Keeping Pace with Changing Requirements for Human Capital at Malaysian Railways (KTMB)

Similar documents
Frequently Asked Questions

Rail System in Malaysia

International Education in the Comox Valley: Current and Potential Economic Impacts

GOODS & SERVICES TAX GST GUIDE ON FREIGHT TRANSPORTATION

Railway Business Strategy and R&D in Europe

LEARNING MANAGEMENT OF BACHELOR OF NURSING PROGRAMME AT OPEN UNIVERSITY MALAYSIA (OUM)

MILITARY LOGISTICS COMPETENCIES COURSES PROGRAMS (TWINNING LOGISTICS DEGREES PROGRAMS) Malaysian Institute of Logistics

Business Area Power Supply

Master of Business NilaiU

CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail

PROGRAM : CERTIFICATION COURSE FOR "200 HOURS TRAINING ON HAEMODIALYSIS FOR REGISTERED MEDICAL PRACTITIONERS "

Customer Support. Superior Service Solutions for Your Laser and Laser Accessories. Superior Reliability & Performance

ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE

CROSSRAIL MOVING LONDON FORWARD. Simon Bennett

ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON DUTY FREE SHOP

How To Understand The Disaster In Korea

Wilmington to Newark Commuter Rail Improvement Project

Service for grinding applications Protect and optimize your drive systems

The future is already here

Summary Report to UNESCO for UNESCO Chair program in higher education at Peking University, PR China

China Railways Development, Financing and Challenges

MANUFACTURING SOLUTIONS

MALAYSIA: THE EMERGING EDUCATION HUB

Application of Earned Value Management System on an Infrastructure Project: A Malaysian Case Study

Integrated Services Workshop Services

The Business Enablers Macau

CHAPTER 10 - INFRASTRUCTURE AND UTILITIES LIST OF TABLES

EMBA PROGRAMME IPD-OUM

English. Trapeze Rail System.

Railway Research and Technology in China Today

Employee Mobility Survey

MRR No. 129 Impact Studies of Automated Enforcement System Implementation

Rapid Transit Backgrounder

Your Multimodal Partner. IBS, the 08/10/10

University College Dublin

Sustainable Solutions. Switch to future thinking

White paper. Engineer to Order Manufacturing

Tourism Western Australia. Fast Facts Year Ending September 2014

Twenty Year Capital Needs Assessment. September 16, 2013 Briefing to CPOC

Customised programmes

Doctor of Philosophy in Business Administration Doctor of Philosophy in Civil Engineering (by Research) Doctor of Philosophy Information Technology

Capabilities Overview

Next-generation mining: People and technology working together

VETERANS WORKING ON THE RAILROAD

The AMT s Reno-Tunnel Program : Improving Safety in the Mount-Royal Tunnel Is the Result of a Partnership with the Montreal Fire Department

CASE STUDY. Automotive Components. Bosch Drancy, France Brake NVH Testing. Braking Systems. France. Automotive. PULSE, Transducers

Nottingham Trent University Course Specification

Foundation Degrees in Mechanical Engineering & Electrical/Electronic Engineering (FdEng)

SYSTEMWIDE REQUIREMENTS

KORAIL Human Resources and Infrastructure System Towards World s Best, Korean Railroad

ata ports & harbours airports railways roads & highways info@ata-recruitment.co.uk

Railway Systems for Smart City Development

MEASAT Satellite Systems Sdn. Bhd.

PRODUCT INFORMATION. SICK LifeTime Services. LifeTime Services for Machines and Systems

Tendering of passenger rail traffic in Norway

How do you manage the brain of the business in a way that supports the opportunities your organisation wants to take advantage of?

The National Safety and Risk Management Diploma Series REGULATORY OVERSIGHT & GOVERNANCE RISK MANAGEMENT SAFETY MANAGEMENT SYSTEMS

9 Alor Setar &2A, 3&3A, PEKAN SIMPANG KUALA, OFF LEBUH RAYA SULTAN ABDUL HALIM, ALOR SETAR,KEDAH

ERTMS for a competitive railway

The risk of derailment and collision, and safety systems to prevent the risk

1. Business Overview. Rolling stock systems. Ground-based systems. Network between systems. Control. Drive. Stop.

Elko, Nevada. Service Center

The ROI of a New Learning Management System (LMS)

The UK Rail Industry: A Showcase of Excellence

1. Bank Draft No. Amount S$ 2. Bank Draft No. Amount S$

Promoting Asian Economic & Financial Cooperation

INTERLOCK PALLET RACKING SYSTEM. The complete range of Pallet Racking Solutions

Global Investing 2013 Morningstar. All Rights Reserved. 3/1/2013

Fire detection and alarm systems

Introduction to PRINCE2

Be an SAP ERP Professional. Deliver Business Excellence.

Seoul Metro line 9 O&M Contract

Program Overview. Program Overview

Level 2 Certificate in International Trade and Logistics Operations ( )

Dual Award Programme 2014/15

Delivering Rail Projects in Asia

Bogie Overhaul. World-class facility producing high performance bogie overhaulss SERVING THE WORLD S RAILWAYS

Grove RT. Igo and Igo M Range. Many building sites, one solution. Features and benefits. Rough Terrain Crane

Railway Simulation & Timetable Planning

Smart Transport ITS Norway

Constructing a High-Performance Tertiary Education System in Finland

Foreign Taxes Paid and Foreign Source Income INTECH Global Income Managed Volatility Fund

The Institute of Car Fleet Management. Education & Training Syllabus

Market comparison: sales and distribution of travel insurance and the growth of bancassurance

Railway Reform in Europe: from endangered species to sustainable systems?

Software Tax Characterization Helpdesk Quarterly April 2012

ABX Logistics Cuts Support Costs, Boosts Customer Service with WebBased Warehouse Management

The E-Learning Program of The Vocational Training Center of the National and Kapodistrian University uses innovative educational tools, such as:

MSc Development Finance

3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND

MALAYSIA. F i r s t H a l f ( J a n - J u n e ) 19 August Investment Performance

Transcription:

Keeping Pace with Changing Requirements for Human Capital at Malaysian Railways (KTMB) Muslimah Shamsudin Introduction Railway services are no longer seen just as a means of transport within nations. With new plans to bridge the gaps in the ASEAN railway network as well as between Europe and Asia, such as the Singapore Kunming Railway Link and the Trans-Asia Rail Link, railways are becoming global providers serving international transport needs. Like all fast moving industries, many railway operators face challenges presented by rapid changes in technology and competitive markets. These operators must take the initiative in positioning the required infrastructure, systems and right people in place to further enhance railway services and regional links. To develop international railway services spanning the globe, railway operators need a highperformance corporate vision with all employees from top to bottom fully committed to the organization. McKinsey Research reports that high-performing organizations have the following attributes: Driven by leaders Built by relentless pursuit of strategies/vision Energized by extraordinarily intense, performance-driven environment Aligned by simple structures and process Based on world-class skills Rejuvenated by well-developed people systems Addressing Human Capital Gap At KTMB, we strongly believe that every aspect of human capital is vital, so all our training programmes are designed to upgrade skills and knowledge gaps, including aspects of attitudes and values. To achieve these goals, KTMB plans and conducts annual training programmes each and every year in track maintenance and management, signalling and communications maintenance, overhead catenary maintenance, rolling-stock maintenance, train operation, occupational safety and health, customer service, management, supervisory skills and personal development. Every new employee entering KTMB must attend a 14-day induction programme, which will be followed up subsequently by various training programmes closely related to job requirements. The training duration varies for different job types and ranges from 3 months to 2 years. The programmes include classroom sessions, practical sessions, observations, field trips, and on-the job-training (OJT) too. Most programmes include written examinations to assess the trainees level of knowledge. The following jobs also have practical assessments to complement their competency level: Assistant Locomotive Drivers Locomotive/EMU Drivers Traffic Assistants Human Capital A Common Understanding To become a high-performing railway, it is vital to ensure that all employees are competent at all times; in other words, there must be a sufficient level of human capital. So what is human capital? There are various definitions. InvestorWords.com defines human capital as the set of skills that an employee acquires on the job through training and experience, and which increase that employee s value in the market place. Another definition is the combined ability, knowledge, skills, expertise, competencies, know-how, and innovativeness of an organization s members to conduct a specific activity, operation, project, or task. It also includes that organization s values, culture, and philosophy. Maintenance of overhead catenary requires skilled employees (KTMB) Japan Railway & Transport Review No. 54 Dec 2009 28

Practical training session for train drivers (KTMB) Team building through trust training 29 Japan Railway & Transport Review No. 54 Dec 2009

Figure 1 KTMB Network and International Connections Hatyai Padang Besar Alor Star THAILAND Rantau Panjang Tumpat Pasir Mas North Butterworth Container Terminal Sungai Petani Krai Butterworth Bukit Mertajam Parit Buntar Taiping Kuala Kangsar Ipoh Gua Musang Batu Gajah Tapah Road Kuala Lipis Slim River Tanjung Malim North Port West Port Kuala Kubu Road Jerantut Batu Caves Kuala Krau Rawang Sentul Kuala Lumpur Mentakab Kajang Port Klang Bahau Seremban Gemas Port Dickson Tampin Segamat Kluang Kulai Pasir Kempas Baru Gudang Johor Bahru Tanjung Pelepas SINGAPORE Japan Railway & Transport Review No. 54 Dec 2009 30

Class 24 locomotive and commuter train at Seremban Station (KTMB) Station Managers Counter Staff Technicians Apart from the operations and technical training programmes, KTMB also invests in personal development and motivation or team-building programmes held annually to create awareness of the importance of team work, communications, positive values and to nurture and improve confidence and self-reliance. Subjects are designed to develop self-awareness in improving work productivity and to attain results-oriented objectives. Human capital for KTMB employees is not only acquired by internal training but also by external training locally and overseas. As examples, employees from Permanent Way, Fleet Engineering, Signalling, Communication and Electrification, and Operations have attended overseas training in India, Poland, Sweden, South Africa, Korea, Hungary, Canada, Australia, and Japan such as: Tenth Training Course for Railway Personnel under the Regional Cooperation Programme, India Railway Safety, Sweden EMU Maintenance and Operation, South Africa and Korea JR East Fellowship Programme, JR East International Railway Course, Zero Accident Training (KYT), Japan Human Capital Requirement for Double- Tracking Project Prior to 1993, all training and development programmes were based on the skills and knowledge required to operate and maintain single-track railways. However, with the 1991 start of the double-tracking project from Seremban to Rawang and Sentul to Port Klang, technical and operations employees needed to acquire new sets of skills and knowledge. While the new rules and regulations for operating trains on double-track sections are compulsory for all technical and operations staff, drivers of intercity and freight trains also had to learn how to operate the first 18 sets of EMUs delivered from Jenbacher, Austria, in 1994 to 1995. The next phase of training continued with the arrival of the second and third sets of 22 EMUs from Marubeni, Korea, and 22 EMUs from UCW, South Africa, in 1996 and 1997, respectively. When KTMB started the second double-track project from Rawang to Ipoh, employees were trained in maintenance and operation of the new ILTIS signalling system. Most programmes in relation to this double-track project were conducted by the respective suppliers and manufacturers. For example, Queensland Rail (QR), Australia, provided various specialist training programmes to selected track employees. Areas covered included maintenance of highspeed lines, track welding, rail turnouts, etc. 31 Japan Railway & Transport Review No. 54 Dec 2009

Front of Malaysian Railway Academy Panorama of Malaysian Railway Academy Table 1 Total Amount Contributed to HRDF Year Amount 2007 RM 79,517.21 2008 RM 1,143,285.48 2009 RM 709,109.30 Dewan Bunga Raya theatre for lectures and other company events RM1 = US$0.293 New Training Facilities Before 2009, major training activities were conducted at the KTMB Training School in Sentul, Kuala Lumpur. However, the Training School, Central Store and Rolling Stock Maintenance Workshop in Sentul had to be relocated to make way for new business expansion and the federal government finally approved KTMB s relocation Rail Development Project. The Project is divided into Package 1 (Workshop and Depot) and Package 2 (Training School and Quarters). Package 1 will be completed in December 2009 and Package 2 was completed in December 2008. The new complex stands in a 400-acre green reserve with lakes in Batu Gajah, Perak, 195 km north of Kuala Lumpur. Japan Railway & Transport Review No. 54 Dec 2009 32

Considering future requirements for training, as well as education and development of other regional railways, the new training facility is called the Malaysian Railway Academy. Operations started in December 2008 to offer major training, education and development activities for KTMB. Up to 360 residential participants and 200 non-residential participants can be accommodated by the facilities which include: Training and Administration Block (including general offices, lecture rooms, computer labs, small seminar rooms) Theatre (for 300 participants) Resource Centre Train Simulator Block Accommodation Block Dining Hall Outdoor Recreational Area (tennis, takraw, volleyball, hockey, football) In addition to the mechanical and electrical engineering systems, MyRA also has state-of-the-art AV facilities to enhance learning. Selected employees are trained in operation and maintenance of electrical power, air-conditioning, fire alarm and other systems. Similar training will be offered in the Rolling Stock Maintenance Workshop and Depot after installation of new equipment and machinery is completed in October and November 2009. Some of the installed machines and equipment are: Under Floor Wheel Lathe Portal Wheel Lathe Surface Wheel Lathe Lifting Jack Drilling Machine Grinding Machine Hydraulic Shear EMU/ETS Car Body Wash Financing Human Capital Development Since 1 December 2007, KTMB has been required to allocate 1% of the total salary and fixed allowances paid to employees to the Human Resources Development Fund (HRDF) for training, education, and development programmes. However, the funds must be spent within 5 years from the date of payment into the fund. Table 1 shows the total funds contributed to the HRDF from 2007. Other Challenges to Human Capital Requirements Due to the frequent changes in technology and processes, it is sometimes difficult to meet new training requirements in a short period. In addition, training attendance can be affected by the ability to release employees for training when there are staff shortages. Another constraint is the shortage of Subject Method Experts (SME) from within KTMB and the company is currently identifying experienced employees from various departments who will be trained as SMEs. The training will be organized at MyRA using internal trainers and also external trainers from private training providers. With more SMEs, more training and development programmes can be conducted for both KTMB and employees of other organizations. Conclusion Despite making good progress in developing human capital, KTMB still faces problems. With on-going future infrastructure development projects, plans to purchase new rolling stock, and new funding procedures since 2007, KTMB s human capital development is a continually improving process. Human Capital Requirement for Future Projects KTMB will soon be starting rapid services between Kuala Lumpur and Ipoh using new electric train sets (ETS) from Korea. The first set is scheduled for delivery in late 2009 with the remaining four in 2010. Experienced KTMB employees have been attending training courses in Korea in 2009 and, upon returning, they will be developing training modules and training the ETS drivers. KTMB has also started a double-tracking project in the northern sector from Ipoh to Padang Besar and in the southern sector from Seremban to Gemas, necessitating training at MyRA on the rules and regulations for train operations in double-track sections and other relevant subjects. Muslimah Shamsudin Mrs Muslimah Shamsudin is currently Senior Manager in Charge of Training & Management at MyRA (Akademi KTM). Prior to her current position she was a Training & Development Manager at KTMB. She completed a post-graduate course in Transport at the University of Wales. 33 Japan Railway & Transport Review No. 54 Dec 2009