RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS



Similar documents
RULE DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

Florida Department of Environmental Protection

CHAPTER PETROLEUM CONTACT WATER

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS

National Precast Concrete Association

WASTEWATER TREATMENT OBJECTIVES

WASTE WATER TREATMENT SYSTEM (OPERATING MANUALS )

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

INDEX GENERAL

Hazardous Waste Accumulation, Storage, & Labeling

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant

NSPS Subpart OOOO: Applicability and Compliance Basics

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Saudi Aramco Project Development

STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. Dry Cleaner Compliance Calendar 2012

Outdoor Storage of Raw Materials SC-33

Provided below is a description of the processes generating wastewater in a poultry plant and a typical pretreatment and full treatment system.

Revised April (May) 2015

FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN

Best Management Practices Fats, Oils, & Grease

Colorado Oil and Gas Emissions Rules

DRAFT REVISED Musts For USTs DRAFT. Printed on Recycled Paper. Updated June 2015

Summary of Environment and Social Impacts for Activates Associated with Petroleum Refining and the Storage of Petroleum Products

Temporary Batch Plants

Spill Prevention, Control, and Countermeasures (SPCC) Regulations Update

GUIDELINES FOR LEACHATE CONTROL


DRAFT Public Outreach Document for What s an SSMP?

SILICON VALLEY CLEAN WATER. May 2015

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

BEST PRACTICES IN LEAK DETECTION AND REPAIR (LDAR) PROGRAMS. November 06, 2014 By: François Thibodeau, Eng.

A Guide to Trouble-Free Cooling Towers

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

Industry Description and Practices. Waste Characteristics

Rutgers Environmental Health and Safety

Container Management for Hazardous Waste Generators Technical Guidance Document HW-2005-G1

Grease Trap Maintenance, Procedures and Cleaning Logs

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

Waste Handling & Disposal

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

F The following spent

Managing Floor Drains and Flammable Traps

SHORELINE SANITATION

IC24. DISPOSAL OF WASTEWATER GENERATED BY MOBILE BUSINESSES AND OUTDOOR ACTIVITIES

TECHNICAL SUPPLEMENT 3: EQUIPMENT LEAK FUGITIVES

Subpart XX Standards of Performance. Terminals. Environmental Protection Agency

Risk Assessment Based Environmental Management Systems for Petroleum Retail Stores

THE BASICS Q: What is VOC? Q: What are flashing losses/voc emissions from hydrocarbon storage tanks? - 1 -

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

Highlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014

Type of Sewer Systems. Solomon Seyoum

Michigan Dry Cleaning Environmental Compliance Workbook

Stormwater BMPs: Secondary Containment and Spill Control. September 2012

BHS CANDLE FILTER APPLICATIONS FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES

City of Shelbyville Site Inspection Checklist

Best Management Practices

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

Fats, Oil, and Grease (FOG) Best Management Practices (BMP) For Food Service Facilities. Guidance Manual

Fats, Oils, and Grease Best Management Practices Manual

Flammable Liquids 29 CFR

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Spill Control Prevention Plan (SCPP)

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

SAFETY AND HEALTH PROGRAM

GUIDANCE DOCUMENT FOR SIZING AND INSTALLATION OF GREASE TRAPS AND INTERCEPTORS

THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO A bylaw to amend Storm Sewer Bylaw No. 1402, 1986

CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION

Manual contents includes:

Facilities Maintenance Standards rev

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections

Prevent Blockages in the Sanitary Sewer System

The City of Boulder 75 th Street Wastewater Treatment Facility

Outdoor Liquid Container Storage

COLORADO REGULATION 7

Civil Engineering Sector Labour-Management Health and Safety Committee

How To Safely Handle A Spill

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

CHAPTER 15 MUNICIPAL SEPARATE STORM SEWER SYSTEM PROGRAM REQUIREMENTS

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

Petroleum Storage Tank Compliance 101

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Septic Tank Use & Maintenance Tips

SEWER CLEANING, INSPECTION AND ASSESSMENT

SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS

WORK IN CONFINED SPACES

Marina Bay on Boston Harbor Water-treatment system by OilTrap Environmental

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Remediation of Water-Based Drilling Fluids and Cleaning of Cuttings

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

BASEMENT FLOODING. Prevention Guide for. Homeowners

Transcription:

BAY AREA AIR QUALITY MANAGEMENT DISTRICT RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS (ADOPTED: January 17, 1979) (AMENDED: November 1, 1989; October 6, 1993; June 15, 1994; September 15, 2004) REGULATION 8 ORGANIC COMPOUNDS RULE 8 WASTEWATER COLLECTION AND SEPARATION SYSTEMS INDEX 8-8-100 GENERAL 8-8-101 Description 8-8-110 Exemption, Less Than 760 Liters 8-8-111 Deleted November 1, 1989 8-8-112 Exemption, Wastewater Critical Organic Compound Concentration Or Temperature 8-8-113 Exemption, Secondary Wastewater Treatment Processes and Stormwater Sewer Systems 8-8-114 Exemption, Bypassed Oil-Water Separator or Air Flotation Influent 8-8-115 Exemption, Municipal Wastewater Collection, Separation and Treatment Facilities 8-8-116 Limited Exemption, Oil-Water Separation Trenches 8-8-200 DEFINITIONS 8-8-201 Organic Compounds 8-8-202 Wastewater (Oil-Water) Separator 8-8-203 Wastewater Separator Forebay 8-8-204 Vapor-tight 8-8-205 Oil-Water Separator Slop Oil 8-8-206 Oil-Water Separator Effluent Channel/Pond 8-8-207 Full Contact Fixed Cover 8-8-208 Secondary Treatment Processes 8-8-209 Air Flotation Unit 8-8-210 Critical Organic Compound 8-8-211 Wastewater 8-8-212 Pre-Air Flotation Unit Flocculation Sump, Basin, Chamber, or Tank 8-8-213 Oil-Water Separator Slop Oil Vessel 8-8-214 Oil-Water Separator Effluent 8-8-215 Sludge-dewatering Unit 8-8-216 Stormwater Sewer System 8-8-217 Junction Box 8-8-218 Sewer Line 8-8-219 Leak Minimization 8-8-220 Leak Repair 8-8-221 Lift Stations 8-8-222 Manholes 8-8-223 Oil-Water Separation Trench 8-8-224 Petroleum Refinery 8-8-225 Process Drains

8-8-226 Reaches 8-8-227 Sumps 8-8-228 Trenches 8-8-229 Vent pipe 8-8-230 Wastewater Collection System Components 8-8-231 Wastewater Separation System 8-8-232 Water Seal or Equivalent Control

8-8-300 STANDARDS 8-8-301 Wastewater Separators Designed Rated Capacity Greater Than 760 Liters per Day and Smaller Than 18.9 Liters per Second 8-8-302 Wastewater Separators Rated Capacity Larger Than or Equal to 18.9 Liters per Seconds 8-8-303 Gauging and Sampling Devices 8-8-304 Sludge-dewatering Unit 8-8-305 Oil-Water Separator And/Or Air Flotation Unit Slop Oil Vessels 8-8-306 Oil-Water Separator Effluent Channel, Pond, Trench, or Basin 8-8-307 Air Flotation Unit 8-8-308 Junction Box 8-8-309 Deleted October 6, 1993 8-8-310 Deleted October 6, 1993 8-8-311 Deleted October 6, 1993 8-8-312 Controlled Wastewater Collection System Components at Petroleum Refineries 8-8-313 Uncontrolled Wastewater Collection System Components at Petroleum Refineries 8-8-314 New Wastewater Collection System Components at Petroleum Refineries 8-8-400 ADMINISTRATIVE REQUIREMENTS 8-8-401 Deleted (October 6, 1993) 8-8-402 Wastewater Inspection and Maintenance Plan at Petroleum Refineries 8-8-403 Petroleum Refinery Compliance Schedule 8-8-404 Uncontrolled Wastewater Collection System Components Election 8-8-500 MONITORING AND RECORDS 8-8-501 API Separator or Air Flotation Bypassed Wastewater Records 8-8-502 Wastewater Critical Organic Compound Concentration Or Temperature Records 8-8-503 Inspection and Repair Records 8-8-504 Portable Hydrocarbon Detector 8-8-505 Records for Wastewater Collection System Components at Petroleum Refineries 8-8-600 MANUAL OF PROCEDURES 8-8-601 Wastewater Analysis for Critical Organic Compounds 8-8-602 Determination of Emissions 8-8-603 Inspection Procedures

8-8-100 GENERAL REGULATION 8 ORGANIC COMPOUNDS RULE 8 WASTEWATER COLLECTION AND SEPARATION SYSTEMS (Adopted January 17, 1979) 8-8-101 Description: The purpose of this Rule is to limit the emissions of organic compounds from wastewater collection and separation systems that handle liquid organic compounds from industrial processes. (Amended 11/1/89; 9/15/04) 8-8-110 Exemption, Less Than 760 Liters: The requirements of Section 8-8-301 shall not apply to any wastewater separator which processes less than 760 liters (200 gals.) per day of wastewater containing organic liquids. This exemption shall not apply to wastewater separators at petroleum refinery complexes after March 1, 1980. 8-8-111 Deleted November 1, 1989 8-8-112 Exemption, Wastewater Critical Organic Compound Concentration Or Temperature: The requirements of Sections 8-8-301, 302, 306, 307, and 308 shall not apply to any wastewater separation system that processes influent wastewater with a temperature of less than 20 degrees C (68 o F) except at petroleum refineries. Wastewater having a concentration of less than 1.0 ppm (volume) critical organic compounds, as defined in Section 8-8-210, dissolved in the water samples, is exempt from the requirements of Sections 8-8-301, 302, 306, 307, 308, 312 and 313. The requirements of Section 8-8-502 must be met. 8-8-113 Exemption, Secondary Wastewater Treatment Processes And Stormwater Sewer Systems: The requirements of Sections 8-8-301, 302, 306, and 308 shall not apply to any secondary wastewater treatment processes or stormwater sewer systems, as defined in Sections 8-8-208 and 216, that are used as a wastewater polishing step or for collection of stormwater that is segregated from the process wastewater collection system. 8-8-114 Exemption, Bypassed Oil-Water Separator or Air Flotation Influent: The requirements of Sections 8-8-301, 302, and 307 shall not apply for wastewater which bypasses either the oil-water separator or air flotation unit provided that: (1) the requirements of Section 8-8-501 are met; and (2) on that day the District did not predict an excess of the Federal Ambient Air Quality Standard for ozone. 8-8-115 Exemption, Municipal Wastewater Collection, Separation and Treatment Facilities: The requirements of Sections 8-8-301, 302, 303, 304, 305, 306, 307, 308, 312, 313 and 314 shall not apply to any publicly owned municipal wastewater treatment facility. 8-8-116 Limited Exemption, Oil-Water Separation Trenches: The requirements of Sections 8-8-312, 313 or 314 shall not apply to oil-water separation trenches used as part of maintenance or turnaround activities. 8-8-200 DEFINITIONS 8-8-201 Organic Compound: Any compound of carbon, excluding methane, carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate. (Amended 11/1/89; 9/15/04) 8-8-202 Wastewater (Oil-Water) Separator: Any device used to separate liquid organic compounds from oil-water waste streams (excluding wastewater separator forebays, air flotation (AF) units, sludge-dewatering units, oil-water separator and /or AF Unit slop oil vessels, and junction boxes).

(Amended November 1, 1989) 8-8-203 Wastewater Separator Forebay: That section of a gravity-type separator which (a) receives the untreated, contaminated wastewater from the preseparator flume, and (b) acts as a header which distributes the influent to the separator channels. (Amended November 1, 1989) 8-8-204 Vapor-tight: A leak of less than 500 ppm (expressed as methane) above background, measured at the interface of the component in accordance with Section 8-8-603. (Amended 11/1/89; 9/15/04) 8-8-205 Oil-Water Separator Slop Oil: Floating oil, flocculant sludge, and solids which accumulate in an oil-water separator or air flotation unit. 8-8-206 Oil-Water Separator Effluent Channel/Pond: An open channel, trench, pond, or basin which handles wastewater downstream of an oil-water separator that has not been treated by an air flotation unit (usually located between the separator and the air flotation unit). 8-8-207 Full Contact Fixed Cover: A stationary separator cover which is always in full contact with the liquid surface of the oil-water separator. 8-8-208 Secondary Treatment Processes: Any wastewater treatment process which is downstream of the air flotation unit, any other biological treatment process at a refinery, or any treatment process which is regulated by the EPA National Categorical Pretreatment Standards. These treatment processes are considered to be wastewater polishing steps and include: activated sludge tanks/basins, trickling or sand filters, aerated lagoons, oxidation ponds, rotating biological contactors, and other biological wastewater treatment processes. 8-8-209 Air Flotation Unit: Any device, equipment, or apparatus in which wastewater is saturated with air or gas under pressure and removes floating oil, floating emulsified oil, or other floating liquid precursor organic compounds by skimming. Also included in this definition are: induced air flotation units and pre-air flotation unit flocculant sumps, tanks, or basins. 8-8-210 Critical Organic Compound: Any compound of carbon, excluding methane, carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates and ammonium carbonate emitted during separation, processing, transportation or storage of wastewater, and having a carbon number of C-14 or less (excluding phenolic compounds). 8-8-211 Wastewater: Any process water which contains oil, emulsified oil, or other organic compounds which is not recycled or otherwise used within a facility. 8-8-212 Pre-Air Flotation Unit Flocculation Sump, Basin, Chamber, or Tank: Any facility which pretreats the air flotation unit's influent with chemical coagulants, and/or adjusts the influent's ph. 8-8-213 Oil-Water Separator Slop Oil Vessel: Any vessel which, as its sole function, treats or dewaters oil-water separator slop oil. 8-8-214 Oil-Water Separator Effluent: Any process wastewater downstream of the oil-water separator that has not been treated by an air flotation unit. 8-8-215 Sludge-dewatering Unit: Any device which, as its sole function, is used to dewater oil-water separator and air flotation slop oil/sludge. 8-8-216 Stormwater Sewer System: A drain and collection system that is designed and operated for the sole purpose of collecting stormwater and is segregated from the wastewater collection system. 8-8-217 Junction Box: Any structure where sewer lines meet and one or more wastewater streams are co-mingled.

(Amended September 15, 2004) 8-8-218 Sewer Line: A lateral, trunk line, branch line, ditch, channel, or other conduit used to convey wastewater to downstream oil-water separators. 8-8-219 Leak Minimization: Reducing the leak to the lowest achievable level using best modern practices and without shutting down the process the equipment serves. 8-8-220 Leak Repair: The tightening, adjustment, or addition of material, or the replacement of the equipment, which reduces leakage to the atmosphere below 500 ppm. 8-8-221 Lift Stations: Any structure whose function is to take water from a low point on a gradient and transport it to the treatment system via a pumping mechanism. 8-8-222 Manholes: Any service entrance into sewer lines that allows access for inspection and cleaning. 8-8-223 Oil-Water Separation Trench: Any grated open topped culvert used to separate debris from oil-water during equipment washing or steaming associated with maintenance or turnaround. 8-8-224 Petroleum Refinery: A facility that processes petroleum, as defined in the North American Industrial Classification Standard No. 32411 (1997). 8-8-225 Process Drains: Any point in the wastewater collection system where streams from a source or sources enter the collection system. A process drain may be connected to the main process sewer line or to trenches, sumps, or ditches. 8-8-226 Reaches: Any segments of sewer pipe that convey wastewater between two manholes or other sewer components such as lift stations or junction boxes. 8-8-227 Sumps: Any below-grade structure typically used as a collection point for wastewater from multiple sewer lines prior to pumping or overflow to wastewater treatment. 8-8-228 Trenches: Any open-topped culvert used to transport wastewater from the point of process discharge to subsequent wastewater collection system components, such as junction boxes and lift stations. 8-8-229 Vent Pipes: Any piping used to ventilate a wastewater collection system component or a wastewater separation system. 8-8-230 Wastewater Collection System Components: Any structure or part of structures used to collect and transport wastewater prior to any treatment. These structures are usually located before oil/water separators and may include but are not limited to process drains, sewer lines, trenches, manholes, junction boxes, reaches, sumps and lift stations (including vent pipes). 8-8-231 Wastewater Separation System: Any structure used to remove oil from water via a physical process including but not limited to oil-water separators, dissolved air flotation units or dissolved gas flotation units. 8-8-232 Water Seal or Equivalent Control: Any seal pot, p-leg trap, or other type of trap filled with a liquid not containing organic compounds in order to create a barrier between the sewer and the atmosphere, or an equivalent physical seal, enclosed piping, pollution prevention measure or abatement device that meets the criteria of Regulation 2, Rule 1. 8-8-300 STANDARDS 8-8-301 Wastewater Separators Greater than 760 Liters per Day and Smaller than 18.9 Liters per Second: A person shall not operate any wastewater separator and/or forebay with a design rated or maximum allowable capacity greater than 760 liters per

day and smaller than 18.9 liters per second (oil-water separators and/or forebays between 200 gals per day to 300 gals per min.) unless such wastewater separator and/or forebay is operated within its design rated or maximum allowable capacity and is equipped with one of the following: 301.1 A solid, gasketed, fixed cover totally enclosing the separator tank, chamber, or basin (compartment) liquid contents, with all cover openings closed, except when the opening is being used for inspection, maintenance, or wastewater sampling. Roof seals, access doors, and other openings shall be checked by visual inspection initially and semiannually thereafter to ensure that no cracks or gaps greater than 0.32 cm (0.125 inch) occur in the roof or between the roof and wall; and that the access doors and other openings are closed and gasketed properly; or 301.2 A floating pontoon or double-deck vapor-tight type cover. All floating roofs must rest entirely on the liquid surface. The floating roof shall consist of two seals, one above the other, the one below shall be referred to as the primary seal, while the other seal shall be referred to as the secondary seal. 2.1 Oil-Water Separator Liquid-Mounted Primary Seal Gap Criteria: No gap between the separator wall and the liquid-mounted primary seal shall exceed 3.8 cm (1.5 inch). No continuous gap greater than 0.32 cm (0.125 inch) shall exceed 10 percent of the perimeter of the separator. The cumulative length of all primary seal gaps exceeding 1.3 cm (0.5 inch) shall be not more than 10 percent of the perimeter and the cumulative length of all primary seal gaps exceeding 0.32 cm (0.125 inch) shall be not more than 40 percent of the perimeter. 2.2 Oil-Water Separator Secondary And Wiper Seals Gap Criteria: No gap between the separator wall and the secondary and wiper seals shall exceed 1.5 mm (0.06 inch). The cumulative length of all secondary and wiper seals gaps exceeding 0.5 mm (0.02 inch) shall be not more than 5 percent of the perimeter of the separator. The secondary and wiper seals must exert a positive pressure against the separator such that the seal surface in contact with the separator wall does not pull away from the separator wall more than the gaps allowed. 2.3 Primary And Secondary Seal Gap Inspection: The primary seal shall be inspected within 60 calendar days after initial installation of the floating roof and once every 5 years thereafter in accordance with the requirements of Section 8-8-301.2.1. The secondary seal shall be inspected within 60 calendar days after initial installation of the floating roof and once every year thereafter in accordance with the requirements of Section 8-8-301.2.2. The owner or operator shall make necessary repairs within 30 calendar days of identification of seals not meeting the requirements listed in Sections 8-8-301.2.1 and 301.2.2; or 301.3 An organic compound vapor recovery system with a combined collection and destruction efficiency of at least 95 percent, by weight. 301.4 Deleted October 6, 1993 (Amended 11/1/89; 10/6/93; 9/15/04) 8-8-302 Wastewater Separators Larger than or Equal to 18.9 Liters per Second: A person shall not operate any wastewater separator and/or forebay with a rated or maximum allowable capacity larger than or equal to 18.9 liters per second (300 gals per min.) unless such wastewater separator and/or forebay is operated within its design rated or maximum allowable capacity and is equipped with one of the following: 302.1 A solid, vapor-tight, full contact fixed cover which totally encloses the separator tank, chamber, or basin (compartment) liquid contents, with all cover openings closed and sealed, except when the opening is being used for inspection, maintenance, or wastewater sampling; or 302.2 A floating pontoon or double-deck vapor-tight type cover. All floating roofs must rest on the liquid surface. The floating roof shall consist of two seals, one above the other, the one below shall be referred to as the primary seal, while the other seal shall be referred to as the secondary seal.

2.1 Oil-Water Separator Liquid-Mounted Primary Seal Gap Criteria: No gap between the separator wall and the liquid-mounted primary seal shall exceed 3.8 cm (1.5 inch). No continuous gap greater than 0.32 cm (0.125 inch) shall exceed 10 percent of the perimeter of the separator. The cumulative length of all primary seal gaps exceeding 1.3 cm (0.5 inch) shall be not more than 10 percent of the perimeter and the cumulative length of all primary seal gaps exceeding 0.32 cm (0.125 inch) shall be not more than 40 percent of the perimeter. 2.2 Oil-Water Separator Secondary And Wiper Seals Gap Criteria: No gap between the separator wall and the secondary and wiper seals shall exceed 1.5 mm (0.06 inch). The cumulative length of all secondary and wiper seals gaps exceeding 0.5 mm (0.02 inch) shall be not more than 5 percent of the perimeter of the separator. The secondary and wiper seals must exert a positive pressure against the separator such that the seal surface in contact with the separator wall does not pull away from the separator wall more than the gaps allowed; or 2.3 Primary And Secondary Seal Gap Inspection: The primary seal shall be inspected within 60 calendar days after initial installation of the floating roof and once every 5 years thereafter in accordance with the requirements of Section 8-8-302.2.1. The secondary seal shall be inspected within 60 calendar days after initial installation of the floating roof and once every year thereafter in accordance with the requirements of Section 8-8-302.2.2. The owner or operator shall make necessary repairs within 30 calendar days of identification of seals not meeting the requirements listed in Sections 8-8-302.2.1 and 302.2.2.; or 302.3 A vapor-tight fixed cover with an organic compound vapor recovery system which has a combined collection and destruction efficiency of at least 95 percent, by weight, inspection and access hatches shall be closed except when the opening is being used for inspection, maintenance, or wastewater sampling, or 302.4 A solid, sealed, gasketed, fixed cover which totally encloses the separator tank, chamber, or basin (compartment) liquid contents, with all cover openings closed and sealed, except when the opening is being used for inspection, maintenance, or wastewater sampling. The cover may include a pressure/vacuum valve. The concentration of organic compounds, measured at the interface of the roof seals, fixed cover, access doors, pressure/vacuum valve, and other openings shall not exceed 1,000 ppm (expressed as methane) above background. Roof seals, fixed cover, access doors, and other openings shall be inspected initially and semiannually thereafter to ensure that there are no emission leaks greater than 1,000 ppm. Any emission leak greater than 1,000 ppm must be reported to the APCO and repaired within 15 days. 302.5 Deleted October 6, 1993 302.6 Roof seals, fixed covers, access doors, and other openings at petroleum refineries shall be inspected initially and semiannually thereafter to ensure that they are vapor tight. A leak in any component that is not vapor tight must be minimized within 24 hours and repaired within 7 days. (Adopted 1/1/89; Amended 10/6/93; 9/15/04) 8-8-303 Gauging and Sampling Devices: Any compartment or access hatch shall have a vapor tight cover. Any gauging and sampling device in the compartment cover shall be equipped with a vapor tight cover, seal, or lid. The compartment cover and gauging or sampling device cover shall at all times be in a closed position, except when the device is in use for inspection, maintenance, or wastewater sampling. (Amended, Renumbered November 1, 1989) 8-8-304 Sludge-dewatering Unit: Any sludge-dewatering unit, equipment, machinery, apparatus, or device shall be totally enclosed and vented to a control device which has a minimum combined collection and destruction efficiency of 95 percent by weight; or shall have vapor-tight covers on the unit, conveyer belts, and storage bins

or tanks except during inspection, maintenance or when the solids storage bin is in use. Sludge must be maintained in vapor tight containers during storage. (Adopted 11/1/89; Amended 10/6/93; 9/15/04) 8-8-305 Oil-Water Separator And/Or Air Flotation Unit Slop Oil Vessels: A person shall not store any oil-water separator and/or air flotation unit sludges in an oil-water separator slop oil vessel unless such oil-water separator slop oil vessel is equipped with one of the following: 305.1 A solid, gasketed, fixed cover totally enclosing the vessel liquid contents, with all cover openings closed, except when the opening is being used for inspection, maintenance, or wastewater sampling. The cover may include an atmospheric vent or a pressure/vacuum valve. Roof seals, access doors, and other openings shall be checked by visual inspection initially and semiannually thereafter to ensure that no cracks or gaps greater than 0.32 cm (0.125 inch) occur in the roof or between the roof and wall; and that the access doors and other openings are closed and gasketed properly; or 305.2 An organic compound vapor recovery system with a combined collection and destruction efficiency of at least 70 percent, by weight. 305.3 Deleted October 6, 1993 (Adopted 11/1/89; Amended 10/6/93; 9/15/04) 8-8-306 Oil-Water Separator Effluent Channel, Pond, Trench, or Basin: A person shall not operate any oil-water separator effluent channel, pond, trench, or basin a design rated or maximum allowable capacity greater than 25.2 liters per second (any oilwater separator effluent channel, pond, trench, or basin greater than 400 gals per min) unless such oil-water separator effluent channel, pond, trench, or basin is operated within its design rated or maximum allowable capacity and is equipped with one of the following: 306.1 A solid, gasketed, fixed cover totally enclosing the oil-water separator effluent channel, pond, trench, or basin (compartment) liquid contents, with all cover openings closed, except when the opening is being used for inspection, maintenance, or wastewater sampling. Roof seals, access doors, and other openings shall be checked by visual inspection initially and semiannually thereafter to ensure that no cracks or gaps greater than 0.32 cm (0.125 inch) occur in the roof or between the roof and wall; and that the access doors and other openings are closed and gasketed properly; or 306.2 An organic compound vapor recovery system with a combined collection and destruction efficiency of at least 70 percent, by weight. 306.3 Deleted October 6, 1993 (Adopted 11/1/89; Amended 10/6/93; 9/15/04) 8-8-307 Air Flotation Unit: A person shall not operate any air flotation unit and/or pre-air flotation unit flocculation sump, basin, chamber, or tank with a design rated or maximum allowable capacity greater than 25.2 liters per second (air flotation units and/or pre-air flotation unit flocculation sump, basin, chamber, or tank greater than 400 gals per min.) unless such air flotation unit and/or pre-air flotation unit flocculation sump, basin, chamber, or tank is operated within its design rated or maximum allowable capacity and is equipped with one of the following: 307.1 A solid, gasketed, fixed cover totally enclosing the air flotation and pre-airflotation-unit flocculation tank, chamber, or basin (compartment) liquid contents, with all cover openings closed, except when the opening is being used for inspection, maintenance, or wastewater sampling. The cover may include an atmospheric vent or pressure/vacuum valve. Roof seals, access doors, and other openings shall be checked by visual inspection initially and semiannually thereafter to ensure that no cracks or gaps greater than 0.32 cm (0.125 inch) occur in the roof or between the roof and wall; and that the access doors and other openings are closed and gasketed properly; or 307.2 An organic compound vapor recovery system with a combined collection and destruction efficiency of at least 70 percent, by weight. 307.3 Deleted October 6, 1993 (Adopted 11/1/89; Amended 10/6/93; 9/15/04) 8-8-308 Junction Box: Any junction box shall be equipped with either a solid, gasketed, fixed cover totally enclosing the junction box or a solid manhole cover. Junction boxes may

include openings in the covers and vent pipes if the total open area of the junction box does not exceed 81.3 cm 2 (12.6 in 2 ) and all vent pipes are at least 3 feet in length. (Adopted 11/1/89; Amended10/6/93) 8-8-309 Deleted October 6, 1993 8-8-310 Deleted October 6, 1993 8-8-311 Deleted October 6, 1993 8-8-312 Controlled Wastewater Collection System Components at Petroleum Refineries: Effective January 1, 2006, all controlled wastewater collection system components at petroleum refineries shall be vapor tight except when in use for active inspection, maintenance, repair or sampling. A leak in any controlled wastewater collection system component that is not vapor tight must be minimized within 24 hours and repaired within 7 days. 8-8-313 Uncontrolled Wastewater Collection System Components at Petroleum Refineries: Petroleum refineries shall comply with either Section 8-8-313.1 or 313.2 below: 313.1 Each uncontrolled wastewater collection system component must be equipped with a water seal or equivalent control according to the schedule in Section 8-8-403. Any uncontrolled collection system component that is not vapor tight must be minimized. Upon installation of a water seal or equivalent control, the provisions of Section 8-8-312 will apply; or 313.2 Effective January 1, 2006 and until January 1, 2007, each uncontrolled wastewater collection system component must be inspected bi-monthly. Effective January 1, 2007, each uncontrolled wastewater system component must be inspected semi-annually. Any uncontrolled wastewater collection system component that is not vapor tight shall be identified, minimized within 24 hours and re-inspected every 30 days. The component may be returned to a semi-annual inspection schedule if it is vapor tight during three consecutive 30-day inspections. Any uncontrolled wastewater collection system component that is not vapor tight during any three inspections in a five-year period must be equipped with a water seal or equivalent control within 30 days after the third inspection. Upon installation of the water seal or equivalent control, the provisions of Section 8-8-312 shall apply. Unless previously identified by the refinery, any wastewater system component discovered by the APCO not to be vapor tight must be minimized within 24 hours and repaired within 7 days. 8-8-314 New Wastewater Collection System Components at Petroleum Refineries: Effective January 1, 2005, any new wastewater collection system component at a petroleum refinery shall be equipped with a water seal or equivalent control. 8-8-400 ADMINISTRATIVE REQUIREMENTS 8-8-401 Deleted October 6, 1993 8-8-402 Wastewater Inspection and Maintenance Plan at Petroleum Refineries: All petroleum refineries must implement an inspection and maintenance plan that meets all of the following requirements: 402.1 By October 1, 2005, all wastewater collection system components must be identified and the APCO must be provided with lists, diagrams or other information sufficient to locate all components. It shall not be violation of this requirement if the refinery discovers that a component has been omitted from the list, diagram, or other information and submits information to the APCO regarding the component. Effective October 1, 2005, any wastewater collection system component found by the APCO that was not identified pursuant to the provisions of this section shall constitute a violation. 402.2 By October 1, 2005, an initial inspection of all wastewater collection system components must be completed by the refinery. The results of the initial inspection shall be made available to the APCO, but any wastewater

collection system component that is not vapor tight shall not trigger the requirements of Section 8-8-313 before the effective date of that Section. 402.3 Effective January 1, 2006, for petroleum refineries that elect to comply with Section 8-8-313.2, the plan must provide for the identification and minimization of leaking components and a re-inspection within 30 days of discovery. The plan must also provide for re-inspections every thirty days until the affected component is either controlled or is returned to the inspection schedule in Section 8-8-313.2. 402.4 Effective January 1, 2006, each controlled component shall be inspected semi-annually. 402.5 Records must be maintained pursuant to Section 8-8-505. 8-8-403 Petroleum Refinery Compliance Schedule: Any petroleum refinery electing to comply with Section 8-8-313.1 shall install controls on uncontrolled wastewater collection system components according to the following schedule: 403.1 By October 31, 2005, install controls on 25% of wastewater collection system components that were uncontrolled as of January 1, 2005. 403.2 By April 30, 2006, install controls on 50% of wastewater collection system components that were uncontrolled as of January 1, 2005. 403.3 By October 31, 2006, install controls on 75% of wastewater collection system components that were uncontrolled as of January 1, 2005. 403.4 By April 30, 2007, install controls on 100% of wastewater collection system components that were uncontrolled as of January 1, 2005. 8-8-404 Uncontrolled Wastewater Collection System Components Election: By November 1, 2004, each petroleum refinery shall choose a compliance option from Section 8-8-313 and notify the APCO in writing indicating which option has been chosen. 8-8-500 MONITORING AND RECORDS 8-8-501 API Separator or Air Flotation Bypassed Wastewater Records: Any person who bypasses wastewater past their API Separator or Air Flotation unit shall maintain records on the amount of bypassed wastewater, duration, date, causes for bypasses, and dissolved critical organic compound concentration (volume). These records shall be retained and available for inspection by the APCO for at least 24 months. 8-8-502 Wastewater Critical Organic Compound Concentration Or Temperature Records: Any person who exempts their wastewater separator because of either wastewater critical organic compound concentration or temperature shall sample and test the wastewater initially and semiannually thereafter and maintain records on the date, time of test, location, and wastewater temperature and/or critical organic compound concentration (volume). These records shall be retained and available for inspection by the APCO for at least 24 months. 8-8-503 Inspection and Repair Records: Records of inspections and repairs as required by Sections 8-8-301, 302, 305, 306 or 307 shall be retained and made available for inspection by the APCO for at least 24 months. (Adopted October 6, 1993) 8-8-504 Portable Hydrocarbon Detector: Any instrument used for the measurement of organic compounds shall be a gas detector that meets the specifications and performance criteria of and has been calibrated in accordance with EPA Reference Method 21 (40 CFR 60, Appendix A). (Adopted June 15, 1994) 8-8-505 Records for Wastewater Collection System Components at Petroleum Refineries: Any person subject to the requirements of this rule shall: 505.1 Maintain records of the type and location of each wastewater collection system component.

505.2 Record the date of each wastewater collection system component inspection, and re-inspection and leak concentration measured for each inspection or reinspection. 505.3 Record a description of the minimization or repair efforts on each leaking component that is not vapor tight. 505.4 Maintain required records for at least 5 years and make them available to the APCO for inspection at any time. 8-8-600 MANUAL OF PROCEDURES 8-8-601 Wastewater Analysis for Critical Organic Compounds: Samples of wastewater as specified in this rule shall be taken at the influent stream for each unit and analyzed for the concentration of dissolved critical organic compounds as prescribed in the Manual of Procedures, Volume III, Lab Method 33. (Amended 11/1/89; 10/6/93; 9/15/04) 8-8-602 Determination of Emissions: Emissions of organic compounds as specified in Sections 8-8-301.3, 8-8-302.3, 8-8-304, 8-8-305.2, 8-8-306.2, and 8-8-307.2 shall be measured as prescribed by any of the following methods: 1) BAAQMD Manual of Procedures, Volume IV, ST-7, 2) EPA Method 25, or 25A). A source shall be considered in violation if the organic compound emissions measured by any of the referenced test methods exceed the standards of this rule. (Amended 11/1/89; 10/6/93; 6/15/94; 9/15/04) 8-8-603 Inspection Procedures: For the purposes of Sections 8-8-301, 302, 303, 304 312, 313 and 402, leaks shall be measured using a portable gas detector as prescribed in EPA Reference Method 21 (40 CFR 60, Appendix A). (Adopted 6/15/94; Amended 9/15/04)