EPOXY-RESIN TERRAZZO FLOORING

Similar documents
SECTION POLISHED CONCRETE FINISHING

Division 9. SignaFlor Pad and Pour Flooring System

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Section Polished Concrete Finishing. Vexcon

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

BENTLEY ELEMENTS COLLECTION LVT

SECTION Formatted Specification for the ULTRAFLOR DIAMATIC Topical Polished Concrete System DRAFT

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Vinyl Composition Tile Installation System

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Section EXTERIOR STONE VENEER Full Mortar

Concrete Repair. Applications and Procedures

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

GigaCrete Specification PlasterMax

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Example Specification for Concrete using Current Building Code Requirements

The Art of Concrete 9/17/2012. ACI Spring 2012 Convention March 18 21, Dallas, TX. Amerete, Inc. started in 2004 as American Concrete Technologies

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

Metropolitan Builders Association Masonry & Concrete Standard

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Installation System. Existing Resilient Sheet Floors

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

Division 4 Section Concrete Masonry Specifications

ENGINEERED QUARTZ STONE

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

LATICRETE 290 Premium Floor and Wall Thin-set Adhesive PRODUCT DESCRIPTION

TECHNICAL REQUIREMENTS AND SPECIFICATIONS

Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES

3M Scotchkote Urethane Coating 165HB

SECTION PLAYGROUND SURFACING TILES

STERI-SOFT HIGH FOOT TRAFFIC, ULTRAVIOLET RESISTANT, URETHANE RESILIENT FLOORING SYSTEM, 1/8 GREEN BUILDING FEATURES TYPICAL APPLICATIONS

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

3 Scotch-Weld TM. Epoxy Adhesive DP110 Translucent and Gray. Technical Data December, 2009

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

See photo below showing this product being applied to a badly corroded floor.

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

Carpet Tile Installation Guidelines

CA-48 TECHNICAL SPECIFICATION

FIVE STAR PRODUCTS, INC. (800)

GUIDELINE SPECIFICATIONS

Technical Data Sheet February 2014

Metal Rescue Rust Remover Technical Data

Moisture and Resilient Floor Covering

Natural Thin Stone Veneer

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

C. Section TESTING LABORATORY SERVICE.

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

MeltonStone Cast Stone Product Specifications

Technical Data May, 2015

Araldite AV 170. Advanced Materials. One component epoxy adhesive. Structural Adhesives. Key properties. Description. Product data.

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Manufactured Stone Veneer Installation Instructions

FIRESTOPPING & SMOKE SEALS

3M Scotch-Weld Epoxy Adhesive

FACT SHEET: HYDRATED LIME FOR MASONRY PURPOSES

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

SECTION POLISHED CONCRETE FLOOR FINISHING

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Resurfacing Concrete. Page 1 of 5

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

AC Tech Project Survey

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

Guide Specifications for Maple Flooring Systems

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

CHAPTER 7: Building Systems ROOFING SYSTEMS

Scotch-Weld. Epoxy Adhesives DP-100 Clear DP-100 NS Translucent. Technical Data June, 2002

8.7 Schluter -KERDI-LINE

Installation PowerPoint for Grasscrete Formers

Colorado State University. Durrell Center Roof Repair

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Product Guide Specification

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

SECTION RESURFACING CAST IN PLACE CONCRETE

Secondary Containment Comparison ATI Ultra COAT vs HDPE

3 Scotch-Weld TM. Structural Adhesive Films AF 6 AF 10 AF 13. Technical Data July, 2001

Wastewater Capital Projects Management Standard Construction Specification

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

SECTION EXPANSION CONTROL

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

Scotch-Weld TM. Acrylic Adhesives. DP8405NS Green. Product Data Sheet. Date: March 2014 Supersedes: August 2013

Transcription:

EPOXY-RESIN TERRAZZO FLOORING GENERAL INFORMATION 1.1 Epoxy-resin thin-set terrazzo flooring installed on concrete subfloors. 1.2 Comply with the recommendations of the National Terrazzo and Mosaic Association (NTMA): Design and Technical Data Book. DESIGN REQUIREMENTS 2.1 Specify submission of a minimum of three samples, minimum 6 x 6 for each color and type of terrazzo. 2.2 Specify submission of two, 6 minimum lengths of each type and kind of divider strips. 2.3 Specify submission of two copies of maintenance recommendations of NTMA or maintenance product members of NTMA. 2.4 Specify that suppliers shall furnish certification attesting that materials meet specification requirements. 2.5 Specify that suppliers furnish properly labeled Material and Safety Data Sheets which comply with current state and federal requirements. 2.6 Specify terrazzo type (select color and design from NTMA information guide or color plates, clearly stipulating any deviation. Where applicable specify that epoxy flooring shall match precast terrazzo flooring. 2.7 Marble chips: Specify acceptable chip sizes/range. 2.8 Stop and divider strips: Specify gauge white alloy of zinc, or (subject to review and acceptance of manufacturer) brass. 2.9 Where substrate cracking is anticipated and/or evident or where a waterproofing membrane is required specify a flexible epoxy membrane compatible with subsequent flooring materials, and acceptable to manufacturer of terrazzo products/system. Facilities shall be notified if significant work to the substrate is required or if the proposed product is subject to..

2.10 Where moisture vapor transmission level exceeds manufacturer s recommendations specify installation of a moisture vapor transmission control system acceptable to manufacturer of terrazzo products/system. 2.11 Specify that terrazzo cleaner have a Ph factor between 7 and 10, where applicable, and that it be biodegradable and phosphate free. 2.12 Specify that terrazzo sealer have a Ph factor between 7 and 10, where applicable, that it shall not discolor or amber, that it shall have a flash point of 80 degrees Fahrenheit (min.) per ASTM D- 56, where applicable, and that it shall be U/L listed as slip resistant. 2.13 Specify that terrazzo be mixed in accordance with manufacturer s instructions, to meet specified design, property and tolerance requirements. a. Performance Requirements (epoxy resin mixed according to manufacturer s recommendations and tested without aggregate added after curing for 7 days at 75 degrees +/- 2 degrees Fahrenheit and 50% +/- 2% RH, shall meet the following requirements): Property Test Method Requirement Hardness ASTM D-2240 using Shore D Durometer 60-85 Tensile Strength ASTM D-638 run at.2" (min.) specimen 3,000 psi (min.) made using C die listed in ASTM D-412 Compressive Strength ASTM D-695, Specimen B cylinder 10,000 psi min Chemical Resistance ASTM D-1308-7 days at room temperature by immersion method have no deleterious effects. The following contaminants used: Distilled Water... 1% Soap Solution Mineral Water... 10% Sodium Hydroxide Isopropanol...10% Hydrochloric Acid Ethanol... 30% Sulfuric Acid

.025 Detergent Solution...5% Acetic Acid Epoxy Resin shall be mixed according to manufacturers recommendations and blended with 3 volumes of Georgia White marble blended 60% #1 chip and 40% #0 chip, ground and grouted with epoxy resin according to 3.02 C-2-Finishing to a nominal 1/4" thickness. All specimens cured 7 days at 75 degrees plus or minus 2 degrees Fahrenheit and 50% plus or minus 2% R.H. The finished epoxy terrazzo shall meet the following requirements: Flammability: When tested in accordance with ASTM-D-635, the Epoxy terrazzo shall comply with the following value: Self-extinguishing, extent of burning 0.25 inches maximum. Thermal Coefficient of Linear Expansion: when tested in accordance with ASTM-D-696, the Epoxy terrazzo will comply with the following value: 25 x 10-6 inches per inch per degrees to 140 degrees Fahrenheit maximum. Temperature range -12 degrees to 140 degrees Fahrenheit. Bond Strength: When tested in accordance with Field Test Method for surface soundness and adhesion as described in ACI Committee No. 403 Bulletin Title No. 59-43 (Pages 1139-1141) the Epoxy terrazzo shall comply with the following value: 100% concrete failure minimum, with 300 PSI minimum tensile strength. Marble Chips: Size shall conform to NTMA gradation standards. When tested in accordance with ASTM C 131-89Abrasion and impact resistance, shall not exceed 40% loss. 24-hour absorption rate shall not exceed 0.75 percent. Chips shall contain no deleterious or foreign matter. Dust content shall be less than 1 percent by weight. CONSTRUCTION REQUIREMENTS 3.1 Contractor shall examine areas to receive terrazzo for defects in existing work that affect proper execution of Epoxy Terrazzo such as cracks in substrate that will be transmitted through topping to surface and deviations beyond allowable tolerance for concrete slab work. Start epoxy terrazzo work only when all defects have been corrected. 3.2 Fire and Toxicity Hazard: There shall be no undue fire hazard before or after setting. Fumes from volatile ingredients shall not be more toxic than those resulting from use of ordinary paint. 3.3 Coordinate furnishing and setting of floor drains, and other items in contact with epoxy terrazzo.

3.4 Concrete subfloors shall be level (maximum variation shall not exceed ¼ in 10-feet) and to have a steel trowel finished surface. No curing agent or other additives which could prevent bonding shall be used. Slab-on-grade shall be placed on an efficient moisture barrier. 3.5 Areas to receive terrazzo flooring shall be broom cleaned and free of loose chips, laitance and all foreign matter. 3.6 Contractor shall provide sufficient water, temporary heat and light, and adequate electric power with suitable outlets within 100-feet of work area. 3.7 Ambient temperature shall be maintained in accordance with terrazzo manufacturer s recommendations, but no less than 50 degrees Fahrenheit. 3.8 Materials furnished shall meet NTMA specifications. 3.9 Materials shall be delivered in a manner to prevent damage to containers and/or bags. 3.10 Materials shall be stored in a clean, dry and heated (if necessary) location (50 90 degrees Fahrenheit). 3.11 Contractor shall maintain uniformity between batches, and install terrazzo as soon as it is prepared. 3.12 Subfloor shall be prepared and primed in accordance with manufacturer s recommendations. Control joints directly above control joints in subfloor. Install divider strips as shown on drawings, in one-piece-for length wherever possible (do not piece out work with undersize lengths). Anchor strips and inserts securely with adhesive and/or mechanical fasteners, per terrazzo manufacturer s recommendations. Place terrazzo mixture in panels formed by divider strips. Trowel mixture to top of strips. 3.13 Grind terrazzo in accordance with manufacturer s recommendations, rough grinding with 24 or finer grit stones or with comparable diamond plates. Follow rough grind with 80 or finer grit stones. 3.14 Grouting: Cleanse terrazzo with clean water and rinse, remove excess rinse water and hand apply grout using identical color as used in topping, filling all voids. Cure grout (grout may be left on terrazzo until heavy/messy project work is complete.) 3.15 Fine grinding: Grind with 80 or finer grit stones until all grout is removed from surface. Upon completion terrazzo shall show a minimum of 70% of marble chips.

3.16 Cleaning and Sealing: Wash all surfaces with a neutral cleaner, rinse with clean water and allow surface to dry. Apply sealer in accordance with manufacturer s directions. Avoid heavy surface deposits. 3.17 Allowable Tolerances: Install terrazzo within the following tolerances: Surfaces: Vary from required plane 1/8" (max.) in 10'-0", measured by a 10-foot straight edge; free from dishing, scratches, pits, and stains. Topping: Uniform and free from bald spots; show at least 70% to 75% chips; within color and design range shown by approved samples. Strips: True to line and flush with adjoining surfaces; with hairline joints free from offset. 3.18 Correct work that is cracked, pitted, stained, soiled, nonconforming, or damaged. Remove and replace work that cannot be satisfactorily corrected in place. 3.19 Protection: Protect completed work from stains, abrasion, and other damage. 3.20.1 Installer shall be a contractor member of NTMA and shall perform all work in accordance with NTMA standards. 3.20.2 Contractor shall provide a one-year guarantee from the date of substantial completion or acceptance by Facilities. REFERENCE 4.1 The applicable CSI Specification Section is 09 66 23