BERKELEY COUNTY ENGINEERING AND

Similar documents
CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Basic Requirements for Residential Plan Review _

Time/Date Stamp when received:

Residential Building Permits

INFORMATION BULLETIN NO.

Commercial Construction Permit Application

INFORMATION BULLETIN NO.

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

City of North Chicago Department of Building and Community Development 1850 Lewis Avenue North Chicago, IL (847) (847) Fax

Residential Building Permit Process

Bureau Veritas Contact Information

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Placement of Manufactured Homes on Private Property

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

C I T Y O F P E A R S A L L

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Name of course: Residential Construction Site Management (RCSM) Level 1

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

2. Complete the appropriate sections of the Auto/Home Quote form. 4. Return all materials to Paul Goebel Group. or your local Citizens Agent.

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Frequently Asked Questions

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Architectural Control Guidelines

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950 KENANSVILLE, NC PHONE: (910) FAX: (910)

Sample Drawing Package for One and Two Family Dwelling Applications

dpd Seattle Permits CAM Establishing an Accessory Dwelling Unit (ADU) What is an ADU?

APPLICANT / CONTACT:_

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

On Your Lot Building How To Get Started

THE KNOXVILLE I TOWNHOUSE

10.08 New ConstructionError! Bookmark not defined.

BUILDING PERMIT SPECIFICATIONS

RESIDENTIAL CONSTRUCTION APPLICATION CITY OF HIGH POINT

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

NEW OR ADDITIONS TO GARAGE/SHOP/STORAGE PERMIT REQUIREMENTS

2. What building projects are exempted? (permit not required)

Botetourt County, Virginia. Frequently Asked Questions

Commercial Building Permit Application & Submittal Guidelines

INCORPORATED VILLAGE OF OYSTER BAY COVE TOWN OF OYSTER BAY, NASSAU COUNTY, N.Y. OFFICE BUILDING INSPECTOR FEE SCHEDULE

Floyd County Department of Inspections 120 West Oxford Street PO Box 218 Floyd, VA Phone: Fax:

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

Residential Plan Routing Information

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

dpd Seattle Permits CAM Establishing an Attached Accessory Dwelling Unit (ADU) What is an ADU?

Single Family Dwelling Submittal Requirement Checklist with Basement

RELOCATION OF BUILDINGS

Manufactured Home Application Packet

SECTION 1 - BUILDING CODE

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

17 East Main Street Cuba,NewYork Code Enforcement

Building Code Inspections and Fees

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

APPLICATION FOR SINGLE PROJECT PROFESSIONAL LIABILITY INSURANCE. Name of Firm or Joint Venture: Address of Head Office:

CHARLOTTE COUNTY Community Development Department

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

PLEASE RETURN DENIAL COMMENTS WHEN RESUBMITTING PLANS*

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas August 30, Prepared for:

Department of Community Development, P. O. Box 427, Herndon, Virginia

7429 Rose Lane Circle

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

Notice to Property Owners

Project Scope Statement Example

ATTENTION BUILDERS, CONTRACTORS AND DEVELOPERS

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

A Homeowner s Guide to Building Permits

T H E G R EA T C A L IF O R N IA S H A K E O U T O C TO B E R 21, 201 0

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Foundation Repair Permit - Residential and Commercial

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

EZITV 2010 HOMEOWNERS DATA COLLECTION FORM

CHAPTER 3 MANUFACTURED AND MOBILE HOMES

Additions and Alterations

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

YOU VE BEEN HIRED AS A GENERAL CONTRACTOR

STATE OF MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY 443 Lafayette Road North St. Paul, Minnesota (651) or DIAL-DLI

3rd Annual Design Drafting Contest

The City of Basehor, Kansas

A HOMEOWNERS GUIDE TO BUILDING PERMITS

City of Fort Smith Building Permit Process Frequently Asked Questions

How To Write A Building Code In Kendall County

Town of Beaumont. Lot Grading Guidelines

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Substantial Improvement/ Damage Review

MISSION VIEJO ENVIRONMENTAL ASSOCIATION PAINTING APPLICATION

City of St. Charles Basement Finish or Remodel

Engineered Wood Foundations

TOWN OF TRURO BUILDING PERMIT APPLICATION

Uncovered Decks & Porches

LAND ASSEMBLAGE REDEVELOPMENT AUTHORITY ("LARA") REQUEST FOR PROPOSALS ("RFP") FOR AFFORDABLE HOUSING DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Prior to submission of drawings for building permit, the architectural control process will be undertaken for the developer and/or builders.

Transcription:

BERKELEY COUNTY ENGINEERING AND BUILDING INSPECTIONS 400 West Stephen Street - Suite 202, Martinsburg, WV 25401-3838 Telephone: 304-264-1966, Fax: 304-262-3128 Web Page: www.berkeleywv.org I. WHAT ARE MASTER PLANS Master Plans are approved construction documents for identical structures proposed to be repeated in Berkeley County. Master Plans include single dwelling units, duplexes and townhouses. The Master Plan Program expedites the issuance of building permits for Master Plan items. An appointment is necessary with the Master Plan Coordinator for service. Please call the Master Plan Coordinator at 304-264-1966. II. DEFINITIONS The following are definitions of terms used in this Information Bulletin: Master Plan: a set of approved construction documents for identical structures proposed to be built repeatedly in Berkeley County. Master Plan Coordinator: The Plan Review Specialist who accepts Master Plan submittals, calculates fees, processes plans, assigns Master Plan numbers, issues building permits, and processes plan change or revisions to a Master Plan. Production Phase: A project for which plans have been submitted to the Department of Engineering and Building Inspections. Model or Plan Type: A designed building or prototype. Each model or plan type is approved under the current code requirement and assigned a specific master plan number. III. HOW TO ESTABLISH A MASTER PLAN A. Submission of Plans The following items must be submitted: 1. Compete sets of plans for single dwelling unit, duplexes or townhouse projects, two of which may require to be stamped by a West Virginia licensed architect or engineer. Contact the Master Plan Coordinator for the number of sets of plans required for submitted. One set of structural calculations. 2. Manual S 3. One set of truss calculations, if applicable. 4. One set of energy calculations, (REScheck). 5. One copy of soils report and/or geological study, if applicable. 6. A completed and signed General Application for each building type. 7. A completed and signed Water Availability letter or well permit for each building or unit. 8. A completed and signed Sewer Availability letter or septic permit, 9. One copy of the recorded plat and all approved improvement drawings. Appointments for submittals are required. Call the Master Plan Coordinator at 304-264-1966 for an appointment. 10. Plan check fees (see section VIII) IV. THE MASTER PLAN REVIEW PROCESS The Master Plan Coordinator will assign a project number to the newly submitted plans. Thereafter, all inquires must refer to the project number.

Single dwelling unit duplexes or townhouse will be routed to department staff to be reviewed for residential mechanical, energy, water and sewer, structural, West Virginia Building Code, engineering, planning, and grading requirements. The applicant will be notified by mail or telephone when the plans are ready to be picked up for corrections. The Master Plan Coordinator will mail, e-mail or FAX the review sheets to the designer at the applicant s request. The applicant will pick up the plans and make any necessary corrections. Each review sheet will have the name and telephone number of the respective plan checker along with instructions on how to handle the recheck (by appointment or by resubmitting the plans). After all the necessary corrections are made, the plans are stamped approved by each discipline. After all approvals are obtained, the plans will be assigned a Master Plan number. All inquiries after this will refer to the Master Plan number instead of the project number. Two sets of plans will be stamped by the Coordinator with an approval stamp. One set of the approved plans and calculations will remain on file with the Master Plan Coordinator and the other set will be returned to the applicant; Electronic copy will also be required. V. REVISIONS TO A MASTER PLAN Changes or revisions to a Master Plan must be approved prior to submitting for production phase building permits. An appointment is required with the Master Plan Coordinator. To revise a Master Plan, two sets of complete building plans must be submitted. Both sets of plans must have all the changes bubbled. All revisions will be routed for review and approval. A plan change fee will be collected for revisions to plans. VI. PERMITS FOR A PRODUCTION PHASE After the Master Plan is established, plans for construction projects will be produced from the established Master Plan set on file. Any changes including minor changes must be approved prior to plan submittal for building permits. The Coordinator will not accept plans that do not match the Master Plan on file. (See Section V for plan changes or revisions to a Master Plan.) A. Building Plan Submittal To submit plans on established Master Plans, the applicant needs to schedule a submittal appointment with the Coordinator. At the appointment the following items must be provided: 1. Complete sets of plans for single dwelling unit, duplexes or townhouse projects including plot plans and legal description, two of which may be required to be signed and stamped by a West Virginia licensed architect or engineer. Contact the Master Plan Coordinator at 304-264-1966 for the number of plans required for submittal. 2. A copy of recorded map and all approved improvement drawings. 3. One copy of plot plans showing house location, driveway and slope. 4. One copy of the soils report (if applicable). 5. One set of energy calculations (REScheck). 6. A completed and signed General Application for each building. B. The Review and Approval Process After determining that the submittal package is complete, the Master Plan Coordinator will assign a new project number and route the plans to the department's staff for expedited reviews, if necessary. Most approvals for single family residence projects are obtained from the Master Plan Coordinator. Once the production phase plans are approved, the following items are required to obtain a building permit: 1. Two complete sets of plans and applicable calculations approved and signed by the plan reviewers.

2. Completed and signed applications. 3. Payment of fees. See Section VIII for plan review and building permit fees of production phases. VII. EXPIRATION OF A MASTER PLAN Master Plans will expire with the County's adoption of a new West Virginia Building Code (WVSBC), or other state mandated regulations. When a Master Plan has expired, a letter will be mailed to the applicant. Expired plans may be returned to the applicant if arrange with the Master Plan Coordinator. All requirements in Section III, How to Establish a Master Plan, will be applicable to Master Plan renewal, with no exceptions, including the Master Plan processing fee. VIII. FEES FOR MASTER PLAN APPROVAL $250.00 Review Fee

Berkeley County Department of Engineering & Building Inspections 2015 IRCCODE MASTER PLAN APPLICATION Applicant Name: Address: Contact Person if other than applicant: Address: Phone Number: IF MORE OPTIONS ARE NEEDED; PLEASE USE SECOND PAGE Phone Number: E-mail address: Fax Number: Elevation View MODEL NAME: A. HOUSE TYPE Basement 1. Walkout 2. Egress window 1. Rancher 2. 3. 4. 5. 6. 7. 2 Story Duplex Cape Cod Split Foyer Split Level 2 Story TH B. EXTERIOR FINISH 1. Vinyl 2. Brick 3. Stone C. FOUNDATION MATERIAL 1. Concrete 2. CMU D. FOUNDATION TYPE 1. Basement 2. Crawl 3. Slab on Grade E. FOUNDATION SIZE 1. 8 2. 10 3. 12 a. Reinforced b. Unreinforced F. GARAGE 1. Front Load 2. Side Load a. 1 door b. 2 door c. Other G. ROOM EXTENSIONS a. 2 foot b. 4 foot H. GARAGE EXTENSIONS a. 2 foot b. 4 foot I. MORNING ROOM 1. 8 2. 10 3. 12 a. 1 story b. 2 story c. 3 story J. SUNROOM 1. 8 2. 10 3. 12 a. 1 story b. 2 story c. 3 story K. PORCH L. DECK M. FIREPLACE 1. Gas 2. Masonry 3. Woodstove 4. Insert Factory Built N. BAY WINDOWS 8. 3 Story TH NOTE: PLANS APPROVED AND RELEASED FOR MASTER PLAN PERMITS MUST BE STRICTLY FOLLOWED. ANY FUTURE REVISIONS MUST BE SUBMITTED FOR REVIEW AND APPROVAL. VARIATIONS IN CONSTRUCTION WITHOUT PROPER WRITTEN APPROVAL WRITTEN APPROVAL FROM THE PLAN REVIEW DEPARTMENT MAY RESULT IN VOIDING THE MASTER PLAN APPROVAL AND REVOKING ASSOCIATED CONSTRUCTION PERMITS. I HEREBY REQUEST MASTER PLAN APPROVAL FOR THE ABOVE LISTED MODEL AND AGREE TO THE TERMS AS NOTED. Signature: Printed Name: Plan Reviewer: Approval Date: Rev: 1/3/14, 10/27/16

Master Plan Requirements Policy 1. Application for master plan review to be submitted, one for each model 2. Master plans must be submitted for review with all documentation for all listed options. A paper copy, minimum size 11 X 17 provided for review a. Clearly identify on all paperwork if it goes with base plan or which option 3. A digital copy to be provided once all options are approved a. A list of possible options with description shall be provided to the builder to ensure that all builders use the same identifier for the same item i. Options include items such as house type, 1, 2 or 3 car garage, sunrooms, morning room, extensions, etc. b. Digital copy to contain folders for each option separate from main plans. Each folder to contain all information relating to that option which varies from base plan c. Options to be given a short identifier (a letter or number) and a descriptor list for the options. The options to be listed by the identifier on permit applications 4. Approved master plans will be valid until adoption of new building codes. 5. Change of suppliers, sub contractors, etc will require plan change forms to be submitted 6. Upon plan review all changes to meet code requirements must be incorporated into plans by the architect/ engineer 7. Any special requirements may require a separate complete review (items not originally shown on plans) Rev: 1/9/13, 10/27/16 IT Rev: 1/3/14, 10/27/16