A1100 GUARDIAN OVERFILL PREVENTION VALVE (with Installation Kit)

Similar documents
Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer

Instructions. Complete RPS 2900 Pump Kit for RoadLazer RoadPak Line Striping System 3A1304A ENG. Pressure Relief Procedure.

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Grade Level Spill Containment Manholes

Installation Guide. Bath and Wall Surrounds SERIES B

Multiport Spill Containment with Defender Spill Containers

Sealant. 30" Model No D: 17-7/8" TO 18-3/8" (454 to 466mm) W: 29-3/4" TO 30-1/4" (756 to 768mm) Under Countertop Installation

Below Grade Spill Containment Manholes Gallon Gallon Gallon. Installation Instructions

MODEL G300 BRAKE BLEEDER

ROUTER TABLE INSERT ASSEMBLY AND OPERATING INSTRUCTIONS

GM DURAMAX LMM Fuel Pickup Kit Installation Guide

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

PATHWAY Classic Series with Handrails Portable Wheelchair Ramp INSTRUCTIONS FOR USE 6428 REV A

Installation Instructions

Table of Contents WARNING SYMBOLS AND DEFINITIONS

Elavo White Ceramic Round Vessel Bathroom Sink

PAINT SPRAY GUN WASHER

ARB Approved. Installation, Operation, and Maintenance Manual. For the OPW Phase I Vapor Recovery System As Certified by Executive Order VR-102-J

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09042K1

Spill Containment Manholes

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

Hydraulic Transmission Jacks Operating Instructions & Parts Manual

American Fireglass Outdoor Fire pit kit information. General instructions/warnings for outdoor gas pan and burner systems

Universal Installation and Maintenance Instructions 71CD-1212 Spill Containment Bucket

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations

GAS SAFETY PRECAUTIONS

55-Gallon Dispenser Package

London Farm Kitchen Sinks

Technical Data. Installation

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit

OPERATING MANUAL CONTRACTOR STYLE AXIAL FANS

cbperformance.com Please read this entire brochure prior to installing your CB Performance Products MAGNASPARK II distributor.

Customer Support

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

USE &CARE GUIDE. Remote Faucet Pump System. See Important Safeguards on page 2

Installation Instructions

Structural Holding System

Gunite Disc Brake Rotors

11101, & INSTALLATION INSTRUCTIONS

READ AND FOLLOW ALL SAFETY INSTRUCTIONS 1. DANGER RISK OF SHOCK DISCONNECT POWER BEFORE INSTALLATION

Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal)

HotLok Pass Through Blanking Panel

PNEUMATIC PLANISHING HAMMER

UNIVERSAL LUMBAR INSTALLATION INSTRUCTIONS

81000 Series Aluminum Gate Valve Installation and Repair Manual

DBF 4XL Dryer Booster Fans

Unpacking, Installation, and Customization

SEPTIC TANK PUMP VAULT FILTER SYSTEM PUMP VAULT INSTALLATION AND SERVICE MANUAL

BRAKE DRUM AND ROTOR SERVICE INFORMATION

Installation Instructions / Warranty

Hydraulic Punch Driver Kit

Service Bulletin No. SB MANDATORY SERVICE BULLETIN. Safetying of standard and flop-type fuel pickup tubes.

tire inflator with pressure gauge

AZEK Rail Install Guide

SINGLE STAGE INLINE FIRE PUMP

Installation and Maintenance Instructions

16-Port Gigabit Green Switch (TEG-S16Dg) 24-Port Gigabit Green Switch (TEG-S24Dg)

Installation Instructions

Installation Instructions

S33 Sump Pump INSTRUCTIONS AND SERVICE MANUAL VERTICAL FLOAT SWITCH S33V1 & S33V1C AUTOMATIC S33P1 & S33PC-1 (CONTROL WITH SERIES PLUG) NOT SHOWN

Model/Sprinkler Identification Numbers

RadianceRail Installation Guide

SE-100-1, SE-200-1, SE-500-1, and SE AIR CHAMP PRODUCTS. User Manual SE BRAKE MODELS: (i) MTY (81)

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

SERVICE INSTRUCTIONS REPLACEMENT INSTRUCTIONS FOR 828XXXX, 830XXXX, 833XXXX, 834XXXX, 836XXXX SERIES MODEL 8300 AND SUNCHASER AWNINGS

Direct AC Wiring Option Installation Guide

USER MANUAL. 10 GPM Small Single Line Cryogenic Coupling

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

Propane Conversion Kit PROPANE CONVERSION KIT INSTALLATION MANUAL

Trunnion-Design Ball Valves

Extrusion Flo-Valve INSTRUCTIONS-PARTS LIST psi (210 bar) Maximum Working Pressure. Model , Series K. Rev.

Bottom Loading Water Dispenser

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

Installation, Maintenance, & Repair Series 4000B/LF4000B

Owner s Manual Gantry Cranes

Installation Instructions

INSTALLATION INSTRUCTIONS P-TRAP SUPPLY KIT Model: RH-3016 These instructions are a guideline for a basic installation

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

TracRac G2. Overhead Rack Installation Instructions. TracRac Inc. 994 Jefferson St. FallRiver MA IN-42000_B

03-07 Ford 6.0 Powerstroke Installation Instructions and Manual P/N: 10401

Rental Services Temporary Cooling - Flexible Water Hose

Trash Pumps Models: 56200, , 56201, , 56300, , 56301,

SELF-STEERING AXLE TABLE OF CONTENTS

* 20 8 RN. 74 Guide Bars HERE S HOW THE OREGON SAW BAR. 12" 14" 18" 20" 36" (Etc.) 0=.050" 8=.058" 3=.063" 4=.043"

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

Operating Instructions Manual. Hydraulic Transmission Jack, Telescopic

FERRORESONANT BATTERY CHARGERS

MGB Chrome Bumper Conversion

INGROUND, ROPED, AND HOLELESS JACK SEAL REPLACEMENT

Retractable Screen. Replacement Screen Instructions

Digital Fingerprint safe

Installation Manual DIAPHRAGM WELL TANK

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

FASCINATION 700 HVLP TANNING PRO SYSTEM USER MANUAL

KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850

Operator s Manual. Pressure Injection Cell Model PC8500. Congratulations! Contents

Transcription:

A1100 GUARDIAN OVERFILL PREVENTION VALVE (with 493192 Installation Kit) Assembly and Installation Instructions (includes 568351 paper template) Important: Read these instructions completely and carefully before attempting to install and operate this valve. Failure to do so may result in improper valve operation allowing for a potential storage tank overfill. An overfilled tank can create extremely hazardous fuel spills which may result in personal injury and property damage. For further information, please call our Customer Service Department at (252) 243-0150. Important: Veuillez lire ces instructions attentivement avant d'installer et d'exploiter cette vanne. Ne pas le faire peut entraîner un fonctionnement incorrect de la vanne permettant un potentiel débordement de la citerne de stockage. Un réservoir trop plein peut créer des déversements de carburant extrêmement dangereuses qui peuvent entraîner des blessures et des dommages matériels. Pour plus d'informations, s'il vous plaît communiquer avec notre service à la clientèle au (252) 243-0150. Assembly 2-7 Tools 2 Packing List 2 Procedure 2-6 Installation 7 General Maintenance 8 Warranty 8 Note: All information, illustrations and specifications in this manual are based on the latest product information available. We reserve the right to make changes at any time without notice. CAUTION: Never disconnect the drop elbow from the tight-fill adapter when the A1100 has reached the positive shut-off level. At this point, the tank truck hose is still full and must not be disconnected until enough fuel has been removed from the underground storage tank to drain the hose. Premature disconnection will result in a hazardous spill and a potential for personal injury and property damage. ATTENTION: Ne jamais déconnecter le coude de baisse de l'adaptateur permet le remplissage étanche lorsque le A1100 a atteint le niveau d'arrêt positive. A ce point, le tuyau de camion-citerne est encore pleine et ne doit pas être débranché jusqu'à ce que suffisamment de carburant a été éliminée du réservoir de stockage souterrain pour vidanger le tuyau. Déconnexion prématurée entraîne un déversement dangereux et un risque de blessures et de dommages matériels.

WARNING: If the underground storage tank is equipped with a ball float vent valve, make sure it is not extended below the positive shut-off point of the A1100, or remove the float vent valve. ATTENTION: Si le réservoir de stockage souterrain est équipé d'un flotteur évent de balle vanne, assurezvous qu'il n'est pas prolongée en dessous du point d'arrêt positive de la A1100, ou supprimer la vanne flotteur de ventilation. ASSEMBLY Tools Needed 1. 1/8" pilot drill bit 6. hammer 2. 13/64" drill bit 7. fine half round file 3. hand drill 8. heavy duty pop rivet gun 4. tape measure 9. masking tape 5. fine tooth hacksaw (24-36 teeth per inch) Optional: Drilling fixture #566675, recommended WARNING: Do not use electrical devices near gasoline vapors, as it could result in fire or explosion. AVERTISSEMENT: Ne pas utiliser d'appareils électriques à proximité des vapeurs d'essence, car il pourrait provoquer un incendie ou une explosion. Packing List (included with A1100-010) (1) valve assembly #A1100 (8) pop rivets #564412 (1) hose clamp #564421 (1) o-ring #480049 (1) warning plate #564420 (1) counter sink indenter #564416 (1) drop tube O-ring #561683 (1) Seal-All sealant #566726 NOTICE: If this valve is to be used with coaxial Stage I drop tube assemblies, you must order the appropriate special kit for proper assembly: Standard coaxial (A0070 style) kit #493195 Self sealing coaxial (A0088 style) kit #493197 TOP TUBE INSTALLATION PROCEDURE The A1100 Guardian can only be installed after the containment manhole has been installed. Existing drop tube may be used only if: 1. Tube is in good condition without holes, cracks, or bends. 2. I.D. of tube will fit over the valve body diameter. Step 1: If already in place, remove the existing 4 cap, adapter and drop tube assembly. Step 2: Find measurement A which is the distance from the top of the tank to the top of the 4 riser pipe as shown in Figure 1. If the tank has a manway, make sure to include the height of the manway when finding measurement A as shown in Figure 2, A = J + H. Consult your tank diagram to determine the proper H dimension. If this dimension cannot be found, use 6 as the H dimension (typical manway height is 5-7 ). 2

Figure 1 Riser Pipe With Spill Containment Manhole Figure 2 Riser Pipe Installed Inside Manway 3

Step 3: Find measurement B from the chart below. It is the distance from the maximum fluid height allowed to the inside top of the tank. Calculations are based on cylindrical tanks with flat ends. For exact dimensions, consult the tank gauge chart provided with your tank. Use the actual capacity of the tank for calculations. NFPA30 Guidelines limit tank fill to 95%. 95% Shut-off Tank Diameter B Dimension Feet Meters Inches MM 6.5 1.98 7.5" 190 7.0 2.13 8.0" 203 7.6 2.29 9.0" 229 8.0 2.44 9.5" 241 8.2 2.50 9.5" 241 8.5 2.59 10.0" 254 9.0 2.74 10.5" 267 9.5 2.90 11.0" 279 10.0 3.05 11.5" 292 12.0 3.66 14.0" 336 The A1100 Overfill Prevention Valve is not recommended for tanks under 6.5 in diameter. Measurement C, cut length Place tape measure here Step 4: To determine the top tube cut length, add A and B. Step 5: Place tape measure at the 95% fill mark on the valve and measure up the tube as shown. Mark and cut the tube at the C measurement length. Note: If you are using an unflanged tube, you will require part #566679 collar kit. Step 6: Wrap the paper drilling template (p/n 568351, supplied) over the drop tube and tape in place. Line up cut-off line on template with the cut length C. 4 NOTE: The 566675 Drill Fixture is recommended to make this step more accurate and to reduce assembly time.

Step 7: Secure with the hose clamp (p/n 564421, supplied) as indicated on the template. Step 8: Drill four pilot holes using the 1/8 drill bit, then enlarge the holes using a 13/64 drill bit. Step 9: Cut tube to proper length using a fine tooth hacksaw. The hose clamp acts as a guide. IMPORTANT: Do not use a power saw or tubing cutter to cut the tube. Step 10: Remove clamp and template, then file away cutting burrs to prevent damage to the O-ring when attaching to the valve. Step 11: Lubricate the O-ring (p/n 480049, supplied) with the Seal-All and insert into the top groove of the A1100 valve. Lubricate the top 1 of the outside circumference of the valve with Seal-All. Step 12: Insert the A1100 valve into the top tube. Align the holes. Step 13: Using the indent tool #564416, countersink one hole. Secure with a pop rivet. Apply sealant over the rivet. Repeat this process with the remaining three holes. 5

BOTTOM TUBE INSTALLATION PROCEDURE Step 14: Tape bottom tube template to tube. Step 15: Drill 1/8 pilot holes, then finish drill with 13/64 drill bit. File cutting burrs from end of tube. Step 16: Lubricate bottom of A1100 valve with Seal-All and install bottom tube, being careful to align holes. Step 17: Using the indent tool, countersink one hole and install a rivet. Apply sealant over the rivet. Repeat with remaining three holes. Step 18: Measure from top of riser pipe to the bottom inside of the tank, measurement D, Figure 1. Step 19: Subtract 6 from measurement D to obtain the correct total assembly length E. Measure length E (D - 6 = E) on the assembly from the flanged end. Mark tube to length E. Step 20: Square cut the the lower tube to length E. Optional: 45 degree cut - The shortest point should start at length E to maintain the 6 maximum clearance requirement at bottom of tank. E 6

INSTALLATION OF COMPLETED ASSEMBLY INTO THE TANK Step 21: Turn completed assembly upside down and shake vertically to remove any metal chips left from the drilling process. Step 22: Install the O-ring (p/n 561683, supplied) on the top flange. Step 23: Position the completed assembly vertically over the riser pipe with the square cut down. Carefully lower the completed drop tube/valve assembly into the riser pipe. Step 24: Use the hose clamp to clamp the warning plate (p/n 564420, supplied) onto the riser below the threads. Make sure label is facing up. Step 25: Reinstall the adapter onto the riser and torque with an adapter wrench. Replace the tightfill cap. The system is now in place and ready for operation. 7

MAINTENANCE The A1100 Guardian is maintenance free. Periodic inspection of drop tube wear due to corrosion is suggested. Please leave these instructions with the owner/operator of the service station for future reference. WARRANTY Emco Wheaton Retail Corporation service station products are warranted to be free from defects in material and workmanship under normal use and service for a period of twelve (12) months from the date of manufacture. The warranty set forth herein shall be the exclusive warranty made by Emco Wheaton Retail Corporation and in lieu of all other warranties, expressed or implied, (whether written or oral), including but not limited to any implied warranty of merchantability or fitness for any particular purpose. Emco Wheaton Retail Corporation s liability under this warranty is limited to, at Emco Wheaton Retail Corporation s option, the repair or replacement of that part which proves to be defective within twelve (12) months of date of manufacture. Emco Wheaton Retail Corporation is not responsible for claims for damage due to improper installation or maintenance, corrosive fluids, or use of a product for a purpose other than that for which it was specifically designed. Emco Wheaton Retail Corporation shall have no liability or be required to fulfill any obligation under this warranty unless the original purchaser returns the claimed defective item to Emco Wheaton Retail Corporation for inspection to determine whether the claimed defect is covered by this warranty. Under no circumstances shall Emco Wheaton Retail Corporation be liable for any consequential, special or contingent damages or expenses or any other charges beyond the invoice value of the defective items. The remedies set forth herein shall be the exclusive remedies available to the user and are in lieu of all other remedies except for the remedies described below. If an Emco Wheaton Retail Corporation product fails within the warranty period, call the Customer Service Department at (800) 234-4394. Describe the problem and provide the product date stamp information to the customer service representative. The customer service representative will provide a product complaint number, if applicable. Ship the defective equipment PREPAID, to Emco Wheaton Retail Corporation for repair or replacement. Emco Wheaton Retail Corporation products should be used in compliance with applicable federal, state and local laws and regulations. Product selection should be based on physical specifications and limitations and compatibility with the environment and material to be handled. EMCO WHEATON RETAIL COR- PORATION MAKES NO WARRANTY OF FITNESS FOR A PARTICULAR USE. All illustrations and specifications in this catalog are based on the latest product information available at the time of publication. Emco Wheaton Retail Corporation reserves the right to make changes at any time in prices, materials, specifications and models and to discontinue models without notice or obligation. p/n 564417 Rev. N, 04/16