Applying Lean Thinking in Construction Project Management

Similar documents
IPD, Lean and BIM: Hype or the Real Deal?

WHITE PAPER. Lean Construction. Technology Advances in Lean Construction

New Zealand BIM Handbook Appendix D - BIM Uses definitions July A guide to enabling BIM on building projects

BIM and Lean Construction Can BIM remove waste from construction processes?

Synergy: Building Information Modeling and

Strategy Deployment Through Collaborative Planning. Linking the Strategy to Practical Activity

Laser Scanning for an Integrated BIM

BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

intergraph Procurement, Fabrication & Construction seminar

BUILDING A STRATEGY FOR BIM

Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University.

Aligning Correct and Realistic Performance Testing with the Agile Development Process

BIM for Interior Designers BIM IN PRACTICE

ASSET. Unlock the power of your Digital Asset

Using lean methodologies to improve performance

Collaborative Project Management Made Simple

CHAPTER 1: INTRODUCTION TO RAPID APPLICATION DEVELOPMENT (RAD)

Leading Continuous Improvement in Established Agile Organizations

d e n v e r a r t m u s e u m

Brochure HP Workflow Discovery for FSI

LCI Lean Project Delivery Glossary

VISUAL management techniques for optimum INVENTORY form, fit and function

BIM BASICS AIRAH PRESENTATION SERIES. Mark Jacobson National BIM Operations Manager AE Smith & Son

BIM Essential Guide. For BIM Adoption in an Organization

BIM Pilot Getting Started Guide. For Construction Professionals. next

Making a positive difference for energy consumers. Competency Framework Band C

SMARTPLANT ENTERPRISE

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

BETTER BY 3D DESIGN AND COORDINATION IN BUILDING SERVICES INDUSTRY

Covance Construction Management Staffing Plan Chandler, Arizona

The Tools of Lean - Value Stream Mapping

SC21 Manufacturing Excellence. Process Overview

Chapter 11. Lean synchronization

Tekla Structures More than a detailing tool. Precast concrete

Map the Value Stream

PS.12. 4D Scheduling A Case Study

Sage 300 Distribution

Design without compromise. Autodesk Revit. Architecture 2010

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Process Improvement Program Project Process

Enhance Production in 6 Steps Using Preventive Maintenance

PROJECT MANAGEMENT PLAN CHECKLIST

Revit MEP. Autodesk Navisworks

Qlik UKI Consulting Services Catalogue

What is Lean Manufacturing?

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

3D Laser Scanning for Manufacturing Facilities Developing the Business Case. By Bill Campbell Founder, Digital Dimensions 360, LLC

Turner Innovation Series BIM Conference Istanbul May Brian Krause, Dan Gramer, Turner Construction Company

Attachment 16.1 SA Power Networks: Customer Data Quality Plan September 2014

How To Implement Lean And Bim On An Infrastructure Project

Lean enterprise Boeing 737 manufacturing Lean Production System

DEPARTMENT OF LOGISTICS UNIVERSITY OF STELLENBOSCH POSTGRADUATE INFORMATION: LOGISTICS MANAGEMENT 2015

Questions and Answers

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

The Scottish Wide Area Network Programme

Implementing Lean Construction: Stabilizing Work Flow *

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

IMPLEMENTING LEAN CONSTRUCTION: UNDERSTANDING AND ACTION

Application of Artificial Intelligence for a Computerized Maintenance Scheduling System

WORKFACE PLANNING CONFERENCE WFP IS MAKING IT HAPPEN. PROJECT PLANNING A CASE STUDY Wayne Cusitar, P.Eng., MBA

Trapeze Rail System Simulation and Planning

Execution Plan Template Design Modeling

RAPID ENGINEERING WITH AGILE RIGHTSHORE DELIVERY (REWARD)

SMACNA BIM Primer Navigant Consulting, Inc. All rights reserved

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Lean Kitting: A Case Study

LEAN AGILE POCKET GUIDE

Job Description Head of CRM

Building Commissioning

ITIL Introducing service transition

ENGR 1181 Lab 2: Quality and Productivity Lab

AEC Supply Chain Optimization

Building Information Modelling

Job Description. Empty Homes Project Officer

LAST PLANNER, LOOK AHEAD, PPC: A DRIVER TO THE SITE OPERATIONS

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

Measuring ROI of Agile Transformation

REAL-TIME SUPPLY CHAIN MANAGEMENT USING VIRTUAL DESIGN AND CONSTRUCTION AND LEAN

SUSTAINING COMPETITIVE DIFFERENTIATION

Lean Sigma Tools in the Hiring Process

White Paper. Process Improvement

Five Core Principles of Successful Business Architecture

IMPORTANT FACTS ABOUT. New Product Development

1) A complete SCM solution includes customers, service providers and partners. Answer: TRUE Diff: 2 Page Ref: 304

Systems Selection Enclosure Systems Material Selection Assessment and Mitigation

The ITIL v.3. Foundation Examination

How To Design A Bim Project

A Study of the Application of Supply Chain Management in Construction Industry

Construction Firm Integrates Business Systems with Comprehensive Solution

FABRICATION DRAWINGS A Paradigm Shift

Transitioning Your Software Process To Agile Jeffery Payne Chief Executive Officer Coveros, Inc.

DevOps: Development Challenges and New Approaches

Lean Construction for Sustainable Business

Points of Defect Creation

Transition to 3D Fabrication Workflows

Getting to a Facility Management BIM

These guidelines can help you in taking the first step and adopt a sustainability policy as well as plan your further sustainability communication.

Transcription:

Applying Lean Thinking in Construction Project Management Ir Dr Sammy K. M. Wan Past President of IIE (Hong Kong Chapter) August 27, 2015 香港工業工程師學會 Institute of Industrial Engineers (Hong Kong) 1

CONTENT 1. Background 2. Lean Thinking in Construction Projects? 3. Applying Lean in Project Life Cycle 3. Conclusion 香港工業工程師學會 Institute of Industrial Engineers (Hong Kong) 2

Applying Lean Thinking in Construction Project Management CHAPTER 1 Background 香港工業工程師學會 Institute of Industrial Engineers (Hong Kong) 3

Background A broad concept of production Lean manufacturing focus on eliminating waste while delivering quality products on time at least cost with greater efficiency. Lean practices reduce wastes in all hidden forms like defect, motion, inventory, transportation, overproduction, processing and waiting. It is helpful for producing consistency and predictability in quality of work and reduction of material waste. 4

Background A broad concept of production More production wastes exist in the construction industry. Cost and schedule in the original and traditional construction paradigm but acceleration in schedules would inevitably escalator cost while reduction in cost usually extended schedules. 5

Background A broad concept of production Lean construction practices is applied to solve significant process issues in particular of collaboration between stakeholders. It approaches value rather than cost and efficiency rather than schedule. Ultimate goals in lean construction are to minimise physical and process waste, and improve value generation to client. 6

Applying Lean Thinking in Construction Project Management CHAPTER 2 Lean Thinking in Construction Projects? 香港工業工程師學會 Institute of Industrial Engineers (Hong Kong) 7

Lean Safety Thinking Hazards in in Construction ACMV Why conventional project fails? Lean thinking is necessary to improve coordination and communication. With extremely poor coordination and communication, a large amount of pending works could escalate after starting work. Inadequate preconditions could arise conflicts at works and design changes or errors are primary sources of rework, i.e. key production waste. Pending works Works released (Wan et al, 2014) 8

Lean Safety Thinking Hazards in ACMV Construction Why conventional project fails? Projects are always managed by breaking into pieces or activities by using schedule to push for work to begin on the earliest start date. Control begins with tracking and rests on thermostat model and action taken either to speed up or re-sequence activities. Reliable release of work from one crew to the next is assumed or ignored. 9

Lean Thinking in Construction Lean production delivery To make significant improvements in the end-to-end design and construction process designers and constructors have to collaborate more closely with the client so that product design and production process can evolve together. The later that constructors are involved the more costly it is to make changes. 10

Lean Safety Thinking Hazards in ACMV Construction Lean production delivery In the industry, lean production delivery can collaboratively align people, systems, business processes and practices of all participants so that they can optimise value for client, reduce waste and maximise effectiveness through all phases of design, fabrication and construction. Concentration of design much earlier and taking lead by client are features of lean production delivery. 11

Lean Safety Thinking Hazards in ACMV Construction Last planner system In construction project, a task should be started after the completion of the preceding task according to the master schedule. There are always changes in design, unavailability of resources, materials, information and site access, i.e. prerequisites and preconditions for task. Tasks of three weeks in the schedule (Koskela, 2009) What happens in reality 12

Lean Thinking in Construction Last planner system Last Planner System commits to near-term (often weekly) tasks to make sure a reliable assignment WILL be done at required time after considering both what SHOULD from higher-level schedules and what CAN be done based on situation at hand. Assignments are likely to get done when they are well defined, resources sound, in right sequence, and within capacity of the crew. Look-ahead plans based upon work tasks reduce interruption, rework, or remobilisation. SHOULD CAN WILL SHOULD WILL CAN High probability of task completion 13

Lean Thinking in Construction Last planner system Allow activities to remain in the look-ahead plan only if the planner is confident that it can be made ready for execution when scheduled. Works are planned and prioritized on weekly basis through coordination meetings and progress is measured by monitoring actual completion and weekly learning to improve work practices. 14

Applying Lean Thinking in Construction Project Management CHAPTER 3 Applying Lean in Project Life Cycle 香港工業工程師學會 Institute of Industrial Engineers (Hong Kong) 15

Applying Lean in Project Life Cycle Client early design In project definition, it is necessary to involve all members to generate and align the needs and values, design concepts and design criteria, rather than working alone between architect and client traditionally. Early involvement of stakeholders helps evaluate alternatives and refine design early from a range of criteria set by client and design intent flow down through the various stages of the project. Through parametric design and collaborative processes, and value loss is minimised and late changes in design are reduced when the conceptual design or design intent is passed along to later stages. 16

Applying Lean in Project Life Cycle Design and detail It helps minimise waste by improved design reviews via early involvement of stakeholders. Contractors contribute by providing specific information including temporary structures and site conditions early in design process. Collaborative design processes help coordinate multi-discipline design by exchanging temporary information and freezing design solutions so that others can start design. It can minimise delays and compress overall time. Joint design reviews are possible during iterative modelling coordination meetings to address clashes, errors and omissions identified in the design. 17

Applying Lean in Project Life Cycle Collaborative planning Recently, BIM may be used for stakeholders to visualise the task and also process sequence for collaborative planning and mutual understanding, where a 3D model is linked to the project plan and simulated to demonstrate the activities for a selected period. 4D scheduling can also serve the function of a virtual first run study where users try different work methods and sequences for optimisation. Using principle in Last Planner, it helps increase resolution of production planning and control that improves work predictability and reduces waste. 18

Contributions of BIM to lean goals Simulation and analysis Auxiliary information systems or analysis models enabled by BIM contribute directly and indirectly to lean goals. Value-adding calculations and a range of parameters (e.g. structural integrity, thermal performance, acoustics, ventilation and circulation, lighting, energy, etc) are valuable for changing design process so that possibility of design improvements or fit for purpose design through rapid iteration can be realised in design practice. 19

Contributions of BIM to lean goals Clash detection BIM contributes directly to lean goals by clash detection. Once physical or clearance clashes in various disciplines are found designers can correct problems and iterate models until they are clash free. There are two types of clashes, a hard clash where objects occupy the same space, and a soft/clearance clash where objects are so close that there is insufficient space for access. By carrying out automate clash checking in a 3D space, a significant amount of time and money that would otherwise be wasted through rework or delay is saved. 20

Global equity Applying Lean in Project Life Cycle Prefabrication The comprehensive digital coordination process is useful for prefabricators as it helps achieve levels of prefabrication. Fabricators are able to get large percentages of prefabrication on major components of the building systems. In modeling, more items are preassembled off site in a controlled environment compared to a construction site and trucked to the site. More preassembled framing panels, plumbing piping and components and cast-in channels can reduce on-site fabrications and improve work safety.

Applying Lean in Project Life Cycle Procurement & resource flow In the pull planning or BIM based quantity take off and estimating are increasingly used during early stages to provide an accurate bill of quantity and reduce time taken to produce this information. It is possible to integrate procurement system with BIM model to visually track the procurement of component and materials arriving on site. In several programmes, it is possible to track components as they are fabricated, shipped and received on site (and also when they are installed) to improve production planning and prevent conflicts existed with other activities. 22

Global equity Applying Lean in Project Life Cycle Pre-task planning Pre-task planning in workface planning offers opportunities for construction preparation and safety planning. In BIM, elements to be built are virtually looked at, employees were able to better identify the hazards and control measures so the task could be completed faster and more safely. Crafts were able to identify the better sequence of activities, and materials, tools, access or space and clearance requirements before starting work. The issues can be captured during pre-task planning.

Applying Lean in Project Life Cycle Better-planned construction It allows for smoother and better-planned construction process that saves time and money and reduces uncertainty and potential for errors and conflicts. By using BIM, many contractors are going beyond the general uses such as clash detection, visualisation and 4D planning. Subcontractor can visually prototype all portions of their work in detail long before starting fabrication. Laser scanning for accurate as-built model to compare actual product with design (crucially in refurbishment projects). Tracking systems to locate material and components help during production management and handover processes. 24

Applying Lean in Project Life Cycle Monitoring & tracking Progress monitoring allows stakeholders to focus on tasks that are behind schedule and track material delivery and resources flow for weekly learning. Through an up-to-date BIM model integrated with facilities management system and extended through mobile technologies, it is possible to access information and knowledge to maximise efficiency. Use of RFID technology to link physical building components with digital information is useful for on-site inspection of work and documentation, real time project progress management, and quality assurance, all of which are important aspects of implementing lean in construction. 25

Applying Lean in Project Life Cycle Kanban pull production The use of KanBIM to support production planning and day-to-day production control on site. Visualization of process, product and method for better coordination and communication and computation of task maturity in weekly work planning and daily work execution. 26

Applying Lean in Project Life Cycle Kanban pull production Maturity index is displayed to planners and team leaders using color-coded symbols on tasks icons to make sure that the preconditions such as preceding work, information, materials, equipment, team, space, external conditions and safety requirements are fulfilled for task execution. Reaffirm commitment to completing mature task and report start and completion or stoppage of tasks and timely reporting for completion and problems. 27

Applying Lean Thinking in Construction Project Management CHAPTER 4 Conclusion 香港工業工程師學會 Institute of Industrial Engineers (Hong Kong)

Conclusion Safety Hazards in ACMV Thinking for a change Lean thinking was proven in the Japanese automotive industry and has slowly gained traction in the construction industry, as evidenced by the increasing volume of papers. Incorporating scheduling and lean tools can achieve a look ahead schedule and a pull technique through a proper schedule. Consequently, converting the flow of resources from interrupted to uninterrupted with idle and waiting time consequently reduced. 29

Conclusion Safety Hazards in ACMV Thinking for a change Lean construction and BIM are not only synergistic but that the synergy spans the entire life cycle of the project through rapid evaluation of alternatives, set based design, joint design reviews, collaborative planning, clash detection, simulation and analysis, etc. Some emerging initiatives are available for involving mobile solutions, GPS devices and RFID for smoothening work processes and maximising efficiency. Lean is about thinking smart. 30