Hot Air & IR BGA Rework Station. Model No.: IR PRO SCC V.4

Similar documents
touchbga.com TOUCHBGA BGA Rework Station IR-PRO-SC v6 User Manual

SHENZHEN ZHUOMAO TECHNOLOGY CO., LTD. 深 圳 市 卓 茂 科 技 有 限 公 司

How To Clean A Copper Board With A Socket On It (Ios)

RE-8500 BGA Rework Station

Instruction manual for Firstline FCS12000CH

WSD130 SOLDERING STATION

Rework stations: Meeting the challenges of lead-free solders

3 IN 1 BATHROOM HEATER

IMPORTANT SAFETY INSTRUCTIONS WARNING READ AND SAVE THESE OPERATING AND SAFETY INSTRUCTIONS BEFORE USING THIS HEATER.

SMD Rework Station TABLE OF CONTENTS

VTSDIR. Main station front panel. Main station rear panel. Figure Velleman nv

User Guide Reflow Toaster Oven Controller

TS1200 Intelligent Lead Free Soldering Station. Operation Manual

User s Manual Before using the inverter, you need to read and save the safety instructions.

TIG INVERTER INSTRUCTION MANUAL

AOYUE. INT 738H (Centigrade / Fahrenheit switchable) Multi-Function Re-Working System INSTRUCTION MANUAL. Replacement Air Nozzles

INFRARED QUARTZ WALL HEATER

NÜVE SANAYİ MALZEMELERİ İMALAT VE TİCARET A.Ş. OT 020 BENCH TOP STEAM STERILIZER USER S MANUAL

NewAir AC-10000E, AC-10000H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

PD 100A. Printing data system

Portable Air Conditioner

13. Troubleshooting. Indoor unit s LED indication of Corona DC inverter unit. Indoor unit s LED indication of Alfa DC inverter unit

AN500T, AN1000, AN1000T, AN1500, AN1500T AN2000, AN2000T

Operator s Manual Revision III 03/31/99

Convection TCO650. For your safety and continued enjoyment of this product, always read the instruction book carefully before using.

Split Air Conditioner

AE Series Convection Reflow Ovens

Digital Photo Picture Frame. Operation Manual

NewAir AC-10100E / AC-10100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

CONTENTS 1. IMPORTANT NOTICE 2 2. TECHNICAL SPECIFICATION 3 3. OPERATION DETAILS 4 4. WIRING DIAGRAM EXPLOSION VIEW 12 6.

ENGLISH INSTRUCTION & INSTALLATION MANUAL DUCTLESS MINI SPLIT AIR CONDITIONING SYSTEMS

Temperature Controller CD401/CD901/CD701/CD501/CD100/CD101 Instruction Manual

B/S/H/ Error codes and service programmes PH

Heat Surge Model X5C Fire Place Insert Service Manual Applies to all units w/ circuit board

SERVICE MANUAL. Room Air Conditioner Multi Split Wall-Mounted Type Indoor. FSAI-Pro-91AE2 FSAI-Pro-121AE2 FSAIF-Pro-181AE2

Dual Laser InfraRed (IR) Thermometer

PLEASE READ ALL INSTRUCTIONS BEFORE USE AND SAVE A COPY FOR FUTURE REFERENCE!

Failure code manual. content

Stereoscopic 3D Digital Theater System. Operator Manual (MI-2100)

User Manual. Air-conditioner Controller SB-DN-HVAC (MAC01.331)

SERVICE MANUAL. Room Air Conditioner Multi Split type Outdoor unit /R410A DC Inverter/

CONTENTS 1. IMPORTANT NOTICE 2 2. TECHNICAL SPECIFICATION 3 3. OPERATION DETAILS 4 4. ELECTRICAL SCHEMATIC DIAGRAM EXPLOSION VIEW 16 6

floater imports DF169 ECO AIR COOLER EVAPORATIVE AIR COOLER WITH IONIZER USER S MANUAL

LS1024B / LS2024B/ LS3024B. Solar Charge Controller USER MANUAL

Convection Ovens. BX Classic. Models BX4 / FG 189C, BX / FG 158C, BX10 / FG 180C. Operator's Manual

MS9000SAN Rework Station

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

LG Wireless Remote Controller

BlueSolar Pro Remote Panel For BlueSolar PWM-Pro charge controllers 12/24V 5, 10, 20, 30A Article number SCC

OPERATION MANUAL. Total Heat Exchanger HRV (Heat Reclaim Ventilation) (Ceiling mounted duct type)

SERVICE INSTRUCTION R410A. WALL MOUNTEDtype INVERTER SPLIT TYPE ROOM AIR CONDITIONER. Models Indoor unit Outdoor unit

Please read operating instructions carefully before use and keep for further reference.

BATHROOM HEATER. User's Manual. Page 2...A515 Page 9...A716

User's Guide Integrating Sound Level Datalogger Model

Service Guide 12/27/03 TESTING, SERVICE & REPAIR GUIDE (For SH Space Heating Models & RA Water Heating Models)

Model: AC-S13CG x 2. Model No: AC-S13CGx2.doc Version 1.0

Int863 INSTRUCTION MANUAL. IR Preheating System BASIC TROUBLESHOOTING GUIDE

Si10-417_C. Pocket Manual. Service Diagnosis SPLIT & MULTI

Six-servo Robot Arm. DAGU Hi-Tech Electronic Co., LTD Six-servo Robot Arm

STERILIZERS, LABORATORY DRYING OVENS

RCS-TM80BG. Contents 4. Weekly Program Function... EG-6 5. Outing Function... EG Sleeping Function... EG-14 XXX XXXX XXXX XXXX XXXX

Convection TCO600. For your safety and continued enjoyment of this product, always read the instruction book carefully before using.

GoFit Platinum Power Vibe

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2014/07) en

HCS-3300/3302/3304 USB Remote Programmable Laboratory Grade Switching Mode Power Supply

User's Guide. Integrating Sound Level Datalogger. Model Introduction

PRODUCTIVITY THROUGH INNOVATION 600 CONTROL DIRECT DRIVE TECHNICAL/OPERATION MANUAL

Wide Range InfraRed (IR) Thermometer with Type K input and Laser Pointer

Operating Instructions Split System Air Conditioner

INSTRUCTION FOR THE USER

QUICK REFERENCE. Wired remote controller BRC2E52C7 BRC3E52C7

PASSIVE INFRARED INTRUSION DETECTOR PASSIVE INFRAROOD DETECTOR DETECTEUR D INTRUSION PASSIF INFRAROUGE

Microwave Oven. Warning: a) This oven is not for commercial use. b) Don't open the cover of the machine except professional person.

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump

GSM Alarm System User Manual

Use and Care Manual. Model CPA12KH AIR CONDITIONER

AM / FM Tuner + RDS. Model: TU

Senses SV series industrial monitor user manual

User Manual. September 18, Copyright Thomson. All rights reserved.

Drayton Digistat +2RF/+3RF

What's causing all these issues?

Thank You... On behalf of the entire team at Thane Housewares, we appreciate your recent purchase

Application Note. Soldering Methods and Procedures for 1st and 2nd Generation Power Modules. Overview. Analysis of a Good Solder Joint

RoHS-Compliant Through-Hole VI Chip Soldering Recommendations

Key. ➍ Micro USB Port ➎ Operating System Toggle Keys ➏ Foam Screen Protectors. ➊ On/Off switch ➋ Bluetooth Connect Button (flashes when searching)

R22. K Control. Indoor Unit. Nomenclature. Compatibility PL H 3 G K H B. Unit style Heat Pump Horse Power

E E V R E - R S - O S L O A L R

SPLIT WALL MOUNTED TYPE AIR CONDITIONERS OWNER'S MANUAL

High Temperature InfraRed Thermometer with Laser Pointer

Operating Instructions Air Conditioner

Bench Autoclave. Standard Operating Procedure. For Installation, Use and Maintenance

PORTABLE AIR CONDITIONER

WALL MOUNTED SPLIT TYPE AIR CONDITIONER

USER S MANUAL FH052EAV1 FH070EAV1. System Air Conditioner (Cooling and Heating) ENGLISH ESPAÑOL FRANÇAIS ITALIANO PORTUGUÊS DEUTSCH E HNIKA

Service manual. Website: CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.

User Manual. Video Doorphone CDV-1020AQ

2-SLICE COOL TOUCH TOASTER

High Efficiency Vaporizing System and Highly Durable Heaters Ensure 25% Increased Output.

IH E Sigma Island 90

DUCT TYPE AIR CONDITIONER

Transcription:

Hot Air & IR BGA Rework Station Model No.: IR PRO SCC V.4

Directory 1. The instructions on installation site and operating precautions 2. Introduction of Rework Station IR PRO SCC V.4 3. The operation instructions 4. PC410 Programmable temperature control instruction 5. 100 Temp control meter Introduction 6. Temperature profile setting introduction

1. The instructions on installation site and operating precautions Installation sites In order to ensure safety and avoid possible damages to rework stations, it should be installed in the following conditions of the environment places Away from inflammables. Free from splashing of water or other liquids. Free from the direct airflow impact from air conditioner, heater or ventilator. With good ventilation, dry and free from excessive dust. Stable and flat location that is free from vibration and shock. Power Supply Supply voltage requirements are as follows: The use of smaller power supply voltage fluctuation Voltage fluctuation: 220~240V±10 Frequency fluctuations: 50/60Hz±0.3 Space requirements To ensure easy operation and maintenance of rework station, parts replacement and repair, please according to space requirements under the proposed About 1.0 meters L * 1.3 meters W Attention: To facilitate operation and maintenance when we have to move the machine forward/backward and turn it, it is required to reserve a room that is >300mm far from the back.

Follow the following precautions, when operating the machine. Please place the rework station in a smooth-air work environment without wind and with less dust; Do not use any object to knock or your hands to sway heating plates; Avoid electric fans or other equipments blowing towards the rework station while it is working, or else, it may cause the heater s abnormal temperature rise, and the work piece will get burnt. Do not place any heavy object on machine control box; The high temperature heating zone should not directly touch any object, or else, it may lead to fires or explosions; the PCB board to be repaired should be placed on PCB board support rack; Don t shake the machine; and put it lightly down when moving it; Don't use your hands to touch the high-temperature heating zone, or else, you will burn your hands While machine working, combustible spray, liquid or gas should`nt be available around the machine; Do not try to change the rework station, otherwise, it will cause fire or electric shock; Do not remove the electric cabinet panel or cover, there is high-voltage components inside, which may lead to electric shocks; In case the metal or liquid falls into the station while it s working, shut off power and pull out the plug. Clean away all the dirt after the machine cools down. It will give out bad smell if there is still dirt when it restarts. When there is abnormal temperature rise or smoke coming out, cut off the power immediately and inform technical staff to repair. If you continuing using machine, it may cause fires or electrical shocks; Power supply should be cut off and stop using machine; Please notice that there should`nt be any power wire or communication cables beneath the rework station or it runs over them, or else, it may lead to machine fault or cause fire or electric shock Attention: The rework station under the normal usage will produce a little peculiar smell, in order to ensure a comfortable, healthy and safe operating environment, please keep indoor and outdoor air circulation

2. Introduction of Rework Station IR PRO SCC V.4 BGA Rework Station IR PRO SCC V.4 designed by Bauer BGA has 3 heaters (Upper hot air Heater, Upper IR heater and Bottom IR Heater) and 2 main heating areas (Upper heating area and Bottom IR heating area). The upper heater heats directly towards BGA part and at the same time, the bottom IR pre-heater auxiliary heats towards BGA part, to ensure BGA gets enough heat to reach the melting point to come to good welding quality. Moreover, the bottom IR heating zone is for preheating the whole PCB board to ensure even heating and prevent the PCB from getting deformed. IR PRO SCC V.4 Overall Diagram: 6 4 5 7 3 9 10 1 2 8

14 11 12 13 15 16 17 18 19 20 21 22

Parts name: 1. Inner thermocouple port for IR and Hot air 2. Cross flow cooling fan 3. Bottom preheating area 4. Laser pointer 5. Upper hot air heating head 6. Knob for adjusting the upper head up/down 7. Knob for adjusting the upper head forward/backward 8. IR upper heating head 9. Power switch 10. Communication port (RS232) 11. Vacuum suction pen 12. Outer thermocouple port 13. Laser light on/off switch 14. PCB supporting mechanism 15. Upper heater: Upper head programmable temperature control meter 16. Bottom heater: Bottom IR heater temperature control meter 17. Thermocouple: Real-time temperature measurement meter 18. LED lamp on/off switch 19. Cooling fan for IR heater head 20. Cross flow fan for cooling down PCB 21. Start button 22. Stop button

3. The operation instructions 1 Usage and heating system: IR PRO SCC V.4 is mainly used for Hot-air & IR BGA / IC desoldeirng and soldering. BGA rework station adopts programmable multi-stage temperature controller to control the main heating head; the heating temperature and time can be set specifically; hot air heating uses high-quality heater from Bauer the bottom is a large-area far infrared heating panels to ensure evenly heating towards PCB and prevent it from deformation to ensure a good welding effect. This machine is equipped with different sizes of hot air nozzles (nozzle sizes are customized) 2 Temperature setting: BGA desoldering: Preheating / Preheating / Preheating / Melting temperature / Vacuum suction pen picks up BGA BGA soldering: Preheating / Preheating / Preheating / Soldering / Cooling / Soldering finish 3 Desoldering:put PCB onto the PCB support racks (as shown as in Fig. 1), and then press the start switch (when using IR head to desolder, press start switch and open the IR cooling fan at the same time); when the temperature profile running finishes, use vacuum pen to absorb the BGA away from the PCB board; next, turn on the machine cross flow cooling fan to cool down the PCB. After that, take away PCB from the clamping device and close the cooling fan. Fig. 1: IR upper head Clamping device The left wire sensor The right wire sensor

Hot air upper head The right wire sensor Desoldering difference for IR upper head and Hot air upper head: IR upper head: when desoldering, the left wire sensor head and the right wire sensor are best placed at either side of the bga chip to monitor temperatures are even. (Notice: when using the IR upper head to desolder, the left wire sensor has to be plugged inside the left thermocouple port, or else, the machine system will constantly beep.) Hot air upper head: the same procedure as above applies to placement of thermocouples around the BGA to detect the real-time temperature, which displays on the thermocouple meter. (The left wire sensor can be plugged into the left thermocouple port or not) 5 Soldering:Check the PCB soldering pad and BGA tin bead one by one before mounting BGA. After checking all is ok, place BGA in the silkscreen frame, and then put PCB on the support racks; move down the upper head to make its nozzle centre cover the BGA (keep the distance between nozzle and BGA1~2mm); press the start switch and run the soldering process; when the process finishes, lift the upper head and keep the distance between nozzle bottom and BGA surface 8~10mm for cooling about 10~20s; finally, move away the upper head and take the PCB steadily from PCB support racks. After soldering, check the appearance carefully. If any abnormal symptom occurs, stop soldering and check the temperature immediately. The soldering can be continuously performed only after the proper adjustment. Otherwise, it may damage the BGA or PCB plate.

6 Features: Security: when using hot air upper head, hot air only heats towards and won t do harm to components around. When using IR upper head, please cover the components around with silver paper within the range of infrared radiation Shortcut: heating time and temperature are digitally displayed; the setting is convenient, intuitive and accurate to optimize the repair time to the shortest possible time. Convenience: it can quickly replace a different hot air nozzle, PCB on the positioning racks can be adjusted in X and Y direction, and the upper head can work at any angle and height. 7 Main parameters: PCB size: MAX 380mmW*420mmL PCB thickness: Unlimited Min BGA size: 1mm 1 mm Max BGA size: 60mm 60 mm Upper power: hot air, 800 W; IR, 500W; Bottom power: 2000 W;

4. PC410 Programmable temperature control instruction 1. Panel introduction S.N 1 Item Function (Parameter/Setting key) Parameter setting key (Auto/Manual key) Auto/Manual switch key (Up key) Increase parameter value 2 (Down key) Reduce parameter value (Pattern key) Selects the program pattern number (Run/Program key) Starts the program, changes the mode from fixed value control to program control (Set/Program key) Program parameter setup (Display Selection key) Changes the indication on SV/MV/TIME display 3 OUT1 OUT2 (Output1 indicator) The LED indicator is lit When ouput1 is ON (Output2 indicator) Bauer BGA Reworking Made Simple

The LED indicator is lit When ouput2 is ON 4 STEP 5 PRO 6 PTN 7 RUN 8 PV Display SV/MV/TIME 9 Display TIME MV 10 SV (Step number display) Indicate the step number of the currently-running profile program (Program monitor indicator) During program control, / is lit when the PV is rising During program control, - is lit when the PV is constant During program control, \ is lit when the PV is falling (Profile group No. display) Indicate the profile program group number (Program control running indicator) The LED indicator is lit during profile program control (PV display) Indicate the practically-measured temperature value (PV display) It indicates the Setting value(sv), Manipulating value(mv), or Time(TIME) (The display can be changed by the DISP SELECT key) (TIME indicator) It is lit when the time(time) is being displayed on the lower display (MV indicator) It is lit when the time(time) is being displayed on the lower display (SV indicator) It is lit when the Setting Value(SV) is being displayed on the lower display 11 COM MAN AL1 (Communication indicator) It flashes when the meter controller is in active communication with a host computer. (Manual control indicator) It is lit in manual control (Alarm1 output indicator) It is lit when the Alarm 1 output is ON Bauer BGA Reworking Made Simple

Program Parameters Setting Ramp Rate1: A ramp consists of a slope (linear gradient) and a target set point. The control set point increases or decreases at a linear ramp rate from the actual measured value until a specified target set point is reached. The relative positions of the actual measured value and the target set point determine whether the slope of the ramp is positive or negative. Parameters R1, R2, R3... express the ramping rate in unites per minute (0.01~99.99), parameters L1, L2, L3... the appropriate target set point in display units. If R1 = END, the program will be ended when the program runs to the slope. Target Set point 1: The target value to which the set point ramps when the programmer has been placed into RVN. Dwell period 1: In a Dwell period, the target set point, which has been attained, remains unchanged for a fixed period. All the dwell periods are defined by their duration in minutes with parameters D1, D2, D3... (0~9999) When the program is running, these parameter display the time remaining in the active dwell period. If the parameter equals zero, the dwell period is skipped. When the controller runs in the PV displaying status: 1). Select the target program pattern number with the PTN/ key.2). Press SET/PROG key, the first program parameter appears in the upper display. The value associated with this parameter will be shown in the lower display.3). Use and key to modify the value.4). Press the PAR/SET key, the next parameter appears. At the same time, the modification has been saved in the memory. Use and key to modify the value. Repeat this procedure till all the parameters are set. Or if there is no key operation within 16seconds, the menu times stop automatically Program Parameter List S/N Mnemonic Parameter Adjustable range 1 R1 Ramp rate 1 1 2 I1 Target set point 1 0~230 end 3 D1 Dwell time 1 0~9999 sec 4 R2 Ramp rate 2 1 5 I2 Target set point 2 0~230 end 6 D2 Dwell time 2 0~9999 sec...... Bauer BGA Reworking Made Simple

HB 230 PC410T can set 8 segment temperature rise+ 8 steps constant temperature parameters and save 10 groups of profile at most. User can choose profile group No. and set parameters according to their needs. Each segment profile consists of 3 control parameters(r, L, D). R stands for temperature rise/drop gradient, L for target temperature, D for constant temperature time. Take the Group No. 9 as example and set with the below temperature parameters: r1=50 L1=55 d1=45 r2=50 r3=50 r4=50 L2=205 L3=180 L4=255 d2=80 d3=45 d4=85 The profile parameters above mean: 4 segment profiles parameters are set. The first segment heats up from the start temperature (PV displayed temp. when start) to the target Bauer BGA Reworking Made Simple

temperature 55 at speed of 50 /s. It maintains 55 for 45s and then enters the second segment which is for heating up from 55 to target temp 205 at speed of 50 /s. Then it maintains 205 for 80s and then enters the 3 rd segment which is for cooling down from 205 to 180 at speed of 50 /s. Then it maintains 180 for 45s. Later, it enters the 4 th segment which is for heating up from 180 to 255 and then remains 255 for 85s. The profile running ends. The calculation formula of profile running time: Total running time= (L1-starting temp.)/r1+d1+(l2-l1)/r2+d2+(l3-l2)/r3+d3+(l4-l3) /r4+d4+(l5-l4)/r5+d5+(l6-l5)/r6+d6+(l7-l6)/r7+d7+(l8-l7)/r8+d8(s) So the profile running time is (suppose the start temp. is 25 ):(55-25)/50+45+(205-55) /50+80+(205-180)/50+45+(255-180)/50+85=260.4(S) Bauer BGA Reworking Made Simple

The below is the introduction of how to set the profile parameters within the said group of profiles for example. 1. Turn on the power, Meters power up. PV displays the meter model No and SV displays the software version No of the meter. As shown as below image: Model No. Software version 3S later Current group No Press PTN key to set group No 2. Set profile group No.: Press PTN key, the group No. will be displayed on the left low corner of the meter panel. For example, if you want to choose No. 9 profile, press PTN until it displays No. 9; after it, start to set temperature profile parameters. Bauer BGA Reworking Made Simple

press SET/PROG to start adjusting value by up/down keys 3. Set the parameters Press SET/PROG to start setting, and then adjust the value by the up/down key to make the SV window display 50.00. The below image is for setting of r1=50. Down key/reduce value Up key/increase value Enter parameter setting Parameters switch Press PAR/SET key to set the next parameter L1. Press Down/Up key to adjust value to make the SV window display 55.00. The below image is for setting of L1=55. Bauer BGA Reworking Made Simple

Press PAR/SET key to set the next parameter D1. Press Down/Up key to make the SV window reads 45. The below image is for setting of D1=45. Press PAR/SET button to enter the second segment setting. r2=50;l2=205;d2=80,with the same way of setting the first segment parameters, to input the parameters of the second segment. As shown as below image: 3.3 With the same way of setting the first segment parameters, set the parameters of the third segment. R3=50;L3=180;d3=45. As shown as below image: Bauer BGA Reworking Made Simple

3.4 with the same way of setting the first segment parameters, set the parameters of forth segment. R4=50;L4=255;d4=85, As shown as below image: 3.5 This group of parameters has only 4 segments, so the r5 of the fifth segment should be set as End. Press down key to adjust the parameters until the SV value reads End. As shown as below image: Down key SV value reads END 3.6. When the R value is End, press PAR/SET to enter the below image, and set HB as 400 which means the max. value of the target temp. L value in every segment will be controlled within 400. Bauer BGA Reworking Made Simple

To press PAR/SET to finish the setting of the current profile. As shown as below image: Bauer BGA Reworking Made Simple

The above steps are the process of setting profiles parameters. Please note that profiles can be set only when the PC410T doesn t run. The parameters can only be read when it is running. To check the parameters, press SET/PROG and then press PAR/SET to switch the parameters. Remark: Setting R as STEP means: ignore the current profile parameters and run the next step parameters. As below image that ignores the step 5 and run the step 6 directly. It is for special purpose only. Bauer BGA Reworking Made Simple

Computer control interface : select your language at set up

5. 100 Temp control meter Introduction 1 Introduction:XMT-100 is used for control bottom IR heating. Output indicator Ou Set parameter Measured value Set value Turn up Key for Cyclically adjusting the digit Turn Down 2,Parameters setting: 2.1 Turn on power and meters power up; PV without display, SV displays 0, as shown in below picture: 2.2 Press SET button,sv window start blink; the digit without blink can be set with parameter(start to set from single digit), and press up/down button to input value. For example:we want to set 160 Fig. 1: press SET, SV display digital tube starts blink; single digit default is 0; if 0 is the value we want to set, then no need to set again

Fig. 2: press cyclically adjust the digit key to move to ten digit(sv digital tube s ten digit doesn t blink), and then press up key to make it 6 Fig. 3: press cyclically adjust the digit key to move to hundred digit (SV digital tube s hundred digit doesn t blink), and then press up key to make it 1 Fig. 4: after finishing setting digits, user has to press SET again P1: P2: Press SET to start Move to ten digit Press up key to input 6 P3: P4: Move to hundred digit Press up key to input 1 Press SET again

6. Temperature profile setting introduction To set BGA temperature profile, insert the wire sensor into BGA to check if the profiles meet the requirements. Our company provide with lead-free and leaded profile for reference. Please according to the type of BGA and thickness of PCB board, we provide following data for reference use only : Upper Lower Lead free profile 1 2 3 4 5 6 7 8 R 5 5 5 5 5 E 0 0 T 5 20 18 24 23 0 0 0 T 4 8 4 7 1 0 0 0 R 5 5 5 5 5 0 0 0 T 5 20 18 26 28 0 0 0 T 4 8 4 1 7 0 0 0 Control the bottom IR temp. within 180 Upper Lower Leaded profile 1 2 3 4 5 6 0 0 R 5 5 5 5 5 E 0 0 T 5 19 16 23 18 0 0 0 T 4 6 4 6 1 0 0 0 R 5 5 5 5 5 0 0 0 T 5 19 16 24 26 0 0 0 T 4 6 4 1 6 0 0 0 Control the bottom IR temp. within 180 3, the temperature profile is include 8 stages, from stage 1-8, normally 5 stages is enough. Stage 1: Pre-heating, setting temperature below 100 Stage 2: Heat up, normally lead free within 205,leaded within 195 ; Stage 3: constant temperature, in order to keep flux function and wipe off the impurity on PCB board, the temperature is lower than stage 2 around 20-30 ; Stage 4: melt BGA ball in this stage, it is request the higher temperature and longer time Stage 5: reflow, it is lower temperature than stage 4, time is around 5-10 S 4 Once setting all parameters, we can put a PCB board and insert the thermocouple

inside of BGA and testing BGA ball temp., start heating, after finish the profile, please check if the work time is reasonable (Remark: the pre-heating lower temp., pre-heating high temp., reflow lower temp., reflow high temperature will be recorded as T1,T2,T3,T4 in timer, meanwhile keep the highest temp., Pre-heating time=t2-t1, reflow time=t4-t3) Lead free solder ball: (pre-heating)150-190 60-90 S (reflow) 217-217 40-90 S (max temp.)240 ±5 Leaded solder ball: (pre-heating)150-183 (reflow)183-183 (max temp.) 210 ±5 60-120 S 60-90 S 5 Estimate this profile if match lead free or leaded solder ball temperature request according to the pre-heating reflow time and max temperature, then confirm if this profile is suitable for this kind of PCB board or not. 6, If the actual max temperature is too high or too low, then make the standard max temp.(245) substract the actual max temp., we take the lead free as sample for explanation: Sample 1: the actual max temperature is 220, 245-220=25, adjust profile like: Temp.: upper L4 rise from 245 to 270, lower L5 rise from 285 to 310 Time: upper d4 rise from 75 to 90, lower d5 rise from 75 to 90 Sample 2: the actual max temperature is 260, 245-220=-15, adjust profile like: Temp.: upper L4 drop from 245 to 230, lower L5 drop from 285 to 270 Time: upper d4 drop from 75 to 70, lower d5 drop from 75 to 70 7 If the pre-heating temperature time is too short, we can adjust as following 2 ways:

7.1 If the actual temp. is not reach 150 after the stage 2(heat up stage)be finished, so adjust the target temperature of upper and lower profile accordingly or extend constant temperature time, normally we should make sure the actual temperature can reach 150 after stage 2. 7.2 after stage 2 be finished, if the actual temp. reach 150,so extend the constant temperature stage time( stage 3),the extend time depend on the pre-heating time situation. 8 if the reflow temperature time too short, how to solve this problem? You can increase reflow stage constant temperature time, the extend time depend on the reflow temperature time situation. 9 Testing again, if you still have problems, adjust the parameters as shown above solution. - 1 -