Texas City Incident Human Factor Aspects

Similar documents
The Importance of Safe Isolation of Plant and Equipment

MANAGING THE RISKS OF CHANGE

U.S. Chemical Safety and Hazard Investigation Board

To Mary Kay O'Connor Process Safety Center Home Page To Program details for Day 1 To Program details for Day 2

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

Safety critical communication. Overview. Communication. Andy Brazier

Operations Management Pro

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Crane Boom Fails, 3 Injured

LOCK-OUT / TAG-OUT SAFETY TRAINING

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

3088 Lockout-Tagout Training Program Course Outline

Roles and Responsibilities of Plant Commissioning, Hydrocarbon Introduction and Acceptance Test Run

Safety Culture Lessons from CSB and Other Major Incident Investigations

Management of change at a major hazard facility

Buncefield Standards Task Group (BSTG) Final report

Assertiveness at Work. Delegate Manual SAMPLE PAGES

Meeting the Challenges in Industrial Safety Management in Construction Works (Dec-2007)

Control of Hazardous Energy (Lockout / Tagout)

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

FATAL ACCIDENT INVESTIGATION REPORT

Lockout / Tagout Program

SAMPLE ASSESSMENT KIT. BSB41307 Certificate IV in Marketing

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

Routine and Emergency Boiler Operation

Bellingham Control System Cyber Security Case Study

Human factors is the term used to describe the interaction

Electrical Contractor Safety Responsibilities and Strategies

INCIDENT/ACCIDENT INVESTIGATION AND ANALYSIS

GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS

Examples of pressure systems and equipment are:

Safety Management Systems (SMS) guidance for organisations

Process Safety Management Program

Health and Safety Policy and Procedures

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Lockout Tagout Program. Table of Contents

Operations Integrity Management System

Asset Integrity - Process Safety Management

CTAA - SAFETY AND SECURITY OFFICER PROGRAM (CSSO)

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.

Page85. Lock-out Tag-out Plan

Michael A. Mitchell, Cameron Flow Control, DYNATORQUE Product Manager

Designing an Effective Risk Matrix

COMAH Competent Authority Inspection of Competence Management Systems at COMAH Establishments

Fatigue Risk Management Systems For Personnel in the Refining &

Aviation Safety: Making a safe system even safer. Nancy Graham Director, Air Navigation Bureau International Civil Aviation Organization

Some Observations about Major Chemical

Using Incident Investigation Tools Proactively for Incident Prevention.

Process Safety Management Program

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

Quality Thinking in other Industries. Dominic Parry Inspired Pharma Training. WEB GMP BLOG inspiredpharmablog.

SOFTWARE-IMPLEMENTED SAFETY LOGIC Angela E. Summers, Ph.D., P.E., President, SIS-TECH Solutions, LP

The Royal College of Pathologists response to Lord Carter s report on operational productivity, February 2016

OIL INDUSTRY SAFETY DIRECTORATE Form No.: OISD-101/B

Fact sheet 6: for farmers

Loans Mentoring Support. The Essential Guide to STARTING A BUSINESS

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

Leadership for the major hazard industries

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

On-Site Risk Management Audit Checklist for Program Level 3 Process

Health and Safety Policy

NOTICE OF AMENDMENT CERTIFIED MAIL - RETURN RECEIPT REQUESTED. November 28, 2012

Care service inspection report

Living well with dementia: A National Dementia Strategy. Accessible Summary. National Dementia Strategy. Putting People First

MODULE 9 Describe the role of government agencies in providing for a safe work place.

MEDICINA y SEGURIDAD del trabajo

SAFETY SIGNAGE PROCEDURE

Control Environment Questionnaire

Railway Management Maturity Model (RM 3 )

REQUIREMENTS OF SAFETY MANAGEMENT SYSTEM

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and Documentation - Project Risk Assessment Examples

Asset Management Guidance for Water Systems

Mauro Calvano. About Aviation Safety Management Systems

Health and safety guidance on the risks of lone working

Health, Safety, Environment and Community. Management System. Fatigue Management PETROLEUM CSG HSEC MANAGEMENT SYSTEM PROCEDURE FATIGUE MANAGEMENT

Developing Supervisors into Frontline Leaders

Power plant safety: a wise business move

Effective Web Communication. Bunnyfoot Services

ACHIEVING COMPLIANCE THROUGH PEOPLE: TRAINING SUPERVISORS TO TACKLE PROCEDURAL NON-COMPLIANCE

How To Monitor Safety Management System Performance

Internal Audit Checklist

J.V. Industrial Companies, Ltd. Dispute Resolution Process. Introduction

Owner-User Pressure Equipment Integrity Management Requirements

LMTCL4002A Assemble and fit commercially tailored or bespoke garments

WHITE PAPERS. Process Safety Management

Fraud Checklist. From the enquiries made and procedures performed in completing Part B of this checklist we consider the risk of irregularities to be

Process Safety in National Grid

PTP-Global. Alarm Management An Introduction

Energy Control Lockout/Tagout

Best Practices Defined:

Managing the Health and Safety Impacts of Organizational Change

Transcription:

Health and and Safety Executive Texas City Incident Human Factor Aspects Jo-Anne Michael HM Inspector of Health and Safety

Heading here in Arial Bold 32pt

Incident Summary Occurred during start-up of the isomerisation unit after a month s shut-down. Highly flammable gasoline components released from a blowdown drum after a tower overfill. 15 fatalities in or near office trailers located close to the blowdown drum. 170 injured and estimated $1.5 billion damage. 43 000 residents told to stay indoors during incident.

Incident Summary Investigation Report by the U.S. Chemical Safety and Hazard Investigation Board Key Issues: Safety Culture Regulatory Oversight Process Safety Human Factors

Process Overview Isomerisation (ISOM) unit boost octane level in unleaded petrol. Accident in raffinate splitter section. Raffinate (mixture of liquid hydrocarbons) fed into tower. The splitter (or raffinate) tower 170 foot distillation column. Split the raffinate into light (40%) or heavy (60%) components. Light components sent to next portion of unit; heavy components to storage.

Incident Overview Raffinate splitter shut down 21st Feb 2005 for scheduled maintenance. Normal workforce 1600, with additional 800 contractors (sited in temporary trailers). ISOM operators: 12-hour shifts every day from Feb 21 st to March 23 rd start-up. No time to complete repairs of level indicator, level sight glass and a pressure control valve before start-up.

Incident Overview No time to complete safety checks of alarms and instruments on March 22nd. Signed off by supervisor on paperwork. The start-up was begun on March 22 nd, aborted and then restarted on March 23 rd during the night-shift. Two supervisors in the day. The experienced supervisor was called away to a family emergency. The second supervisor was preoccupied with other unit.

Texas City Video Six minute video. Illustrates the sequence of events leading to the overfilling of the raffinate splitter tower. A number of human factors influencing events are apparent. Which human factors issues are illustrated in the video? (Job, Organisation, Individual Factors)

Raffinate Section of the ISOM

Human Factors Summary Individuals do not plan to make mistakes; they do what makes sense to them at the time Why did the individuals take the actions that they did?

Human Factors Summary 1. Procedures were not followed. 2. Ineffective communication during start-up. 3. Instrumentation gave misleading information. 4. Operator fatigue. 5. Understaffing and lack of supervision. 6. Ineffective Training. 7. Poorly designed control board display. 8. Poor safety culture.

Procedures not followed The work environment encouraged procedural deviations. Procedures did not reflect actual practice: - In a majority of the start-ups the tower filled above the range of the level indicator. - There were swings in level in the majority of the start-ups. Accepted as normal, had to run raff discharge valve in manual to overcome these. - Tower pressure alarm set-points were frequently exceeded. Procedure didn t address this at all.

Procedures not followed BP allowed supervisors and operators to alter, edit and remove procedural steps without MOC analysis. The start-up procedure lacked sufficient instructions for the Board Operator on start-up - especially for the unusual circumstance of aborting the start-up - a rigorous pre start-up safety review had not been carried out. Time pressure caused the supervisor to bypass safety checks on March 22 nd and yet sign off the start-up procedure to say they had been checked.

Procedures not followed Problems during start-up were so common that operators believed that they had to deviate from the written standard procedures in order to start the unit efficiently. Necessary violations when departing from the procedure is necessary to get the job done.

Ineffective Communication Confusion around whether the light or heavy raffinate tanks were full. - day board operator believed he was instructed not to send heavy raff to storage and closed the tower level control valve, - outside operators believed they were instructed not to send light raff to storage and diverted light raff to the heavy raff line.

Ineffective Communication The condition of the equipment was not communicated across shifts. - Day board operator thought only the tower had been filled with raffinate, and was unaware that the ancillary equipment (e.g. piping) had also been filled with raffinate. ISOM: Brought in some raff to unit, to pack raff with. BP had no shift communication policy and did not enforce formal shift turnover, or require logbook/procedural records to facilitate communication

Instrumentation Misleading The sight glass on the tower was dirty and unreadable. The redundant high level alarm on the splitter tower failed to sound. The level indicator that was available was miscalibrated and gave the operators false readings that suggested the liquid level in the tower was declining. There was no other indication of level available to the operators.

Instrumentation Misleading

Operator Fatigue Day Board Operator had worked 29 days successively on 12 hour shifts. Lost 1.5 hours sleep per day. Estimated sleep debt of 43.5 hours (nearly one weeks sleep). Night Lead Operator had worked 33 days. Acute sleep loss and sleep debt. Baker Report - average rate of overtime at Texas City was 27%, with several employees exceeding 68%. Excessive, likely to compromise safety, and symptomatic of understaffing. CSB concluded that fatigue was a likely contributing factor to the incident. BP had no corporate or site-specific fatigue prevention policy or maximum shift work regulations.

Operator Fatigue The Board Operator did not recognise that feed was entering the tower but not being removed, or that the tower was overfilling. Multiple pressure spikes in the hours preceding the incident. The operators focused on reducing pressure rather than questioning why the pressure spikes were occurring. Rigidity in thinking; difficulty to respond to changing circumstances; takes longer to reason correctly. Cognitive fixation ignoring information that doesn t agree with diagnosis.

Supervisor & Operator Understaffing No supervisor or operator with experience on the isom. unit assisting with start-up. Only one board operator present. Past BP hazard review recommended two during start-ups. 1999 25% budget cut target control room consolidation additional workload added in 2003 to the one operator.

Operator Training Ineffective No effective training for abnormal situation management. - simulators unavailable. - hazards of unit start-up, material-balance calculations, managing tower over-fill scenarios not adequately covered. No effective verification methods of operator competency. 1998 2004 training staff cut from 28 to 8, move to computer-based training, halving of training budget. CSB found this was driven by cost savings.

Poor Control Board Design The display lacked an adequate indication of the liquid level in the tower (and did not calculate the material balance of the system). Two different screens used to display liquid in and out of the unit. Displayed portions of the unit in discrete detailed sections no screen providing a complete overview of the process.

Poor Control Board Design

Safety Culture The product of individual and group values, attitudes, competencies and patterns of behaviour that determine the commitment to, and the style and proficiency of, an organisation s health and safety management The way we do things around here

Safety Culture CSB found that the BP Board of Directors provided no effective oversight of the company s safety culture and major accident prevention programs. Poorly managed corporate mergers, leadership and organizational changes. Process safety performance impaired by cost-cutting, failure to invest, and production pressure from BP Group executive members

Safety Culture Focus on personal safety and work behaviours as a measure of safety performance. CSB noted that despite 23 deaths in the 30 years prior to this incident and many hazardous material releases, BP did not take effective steps to stem the growing risk of a catastrophic event.

Safety Culture CSB found that BP Texas City lacked a reporting and learning culture. Personnel were not encouraged to report safety problems, and some feared retaliation for doing so. Internal audits and studies repeatedly revealed safety problems at Texas City, but little was done to remedy them. Deficiencies in BP s mechanical integrity program resulted in the run to failure of process equipment.

References Link from HSE Human Factors internet pages to the BP Report, CSB Report and Baker Report on Texas City: http://www.hse.gov.uk/humanfactors/topics/texascity.htm To say accidents are due to human failing is like saying falls are due to gravity. It is true but does not help us prevent them.