Municipality of Anchorage

Similar documents
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Certification: Building Plans Examiner. Exam ID: B3

The purpose of this document is to provide standards for persons requesting or subject to County building inspections.

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Sample Drawing Package for One and Two Family Dwelling Applications

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Pre-Drywall Inspection Report

Building Code Inspections and Fees

How To Make A House Safe

Bureau Veritas Contact Information

Uniform Construction Code (UCC) Building Permit Application Package

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Mark Cramer Inspection Services, Inc.

2014 British Columbia Building Code Changes

Estimating Database Checklist

Applications for building permits will not be reviewed until all of the required information has been submitted.

October 5, 2015 Dear Client,

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

Building Condition Assessment Report

City of Fort Smith Building Permit Process Frequently Asked Questions

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

Estimated Cost of Repair

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

Additions and Alterations

PDmB, Inc. Definitions

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950 KENANSVILLE, NC PHONE: (910) FAX: (910)

Development Services City of Lawrence, KS

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Name of course: Residential Construction Site Management (RCSM) Level 1

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Residential Adjustments. Overview 4.1

Chapter 3 Pre-Installation, Foundations and Piers

Uncovered Decks & Porches

City of Oviedo Commercial Shell Building Permit Application Guidelines

Building Code Clarifications - 7. Fire Resistance

Building Information Packet

Inspection Item COMMENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Building Permit Application

C I T Y O F P E A R S A L L

2014 FLORIDA BUILDING CODE

Residential Building Permits

Development Services Guidelines

COMMONLY USED RESIDENTIAL BUILDING CODES

Residential Deck Safety, Construction, and Repair

City of St. Charles Basement Finish or Remodel

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Georgia Association of Home Inspectors

Residential Building Inspection Policies

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Home Inspection Report

Elevating Your House. Introduction CHAPTER 5

South Carolina Home Inspector Standards of Practice

Seattle Public Schools Building Excellence IV Projects Under Construction

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

General Fire Code Requirements Within Commercial Tenant Spaces

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

Patio Covers / Carports

BEFORE YOU BUILD GUIDE

Mobile Home Pre-Inspection Checklist

BUILDING SAFETY UNIT

Does Wall Township require an inspection by the building department on resale of a home?

Frequently Asked Questions

Residential Building Permit Process

CHRIS CURLES and ASSOCIATES INSPECTION SERVICES

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Excerpts from the Canadian National Building Code (NBC)

Botetourt County, Virginia. Residential Information Handout

Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package

Structure Survey Findings:

Design Development Quality Management Phase Checklist Project Phase Checklist Series

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

Building Condition Assessment Report

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

INFORMATION BULLETIN NO.

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

HomeSpec REPORT SUMMARY

Gramercy Place Condo Association, Inc.

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

INFORMATION BULLETIN NO.

BUILDING PERMIT SPECIFICATIONS

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

Page & Turnbull imagining change in historic environments through design, research, and technology

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

Washoe County PLAN SUBMITTAL

Transcription:

Municipality of Anchorage Building Safety Inspection Schedule CALL FOR INSPECTIONS A 24-hour notice is required for all inspection requests. It is the responsibility of the contractor or builder to call in inspection requests. Inspection requests may be made through 343-8300, or may be faxed on the approved fax form to 249-7777. (See pages 4 and 5 of this handout for further details.) INSPECTION SCHEDULE This schedule of required inspections generally covers all required inspections but special circumstances may require other inspections not listed herein. This should be discussed with the individual inspector of your project. With the exception of the excavation inspection, the approved plans must be on the job site and available to the inspector. Plan set must be stamped APPROVED and signed by the individual reviewer(s). This includes the plot plan. This will also include any Change Orders directing modifications to construction plans. Change orders shall be approved before being integrated in the project work. Appropriate Permit Cards must be posted in a conspicuous location, visible from the street. Special Inspections are required when defined by the Engineer of Record or defined by the designer in a Special Inspections Program. This schedule does not identify required Special Inspections. Refer to IBC Chapter 17. Special Inspections and reports shall be completed before Building Safety inspections are conducted. Copies of the Special Inspector s report(s) shall be left at the job site for review by the Building Safety inspector. FIRST SERIES OF INSPECTIONS Excavation: - Only required when it is necessary to over excavate and place fill in excavation. Inspection is made when excavation is complete and before any fill is placed. Fill: Inspected at approximately 50% point of completion and at completion. Compaction reports shall be made available to Building Safety inspector, where required. Footing: - Made after forms are erected and all reinforcing steel is tied in place. Shall include installation of ground cable, when applicable. Foundation: 1. All Weather Wood - Made after walls are sheathed and bolted to footings, before dampproofing and backfill is done. 2. Concrete Masonry Unit - Made after all CMU are laid up and reinforcing steel, hold-downs, anchor bolts and embedments are in place, and before grouting. Inspection to be called for at each bond beam, unless other arrangements are made by Engineer of Record. 3. Poured Concrete Walls - Made after all reinforcing steel, hold-downs, anchor bolts and embedments are tied in place. If wall is greater than 5 feet in height, inspection must be done while one side is still open. 4. Dampproofing of Perimeter Foundation Walls Where shallow foundations occur, dampproofing is optional but advised. Inspections are provided as a courtesy and should be called in before placing insulation board or before backfilling. Page 1 of 6

5. Waterproofing of Perimeter Walls Walls of habitable rooms where earth will be backfilled against the walls, or where designated on the drawings, shall be waterproofed with an approved waterproofing compound, and shall be inspected before placing insulation and backfilling. 6. Perimeter Foundation Drains May be required by plat, by geotechnical report, or by the designer or engineer. Drains must be inspected before backfilling and may be inspected in conjunction with inspections of dampproofing or waterproofing. 7. Cast in Place Concrete Piles, Piers or Columns - Made after reinforcing steel, anchor bolts, and embedments are in place. 8. Driven Piles - Two inspections are required. The first is made after piles are on site and before start of driving to check size, grade and condition; the second inspection occurs after piles are driven. At time of second inspection, a copy of engineer s pile log must be provided to the inspector for inclusion in permit file. 9. Precast Concrete Panels - Made after all reinforcing steel and embedded items are tied in place. [ 10. Concrete Encased Electrodes Commercial buildings; installed by electrical contractor. Call for electrical inspection if building footing and foundation permit has been issued. Underground Electrical Inspection: - To be made after all conduits are installed in a permanent manner and prior to pouring concrete slabs. Electrical systems installed underground and exterior to any building must be inspected prior to covering trenches. Underground Plumbing Inspection: - To be made after all pipe is installed in a permanent manner and prior to covering trenches or pouring concrete slabs. A pressure test shall be made on all piping being installed. Underground Mechanical Inspection: - To be made after all underground HVAC ducting, radiant heat piping or hydronic piping is installed and prior to any ducting or piping being covered. All piping and ducting is to be left exposed until inspected and approved by the Plumbing/Mechanical Inspector. Underground Storage Tank Inspection: See Handout F.04. SECOND SERIES OF INSPECTIONS Rough Electrical Inspection: - To be done after wiring system, including grounding conductor, has been installed in approved boxes, cabinets and service equipment. Switches, receptacles and fixtures are not to be installed at the time of rough-in. Residential One and Two Family Wiring: - All rough wiring for the structure and the electrical service is to be inspected at the same time. Partial inspections or special inspections are subject to additional inspection fees as inspections not covered by the permit fees. Rough inspection to include, but not necessarily limited to, all wiring within walls, panel boards and ground splices terminated by mechanical means. All Wiring: - All wiring to be covered, including that being covered by a suspended ceiling must be inspected before covering. Rough Plumbing/Mechanical: - To be done after all water piping, drain, waste and vent piping, fuel gas piping, HVAC ducting range, dryer and bath exhaust ducting, furnace, boiler, water heater, unit heater, and/or other fuel fired appliances and their venting system have been installed and prior to covering or concealing any portion of these systems. Air pressure test is required on all fuel gas piping. Water or air pressure test is required on all water piping, drain, waste and vent piping. Framing: 1. Residential Framing Inspection - After electrical and plumbing/mechanical rough-in inspections have been approved and all ducts, chimneys, vent, hold downs and shear walls are installed. Page 2 of 6

2. Insulation Framing Inspection - After framing, electrical, plumbing and mechanical are approved and insulation and vapor barrier are in place. 3. Commercial Framing Inspection - After electrical and plumbing/mechanical rough-in inspections have been approved and all ducts, chimneys and vents are installed. If the nature of the work is such that some of the work must be covered before electric, plumbing and mechanical is completed, call for a partial framing inspection of that portion of the structure before any insulation is installed. Wherever possible, make arrangements for partial or phased inspections ahead of time with the appropriate discipline(s). 4. Shear Diaphragm - All required diaphragms, walls, roofs and floors must be inspected after sheathing and hold downs are in place and fastening is completed, before any covering is applied. 5. Commercial Roof Diaphragm Nailing Required. Call for inspection before covering. Provide safe access to perform inspection. 6. Residential Roof Diaphragm Nailing Roof diaphragm nailing inspection, though an option, is advised. Structural inspection will inspect nailing from underside. When roof nailing is called to be inspected, the following applies: Simple roofs (single run pitch - Howe style trusses or similar) must have 60% of the sheathing completed and in place with an opening left at the lower side of the roof for visual inspection. More complex roof systems (multi-level systems with hips and ridges for example) should have sheathing fully completed and have an opening in the lower portion for visual inspection. 7. Shear Walls Exterior shear walls: inspection should be called as part of framing inspection. Inspections must be made before siding, belly band, fascia and exterior trim are in place. Interior shear walls must be inspected before covering. Note: Some interior, double-sided walls must be installed and inspected after insulation is in place and inspected. See below. 8. Insulation - After insulation and vapor barrier are in place. 9. Double Sided Shear Walls Inspected after insulation and vapor barrier are approved. 10. Structural Concrete Slabs, Girders, Beams & Joists - After all reinforcing steel and embedded items are tied in place. 11. Gypsum Wallboard After all rough-in inspections and approvals to cover by all disciplines (structural, electrical, plumbing, mechanical): Inspection occurs when GWB is in place and fastening is complete, before fasteners are covered. On multi-layer installation, each layer must be inspected. This inspection is mandatory at all required fire-rated assemblies, including property line walls of zero lot line residences, but does not apply to the separation wall between Group R-3 and U occupancies. In addition, rated assemblies, whether walls or ceiling lids requiring taping must be inspected for proper taping before final approval. 12. Lath Inspection - Done after weather resistive barrier and lath for gypsum and cement plaster have been fastened in place, before plastering is started. 13. Fire Caulking and Fire Stopping Fire caulking and fire stopping of penetrations through rated wall and ceiling membranes and assemblies must be inspected for approval. Suspended Ceiling System - After all main and cross runners of ceiling grid are supported, ceiling fixtures and lights, plumbing and mechanical lines and equipment are installed, and after plumbing and electrical rough inspections have been approved, partitions are connected and seismic bracing has been installed prior to installation of ceiling panels. Fire Sprinklers Rough-in and 200 psi hydrostatic inspection after all bracing and piping has been installed and special inspection completed on pipe that is to be covered before system complete. Other Inspections - In conjunction with general structural, electrical, plumbing and mechanical inspections, other inspections may include: -fire, zoning, landscaping, traffic, right-of-way, and elevator inspections. The builder must arrange for these and any other required inspections through the Inspection Request phone line. All inspections must be completed and approval given before issuance of a Conditional Certificate of Occupancy or Certificate of Occupancy. See below for additional information regarding many of these inspections. Page 3 of 6

FINAL INSPECTION (*Certificate of Occupancy) Final Structural - After the building or tenant improvement is complete and ready for occupancy. Final grading, doors, windows, porches and decks, exterior stairs, landings, wall opening flashing or caulking, window operating hardware, cabinets, bathroom, kitchens and all life safety items must be completed. Final special inspection reports to be submitted before final Certificate of Occupancy. Final inspection is required BEFORE building may be occupied. Final Electrical - The electrical system shall be completed in its entirety. Conditional electrical approval can be issued only for equipment not on site for installation, e.g. on order, in transport, etc. All electrical equipment and mechanical equipment shall be third party certified (for example, UL certified). Final Plumbing/Mechanical - All plumbing fixtures, gas systems and heating systems shall be properly installed and operable. Final Zoning - Every building that requires a commercial building permit by the Building Safety Division requires a final zoning inspection prior to obtaining a Certificate of Occupancy. In addition, all Planned Unit Developments and cluster housing developments require a final zoning inspection prior to Certificate of Occupancy, whether the permit required by the Building Safety Division was residential or commercial. Included in the kinds of structures requiring final zoning inspection are triplexes and above, all commercial and retail buildings, office buildings, warehouse and industrial buildings, public and government buildings. A final zoning inspection may be required for single family and duplex for site specific requirements identified in the zoning plan review and stamped on plot plan, plans and permit folder. The zoning office will inspect for compliance with the requirements of Title 21, specifically for compliance with plot/site plan approved by zoning and traffic plan reviewers including structure location and configuration, site amenities such as landscaping, paving and striping of parking, loading berth and dumpster locations, etc. To receive a Conditional Certificate of Occupancy, two (2) original as-builts for the structure must be submitted to Building Safety. All commercial projects must call for verification that required handicapped parking has been installed. In addition to the above, inspections for all Planned Unit Developments and other conditional uses and cluster housing developments will include a check for compliance with conditions of approval imposed by the Planning and Zoning Commission by resolution or by the Platting Board site plan review process. The final zoning inspection may include other items when necessary. FINAL AS-BUILT CERTIFIED BY A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE STATE OF ALASKA WITH ORIGINAL STAMP AND SIGNATURE IS REQUIRED TO BE SUBMITTED AND APPROVED BY ZONING PRIOR TO ANY CERTIFICATE OF OCCUPANCY. Fire Final - Required for all commercial and R-1 residential buildings. Inspection to be made when building is complete and all fire detection and suppression systems are functional. All exit signs, door hardware and exit facilities must be installed prior to inspections. All fire access ways, fire lanes, and appropriate signage shall be inspected. All fire detection, alarms, and suppression systems shall have a final inspection and approval before calling for a fire final inspection. Building numbers and Knox boxes shall be installed. Monitoring of sprinkler and/or fire alarm systems by an approved agency or firm, when required, shall be in place before final inspection is requested. A call for final inspection does not include individual inspections for systems. System inspections shall be requested and performed separately, and before final inspections. Existing system service reports with deficiencies corrected shall be available at the site at the time of final inspection. FOR INSPECTION REQUESTS call 343-8300. The inspection request line is a 24-hour call-in recording. To obtain a next day inspection, your request must be recorded before 6:00 a.m. the day you would like the inspection. The recording has a steady tone when the instructions are completed. This tone will stop when you start speaking. Be advised that any background noise will start the recorder. Information should be left in the following order: At the tone please give: 1. Permit number. 2. Phone number. 3. Specific type of inspection; if this is a re-inspection, please so state. Page 4 of 6

4. Lot, block and subdivision. 5. Street address of the job site. 6. Your name or contractors name. 7. Any additional information such as time or directions. A fax line is also available. To utilize the fax system, you must obtain Inspection Form #11 from the Building Safety Division. Fill in the top part with the correct information and fax it to 343-8235. The date you put on the form is the date the inspection will be performed. A separate form must be completed for each inspection requested, i.e., framing - one form; rough - another form, etc. In order to receive your inspection on the day requested the form must be received in Building Safety before 6:00 a.m. that same day. Any appointments or special scheduling must be coordinated by you with the inspector involved the morning the inspection is to be done. There will be an additional charge for inspections requested to be performed on Saturdays or after hours. *For all Certificate of Occupancy requirements see Handout AG.15. Ron Thompson, Building Official DATE: February 9, 2006 (ref. 97-08, 99-10, 00-03, 00-10, 01-02, 01-09; 02-01, 02-06; 04-02) Page 5 of 6

CHECKLIST FIRST SERIES OF INSPECTIONS 1. Excavation 2. Fill 3. Footing Foundation: 1. All Weather Wood 2. Concrete Masonry Unit 3. Poured Concrete Walls 4. Dampproofing of Perimeter Foundation Walls 5. Waterproofing of Perimeter Walls 6. Perimeter Foundation Drains 7. Cast in Place Concrete Piles, Piers or Columns 8. Driven Piles 9. Precast Concrete Panels 10. Concrete Encased Electrodes 11. Underground Electrical Inspection 12. Underground Plumbing Inspection 13. Underground Mechanical Inspection 14. Underground Storage Tank Inspection SECOND SERIES OF INSPECTIONS Electrical: 1. Rough Electrical Inspection 2. Residential One and Two Family Wiring 3. All Wiring 4. Plumbing/Mechanical: 5. Rough Plumbing/Mechanical Framing: 1. Residential 2. Insulation 3. Commercial 4. Shear Diaphragm 5. Commercial Roof Diaphragm Nailing 6. Residential Roof Diaphragm Nailing 7. Shear Walls: a. Exterior Shear Walls b. Interior Shear Walls 8. Double-Sided Shear Walls. Interior/Exterior 9. Insulation 10. Structural Concrete Slabs, Girders, Beams & Joints 11. Gypsum Wallboard 12. Lath Inspection 13. Fire Caulking and Fire Stopping 14. Suspended Ceiling System 15. Fire Sprinklers 16. Other Inspections FINAL INSPECTIONS (Certificate of Occupancy) 1. Final Structural 2. Final Electrical 3. Final Plumbing/Mechanical 4. Final Zoning 5. Final As-Built 6. Fire Final Note: Additional inspection requirements may be identified by the inspectors. Page 6 of 6