EFFECT OF THE SOUTHERN HYOGO EARTHQUAKE ON THE AKASHI-KAIKYO BRIDGE. Seigo Nasu, Masaaki Tatsumi Honshu-Shikoku Bridge Authority, Tokyo, Japan

Similar documents
Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

SEISMIC DESIGN OF HIGHWAY BRIDGES

Preliminary damage survey report on 2015 Nepal Gorkha Earthquake

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft)

GEOLOGIC MAPS. PURPOSE: To be able to understand, visualize, and analyze geologic maps

Earthquakes. Earthquakes: Big Ideas. Earthquakes

DESIGN SPECIFICATIONS FOR HIGHWAY BRIDGES PART V SEISMIC DESIGN

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE

Seismic Isolation Retrofitting of Japanese Wooden Buildings

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

A Preliminary Report The May 19, 2011 Simav, Turkey Earthquake

EARTHQUAKE PREDICTION

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line

GROUND RESPONSE OF KATHMANDU VALLEY ON THE BASIS OF MICROTREMORS

A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE

Unit 4 Lesson 6 Measuring Earthquake Waves. Copyright Houghton Mifflin Harcourt Publishing Company

A Report on Post-Earthquake Rapid Visual Damage Assessment of Buildings Of Tribhuvan International Airport

Determination of source parameters from seismic spectra

Locating the Epicenter and Determining the Magnitude of an Earthquake

Safe & Sound Bridge Terminology

Truss. are both simple and A Matsuo Example continuous trusses. The

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

The Dynamic Crust 2) EVIDENCE FOR CRUSTAL MOVEMENT

CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions

Earthquake Disaster Recovery Plan in TMG

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

ABSG Consulting, Tokyo, Japan 2. Professor, Kogakuin University, Tokyo, Japan 3

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 5 : Geophysical Exploration [ Section 5.1 : Methods of Geophysical Exploration ]

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

How To Check For Scour At A Bridge

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

6.0 Results of Risk Analyses

Name: Date: Class: Finding Epicenters and Measuring Magnitudes Worksheet

A STUDY ON THE EFFECTS OF SURFACE WAVES GENERATED

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

RAILROAD LIFELINE DAMAGE IN EARTHQUAKES

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN

How Did These Ocean Features and Continental Margins Form?

Optimum proportions for the design of suspension bridge

Chapter 7 Earthquake Hazards Practice Exam and Study Guide

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE

Map Patterns and Finding the Strike and Dip from a Mapped Outcrop of a Planar Surface

The Maintenance of Long Span Bridges Barry Colford Chief Engineer & Bridgemaster Forth Road Bridge

NUMERICAL ANALYSIS OF A HORIZONTALLY CURVED BRIDGE MODEL

Steel joists and joist girders are

PROHITECH WP3 (Leader A. IBEN BRAHIM) A short Note on the Seismic Hazard in Israel

Re: Damages to Alaska Building from Legislative Information Office Construction

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

Guidelines for Promotion of Earthquake-resistance School Building July 2003

Magnitude 7.2 GUERRERO, MEXICO

1. The diagram below shows a cross section of sedimentary rock layers.

PILE FOUNDATIONS FM 5-134

Local Seismic Hazard in Alpine Environment From Site Effects to Induced Phenomena Donat Fäh Swiss Seismological Service, ETH Zürich

SEISMIC RETROFITTING STRATEGIES FOR BRIDGES IN MODERATE EARTHQUAKE REGIONS

METHOD OF STATEMENT FOR STATIC LOADING TEST

Introduction to Petroleum Geology and Geophysics

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Great East Japan Earthquake and research and development for network resilience and recovery

Geological Maps 1: Horizontal and Inclined Strata

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Geological 3D-model of the Basel region - a tool to explore geopotentials. Dr. Horst Dresmann. Prof. Peter Huggenberger. Dr.

Seismic Analysis and Design of Steel Liquid Storage Tanks

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY NEWPORT/PELL BRIDGE APRIL 1, 2014 TEN YEAR RENEWAL AND REPLACEMENT PLAN (IN 2013 DOLLARS)

DAMAGE TO RAILWAY ENGINEERING

Lecture 12 Earthquake Magnitude

SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES

CIVL451. Soil Exploration and Characterization

Geological Maps 3: Faulted Strata

THE 2004 SUMATRA EARTHQUAKE AND INDIAN OCEAN TSUNAMI: WHAT HAPPENED AND WHY

Information regarding the Lockheed F-104 Starfighter F-104 LN-3. An article published in the Zipper Magazine #48. December Theo N.M.M.

Page & Turnbull imagining change in historic environments through design, research, and technology

Measures for recovery against seismic damage to wastewater systems

SITE SPECIFIC WIND TURBINE FOUNDATION CERTIFICATION

SMIP2000 Seminar Proceedings COSMOS VIRTUAL STRONG MOTION DATA CENTER. Ralph Archuleta

Structural Assessment Report

Application Study of FLAC in Analysis of Slope Stability

EARTHQUAKES. Compressional Tensional Slip-strike

Control of Seismic Drift Demand for Reinforced Concrete Buildings with Weak First Stories

Lessons learned from the tsunami disaster caused by the 2011 Great East Japan Earthquake and improvements in JMA's tsunami warning system

Name Date Class. By studying the Vocabulary and Notes listed for each section below, you can gain a better understanding of this chapter.

Chapter. Earthquake Damage: Types, Process, Categories

The Current Situation and Circumstances Regarding the Great Earthquake Damage

Introduction to Structural Geology

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)

Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift

Preliminary Damage Assessment (PDA) Field Guide

World Tower. Company, Inc. Classification Overview. Categories: Structure Classification Exposure Categories Topographic Effects Geological

By Chris Gorman, PE M.ASCE PROBLEM:

Bridge Seismic Design, Retrofitting and Loss Assessment

Regents Questions: Plate Tectonics

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

DEVELOPMENT OF REALTIME DISASTER MITIGATION SYSTEM FOR URBAN GAS SUPPLY NETWORK

Chincha and Cañete, Peru, Based

THE REPORT ON THE INVESTIGATION OF THE REACTORS AT FUKUSHIMA DAIICHI NUCLEAR POWER STATION (NO. 1)

Transcription:

IV/305 EFFECT OF THE SOUTHERN HYOGO EARTHQUAKE ON THE AKASHI-KAIKYO BRIDGE Seigo Nasu, Masaaki Tatsumi Honshu-Shikoku Bridge Authority, Tokyo, Japan 1. INTRODUCTION On January 17, 1995, a huge earthquake hit Kobe city and its neighboring cities as well as Awaji island in Hyogo prefecture. This earthquake which was officially named Southern Hyogo Earthquake caused a devastating damage including over 5,000 death and collapse of infrastructure. The epicenter was at the northern tip of Awaji island, close to the Akashi- Kaikyo Bridge. However, the bridge survived without any sever structural damage. This report describe an effect of the quake on the Akashi-Kaikyo Bridge based on a field survey and a basic structural study. 2. SUMMARY OF TOPOGRAPHY AND GEOLOGY OF THE AKASHI STRAIT The Akashi Strait extends in a northwest-to-southeasterly direction and is about 4 km wide. At the center of the strait, the topography consists of a 400 m wide seapotshaped valley with a water depth of 100 m, the two sides of which slope steeply. The geology comprises granite of the Mesozoic era as the bedrock. This is covered roughly with the Kobe stratum of the Mesozoic epoch of Neocene, the Akashi layer of the diluvial epoch of the Quaternary period, an upper diluvial formation, and an alluvial formation (Fig.1). Results of past sonic prospecting and borehole surveys indicate that east-west system faults centering on F1, F6, and F7 are crossed perpendicularly by a northsouth system fault in this part of the strait (Fig.2). Since these faults were only observable below the Kobe layer and do not reach into the Quaternary formation, it was assumed that they had not slipped for at least for 2 million years which is the definition of a nonactive fault. All three east-west faults, including F1, fall toward the north and do not cross the Quaternary period formation. At the center of the strait they are very clear in the results of sonic prospecting, but are somewhat vague at both extensions. In choosing foundation locations for the Akashi Kaikyo Bridge, the relative position of the extension of the north-south fault F5 offshore of Awaji Island and the extension of faults F11 and 4A were investigated by various means. Result showed that the extensions did not approach the periphery of proposed foundations. Thus the foundations of the Akashi Kaikyo Bridge were chosen so as to avoid the vicinity of faults under the strait.

IV/306 Geological time Era Period Epoc Dates back to Geological profile (X 1,000 Years) of Akashi Strait Alluvium 6~10 Alluvium Diluvium Pliocene Miocene Paloepgene 2,000 7,000 13,000 20,000 26,000 Upper Diluvium Akashi strata Kobe strata Cretaceous 65,000 Rokko Granite Jurassic 135,000 Triassic 190,000 Fig.1 Geological profile of Akashi Kaikyo Bridge site

IV/307 (a) Source: Active Faults in Japan (1991), Seabed Investigation by Maritime Safety Agency (Intermediate Report) (Jan. 24, 1995) (b) Source:Report for Recapitulation of Geological Survey of Akashi Strait ( No. 1) * by the Honshu-Shikoku Bridge Authority, Dec.1984 * This report was a collection of geological surveys and reports of academic institutions and committees since 1959. Fig.2 Seabed topography and active fault lines around the Akashi-Kaikyo Bridge

IV/308 3. SEISMIC DESIGN PHILOSOPHY FOR AKASHI KAIKYO BRIDGE 3.1 Design Seismic Input The common seismic input for each foundation was defined as the envelope of two acceleration response spectra on the ground surface, assuming that bedrock equivalent to Type I (defined in the Specifications for Highway Bridges) is exposed at the ground surface: (1) Acceleration response spectrum at the point of bridge construction in the case of an earthquake of magnitude 8.5 at an epicentral distance of 150 km (2) Since a nearby earthquake could cause greater seismic loading than in (1) above, response spectra for past earthquakes (of magnitude 6.0 or more within a radius of 300 km) evaluated from the theory of probability for a recurrence interval of 150 years Fig.3 Earthquake records taken into consideration Fig.4 Standard acceleration spectrum of Akashi Kaikyo Bridge

IV/309 3.2 Seismic Design features of the Akashi Kaikyo Bridge The Akashi Kaikyo Bridge has the following unique characteristics as compared with bridge constructed in the past: (1) The substructure is particularly large. (2) Since the granite rock stratum is extremely deep at the point construction, the thick soft rock layer (the Kobe layer) of the Miocene epoch of Neocene and the unconsolidated gravel stratum (the Akashi layer) of the Pliocene to diluvial epoches laid down on top of the granite have to be the bearing layers. Due to these unique characteristics, the geological conditions at each foundation position were required to be modeled accurately. Further, a new seismic design procedure was established to take into account the non-linear nature of the ground during an earthquake, and the dynamic interactions between the foundations and ground. The foundation response was obtained by means of dynamic analysis using a rigid-body system model with two degrees of freedom as in the earlier standards as well as by carrying out stability checks by means of time-history response with an FEM model able to accurately take into account nearby ground conditions when checking the seismic stability of the foundations. tremor v Ug Horizontal direction -4 Direction of rotation (a) Foundation-ground system model (b) Rigid-body two-degree-of-freedom system model Fig.5 Designing model of foundation- ground system

IV/310 4. EARTHQUAKE RECORDS IN THE VICINITY OF THE AKASHI STRAIT Table 1 shows the list of the observation and their results obtained at the Akashi Kaikyo Bridge site and Fig.6 shows the points of the observation. Fig.7 shows the distribution of maximum acceleration observed in each of these observations. Table 1 Observation at the Akashi Kaikyo Bridge site (1)Observation of (2)Array observat- (3)Observations of intensive quake ions of long-period tower behavior motion quake motion (velocity) Purpose Specification of the observation Field records of To obtain phase To obtain wind large earthquake difference charact- response charactereristics of seismic istics on superstrumotion cture Instrument:acceler Instrument:Servo- Instrument:Servo- -ometer type velocity-meter type velocity-meter Measured depth: Measured point: Measured point: 5 m,60 m,250 m Ground surface Top of tower and Maximum accelera Measured range: middle of tower -tion detected: +/-3 kine Measured 400 gal range: +/- 100 kine Results Data exceeded the Data exceeded the Scheduled to be measurable range measurable range analyzed Fig.6 Earthquake-related observations points for the Akashi Kaikyo Bridge

IV/311 Fig.7 Distribution of maximum acceleration observed

IV/312 5. EFFECT ON THE AKASHI-KAIKYO BRIDGE At the time of the Southern Hyogo Earthquake on January 17, 1995, work on the AKashi-Kaikyo Bridge was at the stage of cable squeezing. As soon as possible after the earthquake, investigations of the situation were undertaken by means of structural inspections, surveys, underwater cameras, etc. to estimate the effects of the earthquake on the structure as well as on the bed rock. The results of these investigations are described below. (1) No damage was incurred by the already-erected main structures, including the anchorages, tower foundations, towers, and cables, etc. (2) Survey results indicated that the main tower foundation on the Awaji Island side (3P) had suffered a relative displacement of about 1.3 m in an approximately westerly direction, while the Awaji Island anchorage (4A) had also been displaced by about 1.4 m to the west. As a consequence, the center span has increased from 1990 m to approximately 1990.8 m, with the side span on the Awaji Island side also increasing from 960 m to approximately 960.3 m. (3) Since a submarine survey indicated no trace of foundation slippage relative to the ground, the measured displacement is assumed to have resulted from displacement of the bed rock itself bearing the foundation.

IV/313 5.1 Visual Inspection of Structures Table 2 shows the results of visual inspections urgently conducted immediately after the earthquake (from January 17 to 19). No visual damage were noted on the structures of the 1A and 4A anchorages. Nor were any visual damage noted on the main towers, cables, catwalks, etc. Table 2 Results of visual inspections and countermeasures implemented Location Results of visual inspection Countermeasures 1A 2P and 3P (1) No visual damage found on the anchorage (2) Reclaimed revetment settled by (2) Restoration of the revetabout 50 cm at maximum and displaced by about 30 cm (3) Cracking in pavement of work yard parking lot (4) Subsidence of channel by 30 cm (extended channel) ment completed (3) Urgent repairs to fill the gaps completed (4) Restoration completed (1) No damage in top deck of main tower foundation (2) No damage in main tower and cable saddle (3) Airplane warning light and neon sign properly illuminated (4) Temporary electric substation (4)Repair completed system at 3P tower damaged (5) Tower elevators halted (5) 2P restored 3P(east)restored (6) Catwalk handrail support and (6) Restoration completed side wire net partially damaged (7) Part of cable squeezing machine (7) Restoration completed damaged 4A (1) No damage found in anchorage (2) Reclaimed revetment settled (2) Restoration of revetment about 1 m at maximum,displac and channel completed -ed by about 20 cm (3) Electric substation system for (3) Repair completed construction collapsed (4) Work yard settled 1 m at (4) Restoration of ground maximum completed (5) Subsidence of channel by about (5) Restoration completed 50 cm (Tanowaki channel) begun

IV/314 5.2 Observed displacement of the substructures Fig.8 Measured displacement of foundations Fig.9 Relative displacement of foundations 5.3 Investigation of Ground Around Main Tower Foundations 1) It is found that no slippage of the main tower foundations occurred, judging from the result of visual ground survey with an underwater camera, sounding surveys, and measurement of the rock bed displacement. 2) With respect to the condition of the ground around the towers, no particularly notable uplift or settlement could be seen.

IV/315 6. EFFECT OF DISPLACEMENT ON THE STRUCTURE The effect of the displacement caused by the earthquake on the skeleton of the Akashi-Kaikyo Bridge is shown in Fig.10 Fig.10 Effect on the structural skeleton of Akashi-Kaikyo Bridge

lv/316 The effects of changes caused by the earthquake, and the measures being taken to cope with them, are summarized in the table below. Table 3 Effects of changes and measures to cope with them Issue Strength Alignment span Effects of earthquake and measures to cope with them According to the results of an analysis in which the earthquakeinduced foundation displacement is added to the completed structure, there would appear to be no problems from a stress viewpoint as regards towers, cables, the stiffening girder, etc. Although the part of vertical alignment exceeds 3% due to the lessened cable sag in the center and the side spans, no problem will occur under the conditions of the highway structure ordinance. Also, the horizontal alignment is now off by about 0.03 degree at the tower, which is not expected to present problems as far as the passage of cars is concerned. The increased 2P-3P and 3P-4A spans will be coped with by adjusting the length of the stiffening girder now being fabricated.