SEMPELL INTERVALVE PRESSURE SEAL GATE VALVES STYLE A

Similar documents
STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

NEWCO VALVES Newmans Inc., Newmans Valve Ltd. NEWCO/OIC Cast Valve Operation & Maintenance Manual

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

Baumann 24000SB Barstock Control Valve

Trunnion-Design Ball Valves

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

Diaphragm Control Valves FLUXOTROL Series I and Series 25 Installation and Maintenance Instructions

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Float and Thermostatic Traps Series H, C and X

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 )

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Pressure Locking & Thermal Binding In Wedge Gate & Parallel Slide Gate Valves

Fire Hydrant Troubleshooting

SureSite Magnetic Liquid Level Indicator

V47 Series Temperature Actuated Modulating Water Valves

Instruction Manual EH /10. Putting You In Control Series. Double Ported Globe Valves

Vogt Valves The Connection Bulletin for Extended Body Forged Steel Valves Welded Bonnet, Bolted Bonnet, Class 800 & Class 1500 CB 22

Type and Type Pneumatic Control Valves. Type (left) and Type (right) Mounting and Operating Instructions EB 8026 EN

Flowserve - Edward Valves Development of the Flowserve Edward Equiwedge Gate Valve

Wafer Check Valve ASAHI AV VALVES. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Fisher 249 Caged Displacer Sensors

Fisher CV500 Rotary Globe Control Valve

DIAMOND Gear Company, LTD. an ERIKS Company. Installation, Maintenance, & Operation Manual Declutchable Worm Gear

Series 2700A Control Valve. Operation and Maintenance INTRODUCTION

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

RMF Engineering

2100 AD Mirror Elevator Ball Nut Replacement Procedure

Easy Tool Retracting System CMC-SR2159ER36

GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

This instruction is valid for all ACF/UCF pump models shown on page 2

VALVEWORKS USA OPERATION AND SERVICE MANUAL FOR MODEL FM 2 4-1/16 GATE VALVE

RUBBER SLEEVE KNIFE GATE VALVE

UNITS Units are designated by the unmounted pump model numbers followed by a letter indicating drive style.

FLANGED END BALL VALVE

Packing and gaskets Page 029 of 040

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013

Materials : Cast iron body

Valve Live Loading With Belleville Springs. Belleville Springs for Valve Live Loading

SINGLE STAGE INLINE FIRE PUMP

INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303

MANDATORY SERVICE BULLETIN

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

1 Important Safety Procedures. Qualified maintenance personnel should read and follow these straightforward instructions.

BALL VALVE Installation and Operations Maintenance Manual

Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations

Tech. Services: (800) Fax: (800) Order Entry: (800) Fax: (800) Internet Address:

ENGINEERED & PROCESS VALVES. Installation, Operation and Maintenance Manual GENERAL VALVE. Twin Seal Double Block and Bleed Plug Valve GENERAL VALVE

WE-350 Series ¼ Turn Electric Actuator

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

Cooling system components, removing and installing

BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS

CHROME FRONT BRAKE MASTER CYLINDER KIT

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Fire Pump Applications

Tri-Homo Style Operation and Maintenance Instructions

Installation Instructions S

2" & 3" Poly Wet Seal Pump Instruction Manual

Operating Manual. Los Angeles Abrasion Machine HM-70A & HM-70AF

Back Pack Sprayer. Operator's Manual MODELS MS - 40 MS - 50

PRESSURE REDUCING CONTROL VALVE

Lenntech psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503

Reasons for reissue of this instruction sheet are provided in Section 5, REVISION SUMMARY.

SunMaxx Solar Filling Station Operating Instructions

Drive shaft, servicing

Mustang Series PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE. M115-2 (Globe) M (Angle) Schematic. Standard Components

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations

IMPORTANT DOCUMENTATION DO NOT DISCARD!

System Saver 318 Air Compressor for Mack E-Tech and ASET Engines

Instruction Manual. Alfa Laval SB Membrane Sample Valve ESE02963-EN

AMG Antrieb und Mechanik GmbH

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

The cylinder head bolts tightening stages have been updated as listed in Table 1.

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Rebuild Instructions for and Transmission

TECHNICAL SERVICE MANUAL

Installation, Operation and Maintenance Manual for Pilot Operated Valves

TYPE E Main Valve Sizes 3 /8 through 12

Fisher EDR and ETR easy-e Valves

Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer

Model 43AP Pneumatic Controller, Style B

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: & OPERATING & MAINTENANCE INSTRUCTIONS GC04/12

FLUSHOMETER - TANK SYSTEM

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

Air Sleeve Maintenance

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

Installation, Maintenance, & Repair Series 4000B/LF4000B

81000 Series Aluminum Gate Valve Installation and Repair Manual

Spicer Axles & Brakes ABIB-0302

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

Transcription:

Installation and maintenance instructions for cast gate valves pressure seal Style A Wedge gate and parallel slide configuration SECTION 1 - VALVE STORAGE CONTENTS 1 Valve storage 1.1 Preparation and preservation for shipment 1.2 Handling requirements 1.3 Storage and preservation before installation 2 Installation 2.1 Preparation before installation 2.2 Installation instructions 2.3 Valve verification before start up 2.4 Operations instructions Table I: Bolt torque figures - packing bolts Table II: Bolt torque to ensure tightness of pressure seal gasket 2.5 Periodic valve verification during service Troubleshooting guide 3 Maintenance 3.1 Packing maintenance 3.2 Bonnet gasket replacement 4 Valve removal 5 Greases and special tools 5.1 Greases Table III: Grease and lubricant list 5.2 Special tools 1.1 Preparation and preservation for shipment All valves are properly packed in order to protect the parts that are subject to deterioration during transportation and storage on site. In particular, the following precautions should be taken: 1. The valves must be packed with the wedge in the closed position. 2. The weld ends surface shall be protected with suitable protective like Deoxaluminite. The end shall be closed with plywood or plastic disc fixed at the edge by strips. 3. All actuated valves must be carefully securely palleted or crated, in order to ensure that the parts of actuator (especially pneumatic piping or accessories) do not extend beyond the skid/crate. 4. The type of packing must be defined in the Customer s Order and shall be appropriate to ensure safe transportation to final destination and eventual conservation before installation. 1.2 Handling requirements A - Packed valves Crates: Lifting and handling of the packed valves in crates will be carried out by a fork lift truck, by means of the appropriate fork hitches. Cases: The lifting of packed valves in cases should be carried out in the lifting points and at the center of gravity position which have been marked. The transportation of all packed material must be carried out safely and following the local safety regulations. B - Unpacked valves 1. The lifting and the handling of these valves has to be carried out by using appropriate means and at respecting the carrying limits. The handling must be carried out on pallets, protecting the machined surfaces to avoid any damage. 2. With valves of large dimensions, the sling and the hooking of the load must be carried out using the appropriate tools (brackets, hook, fasteners, ropes) and load balancing tools in order to prevent them from falling or moving during the lifting and handling. www.pentair.com/valves 2012 Pentair plc. All Rights Reserved VCIOM-01854-EN 15/10

VALVE SLINGING FIGURE 1 1.3 Storage and preservation before installation In case the valves have to be stored before installation, the storage has to be carried out in a controlled way, and has to be performed in accordance with the following criteria: 1. The valves have to be stocked in a closed, clean and dry storage room. 2. The wedge must be in the closed position, and the end faces must be protected with plastic or wooden discs fixed with straps. If possible, keep the original protection. 3. Periodical checks have to be carried out in the storage area to verify that the above mentioned conditions are maintained. For actuated valves, in addition to the above, please refer to the warnings in the manual of the actuator. WARNING For valve handling and/or lifting, the lifting equipment (fasteners, hooks, etc.) must be sized and selected while taking into account the valve weight indicated in the packing list and/or delivery note. Lifting and handling must be made only by qualified personnel. Do not use the lifting points located on the actuator, if any, to lift the valve. These lifting points are for the actuator only. Caution must be taken during the handling to avoid that this equipment passes over the workers or over any other place where a possible fall could cause damage. In any case, the local safety regulations must be respected. NOTE Storage in an open area for a limited period can be considered only in case the valves have appropriate packing (packed in cases lined with tarred paper, and contents well protected with barrier sacks). Do not place consignment packages directly on the ground. Do not expose consignment packages to the weather or directly to the sun. Check the packaging every two months. SECTION 2 - INSTALLATION 2.1 Preparation before installation 1. Carefully remove the valve from the shipping package (box or pallet) avoiding any damage to the valve or, in case of automated valves, to the electric or pneumatic/hydraulic actuator or instrumentation. 2. Clean the inside of the valve using an air line. Ensure that there are no solid objects such as pieces of wood, plastic or packing materials within the valve or on the valve seat. 3. Confirm that the materials of construction listed on the valve nameplates (service and temperature) are appropriate for the service intended and are as specified. 4. Define the preferred mounting orientation with respect to the system pressure. If any (see arrow on the body), identify the upstream side (high pressure) and downstream side (low pressure). WARNING Verify that the direction of the flow in the line corresponds to the arrow indicated on the valve body. Valves without the arrow are bi-directional. See the actuator user manual for the actuator preparation. 2

2.2 Installation instructions Gate valves are normally installed in horizontal pipe with vertical stem. These valves can also be installed in vertical or horizontal pipe with stem other than vertical, but this may require special construction depending on valve size, service condition, material and type of operator. For a correct operation, Intervalve recommends that the valve shall be installed and oriented following the indications of fig. 2. This can help minimize any problem associated with solid particles present in the fluid that otherwise could deposit in the lower part of the body and be obstacle to the wedge complete closure. Unless otherwise recommended by Intervalve, the valve should be installed with the wedge in the closed position, to ensure that the seat ring in the wedge is not damaged during installation. Particular care should be taken with those valves equipped with fail-open actuators. For operating temperatures above 200 C (392 F) thermal insulation of the valve body is recommended. Handling and lifting of the valves during installation MUST be performed following the same criteria and instructions described in previous points 1.2 Handling Requirements and 1.3 Storage and Preservation before Installation. Buttweld valves Position the valve and check the alignment with the pipe, then proceed with welding, in accordance with the applicable welding procedure. 90 max. IMPORTANT After the valves installation and before the line testing, it is recommended to perform an accurate cleaning of the lines to eliminate dirt and any foreign objects that could seriously jeopardize the tightness between seat/disc and the correct operation of the valve. 2.3 Valve verification before start up 1. Tighten the packing just enough to prevent stem leakage. Over-tightening will decrease packing life and increase operating torque. The bolt torque figures for the packing bolts can be calculated as indicated in Table I. 2. Check the operation of the valve by stroking it to full open and full close. 3. If the valve has been stored for a long time, check the bolt torque for bolting (pos. 31) in accordance with table II. IMPORTANT If piping system is pressurized with water for testing, and in case the piping system has been shut down after testing for a long time, the following recommendations should be adopted. a. Use corrosion inhibitor with water to pressurize the piping system b. After testing, the piping system should be depressurized and the test water completely drained. 2.4 Operations instructions 1. Style A Series gate valves do not require special care to work properly. The following instructions will help provide a satisfactory and long life service. 2. Make sure to perform periodic valve verification as described in paragraph 2.5. 3. In case of actuated valves always follow the specific instructions given by the actuator s manufacturer. 4. Never change the setting of torque and/or limit switches which have been carefully set during the final test at Intervalve workshop. FIGURE 2 Installation positions recommended 3

TABLE I: BOLT TORQUE FIGURES FOR PACKING BOLTS For system pressures < 2533 psi For system pressures 2533 psi Torque (ft lbs) = (24.87) x (OD2 _ ID2) x (d) Torque (ft lbs) = (S.P./101.8) x (OD2 _ ID2) x (d) Torque (Nm) = multiply Torque (ft lbs) x 1.3558 Where: OD = Stuffing box bore (in) ID = Stem dia (in) d = Gland stud dia (in) S.P. = System pressure (psi) This Torque method may result in more or less than 30% compression. 2.5 Periodic valve verification during service A Normal check 1. Verify monthly that there is no leakage from packing or in the body/bonnet area. If the leakage has been detected from the packing, tighten nuts according to the procedure described in Section 3. If the leakage does not stop, follow the procedure for packing maintenance (3.1). If the leakage has been detected from the body/bonnet, tighten the nuts (pos. 31) as indicated in Table II. If the leakage does not stop, follow the maintenance procedure for the replacement of the body/bonnet gasket (3.2, 3.3). 2. Every 2 / 3 months, depending on operating frequency, verify the greasing of bearings and stem thread. 3. For actuated valves, in addition to the above, please refer also to the warnings in the actuator manual. IMPORTANT To ensure tightness of pressure seal gasket, pull up bolts must be tightened when valve is under fully hydrostatic test pressure. 1. Every 3 months verify the tightness of gland bolts. 2. Every 6 months on motorized valves and every 8 months on hand operated valves, grease stem and bearings. 3. Every 12 months check the travel of the gland follower, setting a new packing when the end of the travel is approaching. 4. Every 4 years disassemble the critical service valves and/or actuated valves, verifying the sealing surfaces and lap them again when necessary. Substitute the bonnet gasket and the packing, grease the stem. 5. For the actuator, proceed as indicated in its maintenance manual. TABLE II: POSITION 31 FOR GATE VALVES BOLT TORQUE TO ENSURE TIGHTNESS OF PRESSURE SEAL GASKET Stud Torque ft.lbs. Torque Nm ⅜ 18 24.5 ½ 37 50 ⅝ 74 100 ¾ 125 170 ⅞ 207 280 1 310 420 1 ⅛ 443 600 1 ¼ 627 850 1 ⅜ 811 1100 TROUBLESHOOTING GUIDE Symptom Possible cause Solution Stem packing leaking Gland flange nuts too loose Tighten gland flange nuts. Packing damaged Replace packing Body-Bonnet leaking Gasket bolting loose (pos 31) Tighten bolting (pos 31) Gasket damage Replace the gasket Valve leaking Valve not fully closed Close valve Debris trapped in valve Cycle and flush (with valve open) to remove debris Sealing surface damaged Recondition the seat surface Jerky operation Packing is too tight Loosen gland nuts, cycle the valve, retighten Air supply inadequate Increase air supply pressure (for pneumatic act.) Back seat leaking Back seat damage Replace the back seat 4

SECTION 3 - MAINTENANCE The Style A Series valves have been designed to require minimum maintenance. This manual describes on site repairs as: - Packing Replacement - Body/Bonnet Gasket replacement All the other repairs should be performed by Intervalve or Nominated Service Company. 3.1. Packing maintenance If leakage is observed through the packing, tighten the gland nuts slowly and evenly until the leakage stops. 7. When the stuffing box is filled, replace the gland (9) and gland flange (10) in their original position. 8. Tighten gland nuts in accordance with Table I (Bolt Torque figures for Packing Bolts). 9. Cycle the valve. 10. Pressurize the line. 11. If a leakage is detected, tighten the gland nuts slowly and evenly until the leakage stops. CAUTION Do not over-tighten packing gland nuts. Overtightening will increase the torque required to operate the valve. When tightening the gland nut, use half-turn increments until leakage has stopped. Please refer to Figure no. 4. To replace the packing proceed as follows: CAUTION Before starting any maintenance, depressurize, drain and vent the line; check that the valves are not in temperature; disconnect any electrical power supply. Failure to do so may cause serious personal injury and/or equipment damage. 1. Open completely the valve up to the backseat position. 2. Remove the nuts (16) of the gland bolts (15) 3. Lift the gland flange (10) and the gland (9) 4. Remove the worm-out packing using a hooking wire 5. For a better tightness, proceed to an accurate cleaning of the stem and stuffing box and make sure there are no scratches or signs of seizing 6. The repacking shall be carried out by placing one ring at a time around the stem, inside the stuffing box and by making sure that they are correctly oriented. Press it into the bottom (refer to Figure no. 3). FIGURE 4 FIGURE 3 3.2 Bonnet gasket replacement 1 = Braided graphite 2 = Die formet graphite (5 or 6 ring) 3 = Metal ring WARNING Before starting any maintenance, depressurize, drain and vent the line; check that the valves are not in temperature; disconnect any electrical power supply. Failure to do so may cause serious personal injury and/or equipment damage. 5

FIGURE 5 Lifting lugs for DN150 (NPS 6) For DN100 (NPS 4) For DN80 (NPS 3) Please refer to Figure 5. 1. Unscrew the body bonnet nuts (pos.12) and the gland nuts (pos.16) 2. Lift up the yoke (pos.24) operating by the handwheel or gearbox handwheel 3. When the stem nut is free from the stem threads, lift up the yoke. 4. Unscrew the nuts (pos.31). 5. Remove the retaining ring (pos.311). 6. Remove the segment rings, push them out from the body groove by using the body holes placed radially on the top of the body. 7. Lift up the bonnet (pos.6) and pressure seal body gasket (pos.5). Make sure not to damage the packing. We suggest to replace the packing when changing the body gasket. 8. Carefully clean all the gasket housing and lubricate with suitable grease. 9. Replace the body gasket. 10. Reassemble all parts following backwards the above mentioned steps. SECTION 4 - VALVE REMOVAL If the valve needs to be removed from the line for some extraordinary reason, the user should ensure the following: 1. The valve is depressurized, drained and vent. 2. The pipe shall be cut as far away from the valve as possible. TABLE III: GREASE AND LUBRICANT LIST Manufacturer Grease AGIP GRMUEP2 API PGX2 BP GREASE LTX2 ESSO BEACON 2 FINA FINAGREASE HP FINAGREASE EPL2 MOBIL MOBILUX EP2 Q8 REMBRANDT EP2 SHELL ALVANIA R2 SUPERGREASE A TEXACO MULTIFAK EP2 GREASE L2 TOTAL MULTIS EP2 MULTIS 2 VISCOL SIGNAL ROLSFER 2 STATOIL UHIWAYLI LI G2 SECTION 5 - GREASES AND SPECIAL TOOLS 5.1 Greases To lubricate the bearings on manual and gearbox operated valves, we suggest to use the grease AGIP GRMUEP2 or an equivalent product, as showed in the following table: 5.2 Special tools No special tool required for the maintenance operations described in this manual. For the lubrication of the stem thread, use the grease SIGNAL CEP 30 produced by Viscol. As an alternative you can utilize: - CEPLATTYN 300 produced by REINER-FUCHS - GRAFLOSCON produced by KLUBER You can also use a grease having more than 25% pure graphite content (carbon 98%) granulometry 5m, without any abrasive agent. For the lubrication of the actuator, refer to the relevant manual. CAUTION The nuts (pos.31) need to be retightened after valve first pressurization, as indicated in Table II. PENTAIR VALVES & CONTROLS www.pentair.com/valves All Pentair trademarks and logos are owned by Pentair plc. All other brand or product names are trademarks or registered marks of their respective owners. Because we are continuously improving our products and services, Pentair reserves the right to change product designs and specifications without notice. Pentair is an equal opportunity employer. 2015 Pentair plc. All rights reserved. 6