LIGNITE MINING DEVELOPMENT STRATEGY



Similar documents
Electricity and natural gas price statistics 1

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA

ERASMUS+ MASTER LOANS

WP1 Task 1 The Drivers of Electricity Demand and Supply

Costs of air pollution from European industrial facilities an updated assessment

ERASMUS+ MASTER LOANS

The River Devoll Project

Energy prices in the EU Household electricity prices in the EU rose by 2.9% in 2014 Gas prices up by 2.0% in the EU

Implementing the cooperation mechanisms of the RES directive current status and open questions

Pure Power. Wind Energy Scenarios up to By the European Wind Energy Association

ERASMUS+ MASTER LOANS

COMMUNICATION FROM THE COMMISSION

Trends in the European Investment Fund Industry. in the Second Quarter of Results for the first half of 2014

The current electricity costs of energy-intensive industries in Germany

Alcohol Consumption in Ireland A Report for the Health Service Executive

How To Understand Factoring

Fact Sheet on China s energy sector and Danish solutions

Use of Substitute Fuels in Large Combustion Plants (LCPs)

EU Energy Policy and the Energy Situation in Germany

Issue. September 2012

Six greenhouse gases covered by the United Nations Framework Convention on Climate Change (UNFCCC) and its Kyoto Protocol are:

Action 7 To legislate at the appropriate level to limit the presence of phosphates in detergents

Funding and network opportunities for cluster internationalization

Wind Power in Germany in 2014

It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns

Understanding Lignite Generation Costs in Europe

Statistical Data on Women Entrepreneurs in Europe

41 T Korea, Rep T Netherlands T Japan E Bulgaria T Argentina T Czech Republic T Greece 50.

Physical flow accounts: principles and general concepts

WHEN AN EFFECTIVE EU ENERGY POLICY?

Annual European Union greenhouse gas inventory and inventory report 2015

Privatization in Central and Eastern Europewe

ERMInE Database. Presentation by Nils Flatabø SINTEF Energy Research. ERMInE Workshop 2 - Northern Europe Oslo, 1. November 2006

A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour.

Labour Force Survey 2014 Almost 10 million part-time workers in the EU would have preferred to work more Two-thirds were women

Coalbed Methane CO2 Sequestration Project Mecsek Mts Hungary

EU study on company car taxation: presentation of the main results

Ten years after Bucharest, 15 April Bulgaria after accession to the EU

LUSATIAN LIGNITE MODERN, COMPETITIVE AND SUSTAINABLE LIGNITE MINING. 1. Introduction and summary. Wolfgang Ketzmer*

Pendulum Business Loan Brokers L.L.C. U.S. State Market Area

Allianz offers customers an increasing number of Green Solutions

TOYOTA I_SITE More than fleet management

English version. Manual for Determination of Combined Heat and Power (CHP)

Weiss A/S Presentation. by Bo Johansen

Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers

Is fracking cracking the renewable industry? How big a threat is shale gas to renewables?

Business Policy of CEZ Group and ČEZ, a. s.

NERI Quarterly Economic Facts Summer Distribution of Income and Wealth

Renewable energy sources penetration in most of BSEC countries

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

Critical Policy Options to Protect Industry Competitiveness

187/ December EU28, euro area and United States GDP growth rates % change over the previous quarter

99/ June EU28, euro area and United States GDP growth rates % change over the previous quarter

The energy industry and energy price issues in Slovakia during recent years 1

Analysis of the EU fruit and vegetables sector

Annual report 2009: the state of the drugs problem in Europe

Wind energy scenarios for A report by the European Wind Energy Association - August Wind energy scenarios for 2030

Australian Activities in Clean Hydrogen from Coal & Natural Gas. Dr John K Wright Director CSIRO Energy Transformed Flagship Program

Comprehensive emissions per capita for industrialised countries

EUROPE 2020 TARGETS: RESEARCH AND DEVELOPMENT

Clean coal from a Vattenfall perspective

POLISH NATIONAL PROGRAMME ON SAFE CO2 GEOLOGICAL STORAGE

CESEE DELEVERAGING AND CREDIT MONITOR 1

Electricity Sources. Coal Fleet

IAB Adex Benchmark 2012 Daniel Knapp, IHS Electronics & Media

EUF STATISTICS. 31 December 2013

Automotive Suppliers Survey

Norwegian position on the proposed EU framework for climate and energy policies towards 2030

Large Combustion Plant (LCP) Directive Flexibility Mechanisms

Coal ash utilisation over the world and in Europe

Investment and Investment Finance in Croatia, how can the EIB contribute? Dario Scannapieco and Debora Revoltella European Investment Bank

Appraisal of Mineral Properties. August

ENERGY PRIORITIES OF THE POLISH PRESIDENCY OF THE EU COUNCIL: THE CZECH PERSPECTIVE

Analysis of the electricity prices in the Slovak Republic and their impact on the individuals energy security

FEDERATION EUROPEENNE DE LA MANUTENTION Product Group. industrial trucks. A brief guide for identification of noncompliant. - Exhaust Emission -

CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2015

IAB Europe AdEx Benchmark Daniel Knapp, IHS Eleni Marouli, IHS

Electricity, Gas and Water: The European Market Report 2014

Waste-to-Energy s contribution to Resource & Energy Efficiency

European Business Association

POSITION PAPER KEY MESSAGES

Finnish foreign trade 2014 Figures and diagrams FINNISH CUSTOMS Statistics 1

Annual Electricity and Heat Questionnaire

WORLD BANK. SME Financing and the SME ABS Market in Europe

Taxation of tobacco products in the European Union. Frank Van Driessche DG Taxation and Customs Union May 2006

Economic Analysis of the Renewable Energy Policies in the European Union

EXECUTIVE SUMMARY. Measuring money laundering at continental level: The first steps towards a European ambition. January 2011 EUROPEAN COMMISSION

New environmental liabilities for EU companies

Nuclear Power s Role in Enhancing Energy Security in a Dangerous World Al Shpyth, B.A., M.E.S. Director, Government Relations Cameco Corporation

Biomass Pellet Prices Drivers and Outlook What is the worst that can happen?

Update of LCI Background Data Exemplified for the German Steam Coal Supply Chain

Effects of a White Certificate trading scheme on the energy system of the EU-27

SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS

Transcription:

LIGNITE MINING DEVELOPMENT STRATEGY STATEM ENT OF PRINCIPL E Recognizing that lignite will remain the principal fuel for electricity generation in the long term, the use of indigenous coal is encouraged in an environmentally and economically responsible manner, as well as reclamation of lands previously disturbed by mining. BACKGROUND Lignite is of outstanding importance to electricity generation in Kosovo. It contributes to 97% of the total electricity generation, 3% being hydro based pow er generation. Considering all the potential sources for pow er generation in Kosovo, coal safely maintains its leading position. The Kosovo lignite mines are operated at one of the most favorable lignite deposits in Europe due to its geological conditions. With an average stripping ratio of 1.7 m 3 of w aste to 1 ton of coal, coal production at Kosovo mines could supply very competitive fuel to the pow er plants, compared to international fuel sources and energy prices. The total estimated economically exploited resources of approx. 10,000 Mt represent one of the richest lignite sources in Europe, w hich would allow ambitious pow er generation and expansion schemes in the forth coming decades. Coal supply can rise in correlation w ith increasing electricity consumption. RESOURCE ADVANTAGE! Sufficient for electricity generation in decades to come. Coal can be supplied w ith the highest degree of security and with predictable price levels. By this, Kosovo can take advantage of its large reserves and of its location in centre of South East Europe, w here lack of electricity is to be expected in the mid to long ter m period. Coal is of major significance for Kosovo as it provides direct and indirect employ ment for thousands of people in the coal mining and electricity generation industry. EU Pillar, PISG - Energy Office 1

Coal Reserves There are tw o major lignite basins: Kosova lignite basin and Dukagjini lignite basin and also smaller lignite basins like: Drenica, Malishevë, Babush i Muhaxherëve. lignite basin and one potential lignite basin in southern part of Kosovo (Fig. 1). Exploitable Lignite Reserves in Europe Country bn t Germany 42.8 Poland 14.0 Kosovo 10.0 Hungary 7.80 Turkey 5.90 Greece 4.20 Czech Republic 3.50 FR Yugoslavia 3.06 Romania 3.00 Bulgaria 2.50 Macedonia 1.70 Slovakia 0.38 BiH 0.31 Slovenia 0.15 Spain 0.04 Fig. 1 Kosovo Lignite Basins The lignite of the Kosovo basin belongs to the upper Miocene and has an age of about 9 million years. The coal seam thickness varies betw een 56 m and 70 m. The original overburden coverage shows a thickness of 60 m - 120 m. Kosovo has the total estimated resources of approx. 10,000 Mt. Coal Quality The average values of lignite quality parameters of the different mine areas are: Moisture content: vary betw een 35% and 50%. Ash contents: betw een 12% and 21% w ithin the coal seam. The average values are around 14% to 17%. Heating values: 7800 kj/kg on average in the Bardh- Mirash area, w hile 8100 kj/kg in the Sibovc area. From total reserves: 29% ( > 8,4 MJ/kg); 43% (7,7 8,4 MJ/kg); 25% (5.8 7.7 MJ/kg). Sulphur: 1 % in all parts of the mines/deposit including an average content of combustible sulphur of 0,35 %. Lime: Lime concentration is sufficient to absorb significant amount of SO X during combustion so that desulphurization of flue gases is not required. No desulphurization of flue gases required EU Pillar, PISG - Energy Office 2

Lignite market The lignite market in Kosovo is clearly dominated by the demand of the local ther mal pow er plants. Average annual coal demand for electricity generation is 7,5 M t. Total lignite for the use for other purposes or consumers than the pow er plants is estimated to 500,000 t/a. A significant increase of this amount in the long-term is not to be expected. Current Mining Operations Currently only Kosova basin is being exploited in tw o open cast mines Bardh and Mirash. Operations are performed by public ow ned mining and pow er generation company Korporata Energjetike e Kosovës (KEK). Mining operations Two open cast mines: 1. Bardh 2. Mirash Four working fronts: 1. Bardh 2. Mirash-East 3. Mirash-West 4. Mirash-Brand Fig. 2 Kosovo Lignite Mines There are four working fronts (Fig.2): Bardh, Mirash-West, Mirash- East, Mirash-Brand. EU Pillar, PISG - Energy Office 3

Operations at Mirash-East have been stoped due to depletion of accessible reserves. Further operations in this area require relocation of Sitnica river to reach additional 28 M t of distorted low quality coal. This option is not economically acceptable. Open cast Bardh has recently suffered a land slide that damaged all overburden and all coal benches. It w ill require additional 2 years and investments to reestablish all benches and normal production. In Mirash-West a backlog of overburden removal and poor operational condition of main mining equipment gives unstable coal production. Practically major coal production comes from Mirash-Brand were reserves will be depleted w ithin next tw o years. Poor condition of mines and main mining equipment is caused by irrational coal exploitation and poor or no equipment maintenance in period 1990 1999. Poor condition of main mining equipment. Environmental impacts of mining operations The review of the impact of the mining operation on the environment has been carried out considering past damages and future effects of the mining operation. Measures to minimize the future effects of the mining operation like dust and noise emissions, w ater pollution and resettlements have been planned. Env ironmental Issues: - Coal fires - Outside dumps - Recultivation - Water pollution - Noise - Dust - Industrial fog With respect to the past damages, tw o main areas of concern have been identified, the recultivation of the old outside dumps and the extinguishing of smoldering mine fires. The recultivation of the outside dumps can be carried out at reasonable efforts and costs. How ever, special intention must be paid to the mine fires, w hich cause environmental problems (air pollution), safety problems in the mines and an economic damage on the deposit. Sulphur causes selfingition of coal if exposed to oxygen for longer time. EU Pillar, PISG - Energy Office 4

Royalties A basic royalty system is in force but it requires an update. Annual mining lease rental fee should be considered to be levied on companies interested in maintaining privilege of exclusive mining right at a given area for agreed period of time. Revenue collected from fees can be used for dev elopment of local community. Mine operation outlook Coal reserves in currently operating mining fields w ill cover coal demand of existing pow er plants for the next 10 years. New mining field(s) should be developed to meet coal demand of existing and new power plants for next 25 years and beyond. Currently operating fields can supply coal to Power Plants for next 10 years. Fig. 3 Opening of Sibovc in continuity with the existing mines North from the existing mines in so called Sibovc (Fig. 3) there is some 1,73 bn t of explored economically exploitable coal reserves that can be mined. Example: If annual production of 15 Mt of coal is assumed that w ould be sufficient for generation of approx. 7,500 GWh/a, these reserves would last for more than 100 years. In Sibovc area data from more that 300 drillholes w ere collected. EU Pillar, PISG - Energy Office 5

STRAT EGY OBJECTIVES To encourage exploration and use of domestic deposits of lignite in environmentally responsible w ay. The development of long ter m plans for lignite mining in various locations in Kosovo, including assuring proper spatial planning permissions and protection of the areas w here lignite deposits are. The achievement of climate of trust, open information sharing and fair issue resolution betw een the lignite mining industry and local communities. Prepare a clear and stable fiscal framew ork that w ill be attractive for private investors. Take advantage of Kosovo central place in South East Europe, where lack of electricity is to be expected in the mid to long-ter m period and attract export oriented pow er producers. Maximize employ ment opportunity, w ith reference to skilled occupations for which there is potential for employ ment over the long ter m and in w hich skills are transferable to other industry sectors (like ore mining, for instance). To encourage land reclamation and restoration in present and former coal mining areas. To develop research and development initiative in lignite mining and clean coal technologies. To create a high level of public understanding about the economic impact of lignite exploitation for electricity generation. To track technology development and research in lignite products. Actions to achieve objectives 2003 2008 Prepare short-term action plan for increase of the production from existing mines to the level required by demand from the pow er plants. Immediately start preparations for opening of a new mine in the Sibovc field so that production may start in 2008. Vigorously pursue opportunities to maximize economic values of lignite resources by full participation in regional integration processes and initiatives. Prepare an action plan for extinguishing of the underground fires, and for reclamation of the depleted coal mining areas. Planning for opening of a new mine should start in 2003. EU Pillar, PISG - Energy Office 6

Using geological and geophysical information gathered in the previous rounds of exploration, update the estimate of the resource potential in the lignite deposits. Use current information on the mining potential to promote resource availability for electricity generation in a variety of forums, trade shows, presentations at technical conferences, and meetings w ith potential investors in pow er plants. Consult w ith local communities before issuing exploration rights for new mining. Enhance consultation mechanisms betw een government, regulators and the mining industry. Maintain stable, predictive, and competitive fiscal system to enable potential investors to quantify the financial risk and rewards associated w ith mining operations. 2009 and beyond Monitor research and developments in clean coal and open cast mining technology. Monitor developments in alternate or unconventional means of coal utilization. Encourage indigenous coal production, including reclamation of previously disturbed lands. Events that may result in Strategy Adjustment Once a significant amount of the reserves are already committed to exploitation, examine the extent of future right issuance process, w ith the view of preserving the reserves, and avoiding overexploitation. EU Pillar, PISG - Energy Office 7

GOVERNMENT ROLE AND RESPONSIBILITY The State ow ns the coal resources in Kosovo. The government acts as promoter of the resources to the private sector, maintains geoscience database and resident expertise in matters related to coal geoscience, manages the exploration, development of mining under a system of licenses and leases, and collects royalties on coal production, all under the authority of Laws on Mining and Geological Exploration. The Government also regulates environmental performance of coal mines through Environmental Protection Law, and matters related to occupational health and safety through the Occupational Health and Safety Act. The Government has a role to play in helping to provide for reclamation of lands disturbed by coal mining, w hich can restore large tracts of land from an unsafe, derelict state to a productive state that can benefit the community. EU Pillar, PISG - Energy Office 8