TOWN OF WAYLAND Board of Health

Similar documents
SECTION III. LEACHING AREA REQUIREMENTS Residential square footage requirements are based on sidewall area only: Minimum square feet per bedroom

SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS

Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems

Guidelines for Remodeling and Additions with Respect to On-site Wastewater Treatment Systems

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Point-of-Sale Program

Data Management Systems for Wastewater

FREQUENTLY ASKED QUESTIONS. New Subsurface Sewage Treatment System (SSTS) Ordinance

SHORELINE SANITATION

DRAFT Town Overview Why the Wastewater Management Program Was Created Block Island

Time of Transfer Step by Step

Frequently Asked Questions About Septic System Maintenance Inspections

PRINCETON WASTEWATER SERVICING STUDY Municipal Class Environmental Assessment. Oxford County

FREQUENTLY ASKED QUESTIONS

APPLICATION FOR INDIVIDUAL WATER & WASTEWATER FACILTIES

Are Septic Systems Up to Speed?

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia

TOWN OF YARMOUTH. L.L. Pzpr

HOW A SEPTIC SYSTEM FUNCTIONS

A Guide for the Homeowner/Builder

9. Does the County of San Diego keep home plans on file for existing homes?

16 12 INDIVIDUAL SEWAGE DISPOSAL CODE OF HOPEWELL TOWNSHIP.

RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

Welcome to the Inland Wetlands Commission Town of Barkhamsted, CT

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

How To Install An Overhead Sewer

On Site Sewage System Maintenance Inspections. March Building and Development Branch Ministry of Municipal Affairs and Housing

CAPE COD. Regional Wastewater Management Plan Understanding the Cost Factors of Wastewater Treatment and Disposal

ON-SITE WASTEWATER TREATMENT SYSTEMS ACT

Questions and Answers for Local Governments

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Answers to Commonly Asked Questions

Fox Township On-lot Sewage Program

N.J.A.C. 7:9A Amendments

Retail Marijuana Establishment License Application

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM

A Guide to Water Supply Replacement and Subsidence Damage Repair

Barre City City-wide Policy and Program Options

DIVISION 2 BOARD OF HEALTH REGULATIONS

TOWN OF SPENCER Office of Development & Inspectional Services

Choosing your perfect builder

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

APPLICATION FOR NEW CONSTRUCTION

Home Repair After a Hurricane Disaster

Emerging Technologies in Wastewater Collection Systems

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

Check Off (Below) Information That Is Submitted With Permit

A Century of Progress with Pride

APPLICATION FOR HOME SALE/REFINANCE EVALUATION INSTRUCTIONS AND APPLICATION FORM

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

On-Site wastewater Treatment Programs in the Watershed

PUBLIC NOTICE OF INTENT. Bylaw No A BYLAW FOR ESTABLISHING A DEVELOPMENT LEVY FOR LANDS THAT ARE TO BE DEVELOPED OR REDEVELOPED WITHIN THE

SPDES PRIVATE, COMMERCIAL, INSTITUTIONAL GENERAL PERMIT FOR SANITARY WASTEWATER DISCHARGES TO GROUNDWATER FACT SHEET

Package Treatment Plant Policy and Procedure

Certification. Septic Tank Contractors

Bond Release Process for New Subdivision Developments in Fairfax County

How to Choose the Right Sewage Disposal System for Your Property

1. Why has EPCPH developed a Transfer of Title Inspection Program?

YOUR SEPTIC SYSTEM UNCOVERED

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Electronic Signature and Fee Payment Confirmation

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8

Residential Building Permits

sdci Seattle Permits Tip Tree Protection Regulations in Seattle CATEGORIES OF TREES AFFECTED IDENTIFYING TREE TYPES ON YOUR PROPERTY

BUSINESS USE PERMIT APPLICATION

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS

TOWN OF ROWLEY BOARD OF HEALTH

Research of Grey Water for Use in Residential Applications Original date of publication: Updated:

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Homeowner s Guide to Maintaining a Sewage Treatment System

ORDINANCE NO

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report

Town of Surf City Community Development. General Permit Information

What do REALTORS do for me?

Town of Clinton. TRENCH PERMIT 242 Church St.Clinton Ma Telephone# Office (978) FAX (978) This Section for Official use only

Town of Cortlandt Septic System Inspection And Rehabilitation Reimbursement Program

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

EAST BAY REGIONAL SEWER PROGRAM

Procedures for Correcting a Sludge / Grease Clogged Elevated Sandmound Sewage Disposal System.

Final Report On the Effect of Macerating Toilets on Septic Tank Performance

Ferry County Out Building Application

Inspection Item COMMENTS

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 165 Capitol Avenue Hartford, CT 06106

SECTION EIGHT BONDING REQUIREMENTS

FLOOD DAMAGE PREVENTION ORDINANCE

Guidance on applying for approval of installation of a commercial onsite wastewater system

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems

Transcription:

TOWN OF WAYLAND Board of Health 41 COCHITUATE ROAD WAYLAND, MASSACHUSETTS 01778 Julia Junghanns R.S. DIRECTOR OF PUBLIC HEALTH TEL. (508) 358-3617 HOMEOWNER S GUIDE FOR CONSTRUCTION WORK ON A SEPTIC SYSTEM (guide 1 of 2) This guide outlines the important steps in the process to repair/replace or upgrade your onsite wastewater (septic) system and explains what you need to know before you submit your application to the Health Department. Once you have reviewed this guide you should also review our handout, Guide for Repair Work to Septic Systems. The Massachusetts Department of Environmental Protection authorizes the legally designated local health authorities in cities and towns to enforce the provisions of Title 5 of the State Environmental Code (septic system regulations), and to adopt its own regulations as the Board deems necessary. There are 5 common scenarios with your septic system that you will likely be dealing with. Which scenario are you? Scenario 1: You want to sell your house and you need a Title 5 inspection 1. You will need to hire a Title 5 System Inspector. All Title 5 System Inspectors are licensed with the State DEP. A link to the list of Certified Title 5 Inspectors: ADD LINK HERE 1

2. Your Title 5 System Inspector will need to look at your property file at the Board of Health office and gather information on your septic system so they are able to locate it to conduct the inspection. Your system inspector will look for plans, permits, as-built drawings and previous Title 5 Inspection reports (if any were done previously). During this process they should use this information to determine the number of bedrooms your septic system is designed for. They will also need to obtain water meter readings from the DPW Department (in Town Building). Once these steps are completed they will locate the septic system components and conduct an inspection to determine if the system is functioning properly or if it is failed. A report will be completed by the system inspector and submitted to the Health Department with a $50.00 application fee. If your system failed go to step 1. If your system passed the inspection then you have completed the process for your septic system. Your inspection report is good for 2 years and it s good for a 3 rd year if you have the system pumped by or prior to the date of the inspection for both of the 2 years. Scenario 2: You had a Title 5 Inspection and you need a new component or repair as a result of the inspection 1. You will need a permit with our office for this work and you will need to hire a licensed Installer to do the work on your septic system. We have a list of licensed Installers. The licensed installer will contact our department to conduct an inspection of the work. After the work is completed the installer will submit an as-built to our office. Once the as-built is received we will issue the Certificate of Compliance. Scenario 3: You had a Title 5 inspection and your septic system failed, go to step 1. Scenario 4: You are not selling your house but your septic is failing, go to step 1. Scenario 5: You want to add a bedroom to your house (first go to CRITICAL step) Step 1. There are 6 steps in the process for you to follow. The first step in the process of repairing your failing septic system or replacing/upgrading your septic system is to contact a Registered Sanitarian or Professional Engineer to research files, town documents and conduct soil testing at your property. You or your Registered Sanitarian/Professional Engineer should also check with the Conservation Department to determine if any wetland, flood plain, or other environmental issues exist that may require additional approvals regarding your project. The Sanitarian or Engineer will then contact our office to schedule soil testing with the inspector or Director, a Disposal Works Construction Permit must be completed and a fee will be due. House characteristics, soil testing results, and site 2

conditions can dictate size, shape and cost of septic. Title 5 Regulations and Wayland Board of Health Local Regulations will need to be referenced. All these things will be looked at by your Sanitarian or Engineer to determine where your new septic system should be located. It is important to communicate your expectations and concerns with your Sanitarian or Engineer prior to starting the project. Potential or desired locations of your new septic system, size and scope of addition plans, relocation of utilities, accommodating future landscape features or pools/sports courts, access issues, restorations issues, potential aesthetic changes such as raised grades or tree removal are some concerns you may have. Critical step: Determining if your property is located in a Zone II (Nitrogen Sensitive area). Nitrogen Sensitive areas (Zone II s) are protective areas/zones where the town wells draw groundwater under extreme pumping conditions (when there are low levels in the aquifer). Due to the environmentally sensitive nature of these protective zones, nitrogen, a by-product of sewage, is highly regulated. Expansion of septic systems can be limited or prevented within a Zone II. Additions of living space can be limited. 1. You or your engineer/sanitarian will need to look at the Zone II map of the Town to determine if your property is located within this jurisdictional area. A. If your property is located in a Zone II Nitrogen Sensitive area and you want to add a bedroom or add heated finished living space: Adding bedrooms must meet stringent State DEP Regulations. To add a bedroom within a Zone II, you need to have 10,000 square feet of land area per bedroom (4 bedrooms would require 40,000 square feet of land area). If you cannot meet this requirement at your property and you want to use nitrogen reducing technology (Innovative and Alternative Technology) you should know that the Board of Health has a policy for use of Innovative and Alternative Technology including thresholds on allowable square footage of heated finished living space. Please review our policy. Once you have completed this step go back to Step 1. What is Innovative and Alternative technology? Innovative and Alternative Technology to reduce nitrogen is a system that is similar to a mini treatment plant. For a property located in a Zone II, it is typically a unit that is added to a conventional septic system to reduce nitrogen. There are many types of these technologies and any system that is considered must be State DEP approved technology to reduce nitrogen. I/A technologies add extra cost to a septic system. Also for this type of system there are operation and maintenance requirements, fees, and reporting to meet State DEP Regulations. If you are considering this option to add a bedroom you would need to work with a Registered Sanitarian or Professional Engineer to ensure the appropriate State approved technology for your property is considered. You must also meet the 3

Board of Health Policy requirements and a hearing would be required with the Board of Health for approval. B. If your property is not located in a Zone II If you know your current septic system is a cesspool or leaching pit then to add a bedroom you will need to upgrade to a septic system that complies with today s State Title 5 Regulations and Town Board of Health Septic System Regulations. Adding a bedroom triggers the Board of Health New Construction Septic System Regulations. Go back to Step 1. Step 2. After soil testing is conducted the Sanitarian or Engineer will design a septic system and submit the design to our office. The inspector or Director will then review the design for compliance with Title 5 Regulations and Wayland Board of Health Local Regulations and work with the Sanitarian/Engineer if any revisions are necessary. After this process the plan will be ready for approval and the permit will be issued. State Regulations for Title 5 allow up to 45 days for septic system plan review but we try to be as efficient as possible and complete our review and approval as quickly as we are able. In the spring it can become very busy so it s important to start the process as soon as possible if you are on a timeline for the sale of a property. You or your Sanitarian/Professional Engineer contact the Conservation Department to see if there are any conservation issues that need to be considered. Please keep communication open as they have different requirements for the review process. Step 3. After the septic design is approved by our office you will need to hire a Licensed Installer to install the new septic system. Licensed Installers are licensed with the Town of Wayland Board of Health. We have a list of Licensed Installers which can be found on our website. Step 4. The Licensed Installer will coordinate the inspections with our office. During construction of the new septic system the inspector or Director will conduct an excavation inspection and a final inspection. Other inspections will be conducted as needed or as deemed necessary. Step 5. After the final inspection the Sanitarian or Engineer that you hired will need to obtain the as-built elevations and locations of the septic system, the Licensed Installer will also do an as-built. Both as-builts will 4

be submitted to the Board of Health office for staff review and once all is confirmed to be approvable the Certificate of Compliance will be issued. Step 6. If you are selling your house and your septic system failed Title 5 then you will need the Certificate of Compliance for the sale of your property. The Board of Health staff is available to assist you if questions or concerns arise during this process. If you require assistance we encourage you to call and set up an appointment so we can dedicate adequate time to discuss your project. To schedule an appointment our office number is: (508)-358-3617. 5