CN Audit Report as per. TRCert - ISO 9001:2008

Similar documents
QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 AUDIT CHECKLIST

Row Manufacturing Inc. Quality Manual ISO 9001:2008

QUALITY MANAGEMENT SYSTEM Corporate

Client information note Assessment process Management systems service outline

ISO 9001:2008 Audit Checklist

Quality & Safety Manual

CENTRIS CONSULTING. Quality Control Manual

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

ISO-9001:2000 Quality Management Systems

Camar Aircraft Products Co. QUALITY MANUAL Revision D

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A.

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see

DNV GL Assessment Checklist ISO 9001:2015

ISO 9001 Quality Systems Manual

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Revision Date Author Description of change Jun13 Mark Benton Removed Admin. Manager from approval

ISO 9001:2008 Quality Management System Requirements (Third Revision)

Vigilant Security Services UK Ltd Quality Manual

ED FAGAN INC. QUALITY SYSTEM MANUAL

QW Enterprises, LLP. Quality Manual

Micro Plastics, Inc. Quality Manual

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

G & R Labs. Quality Assurance Manual. G&R Labs Scott Boulevard Santa Clara CA Light Meters and Calibration

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA FAX

Quality Management System Manual ISO9001:2008

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

PUBLICATIONS. Introduction

Contents. Management Policy Manual SEM USA Page 2 of 12

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

Competency Unit: Exemplar Global AU Management Systems Auditing

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

ISO 9001:2015 Internal Audit Checklist

Contents of the ISO 9001:2008 Quality System Checklist

ISO 9001:2008 Requirements Explained - An Adobe PDF File for Use on a Network System

Chapter 1. The ISO 9001:2000 Standard and Certification Process

Quality Manual SE Morning Way Suite 102 Clackamas OR 97015

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Quality Manual. Dynamic Manufacturing 156 Armstrong Drive Freeport, PA Revision 6 Revision Date: 7/8/

Certification Procedure of RSPO Supply Chain Audit

Contents of the ISO 9001:2000 Quality System Checklist

CORPORATE QUALITY MANUAL

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

23. The quality management system

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS and MS OHSAS and MS ISO 50001

QUALITY MANUAL ISO 9001:2015

Quality Management System General

QUALITY MANAGEMENT SYSTEM

ISO 9001:2015 Overview of the Revised International Standard

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

Quality Management System Manual

Quality Management System Manual

CUSTOMER SPECIFIC REQUIREMENTS

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

The President of Inductors Inc. is the senior executive responsible for operations.

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

ISO 9001:2008 QUALITY MANUAL. Revision B

Audit Report AS/NZS ISO 9001:2008. RRW and Co Pty Ltd trading as National On Site Training

Quality Management System Policy Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

The Prophotonix (UK) Ltd Quality manual

QUALITY MANUAL ISO Quality Management System

Compliance Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

FMC Technologies Measurement Solutions Inc.

This Business Management System Manual is based on ISO 9001:2008 requirements

Preparation for ISO OH&S Management Systems

UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme

ISO 9001 : 2000 Quality Management Systems Requirements

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

UNCONTROLLED COPY FOR REFERENCE ONLY

Presentation by BSI on the main changes to the IATF ISO/TS certification scheme

Turbo Resources International Quality Procedure

INSTITUTE FOR TESTING AND CERTIFICATION, Inc.

Quality Management System Manual

Certification Process Requirements

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

ISO 13485:201x What is in the new standard?

ONTIC UK SUPPLIER QUALITY SURVEY

ISO 9001:2008 Internal Audit & Gap Analysis Checklist

Disclosure to Promote the Right To Information

Translation Service Provider according to ISO 17100

Quality Management Standard BS EN ISO 9001:

General Rules for the Certification of Management Systems Code: RG

ISO 9001:2008 Quality Systems Manual

Quality Manual ISO9001:2008

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 5

ISO/IEC QUALITY MANUAL

QUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 EFFECTIVE DATE: 11 SEPTEMBER 2015 REV O

Transcription:

C 01 100 045721 Report as per TRCert - ISO 9001:2008 for Projects Concern Manufacturing (Pty) o.2 13 Friesland Drive Longmeadow South Longmeadow Business Park Edenvale 1609 South Africa

Report Client Standard(s) Certification umber(s) Type Contents 1 result... 3 2 Scope... 4 2.1 Description of the organization... 4 2.2 Scope of certification... 4 3 Changes in the management system / Contract review... 5 4 findings... 5 5 Dates... 6 Rev. 20151207 Page 2/8

Report Client Standard(s) Certification umber(s) Type Leader : Leonard Steinhobel Team : Andrew Broughton Management System Representative : Deon Miller Date : 21& 22 nd July 2016 1 result Management system effectiveness was verified on site by means of random sampling by an appropriately selected auditors. This applies in particular to the compliance of workflows with standard requirements and the descriptions in management system documentation. The special features of the organization s business activities, the applicable statutory and regulatory requirements and the requirements set forth in other generally applicable documents were also taken into account. This was done by means of a sampling approach, by conducting interviews and reviewing the appropriate documentation. findings and recommendations regarding opportunities for improvement have been set forth in Sections 4 of this report. The last audit revealed nonconformities which have been demonstrably corrected. The corrections and corrective actions taken in this respect have been verified. A stage 1 audit was performed and the organization found ready for certification. Identified weaknesses, if any, have been eliminated and the respective corrective action verified. Y The current audit revealed the following nonconformities: Standard(s): o. of nonconformity ISO 9001 1 Y The major nonconformities (o. x) with individual standard elements require a re-audit to verify the effectiveness of the corrections and corrective actions (probable date:.ddmmyyyy) The organization has established and maintains an effective system to ensure compliance with its policy and objectives. The audit team confirms in line with the audit targets that the organization s management system complies with, adequately maintains and implements the requirements of the standard(s). The auditor therefore recommends (provided the effectiveness of corrections and/or corrective actions addressing the identified nonconformities has been verified): Y Y Award of the new certificates. Maintenance of the existing certification. Inclusion of the changes (see Section 3) in the scope of application of existing certifications Maintenance or issue of the certificates only after successful completion of a re-audit. Rev. 20151207 Page 3/8

Report Client Standard(s) Certification umber(s) Type 2 Scope 2.1 Description of the organization The company is a proprietary limited company with no group affiliations, and is located in a modern business park It is engaged in the assembly of electronic products to customer specifications, and supplies all industries using electronic equipment. It has 71 employees, and relatively flat in structure. 2.2 Scope of certification Scope of certification: (per standard): Complete electronic manufacturing solution for the electronic Industries, for the domestic and global markets ISO 9001 standard requirements to be excluded from the scope: 7.3 Design & Development The company does not perform design & development as Reasons for exclusions: required by the standard The following sites and their scopes are included in the scope of certification: Site o. (C ext.) Sites included in cert. ame/address of site 01 Central office: Projects Concern Manufacturing (Pty) o. 2 Friesland Drive Longmeadow Business Estate 1609 Edenvale South Africa o. of emp. Scope and processes 71 Complete electronic manufacturing solution for the electronic Industries, for the domestic and global markets Standard (s) ISO 9001:2008 ed X Rev. 20151207 Page 4/8

Report Client Standard(s) Certification umber(s) Type 3 Changes in the management system / Contract review o major changes have been made to the management system and the management system documentation since the last audit. The order details which form the basis of the audit (including number of employees, scope and sites) reflect the actual situation in the organization. 4 findings The audit findings related to the audited standards are listed in the Annexes to this report (see. Annex ISO XXXX). All information gained during the audit will be treated with strict confidentiality by the auditor and the certification body. In view of the sampling approach applied to the audit, weaknesses and nonconformities may still exist which have not been identified during the audit. o. Unit/Department Positive findings Site 1 Analysis of data Meaningful information is available by way of the analysis of data regarding non-conformity causes and trends. 2 Personnel All personnel interviewed at time of audit displayed knowledge of processes and systems 3 Management Commitment from Top Management and management was of a very good standing 4 Processes All processes carried out were carried out with diligence 5 System Based on the findings and opportunities detailed in this report management has already stated correcting issues. The following recommendations and opportunities for improvement provided by the auditors are intended to contribute to the continuous improvement of the management system. o. Unit/Department Site 1 Organisational structure Recommendations and opportunities for improvement 5.5.1 The position of Management Representative could be indicated on the Organogram 2 Outsourced process 4.1 Calibration could be included in the QMS as an outsourced process and controlled as such. 3 Control of documents 4.2.3 Procedure states that changes are indicated in Italics. An isolated incident noted. Given other controls in place the need for this could be reviewed. 4 Certification oted that the website makes reference to ISO 9002. This is in the process of being resolved. Review at Surveillance 1 5 Preventive Action 8.5.3 Procedure PC-QP-8.5 could expand on how preventive action is addressed within the business. 7 Evaluation of competence 6.2.2 Floor Training and Competence record could be signed off by the assessor. 8 Statutory training 6.4 oted that Fire Fighter training has expired. Further are no certified health and safety representatives trained and appointed. Rev. 20151207 Page 5/8

Report Client Standard(s) Certification umber(s) Type 9 Processes 7.5 oted that some processes have some variables and the instruction also allows for some further variables 10 Testing 7.5 Instructions could aid in the testing of products such as amount of times to maintain consistency 11 Soldering Process 7.5 Wave solder could include times and some inspection steps for consistency. 5 Dates Due Date for the next audit 18-08-2017 Agreed date for the next audit July 2017 Date Leader / or(s) Rev. 20151207 Page 6/8

Report Client Standard(s) Certification umber(s) Type Annex ISO 9001:2008 (please delete if not an ISO 9001:2008 audit) Item Policy / objectives result Top Management has declared its quality policy binding and implemented. The quality policy is appropriate and provides a framework for the respective quality objectives. It commits all employees to pursue continuous quality system improvement. Key quality objectives include: Deliver Quality Products Monitoring CR, Complaints& Customer Service Detailed analysis of CR/ Close out and Costs Meet and exceed customer exportations Customer Surveys rating 1 to 5 Lowest rating 3 Contract knitting 29-06-2016 o rating lower than 4 Process control including outsourced processes Customer-related and other requirements The processes available in the organization have been identified and documented. Process workflows and interactions have been described and appropriately controlled. The processes are evaluated at regular intervals by means of key performance indicators. Key processes within the scope of product realization include: Kitting SMT Solder Paste SMT Placements SMT Reflow SMT PCB Final inspection Conventional Assembly Wave Solder Solder Assembly PCB Final Inspection PCB Cleaning PCB Mechanical Assembly Testing Packaging DispatchThe following processes have been outsourced: IT Calibration These processes are appropriately reviewed and controlled. The organization analyses and evaluates customer requirements and/or enquiries and any documented, assumed, statutory and regulatory requirements within the scope of a production and feasibility study performed in a team. Offers are prepared and approved by xxx. The person who prepared the offer reviews the contract to ensure its compliance with the offer and documents this compliance in an order confirmation. The same procedure applies to amendments. The following process requirements significantly affect product or service quality: Kitting SMT Solder Paste SMT Placements Rev. 20151207 Page 7/8

Report Client Standard(s) Certification umber(s) Type Item result SMT Reflow SMT PCB Final inspection Conventional Assembly Wave Solder Solder Assembly PCB Final Inspection PCB Cleaning PCB Mechanical Assembly Testing Packaging Dispatch Key regulatory, statutory and customer-related requirements include: IPC A - 610 Revision D OHSAS Customer satisfaction and complaints Internal audit and management review Use of certificate and logo The organization maintains documented and effective procedures governing the handling of information, data analyses, improvement actions and responses to customer feedback. The organization measures MS implementation, maintenance and effectiveness by means of annually scheduled system audits. The organization reliably carries out these audits. The nonconformities identified in these internal audits had been corrected by the time the audit documented in this report was performed. Top management reviews the organization s quality management system at regular intervals and in line with the requirements to ensure its continuous suitability, adequacy and effectiveness. The management review of 19-07-2016 was carried out in accordance with the requirements and was effective. The organization uses the logo and the certificate (e.g. on business cards, company brochures, websites etc.) in compliance with the requirements. Chapter of standard 4.1 4.2 5.1 5.2 5.3 5.4 5.5 5.6 6.1 6.2 6.3 6.4 Rating*) 2 2 1 1 1 1 2 1 1 2 1 2 o. of nonconformity Chapter of standard 7.1 7.2 7.3 7.4 7.5 7.6 8.1 8.2 8.3 8.4 8.5 Rating*) 1 1 4 1 2(3) 1 1 3 1 1 2 o. of nonconformity 1 *Rating: 1 = conforming 2 = conforming but opportunities for improvement 3 = failed/nonconformity (see nonconformity report) 4 = not applicable 5 = not audited in this audit Rev. 20151207 Page 8/8