SECTION 11.0 EVALUATION OF THE ADVANTAGES AND DISADVANTAGES TO THE ENVIRONMENT

Similar documents
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

LNG CANADA EXPORT TERMINAL PROJECT (PROJECT)

Proposed Terms of Reference for EIA studies

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

APPENDIX 4. Risk Tables

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

Environmental guidelines for preparation of an Environment Management Plan

CHAPTER 4 ALTERNATIVES COMPARISON

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$ %3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

Development proposals will require to demonstrate, according to scale, type and location, that they:-

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS

9.0 Project Follow-Up Measures and Monitoring

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Summary of Commitments

23.1 RENEWABLE ENERGY

NAPA COUNTY WATERSHED SYMPOSIUM

Energie Saguenay Project Update and Preliminary Consultation Results. June 3, 2015

Environmental Guidelines for Preparation of an Environmental Management Plan

Sec. 22a-1a page 1 (4-97)

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

Gold Ray Dam Interagency Technical Team Meeting

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects

Oregon. Climate Change Adaptation Framework

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

PROPOSED TERMS OF REFERENCE

Environmental Construction Operations Plan (ECO Plan) Framework

Introduction to protection goals, ecosystem services and roles of risk management and risk assessment. Lorraine Maltby

NASA Stennis Space Center Environmental Resources Document

National Environmental Policy Act and Permitting Services for the Mining Industry

NRDA PROCEDURES AND TERMS

ANNEX 2 Emergency / Pollution Incident Response Plan

Guide to the Remediation Report & Fee Submission Form

Section 4 General Strategies and Tools

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc.

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

MBJ Environmental Programmes

Ross Van Bostelen December 9, 2014 Via . Robb Trend Coal Mine Expansion Project - Information Request to Coal Valley Resources Inc.

Aiding the Hydro-scheme development process. Web-links to useful information sources

SEC PURPOSE. SEC DEFINITIONS. SEC COLLABORATIVE FOREST LANDSCAPE RESTORATION PROGRAM.

Ch. 15-Restoration Ecology

Phase A Aleutian Islands Risk Assessment. Options and Recommended Risk Matrix Approach. April 27, 2010

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

Restoration Planning and Development of a Restoration Bank

8.17 ACCIDENTS, MALFUNCTIONS AND UNPLANNED EVENTS

There is a concerted effort in the regionto understand the sources, fate, transport and

APPLICATION OF GEOSPATIAL TECHNOLOGIES FOR SUSTAINABLE ENVIRONMENTAL MANAGEMENT

PROPOSED TERMS OF REFERENCE

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

MANAGEMENT STANDARD CLOSURE PLANNING

Key programs and relevant studies

ENVIRONMENT MANAGEMENT PLAN

IAIA WNC Forum: INAC s Environmental Review Process under CEAA 2012

Chapter 8. List of Preparers

PUBLIC NOTICE Application for Permit

SUFFOLK COUNTY WATER QUALITY PROTECTION AND RESTORATION PROGRAM AND LAND STEWARDSHIP INITIATIVES INFORMATION FOR APPLICANTS

Part B Integrated Monitoring Design for Comprehensive Assessment and Identification of Impaired Waters Contents

Water Security Agency. Plan for saskatchewan.ca

PROPOSED EXCESS SOIL MANAGEMENT POLICY FRAMEWORK

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists

HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041

How To Conduct An Environmental Impact Assessment

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Fire Management needs assessment and priority actions

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

. (1) the prospectivity of Victoria s geology for commercial sources of onshore unconventional gas;

American Forest Foundation (AFF) Standards of Sustainability for Forest Certification

Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!

PRESENTATION 2 MAJOR ENVIRONMENTAL PROBLEMS

5 ALTERNATIVE SOLUTIONS AND EVALUATION

Kristina Veidemane, Baltic Environmental Forum Panevezys,

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011

CDPHE. The Colorado Department of Public Health and Environment, the State agency responsible for hazardous waste site compliance and oversight.

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT

DRAFT ENVIRONMENTAL ASSESSMENT TEMPLATE

Operational policy. Commercial filming and photography in QPWS managed areas. Visitor Management. Policy issue. Background.

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

Comparison of HSESAP Revisions 2 and 3

12 ENERGY Introduction

10.1 LNG TERMINAL, MARINE TRANSFER PIPELINES, LNG STORAGE TANKS AND THE REGASIFICATION FACILITIES

FINAL GUIDELINES FOR AN ENVIRONMENTAL IMPACT ASSESSMENT: GEODEX SISSON BROOK PROJECT (OPEN PIT MINE)

NOTICE OF PREPARATION

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

Permitting of Development and Infrastructure Projects in Abu Dhabi

National Planning Policy for Waste

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

RISK ASSESSMENT REPORT

Experience from the first large scale tidal turbine EIA in Europe. How do we work towards effective and proportionate EIA?

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Pollution Incident Response Plan

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

Avison Management Services Ltd. COMPANY PROFILE

Transcription:

SECTION 11.0 EVALUATION OF THE ADVANTAGES AND DISADVANTAGES TO THE ENVIRONMENT

TABLE OF CONTENTS PAGE 11.0 EVALUATION OF THE ADVANTAGES AND DISADVANTAGES TO THE ENVIRONMENT... 11-1 September 2013 Page i

11.0 EVALUATION OF THE ADVANTAGES AND DISADVANTAGES TO THE ENVIRONMENT This section presents an overall Project evaluation of the advantages and disadvantages to the environment, during the construction, operation, and decommissioning phases. As required in the TOR for the EA, a justification is provided for the identified disadvantages. This overview reflects Pieridae s commitments to regulatory compliance and to sound environmental management principles. The list of advantages and disadvantages assumes the successful implementation of the specific mitigation measures and monitoring programs as described in this EA and are reflective of an undertaking that is in full compliance with all applicable regulatory requirements, contemporary approaches to environmental management, and sustainability assurance. Tables 11.0-1, 11.0-2, and 11.0-3 summarize the evaluation of the Project by Phase. For the most part, disadvantages of the Project are short-term and localized and associated with environmental effects that were not considered significant. The disadvantages are offset by mostly economic benefits, which are expected to be long-term and far reaching, i.e., relevant to the local community, the region, and the province of NS. Table 11.0-4 discusses advantages and disadvantages with respect to potential malfunctions and accident scenarios. Table 11.0-1 Construction Phase Project and Disadvantages Construction Phase Biophysical Environment Geological (soil quality) Groundwater (quality and quantity) Surface Water (quality, sediment quality) Air Quality and Climate Change Project site development work will eliminate concerns and hazards associated with on-site tailings and AMO. Potential for minor impairment to surface and groundwater resources from works and activities at contaminated sites; Project will identify extent and degree of site contamination within the Project site boundaries and provide for adequate site management (i.e., isolation, removal, and remediation). Potential for minor impairment to groundwater quality; possible localized alterations in flow and volume; construction-related effects short-term and to remain within applicable regulatory standards and requirements. Potential for minor impairment of surface water quality and flow during construction, however, effects localized short-term and to remain within applicable regulatory standards and requirements. Increased air emissions; constructionrelated emissions localized short-term and to remain within applicable regulatory standards; emission sources located in designated industrial park. September 2013 Page 11-1

Construction Phase Noise, Lighting Increased noise levels; constructionrelated noise effects localized short-term and to remain within applicable regulatory standards; increased lighting will change rural character of Goldboro; noise and light sources located in designated industrial park. Flora, Fauna and Terrestrial Improved inventory of area habitat Habitat (including SAR) and species (for SAR). Permanent loss of terrestrial habitat; no rare habitat involved (site previously disturbed through mining and logging activities); together with other future developments, Project may contribute to cumulative adverse effects on Mainland Moose population and bats; Proponent committed to contrinute to moose and bat recovery programs; avoidance of identified plant SAR; site designated for industrial use; development represents brownfield site development and is in line with municipal planning objectives. Wetlands Site development will involve removal of several small wetlands; all of which are considered common in the region and do not provide critical habitat for SAR; loss will be permanent; remaining wetlands in region extensive; to be mitigated/compensated through implementation of a wetland compensation program. Freshwater Aquatic Species and Habitat (including SAR) Marine Species and Habitat (including SAR) and Marine Sediment Transport Improved inventory of area habitat and species (for SAR). Improved inventory of area habitat and species (for SAR). Socio-Economic Environment Agriculture No agriculture within zone of influence of proposed facility. Forestry Location has no particular value for forestry. Fisheries, Aquaculture and Harvesting Potential for HADD and reduced productivity; mitigated through ecological channel design to extent possible, and maintenance of flow regime; residual effects to be addressed through offset plan/ Fish Habitat Compensation Plan. Some habitat loss at wharf and jetty; offset by marine habitat creation / enhancement of habitat productivity. Potential for some localized, temporary impairment of marine water and sediment quality and potential sediment transport; effects considered not significant. Marine traffic, water quality impairment, and near-shore construction activity could affect fish harvesting and aquaculture. Considered a trade off against significant economic benefits for the local community. September 2013 Page 11-2

Construction Phase Socio-economic Environment (Economic Conditions, Population, Employment) Will provide short term (construction) employment through direct hires and economic benefits through direct expenditures and multiplier effects. Will strengthen existing regional and provincial industrial capability. Will encourage and facilitate local population growth. Residential Property Values Property values likely to increase. Human Health Discovery and safe disposal of potential mine tailings within the Project footprint. No air quality issues identified; all emissions and discharges to remain within applicable regulatory standards. Potential for exposure to dust or site runoff contaminated by hazardous Land Use Existing and Planned Road Transportation Landscape Aesthetics and Recreational Opportunities Project is compatible with and supports land use designation. Project related economic benefits provide the public with financial resources for infrastructure improvements and maintenance.. Project s information centre will provide for local learning and interpretation opportunities. Increased tax revenues and higher population numbers (temporary and permanent) expected to provide for increased demand and business opportunities in local and regional recreation and tourism sector. Increased municipal tax base will allow for improvement and maintenance of recreation / tourism infrastructure. materials; addressed by RMP. NA Increased traffic volumes effects expected to be localized, temporary; and well within existing road capacity; residual effects considered a trade off against significant economic benefits for the local community and with it the financial resources for infrastructure improvements and maintenance. Change of local landscape character from rural to industrial; some impairment of visual quality for some locations ( foreground visually dominating by industrial features; visual intrusion by lighting). Site development fits municipal planning objectives in that it will take place in a designated industrial park with other existing and planned industrial uses. Visual aesthetics not raised as a concern during community consultation. Potential for temporary limitations on recreational boating near the jetty; considered a trade off against significant economic benefits for the local community and, with project-generated increased revenues, there is potential to off-set adverse effects through improvements in local and regional recreational infrastructure. September 2013 Page 11-3

Aboriginal Use of Land and Resources Archaeological Resources Construction Phase First Nations communities engaged in Project development process (signed MOU in place). Proponent committed to collaborate with First Nations communities to ensure realization of Project benefits for Aboriginal communities. No interaction with land claims. No significant adverse effects on natural environment resources (see summaries under Biophysical Environment). Improved inventory and knowledge of area resource. Table 11.0-2 Operations Phase - Project and Disadvantages Operations Phase Biophysical Environment Geological (Soil Quality) Groundwater (Quality and Quantity) Surface Water (Quality, Sediment Quality and Transport) Air Quality and Climate Change No interaction with Project identified. With the provision of natural gas, the Project is making a fuel source available that generates the least GHG emissions of all fossil fuels. Discharges of (treated) wastewater; all discharges compliant with applicable water quality standards. Potential for some impairment of marine water and sediment quality and sediment transport; effects considered not significant; trade off through new wharf infrastructure providing opportunities for large scale naval transport to and from the industrial park and associated economic benefits. Increase in emissions from local sources; levels to remain within regulatory standards. GHG emissions not significant in global context but in relation to NS s GHG reduction targets. Emission sources located in designated industrial park. Currently the province has no industry binding GHG standards in place; proponent committed to GHG management and/or GHG offsets within NS. Noise, Lighting Potential for increase in noise levels; proponent committed to mitigation so that levels remain within regulatory standards. Increased lighting will change rural character of Goldboro; noise and light sources located in designated industrial park. September 2013 Page 11-4

Flora, Fauna and Terrestrial Habitat (including SAR) Wetlands Freshwater Aquatic Species and Habitat (including SAR) Marine Species and Habitat (including SAR) No interaction with Project identified. No interaction with Project identified. Socio-Economic Environment Agriculture No agricultural activity within zone of influence of proposed facility. Forestry No interaction with Project identified. Fisheries, Aquaculture and Harvesting Socio-economic Environment (Economic Conditions, Population, Employment) Will provide long term (operation phase) employment opportunities. Contribute to local and regional economy (direct expenditures and benefits through multiplier effect). Increased municipal tax base. Strengthening of existing industrial capability of region and Province. Operations Phase Migrating bird species movement pattern could be disrupted as a consequence of the presence of the new development. Effect not considered significant. Potential for change in sedimentation patterns around marginal wharf; significance unknown; but not expected to be significant trade off through new wharf infrastructure providing opportunities for large scale naval transport to and from the industrial park and associated economic benefits. Marine traffic and water quality impairment, could affect fish harvesting and aquaculture; effects expected to be not significant and considered a trade off against significant economic benefits for the local community. Residential Property Values Stability in property values. Human Health None identified; all emissions and discharges to remain within applicable regulatory standards; working environments in compliance with regulatory requirements. All potentially contaminated material managed and safely disposed of. Land Use Existing and Planned Transportation Project is compatible with land use designation and supports municipal planning objectives for the Project location. Project related economic benefits provide the public with financial resources for infrastructure improvements and maintenance. None identified; operation related traffic volumes are well within road capacity. Increased traffic volumes; effects expected to be localized. September 2013 Page 11-5

Recreational Opportunities and Aesthetics Aboriginal Use of Land and Resources Archaeological Resources Information Centre will provide interpretive and learning opportunities Increased tax revenues and higher population numbers (permanent workforce) expected to provide for increased demand and business opportunities in local and regional recreation and tourism sector. Increased municipal tax base will allow for improvement and maintenance of recreation/tourism infrastructure. First Nations communities engaged in Project development process (signed MOU in place). Proponent is committed to collaborate with First Nations communities to ensure realization of Project benefits for Aboriginal communities. No interaction with land claims. No significant adverse effects on natural environment resources (see summaries under Biophysical Environment). No interaction with Project identified. Operations Phase Change of landscape character from rural to industrial; some impairment of visual quality for some locations (foreground visually dominating by industrial features; visual intrusion by lighting). Site development fits municipal planning objectives (designated industrial park with other existing and planned industrial uses). Visual aesthetics not raised as a concern during community consultation. Potential for temporary limitations on recreational boating near the jetty and not considered; considered a trade off against significant economic benefits for the local community. Project-related increased revenues provide potential to off-set adverse effects through improvements in local and regional recreational infrastructure. Table 11.0-3 Decommissioning Phase - Project and Disadvantages Decommissioning Phase Biophysical Environment Geological (Soil Quality) Groundwater (Quality and Quantity) Surface Water (Quality, Sediment Quality and Transport) Air Quality and Climate Full site decommissioning to applicable standards. No interaction identified. Upon completion, elimination of operations-related discharges; potential for rehabilitation of natural shoreline and processes. Upon completion, elimination of operations-related emissions. Potential for impairment of marine water and sediment quality from dismantling of infrastructure; short-term and localized. Dust emissions from decommissioning work; short-term and localized. September 2013 Page 11-6

Noise, Lighting Flora, Fauna and Terrestrial Habitat (including SAR) Wetlands Freshwater Species and Habitat (including SAR) Marine Species and Habitat (including SAR) Upon completion, elimination of noise and lighting sources. Potential for rehabilitation of terrestrial habitat. Potential for rehabilitation of wetland habitat. Potential for rehabilitation of natural shoreline and processes. Potential for rehabilitation of marine habitat. Socio-Economic Environment Agriculture No agricultural within zone of influence of proposed facility. Forestry Potential for site re-vegetation/ forestry. Fisheries, Aquaculture and Upon completion, access regained Harvesting to marine areas to the degree that jetty and marginal wharf will be removed (municipality may decide to maintain some of the marine Socio-economic Environment (Economic Conditions, Population, Employment) Residential Property Values Human Health Land Use Existing and Planned facilities for other uses). Will provide short term (decommissioning) employment; will provide opportunity for other commercial/industrial use of property. Cannot be determined at this point as dependent on after use scenario. Site rehabilitation; removal of infrastructure and materials with potential for contamination. Decommissioning to be in close consultation with municipality to consider opportunities for after uses (commercial, industrial, resources related). Decommissioning Phase Noise-effects associated with decommissioning work; site lighting likely reduced during decommission but may continue at some level above current rural light levels until completion for decommissioning; noise effects shortterm and localized. Potential for impairment of aquatic habitat (through water and sediment quality) from ground disturbing activities; short-term and localized. Potential for impairment of marine habitat (through water and sediment quality) from dismantling of wharf and terminal; shortterm and localized. Potential for reduced demand for residential property following completion of the decommissioning; dependent on subsequent use of property and economic development in the region. All potentially contaminated material managed and safely disposed of. Condition of site soil and groundwater demonstrated to be free of residual contamination by Project activities. NA September 2013 Page 11-7

Decommissioning Phase Road Transportation No interaction identified. Increased traffic volumes; effects expected to be localized, temporary, and well within existing road capacity; residual effects considered a trade off against economic benefits for the local community. Recreational Opportunities and Aesthetics Upon completion, capability for recreational use of some areas may be re-established. Potential for rehabilitating rural landscape characteristics. Elimination of temporary navigational restrictions for Aboriginal Use of Land and Resources recreational boating. No interaction with land claims; opportunities for cooperation between proponent and Aboriginal communities regarding decommissioning activities (employment) as well as after use scenarios. Archaeological Resources No interaction identified. Table 11.0-4 Malfunctions and Accidents - Project and Disadvantages Malfunctions and Accidents Effects on Natural Environment s, in particular terrestrial, freshwater and marine species and habitat, as well as water resources and air quality as a result of: spill of fuels, lubricants, or release of hazardous material to air or water; fire; LNG leaks and fire; vessel collision; and failure to properly exchange ballast water. Coordination with local and regional emergency response units including sharing of resources, training and preparedness. Location in designated industrial park, by design separates the Project from potentially sensitive land uses and most residences. No rare or unique habitat features at or near the site. Consequences ranging from small incidences and localized contamination to fires or large spills. Failure to properly discharge ballast water can lead to introduction of organisms with potential to adversely affect marine life. Project provides major, long-lasting and far reaching economic benefits and employment contributing to economic well being of the area. Integration of specific accident prevention / mitigation measures (e.g., ESD system, leak and fire detection systems, constructed berms for containment areas; appropriate spacing of equipment; double shell tanks; emergency release couplers at loading jetty. Project design, construction and operation in compliance with all applicable LNG specific codes and standards most importantly CSA Z2786. LNG liquefaction, storage and transport represents proven technology with excellent safety record.development of comprehensive Health, Safety and Environmental Management System. Likelihood of accident/malfunction September 2013 Page 11-8

Effects on Socio-Economic s, in particular human health as a result of direct exposure or exposure via pathways resulting from: Spill of fuels, lubricants, or release of hazardous material to air or water. Malfunctions and Accidents scenario with significant consequences for natural environment s very remote. Coordination with local and regional Consequences ranging from human emergency response units including exposure to localized contamination to sharing of resources, training and injuries and loss of life as a result of preparedness. from fire asphyxiation, freeze burns. No residences at or immediately For justification see above listing for adjacent to site. Natural Environment ; plus: Likelihood of accident/ malfunction scenario with significant consequences for socio-economic s very remote. September 2013 Page 11-9