TABLE OF CONTENT

Similar documents
TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

Contracting Strategy of a Project

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

TABLE OF CONTENT

TABLE OF CONTENT

STORAGE TANK SELECTION AND SIZING (ENGINEERING DESIGN GUIDELINE)

TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

TABLE OF CONTENT

Mechanical Installation

building engineering services association specification for: Domestic Heating

Flushing and Cleaning the A/C System

TABLE OF CONTENT

Roles and Responsibilities of Plant Commissioning, Hydrocarbon Introduction and Acceptance Test Run

TABLE OF CONTENT

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Recharge Procedure for Telemark TVP-2000 and TVP-3500

TABLE OF CONTENT

Dry-out Design Considerations and Practices for Cryogenic Gas Plants

TABLE OF CONTENT

Boiler Preparation, Start-Up and Shutdown

TABLE OF CONTENT

Standard Hydraulic Piping Flushing Procedure

HVAC Preventative Maintenance Basics. Presented by Mike Crawley

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

INDIAN STANDARDS (BIS) ON WELDING

Pump Selection and Sizing (ENGINEERING DESIGN GUIDELINE)

PBX Series Quick Fit Connector Bimetallic Steam Traps

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

TABLE OF CONTENT

Steam System Best Practices Condensate System Piping

This chapter is devided into two sections:

SECTION 807 PUMP STATION REHABILITATION

TABLE OF CONTENT

CONFINED SPACE ENTRY (PROJECT STANDARDS AND SPECIFICATIONS) KLM Technology Group

DESIGN STANDARDS SECTION

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

Eastman plasticizers. Bulk storage guidelines. Storage equipment. Tank components and materials. Piping. Pumps. Valves. Gaskets

The Pipelines Regulations, 2000

Chapter 5 - Aircraft Welding

Piping Hydraulic Line Design and Sizing Software KLM Technology Group

Steam Coil Installation, Operation and Maintenance

Domestic Chemical Water Treatment Manufacturers Association

How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page.

HYDRYER TYPE P Heat Regenerative Dryers ISO 9001 CERTIFIED

Design of Purified Water and Water For Injection Systems. Hugh Hodkinson Engineers Ireland Chemical & Process Division

IMPORTANT SAFETY NOTICE

Factory owners must ensure the boiler is:

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

BRAZED PLATE INSTALLATION MANUAL

Filtering Samples to On-Line Process Analyzers. Guidelines for Proper Filtration and Delivery of Samples to On-Line Process Analyzers

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE

CATHODIC PROTECTION SYSTEM DESIGN

INSTALLATION INSTRUCTIONS Fan Coil Replacement Coil Kit EBX & EBXX

74 Chapter CO 2 Cleaning

CARING FOR YOUR WATER HEATER

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007

TABLE OF CONTENT

Not required for most applications Not required for most applications High pressure ( provided) High pressure ( provided)

Validation Guide. USTR 805j (5) Steam sterilization of Pall filter assemblies which utilize replaceable filter cartridges

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

HOT WORK PERMIT PROCEDURES

PLANT MAINTENANCE - PLUMBER & STEAMFITTER APPENDIX A D.O.T. CODE O*NET CODE WORK PROCESSES

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

Lawn Sprinkler Systems Reserve Irrigation Inc. O & M. Version Roseland Drive Macedonia, Ohio

Oil and Coolant Circulating Heating System. Model - OCSM

1. Conductivity < 15 micro ohms/cm 2. ph of 6.0 to Nonvolatile TOC content < 1.0 ppm

How To Clean Up A Reactor Water Cleanup

OIL & GAS PRODUCTION AUDITING

Winterizing Your Trailer and Storage Ideas

No. Name Description Main input Data Main Output Data. cooling duty, process in/out temperature, inlet air temperature

Tri-Homo Style Operation and Maintenance Instructions

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

Safety Policy and Procedure

TABLE OF CONTENT

ASME/ANSI B Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B Malleable Iron Threaded Fittings ASME/ANSI B16.

Facility Operations Physical Safety Guidance Document

Backup Fuel Oil System Decommissioning & Restoration Plan

Approval of this procedure is provided by signatory indicated in the approval block at the footer of Page #1, for and on behalf of Jabiru Pty. Ltd.

Mechanical Seal Piping Plans

01 - Plastic Pipe Cements and Primers

RMF Engineering

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Select Radiators Installation Guide

Control of legionella bacteria in water systems

valve solutions Chemical Cosmetic Cryogenic Food & Beverage Marine Mining Nuclear Oil & Gas Paint Pharmaceutical Pulp & Paper

Transcription:

Page : 1 of 14 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia PRE COMMISSIONING SPECIFICATION FOR CLEANING TABLE OF CONTENT SCOPE 2 PROCEDURE 2 Utility Systems 2 Process Unit/ Piping 3 Reinstallation 4 RECORDS 4 PRECOMMISSIONING CLEANING OF PIPEWORK AND ROTATING EQUIPMENTS 4 Scope 4 Cleaning Requirements 5 Chemical Cleaning 7 Quality Control 9 Documentation 10 Conservation of Cleaned Systems 11 APPENDIX A 13 APPENDIX B 14

Page 2 of 14 SCOPE The purpose this Project Standard and Specification is to describe the way in which Systems, piping and Units shall be cleaned during pre-commissioning. PROCEDURE General Manufacturer s instructions for cleaning their equipments shall be followed and implemented. The Contractor shall also follow the procedure of the Vendor after the equipment Control valves, orifice plates, flow meter elements, safety valves and permanent in-line blinds shall all be removed and lines flushed to open ends. Do not flush at any time into equipment. Utility Systems 1. Sewer Piping Before line flushing is started, a check shall be made on the sewer piping system to ensure that water drainage at design rates can be achieved. Care must be taken that hydrocarbon liquid or vapor cannot back up into any Unit via the sewers. 2. Water Lines Water systems shall be flushed out with water from the main supply headers using water of designed specification quality. Disconnect supply lines to users and shut off their supply valves. Flush the supply headers and then flush out each off-take in turn, taking larger lines first. 3. Instrument Air Line The instrument air lines shall be cleaned using the following procedure. Disconnect all supplies to instruments and shut off all off-takes. Make pressure up to Pipe header by instrument air at normal working pressure. Shut off battery limit valves and blow each off-take in turn, taking first for the larger lines. Continue blowing until each line is dry and free of dust and oil and in accordance with the quality specification for instrument air.

Page 3 of 14 Never blow out lines when the battery limit valve is open. 4. Utility Air Lines Utility air lines shall be flushed in a similar manner to those of instrument air. Slowly pressure up the header and blow out each off-take starting with the larger lines first. 5. Nitrogen Lines These lines shall be blown out with instrument air. Air shall be purged out afterwards using the nitrogen supply. 6. Pump Systems The line from the suction vessel to the pump shall be water flushed by gravity to the pump suction. Do not flush through the pump. Lines to slop tankage or another vessel shall be water flushed using the installed pump. Product and shipping lines shall be cleaned by Contractor using procedures such that no product will have to be slopped. Process Unit/ Piping 1. Flushing, Blowing and Shock Blowing Process lines shall be flushed after hydrotesting was done and supervised by commissioning personnel. The Contractor shall avoid over-pressuring lines, equipment or vessels and also avoid creating negative pressures. Where process compressors are intended to be used for air blowing of lines, the specification shall be checked to ensure that the compressor design will allow for this. Process lines if service for air, gas and steam shall be blown with air or steam. During this operation, all instruments shall be isolated, all orifice plates, flow meter elements, control valves and safety valves shall be removed. The flushing and blowing shall be carried out through both block valves and bypasses. Hydrostatic test water shall be drained thoroughly before air or steam blowing is carried out. The Contractor shall select the section of the systems for the flushing, blowing or shock blowing such that the lines in the selected section shall be thoroughly cleaned. The manual cleaning for the line shall not be allowed for the project.

Page 4 of 14 Where pipelines are made of stainless steel, duplex stainless steel or carbon steel with internal stainless steel cladding, the requirements concerning chloride content in water must be followed. 2. Drying All natural gas handling piping, vessels and equipments shall be dried to a water dew point of -22 F (-30 C) and inerted with nitrogen. The Contractor shall submit his procedure for this drying and inerting to approve with the mechanical completion plan document. Reinstallation On completion of cleaning, orifice plates, control valves, etc, shall be reinstalled and previously disconnected lines re-connected. After flushing out and circulation operations with water have been completed, water shall be thoroughly drained from the Unit. All low point drains and vents of piping or equipment which may retain water must be opened. Other necessary steps for complete water removal such as air blowing shall be carried out where required. The Contractor shall perform all required work according to the Vendor procedure for the equipments which touch with the water after these operations are completed Where specified by process conditions or process specifications, all lines and equipment within the process Units shall be dried and preserved under an inert gas. RECORDS The records for flushing and blowing to approve standards of cleanliness shall be retained in each Systems Completion Manual. PRECOMMISSIONING CLEANING OF PIPEWORK AND ROTATING EQUIPMENTS Scope Debris, rust, scale or welding slag carried into rotating equipment through inlet piping or present in lube, seal or control oil systems can cause damage in service. Therefore, upstream pipework and equipment must be thoroughly

Page 5 of 14 cleaned. Equipment and pipework in modules/packages shall be cleaned prior to dispatch to site unless this is impractical, e.g. as may be the case with steam generators. This procedure lists the type of pipework and equipment to be cleaned, defines the required degrees of cleanliness and outlines acceptable mechanical or chemical methods of achieving these. Mandatory precautions and minimum quality control requirements are included. Requirements shall be regarded as minimum acceptable. Compliance with this standard, or Vendor s/subcontractor s standard, shall not relieve the Vendor/Subcontractor of the responsibility of properly and safely cleaning pipework and equipment so as to be fit for specified operating duties. Cleaning Requirements Lists of the piping systems and equipment to be cleaned and refers to applicable Internal Surface Finish Class and Acceptable Methods which are defined in Table 2.The cleaning requirement shall apply following: 1. Internal Surface Finish Class Class 1 Class 2 Class 3 Removal of all loose material and adherent material which could become detached during operation of the plant. a) Removal of all loose material and adherent material which could become detached during operation of the plant. b) Removal of all oil, grease and protective coatings a) Removal of all loose material and adherent material that could be detached during operation of the plant. b) Removal of all oil, grease, and protective coatings. c) Removal of adherent mill scale, rust and welding slag to achieve bare metal. d) Protection of cleaned surfaces to prevent rusting after cleaning 2. Acceptable Methods of achieving required internal surface finish. Method 1 Method 2 Method 3 Before fabrication, remove rust and scale mechanically (not necessary for stainless steels and high alloys) and use inert gas shielded arc welding processes for root runs. Use cold drawn tubing and cold bending. Weld using inert gas shielded arc processes for root runs. If fabricated without inert gas shielded arc welded roots,