and secondary rough 5 3.7 Bunkers 5 3.8 Practice facility 5 3.9 Conservation 5 3.10 Trees and Copses 6 3.11 Course development and design 6 3.12 Health and Safety 6 3.13 Security 6 4. Resources 7 4.1 Staff 7 4.2 Machinery 7 4.3 Irrigation 7 5. Use of the Course 7 5.1 Daily Course preparation 7 5.2 Players and greenstaff 8 5.3 Course usage 8 5.4 Trolley bans and Temporary Greens 8 6. Complaints 9 Appendix A Course development plan and schedule Appendix B Staff structure and job descriptions Appendix C Course closure policy and procedure

1 INTRODUCTION WORTLEY GOLF CLUB COURSE MANAGEMENT POLICY 1.1 GENERAL Effective management of the courses requires a cohesive long-term plan to compensate for changing staff and committee membership. The Management Committee has fully debated and approved this policy document. Its purpose is to give members confidence that progress will be made towards the realisation of agreed objectives. The document explains what the Club expects of its course, lays down course management principles, defines the required standards for different areas of the courses and states the resources necessary to achieve those standards. This definitive document should provide for easier day-to-day planning and a clearer understanding by members and staff of the intended goals. 1.2 AIM The purpose of this document is to set out in detail the course management policy for Wortley Golf Club (WGC), as developed by the Green Committee and approved by the Management Committee. 1.3 OBJECTIVE The courses shall be: a) Open for play as often as possible throughout the year. The use of temporary greens will be kept to a minimum. (For management of putting surfaces, see Sections 3.4 and 3.5). b) A fair but demanding test of golf for players of all abilities. c) Consistently well maintained. d) Protected from lasting damage caused by excessive play or bad weather. e) Managed and developed with consideration for the impact on wildlife, ecology and landscape.

2 ROLES & RESPONSIBILITIES 2.1 THE MANAGEMENT COMMITTEE The Management Committee is responsible for the management of WGC. It is committed to the allocation of sufficient funds to implement the policies set out herein. 2.2 THE GREEN COMMITTEE Constitution The constitution of the Green Committee and terms of service of its members are defined in the Rules of the Club. Responsibilities The Green Committee is responsible to the Management Committee for formulating and revising, as necessary, the Course Management Policy. Implementation of the Course Management Policy is the responsibility of the Course Manager. The Green Committee is the main mechanism for communication between the Course Manager, other Club Committees and the members. In consultation with the Secretary, the Committee will keep under review the intensity of use of the courses and make recommendations to the Management Committee, as appropriate. The Green Committee will discuss suggestions and complaints from other Club Committees, the Secretary and from members. It will decide, in consultation with the Course Manager, on any actions to be taken. Committee meetings will be held as requested by the Chairman. The Course Manager, will attend all meetings. Minutes will be produced and distributed within five normal working days. 2.3 THE COURSE MANAGER Overall Responsibilities The Course Manager is responsible to the Chairman of Green for implementing the Club s approved course management policy. He/she will work in collaboration with the Club Secretary and the Green Committee. Job purpose To manage the golf course and the greenkeeping team in accordance with the Club s Golf Course Management Policy, its Health and Safety Policy and the Greenkeepers Code of Conduct.

Specific Responsibilities Ensure that the course complex is maintained to a high standard and managed in accordance with the agreed course management policy. Identify and determine polices for the development of the golf course. Assist the Green Committee in reviewing and updating the course management policy document. Actively participate in the work practices and associated tasks required to maintain and enhance course standards and presentation. Keep up to date with technological developments relevant to golf course management. Maintain an inventory of all course machinery and equipment and oversee its use, maintenance and replacement. Ensure that records, job sheets etc. are properly maintained. Ensure compliance with all relevant health and safety legislation. Staff Allocate responsibilities to subordinate staff and supervise their work. Foster a team spirit among staff and promote individual skills and motivation. Encourage the further training of staff and undertake performance appraisals annually, or as required by the Management Council. Ensure that legal, statutory and other provisions governing or affecting the staff, their health and safety and their duties are strictly observed. Finance Compile budgets as required and exercise strict budgetary control. Take responsibility for purchases and procurement relating to the course complex. Communications Attend meetings of the Green Committee, providing it with the information necessary to make decisions and assist in keeping the members well informed of course changes and developments. Collaborate with the Secretary on matters affecting the use of the course and on other matters, such as accounting procedures and staff employment.

Inform the Professional of any changes to course conditions on a daily basis. 2.4 PROFESSIONAL ADVISOR It is policy to seek reports from an independent consultant agronomist, as required. These reports will be actioned, as appropriate, by the Course Manager following discussion with the Green Committee. 3 COURSE STANDARDS 3.1 TEES The main objective in developing and maintaining good tees is to produce firm, even stances over a sufficient area to withstand the demands of regular play. At the appropriate time, the tees will be aerated, top dressed, fertilised, scarified, irrigated and over-seeded as necessary. Weed, worm and pest control will be carried out as required. The Course Manager shall ensure that tee markers are moved daily to distribute wear. Markers are to be set at a minimum of 6 yards apart. Divot holes will be filled as required. Mowing will be carried out to achieve a consistent fine textured and dense sward. The tees will be cut at a minimum height of 10mm. Summer tees will normally be used from 1st April to mid-october and the winter tees for the rest of the year. Mats may be used for winter golf where appropriate 3.2 FAIRWAYS The fairways will be cut at a height of 12mm to 20mm depending upon growth. Fairways will be verti-drained, slit-tined and scarified as required to improve the quality of the turf. Divotting will be carried out during the season as appropriate. Weed, worm and pest control shall be carried out as required. The maximum carry from the men s medal tee marker to the fairway shall be 150 yards. Minimum and maximum fairway widths shall be 25 yards and 40 yards respectively. 3.3 GREEN SURROUNDS, APRONS AND COLLARS A regular programme of aeration, scarification, top dressing and weed, worm and pest control will be used to maintain the quality of the sward in these areas. The programme on the aprons and collars will be similar to that used for the greens. 3.4 GREENS The policy is aimed at attaining firm, true and consistent putting surfaces all year round. The application of fertiliser and water will be designed to encourage the growth of bents and fescues and discourage the spread of annual meadow grass. During the growing season and for main competitions the greens will usually be cut no lower than 4mm. They will be double-cut as

appropriate, particularly in preparation for tournament play. In winter and spring the height may be raised to a maximum of 6mm. In summer, greens will usually be cut daily. The holes will be moved regularly, before major competitions and on Fridays for weekend competitions. 3.5 TEMPORARY GREENS These will be used only during the winter period or when essential work is being carried out on the greens. It will be the daily responsibility of the Course Manager or his elected representative from the greenstaff to decide when temporary greens should be used. This would only normally occur during adverse weather conditions (see Section 5.4). 3.6 PRIMARY ROUGH AND SECONDARY ROUGH The primary rough will be at a height of 30mm to 45mm. Secondary rough will be at a height of 50mm to 75mm. There are certain areas on the courses that do not come into play in normal circumstances and these are managed in accordance with the Club s environmental management plan. No herbaceous species or tree/shrub, other than those naturally occurring in the environmental locality, shall be planted in the rough. 3.7 BUNKERS All bunkers are to be maintained so as to ensure adequate drainage and to produce sand-faced bunkers with an even distribution of stone-free sand to a consistent depth of 2 on slopes and 4 on bunker floors. Regular maintenance will ensure a well-defined edge to a level sand surface which is debris free. At least one rake will be provided per bunker, rakes being placed in the bunker. The greenstaff will rake all bunkers a minimum of five times per week. Bunkers shall be raked for major competitions at the weekends. Sand depths will be checked regularly and the sand will be re-distributed or bunkers topped up with a specified bunker sand as necessary. 3.8 PRACTICE FACILITIES The practice areas will be managed in a similar manner to the course. The practice net shall be regularly checked for serviceability and safety. 3.9 CONSERVATION (Conservation policy to be drawn up and inserted)

3.10 TREES AND COPSES The management of trees and copses requires a long term perspective and will be carried out in accordance with professional advice. Trees and copses will be inspected annually by the greenstaff with diseased trees and those causing over crowding being pruned or removed. The general policy is to achieve a landscape and population of trees and under-storey, which is consistent with the local environment. All new plantings shall be properly protected and mulched and weeds around them shall be controlled for three years in accordance with the recommendations of the Forestry Commission. In periods of drought it may be necessary to water young trees. Only the following species shall be planted in areas designated as woodland: Oak, Ash, Sweet Chestnut, Silver Birch, Hazel, Scots Pine, Larch with Gorse and Broom as edging shrubs. 3.11 COURSE DEVELOPMENT AND DESIGN A Course Architect will be consulted before making any major alterations which affect the playing strategy of the full measured course. 3.12 HEALTH AND SAFETY The Club is committed to ensuring that safe working practices are adopted. Its policy is laid out in the WGC Health and Safety Policy Document (July 2009). In conjunction with this policy, a health and safety audit will be carried out in accordance with the Health and Safety at Work Act 1974 and a COSHH assessment register compiled. Health and safety inspections shall be carried out by the Course Manager, Secretary and the Health and safety Advisor at 6- monthly intervals. 3.13 SECURITY All the Greenkeepers outbuildings have been fitted with security devices, which fully meet the requirements and recommendations of the insurance assessors report ( December 2009)

4 RESOURCES 4.1 STAFF The club will employ a Course Manager, Deputy Course Manager and sufficient Assistant Greenkeeping staff to satisfy the requirements of this document. The greenstaff will be encouraged to further their personal development and to work towards recognised greenkeeping qualifications. Staff appraisals shall be carried out annually. The Chairman of Green and one other person appointed by the Management Committee shall perform that of the Course Manager. Appraisals of the other staff will be undertaken by the Course Manager. 4.2 MACHINERY The Course Manager will produce an inventory of machinery and a rolling tenyear plan of machinery replacements, additions and repairs for consideration, by the Green Committee prior to final approval by the Management Committee. The Course Manager is responsible for keeping up to date with developments in golf course machinery and for making recommendations to the Green Committee concerning these developments. He is also responsible for all aspects of the maintenance and use of all course machinery and for keeping records of equipment maintenance and servicing. 4.3 IRRIGATION The borehole licence is restricted to 7000 cubic metres per annum (April to October inclusive) at a maximum rate of 89 cubic metres per day and must not be exceeded. This licence expires on 31 st March 2017. Supplementary water is to be provided from the mains supply. The Course Manager is responsible for ensuring adherence to these requirements. The Course Manager shall retain an as laid plan of the irrigation system. 5 USE OF THE COURSE 5.1 DAILY COURSE PREPARATION Green staff normally start work at 6.30am in summer, and 7.00am in winter. Players starting before 9.00am will give priority to the greenstaff so that course preparation can be completed in the shortest possible time. After 9.00am, greenstaff will give priority to players and are expected to be vigilant so as not to delay play unreasonably. Notices will be posted if: - a) Chemicals have been used or are being used on the courses b) Greens or tees are in temporary use c) Abnormal work is in progress. d) Trolley bans are in operation.

5.2 PLAYERS AND GREEN STAFF Players are to ensure that it is clear for them to play without endangering greenstaff. They must not play to a green if work is in progress, unless the greenstaff indicate that it is safe to proceed. The greenstaff will then stand aside. The Course Manager shall take particular care to arrange the work programme to take into account all competitions. Casual golfers starting at any hole other than the 1 st hole before 10am should always give priority to greenstaff. 5.3 COURSE USAGE For Course Closure policy and procedure see Appendix C The course will be closed when the following severe weather conditions exist: a) When the ground is waterlogged. b) When there is snow cover. a) During fog when visibility falls below a golfer's striking range. b) Under extreme conditions when the course is particularly dangerous for play. A decision to close the course can only be made by the Course Manager or his elected representative from the greenstaff. In the absence of the Course Manager or his representative, the course may be closed by The Captain and The Chairman of Green. Course closure may only be rescinded by the person responsible for its closure, or his elected representative, after the conditions which led to its closure have ceased and after a full inspection of all affected playing areas. During course closure the practice ground will remain open. It may be closed under severe conditions at the discretion of the Course Manager or his elected representative. Clearly, some of the above conditions are difficult to define precisely and the judgement of the Course Manager must be the authority to be upheld. Changes to course conditions will be communicated to the Professional on a daily basis after full course inspection, Whenever possible this should be done before 8.00am.

5.4 TROLLEY BANS & TEMPORARY GREENS During the winter months soil compaction should be minimised. Members are requested to follow trolley signs around greens and to avoid walking on roped off areas. They are also requested to avoid using trolleys, if at all possible, throughout the winter period. ALL TROLLEYS AND BUGGIES will be banned when ground conditions are such that excessive damage to the course or danger to the players may result. Trolley and buggy bans will be lifted when the condition causing the ban has ceased. TEMPORARY GREENS will only be used when: a) Major maintenance operations are taking place on the main greens b) When the main greens are waterlogged to the extent that excessive damage may result. c) When there is a hard frost. Hard frosts are defined as frosts that have no immediate prospect of thawing and may last a full day. Pins will be returned to the main greens when the condition causing the use of temporary greens has ceased. In the case of hard frost this will not be until a complete thaw has occurred as excessive damage to greens can result from play when a surface thaw overlies a frozen subsurface layer. 6 COMPLAINTS All complaints by members must be made in writing to the Chairman of Green. He will investigate the matter together with the Course Manager. If appropriate, these complaints will then be discussed by the Green Committee. Replies will be in writing and signed by the Secretary or Chairman of Green. Complaints and accolades should be copied to the other elected members of the Green Committee.