CONSTRUCTION COST DATA

Similar documents
SINGAPORE 2014 Langdon & Seah Singapore Pte Ltd

CONSTRUCTION COST GUIDE

Schedule B to By-law Part A Fees Payable for Permits

Schedule B to By-law

- 5 - Table1. Maximum Compartment Volumes

INLAND REVENUE BOARD MALAYSIA INCOME FROM LETTING OF REAL PROPERTY

EP Waterproofing System - Projects

I. AMFITEATRU HOTEL ** For more details visit :

What you need to know about. Smoke alarms for residential buildings

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

INSURANCE CORPORATION

Seeking Expressions of Interest

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

Making changes to your home

Exceptional New Construction in Fantastic Area

Life isn t just how you feel about your home. It s how you feel about yourself when you are home.

Technical housing standards nationally described space standard

Segreti Design Scope of Interior Design Services

EIS PROT. IPC WASTE DATE APP. FILE DEVELOPMENT DESCRIPTION AND LOCATION NUMBER RECD. RECEIVED APPLICANTS NAME TYPE STRU LIC. 16/61

How To Write A Home Protection Insurance Policy

Property Features. Rate SF $28/SF/annum, FSG Parking.. 1/1,000 at prevailing building rates

Multi-storey residential buildings - warranty insurance exemption. This updates the previous Practice Note issued June 2006

Company Profile.

RE: Benchmark Costs Per Square Metre for School Function Areas


HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER May 2015

Technical housing standards nationally described space standard

Change of Address Form Help with your Rent and Council Tax

Chalet Vicuna Megeve

Vancouver / Calgary / Edmonton / Toronto / Ottawa / Montreal / Halifax / St. John s altusgroup.com

Design Scenario Interior Design STAR Event

Concepts. Products. Service. 30 Crown Place, London EC2

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

MULTIFAMILY (5 or more apartment units)

PROFESSIONAL CREDIT CERTIFICATION (PCC) Leading credit specialisation

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA:

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata Developer Premier Mica Mining And Manufacturing Company

Community Infrastructure Levy (CIL) Guidance Note 7. Examples of how CIL liabilities are calculated

How To Build A Luxury Apartment Complex In London

MALAYSIA COMMERCIAL REAL ESTATE INVESTMENT SENTIMENT SURVEY 2016

Cost Comparisons between Leasing and Using Office Space at Regatta 1 Business Centre

Owner Cleaning and Maintenance Checklist

Spouse #1: Spouse #2: Who is the primary contact, and what is the best time and way to reach that individual?

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.

SECTION 6 COMMERCIAL ZONES

National Flood Insurance Program Summary of Coverage

University Policy No.: FM5205 Classification: Financial Management

The solution for your business

Abel Insurance Agency

PROJECT COST ESTIMATES & FEASIBILITIES

Applies to: All Employees within the Facilities Management Department (FMD)

Maciej Hincmanowski Grzegorz Brzeziński INFINE Sp. z o.o.

HOME INSURANCE ASSESSMENT

Outlook for the construction industry. Part One: BETA monitoring report Joinery ITO August 2013

IMPORTANT INFORMATION

FIRE-FIGHTING DESIGN BRIEF REPORT

PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS

Errata has been identified as follows:

Tenant Handbook Broll 2014

September 27 (Tue) ~ 29 (Thu), Putra World Trade Centre (PWTC) Kuala Lumpur MALAYSIA

Construction of A hospital Building

NAPCS Product List for NAICS 54141: Interior Design Services

QUESTIONS AND ANSWERS REGARDING PARTICIPATION IN THE NATIONAL FLOOD INSURANCE PROGRAM

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP

FOR LEASE UP TO 20,000 SQ.FT. OF RETAIL/RESTAURANT SPACE 2388 YONGE STREET TORONTO, ON

Concepts. Products. Service. Scandic Berlin Potsdamer Platz

Master of Business NilaiU

Houses in Multiple Occupation

ARCHITETTO ANDREA FERRARO

Commercial Property Market Report Riga

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

EMR Shielding of single level home from 3G mobile phone tower

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

Measuring Single Family Dwellings Town homes Condominium Units. P) ~ F)

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

Nationally Described Space Standard technical requirements. Consultation draft. September 2014

EARTHQUAKE SAFETY IN THE WORK PLACE

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

A. NICOLAIDES HOLDINGS LTD PACKAGE NO. 6

Amenity Features. encouraging efficient and effective building management; enhancing the quality of life for residents and users;

CONSTRUCTION PROGRESS MONITORING REPORT

The Home Insurance Healthcheck

Commercial and Office. Space for Rent

A) Additional construction on existing dwellings, increased by less than 20% of current footprint

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

RARE, PRECIOUS AND PRIVILEGED. LIFESTYLE LIKE A PEARL.

New York, Dean. Price 182,500

Second Units A guide for homeowners in Brampton

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

Weissgold Apartments, Lake Traunsee - Austria

DATE RECEIVED FILE NUMBER DEVELOPMENT DESCRIPTION AND LOCATION APP. TYPE EIS RECD. PROT. STRU APPLICANTS NAME IPC WASTE 14/35900

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Table PARKING SPACE RATES AND PARKING SPACE OCCUPANCY

Transcription:

1 Construction Cost Specification Kuala Lumpur Construction Cost Trend Construction Costs for Kuala Lumpur Construction Costs for Johor Bahru Construction Costs for Penang Construction Costs for Kota Kinabalu Construction Costs for Kuching Construction Costs for Selected Asian Cities International Building Costs Major Rates for Malaysia Major Rates for Selected Asian Cities ACMV Costs for Various Designs & Developments in Kuala Lumpur M&E Costs for Selected Asian Cities Unit Costs for Ancillary Facilities for Kuala Lumpur FitOut Costs for Kuala Lumpur

1 1. CONSTRUCTION COST SPECIFICATION The costs for the respective categories given on the following pages are averages based on fixed price competitive tenders. It must be understood that the actual cost of a building will depend upon the design and many other factors and may vary from the figures shown. The costs per square metre are based on construction floor areas measured to the outside face of the external walls/external perimeter, and are inclusive of lift shafts, stairwells, plant rooms, water tanks and the like. The costs per square metre excludes local infrastructure cost. All buildings are assumed to have no basements (except otherwise stated) and are built on flat ground, with normal soil conditions and minimal external works. The costs excludes land cost, professional fees, finance costs and legal expenses. The standards for each category of building vary from country to country and do not necessary follow those of Malaysia. DOMESTIC Average standard apartments of 612 units per floor, 46m 2 83m 2 per unit. Kitchen cabinets, basic home appliances and air conditioning allowed for luxury apartments and prestige houses. Prestige houses include provision of functional light fittings only. Interior fitout and decoration is excluded. No light fittings have been allowed for other types of domestic construction. 14

OFFICE / COMMERCIAL Based on buildings 2030 storeys high with floor plans minimum m 2 per level. Average standard offices and shopping centres exclude A/C ducting, ceiling boards and light fittings to tenants areas. Prestige offices have curtain wall elevations, granite finishes lobbies with A/C ducting, ceiling boards and light fittings to tenants area. INDUSTRIAL Flatted factories exclude manufacturing equipment, airconditioning and electrical distribution system to tenants areas. Owner operated factories exclude manufacturing equipment, airconditioning and special services provisions. HOTELS F.F.&E. includes interior decoration and loose furniture etc. but excludes operator s items (e.g. cutlery, crockery, linen etc.). OTHERS Carparks to be multistorey, ground. Schools with standard government provisions. Student hostels to university standard. 15

1 1. KUALA LUMPUR CONSTRUCTION COST TREND 2002 2012 Domestic RM/m2 3,000 2,500 2,000 1,500 500 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Bungalows (mass housing) Detached houses and bungalows* Terraced houses Luxury apts, high rise Average standard apts, high rise Low cost flats, high rise Low cost flats, low rise (<6 levels) (<15 levels) Low cost housing Office / Commercial RM/m2 4,000 3,500 3,000 2,500 2,000 1,500 500 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Average standard offices, high rise Prestige offices, high rise* Shopping Centres * Cost are at lower range cost All cost are at an average level unless otherwise stated 16

RM/m 2 1,800 1,600 1,400 1,200 800 600 400 200 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories, low rise RM/m 2 8,000 7,000 6,000 5,000 4,000 3,000 2,000 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Resort Hotel inclusive of F.F.&E. 3star budget hotels, ditto 5star luxury hotels, ditto* * Cost are at lower range cost All cost are at an average level unless otherwise stated 17

1 CONSTRUCTION COSTS FOR KUALA LUMPUR DOMESTIC Bungalow (mass housing) Detached houses and bungalows Terraced houses Average standard apartments, high rise Luxury apartments, high rise Low cost housing Low cost flats, low rise (<6 levels) Low cost flats, high rise (<15 levels) OFFICE / COMMERCIAL Average standard offices, high rise Prestige offices, high rise Shopping centres HOTELS Resort hotels, inclusive of F.F.&E. 3star budget hotels, ditto 5star luxury hotels, ditto 1,340 2,030 680 920 2,125 560 640 700 1,385 1,950 1,395 2,910 3,530 5,480 BUILDING 930 1,375 600 680 750 1,525 1,805 3,075 3,950 905 810 170 290 795 100 120 180 940 1,400 830 1,250 1,190 1,875 RM/m 2 SERVICES 280 440 130 190 240 1,155 1,155 1,565 1,445 2,245 2,840 850 1,210 2,920 660 760 880 2,325 3,350 2,225 4,160 4,720 7,355 TOTAL 1,210 1,815 730 870 990 2,680 2,960 4,640 5,395 18

INDUSTRIAL Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories, low rise 805 1,045 865 1,155 820 1,090 1,025 1,255 530 595 360 485 695 750 520 585 1,335 1,640 1,225 1,640 OTHERS Basement car parks (<3 levels) Elevated car parks (<4 levels) Primary and Secondary schools Student hostels Sports clubs including F.F.&E. 590 650 830 1,670 1,180 750 740 895 1,775 370 210 190 240 540 465 290 210 290 640 1,370 800 840 1,070 2,210 The costs are at 4th Quarter 2012 levels, inclusive of preliminaries (10%) but exclusive of contingencies. 1,515 1,840 1,545 1,840 1,645 1,040 950 1,185 2,415 19