Guide to Using Top-Cast Surface Retarder

Similar documents
SECTION 12. Surface Retarders. Sec 12 TECHNICAL DATA SHEET. Surface Retarders. Face-Off Top Cast American Owned American Made

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

GUIDELINE FOR EXPOSED AGGREGATE FINISHES

SC2000 CEMENT BONDING PROCEDURES

Resurfacing Concrete. Page 1 of 5

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

International Greenhouse Company

LAYING BLOCK AND BRICK

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form

K2 STONE NATURAL VENEER

Minor Cracks in Horizontal Surfaces

T R A N S F E R A B L E F U L LY

BENTLEY ELEMENTS COLLECTION LVT

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Selection, Use, and Care of Brushes

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

Installation PowerPoint for Grasscrete Formers

Site sampling and testing of concrete

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

Free-Form Concrete Pool

Summit Racing Equipment s Paint and Auto Refinishing System was developed specifically for the home enthusiast and small shop owner wanting a

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Construction of Quality Hot Mix Asphalt Pavements

SEE HOW TO MAKE LIME PLASTER WHY USE LIME? PATTI STOUTER, BUILD SIMPLE INC. FEBRUARY 2013

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Mineral waterproof coating PCI Dichtschlämme

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Division 9. SignaFlor Pad and Pour Flooring System

Installation System. Existing Resilient Sheet Floors

BEST PRACTICE GUIDE. Fibrelime Premixed Universal Plaster and Render

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Vinyl Composition Tile Installation System

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

Flocking of textiles. Flocked shirt 13. flocking drying cleaning. adhesive. application. creation

SECTION POLISHED CONCRETE FINISHING

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment

Lab 1 Concrete Proportioning, Mixing, and Testing

Moisture and Resilient Floor Covering

Lesson 3. Portland Cement and Concrete

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

Chapter 2 Basis of design and materials

Example Specification for Concrete using Current Building Code Requirements

FRAMED & MOUNTED TILE MURAL

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

Peasouper Operator s Manual

How to Install Hardwood Flooring Over a Sub Floor

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

Wall and Ceiling Products Moisture and Corrosion Proof Panels

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

How to build a Pizza Oven in 4 days

REFLECTIT. Reflectit Application Instructions Spray and Roller DS % Acrylic Coating Providing a Pearlescent Appearance

Electronics and Soldering Notes

G VYCOR DECK PROTECTOR. For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects.

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

Baumit Renders for Porotherm Masonry. Application Guidelines. n Light and easy application n Tried and tested

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Tractor Painting Tips

A Manufacturer s and Contractor s Guide to Coloring Ready Mix Concrete with Bayferrox C Iron Oxide Pigments

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

Protecting Galvanized Steel Sheet Products from Storage Stain Rev 2.1 Aug-03

SECTION 4Aggegate Subbase

Herringbone Pattern Flooring

Housing Services Guidance for tackling condensation, damp and mould in your home

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

Manufactured Stone Veneer Installation Instructions

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

Cold Weather Concrete Practices

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

You have just purchased the most portable and economical spray chrome system in the world!

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Acrylic Coatings: The Perfect Stucco Finish

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

KALPANA INDUSTRIES LTD. TECHNICAL DATA SHEET

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

OWNER S MANUAL FOR THE PATIO SAUNA

PROPERTIES AND MIX DESIGNATIONS

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES

Carpet Tile Installation Guidelines

Cost-effective solutions for all applications.

Vanishing Lid Trays Construction Methods with Tile or Masonry

Transcription:

Guide to Using Top-Cast Surface Retarder Guidelines for mix designs, placing and finishing exposed aggregate concrete Grace s Top-Cast surface retarder is designed to expose a wide range of aggregate sizes on the surface of horizontal concrete. With 11 different degrees, or depth of surface paste retardation, a contractor, architect or owner can achieve a whole range of exposed looks, depending on their choice of aggregates, mix designs, integral color, finishing techniques, and level of Top-Cast. Typically the first decision would be to decide what you really want to see on the surface of your concrete. Next, the concrete mix should be designed with the desired amount, color and size of aggregate you wish to see on the final It is recommended that you consult with your local ready mix company for assistance, as they generally have the most knowledge of available aggregates in their markets. They also have the best understanding of designing the appropriate mixes to best achieve the end result look you might desire. Once the mix design has been properly designed, then the concrete placing and finishing contractor must understand how to finish the concrete in a manner that will ensure that the aggregate that you wish to see on the surface is at the desired location within the concrete matrix in order to be adequately exposed. Lastly, the right level of Top-Cast must be selected in order to remove the desired amount of surface paste to expose the aggregate. It is recommended that the ready mix producer consult with their local Dayton Superior Sales Professional for specific procedures, when working with Top-Cast applications. Note: When using Top-Cast, a 6 sack mix (564 lbs./256 kg cement) should always be used to achieve correct etch. Mixes with more or less cement may yield different results. Always install a mock up to ensure desired results. Product Aggregate Size to Expose 03 Violet Acid Etch Finish 05 Light Blue Sandblast Finish 15 Yellow Up to ¼" (6.55 mm) 25 Beige 1/8" 1/4" (3 mm -6.5 mm) 50 Canary Green 1/8" - 3/8" (3 mm -9.5 mm) 75 Blue 1/8" - 3/8" (3 mm -9.5 mm) 100 Gray 3/8" - ½" (9.5 mm- 13 mm) 125 Pink 3/8" - 5/8" (9.5 mm- 16 mm) 150 Green 3/8" - 5/8" (9.5 mm- 16 mm) 200 Salmon 5/8" - 1" (16 mm -25 mm) 250 Orange 1" - 1½" (25 mm -38 mm) Placing and Preparing Concrete for Top-Cast Place concrete at a 4 inch 5 inch maximum slump (100mm to 125mm). Screed FLAT, this is very important particularly for the Micro Finishes (03 15). Bull float with a wooden bull float in both directions. Roller Tamp or Jitterbug in both directions. For Micro Finishes Only (03-15). Bull float a second time. Wait until the bleed water has left before you do anything further. Do all your edge work next, edge the slab with a metal edger then break the surface again with a wood float. Begin the finish of the slab as you would with a mag float. At this point, you need to decide how you want the final surface, additional passes with a steel trowel compacts the final surface or tightens the The big point now is to make sure that no Bird Baths or dips in the final surface show up. The intention is to get a tightly finished flat 1

If you choose to only make one pass, apply the Top-Cast as soon as the finisher comes off the slab with their skates or kneeboards. temperatures as well as job site conditions and the washing procedures used. Try washing from about 6 to 10 inches away. Moisture is needed in the top surface of the slab to react with the Top-Cast. Look for a surface that you can wipe your hand across to feel and see moisture. This is the key time of the process. Do not wait too long, early application is far better than too late. Placing and finishing guidelines for exposing aggregates larger than 3/8" (10mm) Apply the Top-Cast with a Hudson type sprayer with an adjustable nozzle or a fan type nozzle with a (.3 or.5 GPM). Apply Top-Cast with a sprayer at a rate of 175 350 ft2/gal. The Top-Cast will dry on the surface in about 20 minutes or so, depending on the temperature. The Top-Cast, once dry will resist a light rain. You may also place tarps over the slab to maintain heat in cooler temperatures as well as protect from standing rainwater. We would advise if you are tarping with insulated tarps, to first cover with plastic to protect from drag marks. In very hot weather, a water based curing agent may also be used over the Top-Cast to aide in etch retention as well as moisture retention in the surface allowing the retarded matrix to be more easily removed. You can begin washing the retarded surface off in a little as 4 hours. The concrete surface must be adequately hard to resist the cleaning process. Generally wash the slab 12 to 16 hours later, this is totally dependent upon the mix design and ambient Top-Cast 150 These mix designs will typically contain approximately a 60/40 ratio of coarse aggregate to fine aggregate Concrete should be placed between 4 and 5 inches (102 mm to 127 mm) in slump. Concrete should be finished as little as possible to ensure that the aggregate stays tight and close to the surface of the concrete. Pushing the aggregate down can result in insufficient exposure of the coarse aggregate. Concrete surface shall be free of bleed water before placing Top Cast. Page 2 of 6

For this level of exposure, one would normally use Top-Cast 75, 100, 125, 150, 200 or 250, depending on aggregate size to be exposed. Top-Cast shall be applied as soon as finishing procedures are complete and concrete surface still contains high degree of moisture. Look for a surface that you can wipe your hand across to feel and see moisture. This is the key time of the process. Do not wait too long, early application is far better than too late. Apply Top-Cast at a coverage rate of 175 to 300 ft²/gal. ( 4.3 to 7.4 m²/l). Full coverage must be achieved. Apply Top-Cast with commercial grade Hudson or Chapin sprayers. Adjustable or fan tip nozzles can be used (.3 or.5 GPM). Depending on ambient temperatures and humidity, Top-Cast, will dry in about 1 2 hours; once dry, Top-Cast provides good protection against intermittent rain. Once Top-Cast is applied, it is not necessary to cover with plastic unless rainfall is expected before Top- Cast is completely dry or heavy downpours are in the forecast. You may also place tarps over the slab to maintain heat in cooler temperatures as well as protect from standing rainwater. We would advise if you are tarping with insulated tarps, to first cover with plastic to protect from drag marks. Top-Cast must not be removed before underlying concrete has sufficient set to withstand washing by method used for Top-Cast removal. Methods used for Top-Cast removal are typically stiff bristle brooms and water hoses, power washers, or commercial floor scrubbers in conjunction with water hoses. The concrete surface must be adequately hard to resist the cleaning process. Generally wash the slab 12 to 16 hours later, depending on temperature & humidity. The slab can be washed up to 16 hours later, however, this is totally dependent upon the concrete mixture and ambient temperatures as well as job site conditions and the washing procedures used. Try washing from about 6-10 inches (152-254 mm) away. Placing and finishing guidelines for exposing aggregates 1/4" to 3/8" (6mm to 10mm) Top-Cast 50 These mix designs will typically contain approximately a 50/50 ratio of coarse aggregate to fine aggregate. Concrete should be placed between 4 inches to 5 inches (102 mm to 127 mm) in slump. Finishing for this level of exposure should be very similar to broomed concrete. When surface is smooth, free of bird baths and firm enough to normally be broomed, apply the Top- Cast. Top-Cast must be applied prior to losing surface moisture; look for a surface that you can wipe your hand across to feel and see moisture. This is the Page 3 of 6

key time of the process. Do not wait too long, early application is far better than too late. Concrete surface must be free of trowel marks or they will show up after surface removal. Apply Top-Cast between 175 to 300 ft²/gal. ( 4.3 to 7.4 m²/l). Ensure that full coverage is achieved. For this level of exposure, one would typically be using Top-Cast 25, 50 or 75 depending on aggregate size and desired look. Apply Top-Cast with commercial grade Hudson or Chapin sprayers. Adjustable or fan tip nozzles can be used (.3 or.5 GPM). Depending on ambient temperatures and humidity, Top-Cast, will dry in about 1 2 hours; once dry, Top-Cast provides good protection against intermittent rain. Once Top-Cast is applied, it is not necessary to cover with plastic unless rainfall is expected before Top- Cast is completely dry or heavy downpours are in the forecast. You may also place tarps over the slab to maintain heat in cooler temperatures as well as protect from standing rainwater. We would advise if you are tarping with insulated tarps, to first cover with plastic to protect from drag marks. Top-Cast must not be removed before underlying concrete has sufficient set to withstand washing by method used for Top-Cast removal. Methods used for Top-Cast removal are typically stiff bristle brooms and water hoses, power washers, or commercial floor scrubbers in conjunction with water hoses. The concrete surface must be adequately hard to resist the cleaning process. Generally wash the slab 12 to 16 hours later, depending on temperature & humidity. The slab can be washed up to 16 hours later, this is totally dependent upon the mix design and ambient temperatures as well as job site conditions and the washing procedures used. Try washing from about 6-10 inches (152-254 mm) away. Placing and finishing guidelines for exposing aggregates smaller than 1/4" (6mm). These may be referred to as Micro-Exposed Top-Cast 05 Mix designs should be heavy on sand contents (60/40). Coarse aggregate should be 3/4" (19 mm) in size if possible. The larger the aggregate, the easier it is to work the stone down from the Avoid small coarse aggregate if possible. Concrete should be placed between 4.5 inches to 5.5 inches (114 mm to 140 mm) in slump. Screed FLAT, this is very important particularly for the Micro Finishes (03 15). Concrete should be rolled with roller tamper to ensure that coarse aggregate is pushed down from the Page 4 of 6

Rolling with tamper should be immediately followed with bull-floating. If possible, and for best results, concrete should be bull-floated in both directions. Remember, the objective when finishing this type of concrete is to get the stone down and away from the There shall be no trowel, edger or jointer ridge marks on the If ridge marks are visible on the surface prior to application of Top-Cast, then they will show on the final surface after Top-Cast removal. Concrete should be floated and then troweled to level and smooth surface, additional passes with a steel trowel tightens the The big point now is to make sure that no Bird Baths or dips in the final surface show up. Apply Top-Cast between 175 to 300 ft²/gal. ( 4.3 to 7.4 m²/l). Ensure that full coverage is achieved. Apply the Top-Cast as soon as the finisher comes off the slab with their skates or kneeboards. Moisture is needed in the top surface of the slab to react with the Top-Cast. Look for a surface that you can wipe your hand across to feel and see moisture. This is the key time of the process. Do not wait too long, early application is far better than too late. For this level of exposure, one would normally be using either Top-Cast 03, 05 or 15 depending on desired look. (See Top-Cast brochure for chart.) Top-Cast must not be removed before underlying concrete has sufficient set to withstand washing by method used for Top-Cast removal. Methods used for Top-Cast removal are typically stiff bristle brooms and water hoses, power washers, or commercial floor scrubbers in conjunction with water hoses. You can begin washing the retarded surface off in a little as 4 hours, depending on temperature & humidity. The concrete surface must be adequately hard to resist the cleaning process. Generally wash the slab 12 to 16 hours later. The slab can be washed up to 16 hours later, this is totally dependent upon the mix design and ambient temperatures as well as job site conditions and the washing procedures used. Try washing from about 6 to 10 inches (152-254 mm) away. Common mistakes or issues when using Top-Cast: Applying the product too late without sufficient surface moisture being present. Not achieving full coverage when applying. Not using the proper sprayers. Cheap is not better or sufficient! Using wrong mix designs for desired look. Not having enough finishers to complete necessary finishing work in time to apply Top-Cast at the right time. Removal issues are commonly caused by late application, not waiting too long to remove. Waiting too long to wash off in hot weather. Stones showing on the edges of micro-exposed surfaces. This is normally caused by floating out edger marks with float parallel to the form. After edging the first time, floats should be used to swipe paste back over the edge of the form. This is done by placing float onto concrete surface about 6" to Page 5 of 6

10" (152-254 mm) out from the form at a 45 degree angle to the form and swiping back to the edge. Float should be kept flat while doing this procedure. Only Non-Absorbent materials shall be used. Absorbent materials such as wood can leave dark spots in the concrete. If impressions are left in fresh concrete by knee boards, impressions should be properly repaired before applying Top-Cast. Exposed aggregate concrete looks best when enhanced with integral color, thus showcasing color and aggregate! Great looking exposed aggregate jobs are the result of the right mix design, the right placing and finishing techniques, a high quality surface retarder that will give you a consistent depth of etch, and the amount of detail in washing and cleaning the slab. Information in this document is intended as a guide. Actual mix designs, finishing and job conditions will impact final outcome. Page 6 of 6