Large Customer Connection Enquiry Form

Similar documents
Customer connection enquiry form (For the connection of loads and generators)

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

SA Power Networks Network Tariffs - Residential APPLIES TO USAGE FROM 1 JULY 2015

Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation

Jemena Electricity Networks (VIC) Ltd - Network Tariffs For The 2015 Calendar Year (Exclusive of GST)

Network Price List and Explanatory Notes

Daily Daily Network Network Network Energy Rates Step Rates Capacity. Price Rates Rates

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK

Energex. Statement of expected price trends. 1 July 2014 to 30 June /15 Statement of expected price trends

SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems

Connecting to the network information pack Version 2

ES3. PART A Metering Installation Requirements July 2015

Energy Price Fact Sheet

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

Network Price List (excludes GST)

NETWORK PRICE LIST 2014/2015. Effective 1 July 2014

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

NEW COMMERCIAL Rates. Understanding the. Commercial Customers

Register of Completed Embedded Generation Projects (Non-registered, typically 30kW to 5000kW)

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

POWER NETWORKS Electricity Network Tariffs and Charges and Future Price Trends

Explanation of Net Energy Metering and Annual Net Surplus Electricity Settlement Options

Distributed Generation: Frequently Asked Questions

JEA Net Metering Policy Tiers 1-3

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd.

Design Guide. Managing Peak Energy Demand In Live Performance Venues

Solar Power Frequently Asked Questions

Brochure. Electric generators to power the world

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Free electricity for your home, offices or factory with solar PV panels

INDEPENDENCE POWER & LIGHT DEPARTMENT Independence, Missouri. Schedule NM-1 Customer-Generator Net Metering Contract Service Rider

Rules of Thumb Energy Efficiency in Buildings

New electricity connection, substantial increase in load and major headworks

Application for accreditation of a power station

Energex Customer Charter. For residential and small business customers

MicroFIT Connection Application Guidelines

Off-grid Hybrid Solar: Market Overview, Business Case & Technical Considerations

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

Application for electricity connections Business premises

We're with you... solar. Call today FOR THE LIFE OF THE SYSTEM YEAR WARRANTY * YEAR OLD BACKED BY CSR BRADFORD CSR A AUSTRALIAN COMPANY

Japan s Largest Photovoltaic Power Plant

factor max Delivering Electrical Efficiency INFORMATION PACK factor max

Photovoltaic in Mexico Recent Developments and Future

Residential. Tariff Supply/Usage Unit excl. GST incl. GST

Consumer guide. be brighter. actewagl.com.au/solar

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

Energy Tariffs and Associated Charges

Meter installation, alteration and abolishment fees

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Solar Power Plant Design and Interconnection

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

ENERGY SOLUTIONS RESIDENTIAL STORAGE BATTERY SYSTEM

ENERGY PRICE FACTSHEET

UNDERSTANDING ENERGY BILLS & TARRIFS

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -

TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015

Rooftop Solar Potential

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

Past and projected future components of electricity supply to the ACT, and resultant emissions intensity of electricity supplied

Non-Network Options Report

Wind-Diesel Hybrid System Options for Alaska. Steve Drouilhet National Renewable Energy Laboratory Golden, CO

Australian Remote Renewables: Opportunities for Investment

Mini-grid Implementation Experience as an EPC Contractor. Fabian Jochem Juwi international GmbH

Solar Cloud. Application for Individual Retail Exemption 1 Legal Name Share My Solar Pty Ltd. 2 Trading Name Solar Cloud

Western Australian Feed-In Tariff Discussion Paper

Request for Quotation: Design, supply, delivery and installation of web based photovoltaic monitoring system for solar traffic lights.

NBF. Electrical. WHY GO SOLAR? NBF ELECTRICAL EXPLAINS WHY

Pass Through Costs for Business Electricity Customers from 1 st October 2015

Standard Electricity Prices and Charges*

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation

Energy Systems Integration

Information Guide for Standard Control Services Pricing. 1 July 2015 to 30 June 2016

Welcome to Ergon Energy Retail

Queensland Government Gazette

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Distributed Generation and the Impact on a Distribution System. Brian Lassiter Technical Sales Engineer

Princeton University Microgrid

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

The potential of battery energy storage for grid connected domestic renewable sources of energy

A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance

AusNet Electricity Services Pty Ltd. Tariff Structure Statement

The South African Grid Code

Solar*Rewards Frequently Asked Questions

WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN

Starting Current Reduction of Residential HVAC System and Peak-Load Impact of Power System: A Case Study

Renewable Energy Hosting Capacity in Horizon Power Systems. November 2013

Physical Address: City: State: Zip Code:

FIT TIER 2 Application

Additional Solar System Information and Resources

Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

Standard Electricity Prices and Charges *

Impact of Renewable generation

Transcription:

Page 1 of 6 Large Customer Connection Enquiry Form (For the Connection of Loads and Generators) Please complete all Mandatory Fields * and as much detail as possible to ensure Energex can meet your requirements. When completed, please attach and e-mail this form to lcc@energex.com.au *Enquiry from Customer Customer s Consultant Customer s Builder Customer s Electrician Applicant Details *Applicant Name (Please print) *Company Name (If applicable not trading name) *Site Name or Reference *ABN or ACN (If applicable) NMI *Business Phone Number Mobile Number *E-mail *Postal Address Postcode Select preferred application form delivery method (if required) Email Post Contestability (Alternative Control Services) The National Electricity Rules allow customers to construct, design and own their connection assets where the works are considered a dedication connection. A dedicated connection is one in which no other customers will be connected to. These assets may also be gifted (at no cost) to Energex. Energex may also be able to offer a quote to construct and design these assets. Specific rules covering the materials, auditing, construction and design may apply and are available for download from the Energex website. http://www.energex.com.au/service_providers/technical_docs/asp/technical_documents.asp Energex at its own discretion will determine the Network Coupling Point i.e. the point at which the Network connects to the Connection Assets. Further information can be found on the Energex website or by contacting our Call Centre on 13 12 53.

Page 2 of 6 Consultants Details (Energex Accredited) Contact Name (Please print) Company Name (If applicable) ABN or ACN (If applicable) Business Phone Number Mobile Number E-mail Postal Address Postcode Select preferred application form delivery method (if required) Email Post Please choose from the following options. Quotes for services will be provided when available and will only be indicative in nature at this stage. *Option 1 *Option 2 *Option 3 *Option 4 Customer design, construct and own Energex design, construct and own Customer design, construct and Energex own Unsure at this stage Please note that all Network (used by more than one customer, including future use) will continue to be designed, constructed and owned by Energex Property and Enquiry Information Details *New Connection *Customers Business Name *Contact Person Name/s *Email Site Name *Street Address *Upgrade to Existing Connection *Estimate of Total Project Cost *ABN Number Phone Number *RP Description/Lease No. *Suburb Additional details on location i.e. restrictions, environmental, cultural, etc. Is the registered owner of the property the applicant? Yes No If No, please enter name of registered owner

Page 3 of 6 *Type of Connections Load Connection Generator *New Connection Load >1MV.A+ (If you require a new connection to either a new premises, property or equipment above 1MV.A) *New Generator Connection up to 400kW (If you require a connection for generation plant up to 400kW) *New Generator Connection 400kW+ (If you require a connection for generation plant above 400kW) *New Parallel Generation Agreement (If you have an existing or new connection and require an agreement for a generation system that will not export into the electricity grid but will make a physical connection) *Upgrade Existing Connection or Contract (If you require an upgrade of the existing supply or require modification to an existing contract) *Development (If you require a connection to a development (i.e. You are not the final end user) which has an estimated total consumption of >4GWh or >1MV.A demand) *Other (If your enquiry does not relate to any of the above options, please ensure you describe your enquiry in the area provided on the last page however this form is used generally for generators and large customers only) Please note that if you wish to connect a small photovoltaic system (<=10kW 1-ph or <=30kW 3-ph) telephone our Contact Centre on 13 12 53 as this is not the correct form. *Connection Voltage (kv) *Purpose of Industry / Load *Additional Maps, Site Plans or Diagrams Attached? Yes No General Load Details *Full A/C Demand and Details (e.g. Split System, Chiller etc.) *AS3000 Calc Demand MW kw Amp *Preferred Electrical Substation Indoor Outdoor (ground) Pad Mount Type *Preferred Location of Substation Site Plan attached? Yes No High Rise Developments Total Number of Levels Number of Residential Levels Number of Residential Units Number of Commercial Levels Gross Commercial Floor Area Total Estimated Demand MW kw Amp Other Development Types Type of Plant (eg rolling mill, turbine gas/steam) Network Charges *Are Indicative Network Charges requested at this stage of the enquiry? Yes No *Authorised Demand (highest 30min average demand expected after diversity for a 12 month period) *Energy Consumption (estimated energy consumption in kwh per annum - for generators - energy production) *Anticipated average monthly maximum demand (i.e. the average of all 12 monthly maxima) kw kwh kw *The peak energy as a proportion of total % Anticipated Power Factor *Anticipated Power Factor (at high load) (e.g. 0.85) Power Factor Correction to be Installed? Yes No

Page 4 of 6 Metering Arrangements *Metering Required HV Metering LV Metering Metering Provider (Responsible person:- responsible for the provision, installation and maintenance of a metering installation) Retailer Details Retailer Name (FRMP: Financially Responsible Market Participant) Registered Participant Registered Participant Reference No. (Embedded Generation >5MWh to be registered with AEMO) Significant / Disturbing Loads (e.g. Harmonics, Large Motors, Welders, Thyristor Drives) Details of Disturbing Loads Significant Load Refer to Attached Detail Yes No Generating Systems (Preliminary Details where applicable) Size Size MW / MVAr MW / MVAr Number of Units Output of Units (kva) Unit: 1-2 - 3-4 - Type of System (e.g. Diesel, Wind, PV, Synchronous Machine) Purpose of Operation Standby Only Co-Generation Commercial Operation / Connection Isolated from Energex Supply Parallel operation (No Export) Parallel Operation (Export) Forecasts Total Hours of Operation per Annum: Maximum Export Demand (kw) to Energex Network: Export Energy (kwh per annum) Supplementary Forms Energex will require more Technical information about the Embedded Generation. Please complete the most appropriate form from the list below and submit with this Enquiry. Form 1060 is mandatory for all Solar PV enquiries. Inc. Form Description F1060 F1552 F1551 F1369 F1554 F1370 Network Connection Application: Embedded Generation (Including Solar PV) Request of PV/Inverter Information Request of Generator Information Request of Motor/Drive Information Request of Load (UPS) Information Request of Furnace/Drive Information

Page 5 of 6 Connection Construction Timing *Temporary Building Supply Required? Yes No *Maximum Temporary Supply Demand *Required by Date / / *Date Permanent Electricity Supply Required / / *Details of Staging Time Frame and Other Construction Requirements Yes N/A Special Requirements / Future Load Requirements List any special requirements and future load requirements in relation to the connection, (eg N -1, back up supply etc) Other Information / Comments

Page 6 of 6 Notes You will receive a reply from Energex acknowledging your enquiry within 5 working days of reception. This reply will normally be sent via e-mail and will detail any missing information required before the enquiry can be presented to a Network Connection Manager, failure to provide this information will result in your enquiry being placed on hold. The reply to your enquiry will contain a Work Request number, this reference number is to be used in all future contacts with Energex in regards to this specific project. The reply will also confirm that Energex is the correct Network Service Provider (NSP), if not you will receive further instructions for the relevant NSP for your enquiry. Your enquiry will be processed under the National Electricity Rules (chapter 5); you should take time to understand your responsibilities under this document. A link to Rules can be found on the Energex website www.energex.com.au or at the Australian Energy Market Commission website http://www.aemc.gove.au/rules.php this document is regularly updated. From this enquiry you will receive an enquiry response which will provide an outline of costs, connection method and connection requirements. If you wish to proceed to a connection, an application to connect form will need to be forwarded to Energex with your relevant Work Request number, application fee and additional information.