Integrated Operations. Process control commissioning at Ormen Lange

Similar documents
System 800xA Full-scale simulation for Full Gas

Taking a Giant Leap in Subsea Technology

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

Drives and motors. A guide to using variable-speed drives and motors in data centres

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

Power management system Reliable and energy efficient

Making power plants energy efficient ABB, integrated power and automation solutions

Dry-type transformers. Dry-type transformers from ABB The ideal solution for the oil and gas industry

Energy efficiency in buildings A must, both economically and ecologically

To enable transport of wellstream over long distances. Compressor located by the wellheads.

Plant automation and telecontrol in one system. SIMATIC PCS 7 TeleControl SIMATIC PCS 7. Answers for industry.

Electrification of petroleum installations Commercial justifiable and necessary for the climate

System 800xA Fully automated ESD System for major gas plant increases safety

Kårstø. Gas processing plant FACTS

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

Brochure Introducing HVDC

A reliable gas supplier FACTS

How does gas come to Europe in the future? Development of German-Norwegian gas sales and transport systems.

Making power plants energy efficient

Birth of a Norwegian. giant

Brochure. ABB Customer Training Program for Motors and Generators Sharing knowledge and creating value

XWEB EVO Supervisor and Monitoring Systems. November 2014

Infrastructure & Cities Sector

NATURAL GAS IN NORWAY

Power Generation Service Life Cycle Management for Power Plants

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS

A new paradigm in real-time integrated environmental monitoring

The New Technology Frontier: Moving Oil and Gas Production to the Seabed. By: Allen Rentcome and Rick McLin, Rockwell Automation

E&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina. Annual production in Argentina approx. 25 million barrels of oil equivalent

Brochure. Electric generators to power the world

Gas turbine power plants

Dynamic Modeling Of An Ozone Disinfection Facility

GE Energy Industrial Solutions. New. AF-6 Series Drives. Built-in features Built-in simplicity. GE imagination at work

Drives and motors. A guide to using variable-speed drives and motors in car parks

Rex W. Tillerson Chairman and CEO, Exxon Mobil Corporation Offshore Northern Seas 2006 Stavanger, Norway August 22, 2006

World s Greenest High Performance Data Center

Subsea processing. Oslo 8. September 2011 Håvard Eidsmoen, Statoil

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea.

ARCTIC OIL & GAS CHALLENGES AND OPPORTUNITIES UNIS, LONGYEARBYEN, APRIL 12TH, 2016

HEAT PUMP FOR DISTRICT COOLING AND HEATING AT OSLO AIRPORT, GARDERMOEN

FACTS Customer Service. Your uptime insurance ABB FACTS Care

Total Subsea Services

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES

ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource

Norway. Background. Oil. 1 of 6. Last Updated: August 2011

VIRTUAL COMMISSIONING OF A LARGE LNG PLANT WITH THE DCS 800XA BY ABB

Statement of Work. 3.0 Details of Service Pre Start-up Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

Training for Operations and Maintenance

Process gas chromatographs. Measurement made easy. Compliance Solutions for 40CFR60 Subpart Ja

vacon ac drives for mining & minerals

Engineering Software Enables Designing for the Deep

Energy efficiency and cost reduction solutions for industry. PowerLogic application brochure

A guide to using variable-speed drives and motors in swimming pool halls

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

Solutions for Onshore Oil and Gas. Creating value through integrated solutions. Oil & Gas. Upstream and Midstream

Cranes Power, Control and Automation application solutions

Discover Performance Through Digital Intelligence The Digital Suites for Oil and Gas

A shortcut for temporary dwellings, canteens and offices with modular construction by Malthus Camp

Power transformers. Phase shifting transformers Reliable and efficient power flow control

WELLHEAD FLOWLINE PRESSURE PROTECTION USING HIGH INTEGRITY PROTECTIVE SYSTEMS (HIPS)

Liebert : The Right Cooling For IT Environments. Precision Cooling For Business-Critical Continuity

Monitoring the autoclaving process in the pharmaceutical industry

Offshore Platform Powered With New Electrical Motor Drive System

Using CFD for optimal thermal management and cooling design in data centers

Australian Centre for Energy and Process Training

The Competitive Edge. The Foundation For Competing

Enterprise Remote Monitoring

Industry Solution. Integrated Upstream Asset Management

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

Comfort and superior energy efficiency through intelligent home automation

Topsides, Floaters & Onshore Facilities

Operational Experience and Initial Results from the First Test Period at CO 2 Technology Centre Mongstad

Intelligent valve control and monitoring. DSP-PL Intelligent Subsea Positioner

Product Brochure. Controlled start transmission

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer

Drives and motors. A guide to using variable-speed drives and motors in retail environments

Safety & Automation System (SAS) - How the Safety and the Automation Systems finally come together as an HMI

Domestic & General deliver a new IBM WebSphere Application Server Environment at speed using RapidDeploy for Application Deployment

Realize your full potential with the new version of SIMATIC PCS 7

Flue gas measurement and control Partial-insertion pitot tubes in CEMS applications

Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway

Realize more value from System 800xA Apply Asset Management for more benefits

Data Centers: Definitions, Concepts and Concerns

Preferred partner. Investor Day London, March 17, 2015 Luis Araujo, CEO Svein Stoknes, CFO

THE KVAERNER MEMBRANE CONTACTOR: LESSONS FROM A CASE STUDY IN HOW TO REDUCE CAPTURE COSTS. Kvaerner Oil & Gas, Sandefjord, Norway

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery

VE : Thermal / Systems Pack. 1. Tabular Room Data editing for thermal properties

SOFTWARE-IMPLEMENTED SAFETY LOGIC Angela E. Summers, Ph.D., P.E., President, SIS-TECH Solutions, LP

Cubility - Facilities and offices

MICROPACK Visual Flame Detection Application Note

Data Center Infrastructure & Managed Services Outline

Satellite REPRINTED FROM. John D. Prentice, Stratos Global Corp., USA,

Lambda Tuning the Universal Method for PID Controllers in Process Control

EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA

Renewable Electricity Generation in Scotland

OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017

REPORT Bjørn G. Bergem, Arild Hervik and Oddmund Oterhals SUPPLIER EFFECTS ORMEN LANGE

Mechanical Engineering Technician- Plant Technician

Field Products. Experion LX. Proven, Easy to Use and Purpose-built Distributed Control System

Intelligent control system with integrated electronic expansion valves in an air-conditioning system operating at a Telecom telephone exchange

Transcription:

Integrated Operations Process control commissioning at Ormen Lange

Development of Ormen Lange Faster commissioning, reduced downtime and improved energy efficiency have been the results of process control performance services carried out at the plant serving Ormen Lange, one of the largest natural gas fields in development on the Norwegian continental shelf. The services were carried out alongside commissioning by a team from ABB s Integrated Operations department. The Ormen Lange gas field is located in the North Atlantic, 120 km northwest of Kristiansund, where the depth varies between 800 and 1,100 meters. The reservoir is 3,000 meters below sea level, covering an area 40 km long and 8-10 km wide. The field does not feature any conventional offshore platforms. Instead, 3 subsea templates on the ocean floor are connected directly by two 30 inch, 120 km long pipelines to the onshore process terminal at Nyhamna. The wellheads on the ocean floor are connected to the onshore process terminal at Nyhamna. Process control optimization of the onshore plant was carried out alongside commissioning. 2 l Process control commissioning at Ormen Lange

The wellheads, 800 to 1,100 meters below sea level, are connected directly to the onshore terminal; the reservoir itself is 3,000 meters below sea level. The gas from Ormen Lange is blended with gas from other fields at the Sleipner platform in the North Sea and transported to Easington in the UK via the 1,155 km Langeled pipeline, the world s longest subsea export pipeline. The Ormen Lange field can supply up to 20 percent of the UK s demand for gas. The field was discovered in 1997 by Norsk Hydro s oil and gas division, which has since become part of Statoil. Following the start of production in September 2007, responsibility for operation was handed over to Norske Shell. Norway s biggest project ever The development of the field has been the largest single project in Norwegian industrial history. ABB supplied automation, electrification, telecommunications and operator training systems. A comprehensive automation, safety and information management system oversees all applications for operation, maintenance, planning and reporting, using a distributed control system with 15,000 I/Os. The engineering contractor for the facility was Aker Solutions. Process control services, covering services to speed up commissioning of the control logic, as well as to increase the uptime and efficiency of the equipment, was an additional order placed by Norske Shell while planning the start of operations, in the summer of 2007. The project was to run in tandem with commissioning of the automation system, aiming to adapt the control logic and its parameters to the actual production situation in an efficient way. Underpinning the project was a tight integration with Ormen Lange operations and hence access to their operational- and process expertise this collaboration was key to the benefits achieved. The result is faster commissioning and start-up. The project has also increased uptime by four to five days per year, which represents a significant increase in revenues, bearing in mind that the field production capacity is 70 million standard cubic meters of gas per day. In addition, energy efficiency has improved. The work also enabled Shell to learn about the system more quickly, helping the company to use the equipment in the most effective way. The work was carried out by a team specializing in process and production optimization from Integrated Operations, a department within ABB that delivers solutions and services for more profitable operations and improved work processes. The value of the optimization project is $4.3 million (25 million Norway kroner) up to 2010, an amount quickly recouped by Norske Shell through more rapid start-up and increased uptime. The contract was originally for three years but was extended by another two years in 2010. Process control commissioning at Ormen Lange l 3

Process control at Ormen Lange The system that ABB s Integrated Operations team was taking on in the summer of 2007, with a view to optimize, is one of the largest automation systems ABB has ever built. This is an extremely large system. Although Norske Shell was involved throughout the design phase, we did not feel we had sufficiently detailed expertise to optimize the system, says Arne Røsdal, Norske Shell s operations support supervisor of Ormen Lange. The comprehensive automation, safety and information management solution includes applications for daily operation and maintenance, as well as planning and reporting. Automation system with 15,000 I/Os The distributed control system is an ABB 800xA with 6 operator workplaces and eight engineering stations, requiring 42 servers in six cabinets for the process automation and information management system. The 15,000 I/Os are mainly on HART and Profibus. The process is monitored and controlled by 67 AC 800M controllers (43 single AC 800M, 12 single AC 800M HI and 12 redundant AC 800M HI), handling process control, process shutdown, fire and gas alarm, HVAC, power distribution control system, subsea control units and fire water pumps. Two safety systems for emergency shutdown and anti-surge systems are supplied. The production process is monitored from a control room at Nyhamna. A curved wall with a large screen display provides the operators with an overview of the process facility. Camera monitoring of process sections is also integrated into the safety and automation system. Process control services started at the same time as commissioning. 4 l Process control commissioning at Ormen Lange

The production is monitored from a control room at Nyhamna. With the expertise of ABB s Integrated Operations team, it was easier to identify problems early and to solve them permanently Arne Røsdal, operations support supervisor for Ormen Lange, Norske Shell Early operations were greatly helped by a simulator of the automation system, provided by ABB, which enabled us to try different parameters. But there is a limit to how much you can do in a simulator. We decided it would be useful to have a team of experts from ABB to help with the tuning of the system during the start-up phase, says Røsdal. Control logic commissioning and tuning We started our process control services at the same time as commissioning, says Lars Nummedal, technical lead of the ABB team, known to Norske Shell as the tuning team. We complemented Shell s operational expertise with our process control expertise and the first objective was to get the plant and sub-systems up and running as quickly as possible. We started by tackling any obvious problems and then gradually moved on to loop tuning, control logic improvement and operational support. The members of ABB s Integrated Operations team are specialists in chemical engineering and process control, typically postgraduates to MSc or PhD level. They work closely integrated with the Shell team, spending most of their time in the control room. A remote control room in Oslo, built by ABB and owned by Shell, is used for backup operations, The ABB team quickly moved from trouble-shooting to loop tuning, control logic improvement and operational support. but ABB also has staff on site in Nyhamna. At any time, five to ten ABB staff are working on the project. Tuning support is always very useful at start-up, as there are often problems managing control functions. It is difficult to control the entire process while trying to predict how the different functions will influence each other, says Røsdal. The Shell staff and the ABB team have an intense dialogue with each other and through this, we learn how the process works and what is possible to achieve. As the project progressed, we also realised that the ABB team members had a useful competence in processing as they helped to sort out several problems in cooperation with the engineering contractor. This resulted in a problem-free start-up. Normally, when starting a plant, you tend to have long downtime periods while solving problems and then waiting for the plant to get back to stable operation. This was avoided when starting Ormen Lange, says Røsdal. The members of our tuning team are experts of process operations, particularly the dynamic performance of the system. We know the way pressure and temperature fluctuate and how levels change. Using tailor-made tools and applications, we can put the finger on a problem and adapt the software or control strategy, as well as pinpoint issues with the mechanical equipment or the operational procedures. Simply put, we suggest and implement changes to ensure that the system behaves in the way the operators and engineers want, explains Nummedal. With the expertise of ABB s Integrated Operations team, it was easier to identify problems early and to solve them permanently, adds Røsdal. Process control commissioning at Ormen Lange l 5

Optimizing the process plant Improved profitability with rapid commissioning ABB s Integrated Operations team minimized the time needed for commissioning, enabling the facility to start earning revenue earlier. Just by shortening the time to start-up by four to five days, the cost of the contract could be recouped many times over. The team also provided continuity by helping to manage the transition from start-up to the operational phase. The performance level that has been established will now be maintained there is a service agreement in place to maintain and if possible improve on this level. Correct tuning can prevent many problems. Issues associated with overload are reduced. With less fluctuations and more stable operation, we can increase the throughput. The workload for staff is also reduced, as they otherwise have to go out to the plant and investigate problems. In addition, there is less need to shut down, as the ABB team has the expertise to make adjustments while the process is running, says Røsdal. Focusing systematically on the tuning, ABB helps to free up the Shell staff for other duties, says Røsdal. The tuning of the controllers was a deciding factor enabling us to start the plant rapidly. During operation, the troubleshooting carried out by the team has been particularly useful, says Reidar Haugsgjerd, startup advisor for Ormen Lange at Norske Shell. Increased profit, safe operation and lower costs The optimization has resulted in improved plant up-time, less wear of equipment, increased condensate production and reduced energy use. This means maximized profit with safe and robust operation, while maintaining quality constraints and export requirements. It has also minimized time for duty change due to varying demand from the customer and enabled the plant to achieve the quickest possible resumption of production following downtime. The result has been increased uptime by four to five days per year. We have also introduced several improvements to the process. For instance, condensate production has increased. Condensate is a more valuable product than gas, so this helps increase revenues. The process is now optimized to produce the highest proportion of condensate possible. The ABB team has also helped reduce the amount of heat transfer medium in the cooling processes, says Røsdal. On top of this, the ABB team has identified opportunities for energy savings of more than 3 MW. Significant energy savings were achieved by, for instance, optimizing control of the export compressor by reducing the cooler temperature, making more power available to increase the export rate. All energy efficiency improvements are of interest. Electricity is a large part of the running costs for the plant and Ormen Lange also pays for the CO 2 emissions. In addition, we have to work within the maximum capacity of the electrical plant. If 1 MW is saved, the freed-up capacity can be used The optimization has helped Shell maximize revenues through improved up-time, less equipment wear, reduced energy use and higher condensate production. 6 l Process control commissioning at Ormen Lange

somewhere else, for instance to increase the export rate, which will boost revenues. The effort invested in improving energy efficiency gives rapid payback, says Røsdal. Gain for engineering contractor The early start-up has also been a benefit for the engineering contractor, Aker Solutions. The quick commissioning benefited Aker directly. It is a distinctive advantage to the engineering contractor to finish its part of the project as early as possible, both to save its own costs and to earn any bonuses stipulated in the contract. Rapid completion is also a competitive advantage and an important reference for future contracts, says Romar Ekbraaten, responsible for integration of the automation system on behalf of the engineering contractor, Aker Solutions. Ekbraaten monitored the overall reliability of Ormen Lange during the first year of operations. Tuning of the controllers has given an important contribution to the high reliability, together with robust design and small fluctuations. Compared to other similar projects, Ormen Lange showed outstanding reliability from day one, says Ekbraaten. Tuning the controllers during start-up turned out to be much better than the traditional alternative, which is to start up with theoretical design values and values obtained during simulation. A substantial part of this data is normally modified during commissioning, as it becomes part of the complete system and no longer works in isolation. During this stage, equipment failures are common if equipment is forced to work with parameters it was not designed for. While starting up Ormen Lange, this could be prevented by parallel verification, says Ekbraaten. Further benefits with earlier involvement In hindsight, it would also have made sense to have the ABB tuning team involved at an earlier stage, during mechanical completion. In many projects, this stage includes all tests up to full loop test and handover to commissioning. It would have been useful to verify the systems implemented on a running basis, says Ekbraaten. ABB can assist the engineering contractor by ensuring the dynamic behavior is the way the customer wants it when the system is commissioned. These process control engineering services are based on thousands of hours of control room experience. The services enable the contractor to optimize the engineering for the control tasks ahead and will reduce the commissioning and start-up time, says Nummedal. The engineering contractor, Aker Solutions, also benefited from the rapid start-up of the process plant. Continuing and sustaining the improvement There is no doubt about the enormous usefulness of ABB s tuning team when starting up the plant. They were one of the keys to the success, says Per Sælevik, startup leader of Ormen Lange at Norske Shell. We have learned a lot both about the automation system and about the process in general. The work with the tuning team has given us an invaluable overview of which parameters are important, based on actual operation of the plant. We can tackle bottlenecks and remove these systematically, says Røsdal. The tuning team gives us important information on a continuous basis, Røsdal concludes. Process fingerprint service A service to identify possible process control improvements is also available to operators of brownfield sites. For reasons like tail production, process changes, equipment changes, or changes in reservoir or fluid characteristics, a production plant may no longer operate as it was intended in the design phase. ABB s Process Fingerprint Service will identify how production can be increased and operational expenses reduced while ensuring safe operation. Process control commissioning at Ormen Lange l 7

Contact us ABB AS Process Automation division Ole Deviks vei 10 P.O. Box 6359 Etterstad NO-0603 Oslo Norway Tel: +47 22 87 20 00 E-mail: io@no.abb.com www.abb.com/oilandgas Notes: We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this document. We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB. Ormen Lange brochure /Sept 2010 Copyright 2010 ABB All rights reserved