PROCESL, Engenharia Hidráulica e Ambiental, Lda.

Similar documents
Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Towards sustainable and strategic management of water resources

Progress of Water Environmental Governance/Management and Future Challenges in Vietnam

Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences

Construction Services

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI

NEWTECH CONSULTING GROUP

Permanent Secretary Office of Environmental Services Lagos State Ministry of the Environment At. Dar es Salaam, Tanzania

HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back!

WE DO IT FOR YOU. 50 years experience and leadership

References Book of HERA Group. Cleaning, Restoring and Remediation treatment of polluted soils

Environmental Management Plan

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

The Water, Energy, Food Nexus: Lebanese Policy and Institutional Analysis

authorization for industrial waste water drainage. Periodic waste water sampling and analysis. Design of waste water treatment systems.

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

IRRIGATION PROJECTS IMPLEMENTED BY FAO IN LEBANON

PLANNING APPLICATION: 12/00056/APP

ULUDAĞ UNIVERSITY INSTITUTE OF SCIENCE ENVIRONMENTAL ENGINEERING ACADEMIC YEAR INSTITUTE REQUIRED COURSES

Country specific notes on municipal waste data

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

ENERGY EFFICIENCY STRATEGY AT THE NATIONAL OFFICE OF ELECTRICITY AND DRINKING WATER «ONEE»

FINANCING AND PRIVATE SECTOR OPPORTUNITIES IN AFRICA. Fernando Costa Lima

Basics of Sustainability. Environmental Impact Assessments (EIA)

Proposed Terms of Reference for EIA studies

Tiger Brennan Drive Extension Stage 2. Project Environmental Management Plan

Water resources. The main problems of pollution that need to be addressed in the country are the following:

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

WATER RESOURCES MANAGEMENT IN THE REPUBLIC OF AZERBAIJAN: OVERVIEW AND OUTLOOK

DEPARTMENT OF GEOGRAPHY

Concept Note for an IWRM Masters Degree Program. Armenia, Azerbaijan and Georgia 2012

Concept Note for an IWRM Masters Degree Program. Armenia, Azerbaijan and Georgia 2012

Experiences in the application of Espoo Convention Spain

How do storm water and wastewater networks function together with the wastewater treatment plant? Theo G. Schmitt, Kaiserslautern University (Germany)

Environmental Management Systems in Hotels. 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel

1947 José Vaz Guedes, creates Somague group João Vaz Guedes, takes over company leadership Vaz Guedes family, owns 100% of capital.

GROUNDWATER MONITORING AND DATA MANAGEMENT IN THE MEDITERRANEAN REGION. Marrakech, May 2005

Environmental guidelines for preparation of an Environment Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

The Water, Energy, Food Nexus: Lebanese Policy and Ins=tu=onal Analysis

Water Resources Development and Management in India - An Overview

Water Quality Management and Regulation Tools

Building Tennessee s Tomorrow: Anticipating the State s Infrastructure Needs July 2011 through June 2016

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

CONTROL FLOODING AT LOW AREAS OF MARGINAL EXPRESSWAY TIETÊ RIVER IN THE CITY OF SAO PAULO, BRAZIL

PROPOSED TERMS OF REFERENCE

Permitting of Development and Infrastructure Projects in Abu Dhabi

Stormwater harvesting

INTEGRATED WASTE MANAGEMENT SERVICES

ENVIRONMENTAL PROTECTION

MINISTRY OF ECONOMY. TURKISH ENGINEERING CONSULTANCY SECTOR An overview

How To Conduct An Environmental Impact Assessment

Environmental Guidelines for Preparation of an Environmental Management Plan

FRESHWATER COUNTRY PROFILE NORWAY

ENVIRONMENTAL MANAGEMENT STRATEGY

ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE

Managing the Island s Water Resources Planning for the future

Antamina Closure Plan: A Top Level Practice. Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010

Environmental Technology global events by one expert. environment.messefrankfurt.com

Semi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project

Summary: Introduction

NAPCS Product List for NAICS 54162: Environmental Consulting Services

edms 5. THAILAND 5.1 Water Resources Management Policies and Actions

Ingredion ANZ Pty Ltd

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

7th Framework Programme Theme 6 Environment (including climate change)

Strategy for 2012 to An active player from rural areas to the metropolis

Introduction to Waste Treatment Technologies. Contents. Household waste

Water Innovation Europe 2015 Water and agriculture in the circular economy

1. Portugal and Porto

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting

SINGAPORE INSTITUTE OF PUBLIC ADMINISTRATION. TRAINING calendar. Regional Training Centre For Public Administration

2006 Standard Application Processing Time. 10 months. 14 months

Arizona 1. Dependent Public School Systems (14) Arizona ranks 39th among the states in number of local governments, with 639 as of June 2002.

Local Water Supply, Sanitation and Sewage

Public Works Engineering Technician: Speciality Civil Constructions

DRAFT Public Outreach Document for What s an SSMP?

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa

Lebanon Hotspot Report: the Garbage Mountain

Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž

HYDROLOGICAL CYCLE Vol. I - Anthropogenic Effects on the Hydrological Cycle - I.A. Shiklomanov ANTHROPOGENIC EFFECTS ON THE HYDROLOGICAL CYCLE

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Water: The Environmental Outlook to 2050

Proposed General Plan Update Goals, Policies, and Implementation Actions

CESAB Research Center for Environmental Sciences and Biotechnologies European University of Rome

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

at a disposal site for which a permit has been issued; or

CWSRF Project Descriptions and Examples for Green Project Reserve

The environment management services industry

Hashemite Kingdom of Jordan Ministry of Water and Irrigation. Water in Jordan: Water security and protection

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities

Current Statistics Northern Tier Pennsylvania. Number of Jobs 5,700 94,600 Average Earnings Average industry earnings per worker includes benefits

Building Drought Resilience through Land and Water Management

It is better to fail in originality than to succeed in imitation. Herman Melville ( )

TURKEY ANATOLIA WATERSHED REHABILITATION PROJECT Sedat Kadioglu Ministry of Environment Abdulmecit Yesil Ministry of Agriculture and Rural Affairs

Caring for. our. harbour

River Basin Management in Croatia

Transcription:

PROCESL, Engenharia Hidráulica e Ambiental, Lda.

Subject-matters

Areas of Activity Planning PROCESL assures a global engineering high quality, providing the best technical resources to achieve the optimization of its results. Roads and Highways Engineering Environmental studies The scope of its activity is consulting and developing projects and studies in engineering, construction and planning, especially in the field of hydraulic, sanitary and environmental engineering. Agricultural Hydraulics Infra-structures and Public Works Projects Organization and Institutional Development Studies Economic and Financial Studies

Areas of Activity Plannning Environmental Studies Infra-structures and Public Works Projects Pollution Control Strategic and Waste Management Plans Waste Valorization Water Resources Basic Sanitation Urban Planning Environmental Monitoring Works and Monitoring Plans Environmental Certification and Implementation of EMS SEA and Sustainability Reports Climate Change Diagnosis, Audit, EIA and Environmental Responsibility Ecology Studies Noise Mapping / Acoustic Studies Controlled Landfills and Solid Waste Treatment Plants Screening and Recycling Centres, Undifferentiated and Selective Waste Removal Systems Submarine Emissaries Pumping Installations and Domestic and Industrial Wastewater Treatment Plants Dams, Pumping Plant for Water Supply, WTP, Water Supply Systems Mathematical Modeling of Water Resources Exploitation and Renewable Energy Territorial and Environmental Planning

Areas of Activity Roads and Highways Engineering Economic and Financial Studies Organization and Institutional Development Studies Agricultural Hydraulics Geometric design of roads and Earthworks Drainage Roads Signs and Safety Equipment Pavements Fencing and road limits, Land Expropriations, Traffic detours and temporary road connections Support for Implementation of Organizational Reforms Financial and Economic Evaluation of Projects Studies of Basic Sanitation Systems Financial Basis Socioeconomic studies Administrative Organization of Basic Sanitation Services Proposals for Legislation and Regulation in the Sanitation Field Rationalization of Working Methods and Decision Circuits Irrigation Schemes Rural Roads Agricultural Drainage Hydraulic Works adduction Irrigation Networks Electrical and Telecom Infrastructures Environmental impact assessments and landscaping

Companies in which PROCESL has a holding HIDROQUATRO Consultores de Hidráulica, Recursos Hídricos e Ambiente, Lda. (100% since September 1999) AIA Avaliação de Impactes Ambientais, Lda. (100% since September 1999) Ecoprogresso - (55% since August 2010)

International Partnerships South Africa ProRem Angola SOAPRO Brazil Cobrape Lybia Al Raed Macau/China CeslÁsia

PROCESL in the world Angola Algeria Brazil Cape Verde Dominica Guiné Equatorial Chile Slovakia Spain Libya Macau Mozambique Portugal S. Tome and Principe Tanzania

Wastewater Treatment Plant Macao Location: Aterro da Areia Preta Macao Technical Clique Assistance, para Co-ordination editar and o Supervision estilo of the construction works and equipment supply in association with CESL-ASIA (CESL Group) Main characteristics Liquid phase with 3 18 000 m 3 /lines Solid phase with 3 band filters (30% MS) and 1 sludge and used oil incinerator with a 75 tonne/day capacity for solid waste Treatment and control of combustion gases, noise and odours

Solid Waste Incineration Plant Macao Main characteristics 3 lines of 12 tonne/h (two are in place since 1992 and a third one will be installed in 2012) Reverse acting incinerators and natural circulation boilers Treatment of gases by semi humid reactor Location: Taipa Island Macao

Consultancy Services for Dominica Solid Waste Final Design, Tender Documents, Supervision of Construction Location: Roseau Dominica Design of a new sanitary landfill capacity of 170.000 m 3, to be constructed in a quarry area near Rouseau Work description Design of the restoration of two obsolete existing landfills including environmental recuperation and safe environmental closure Preparation of Tender Documents Evaluation of Works Tender Supervision of Works Site Location

Al Bayda Infrastructures Redevelopment Project 1 st, 2 nd and 3 rd Phase Location: Al Bayda, Libya Main characteristics 1 st Stage - Assessment and diagnosis of networks of existing infrastructures, the rough estimate and preliminary investment needed for renewal and rehabilitation 2 nd Stage - Preparation of preliminary design of this solution 3 rd Stage - Preparation of the detailed design of these and technical assistance

Consultancy to Evaluate the Social and Environmental Impact of the PMER (Angola) Location: Provinces of Bié, Huambo, Malange, Moxico, North Kwanza, Luanda and Uíge Preparation of terms of reference for tenders, environmental impact assessment, environmental monitoring of the works included in the project, environmental management and training of the senior technicians of the various ministries in the evaluation of the environmental impact Activities: To contextualise the environmental and social process To develop the evaluation of the subprojects and implementation To improve institutional capacity

Environmental, Quality and Safety Monitoring Works in the Port of Praia Location: City of Praia, Island of Santiago Cape Verde Setting up and implementation of the Quality, Environmental and Safety Management System, including the preparation of the corresponding Environmental Management Plan (EMP), the Safety and Health Plan (SHP) and the Quality Plan (QP) Noise, Vibrations and Quality of Air Monitoring

Detailed Design of the Affected Networks Infrastructures for the Oran Surface Subway Location: Oran, Algeria Identification of conflict situations, design of temporary and definitive works, detailed design of approved solutions and analysis of the contractor s proposal for the works

Code of Practice for Waste Management on Islands European Islands: Mallorca (Spain), Crete (Greece), Barnholm Clique (Denmark), para Isle of editar Wight (UK), o estilo Madeira and Azores (Portugal) PROCESL was responsible for the study related to the Portuguese Islands The manual includes: Legal framework Identification of solid waste management problems Selection of strategies Organisation Collection solutions Transport and treatment Economic aspects Implementation of solutions and strategies

Hydrological Master Plan of the Tagus river catchment areas Location: Basins of the Tagus river, Portugal Direction Clique of the Plan para and editar the joint venture o estilo coordination with participation in all the phases of the Plan and was responsible for the following activities: Diagnosis Proposal of actions and measures Physical and financial planning

Thank You