For personal use only

Similar documents
For personal use only

ALCYONE REPORTS JORC SILVER RESOURCES

How To Mine And Treat Ore From Castle Hill Stage 1

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

Cannon Big Pit Given the Green Light

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

SEPCO III Completes Successful Site and Country Visit to Tanzania

Update on Heap Leach potential of the Murchison gold project

For personal use only

INVESTOR PRESENTATION JULY 2013

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Interim Financial Report for the half-year ended 31 December 2011

Resources Rising Stars

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Positioned for Production: Exploring for Growth

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Pathway to Production

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Sorby Hills Silver Lead Project

ENCOURAGING PRELIMINARY METALLURGICAL TESTWORK FOR OXIDE HEAP LEACHING AT THE SOUTH HOUNDÉ PROJECT

FOCUS MINERALS LIMITED

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

Mako Project, Eastern Senegal Completion of Scoping Study

Punching Above Its Weight

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Armadale Capital Plc Armadale or the Company Robust Project Demonstrated by Mpokoto Feasibility Study HIGHLIGHTS

For personal use only

Mt Carrington Gold Silver Project Positive Scoping Study

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

September 2015 Quarterly Activities Report

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

Press Release 30 th October 2015

Exploration and Development Activity

For personal use only

Quarterly Activities Report

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

The Unparalleled Opportunity of Colluli the Colluli Potash Project presented by Danakali

WARWICK AND ATLAS IRON ANNOUNCE MERGER TO CONSOLIDATE PILBARA IRON PROJECTS

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

PALADIN ENERGY LTD ACN

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

For personal use only

Report for the Quarter Ended 30 September 2015

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

Press Release 29 th January 2016

For personal use only

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Improving Energy Efficiency Across Mineral Processing and Smelting Operations A New Approach

For personal use only. MRV Metals Launch February 2016

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

BAUXITE RESOURCES LIMITED

Savannah North Scoping Study Looking into the future 3 February 2016

Quarterly Activities Report

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012

Merlin Diamonds Limited

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

ANNUAL GENERAL MEETING November 2015

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

Payback period 2.4 years (7% improvement from 2.6 years stated in the MPFS);

COMPANY PRESENTATION. Cape Town 2016

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

BUILDING COPPER MINES IN BRAZIL BMO Global Metals & Mining Feb 2015

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

JULY 2014 QUARTERLY ACTIVITIES REPORT

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

For personal use only

PANTERRA GOLD LIMITED QUARTERLY REPORT TO 31 DECEMBER 2015

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

Botswana Power Development! March 2015!

PANTERRA GOLD LIMITED

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

Walford Creek: New Generation Base Development

Mines and Money Presentation

Detour Gold Provides New Life of Mine Plan for Detour Lake

TIGER RESOURCES LTD ACN

C o r p o r a t e P r e s e n t a t i o n A u g u s t

AVINO SILVER & GOLD MINES LTD.

Australia s next mid-tier gold producer

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E

THE ROLE OF METALLURGY IN ENHANCING BENEFICIATION IN THE SOUTH AFRICAN MINING INDUSTRY

An Industrial Minerals Company. Corporate Presentation (ASX:TON)

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

13 July Highlights

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

Transcription:

Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 Excellent Metallurgical Test Work Results 4 March 204 Highlights 88% recovery on the transitional ores at Fair Bride via Ultra-Fine Grind and Carbon in Leach test work +96% recoveries on all oxide ores in Stage via oxide leaching Mozambique-focused gold explorer Auroch Minerals NL (ASX: AOU) (Auroch or the Company) is pleased to provide shareholders with the results of its metallurgical test work program (refer announcement dated 3 November 203). The focus has been on Stage non-refractory 2 gold resources at the Manica Gold Project. The results ensure the accuracy of recoveries used for the metallurgical plant design in the Definitive Feasibility Study, for the processing of ore from the Fair Bride, Dot s Luck and Guy Fawkes deposits. Flotation No historical test work has ever been conducted on the non-refractory transitional ore samples at Fair Bride or Dot s Luck. The results of the recent test work indicated the need for a pre-wash stage prior to flotation. The addition of an activator in the mill and sulphurdising agent prior to flotation was included in the current metallurgical test work program. The tests showed that 80% of the Au and 97% of the sulphide sulphur is recovered into the concentrate. The flotation tails will be treated in a standard leach circuit. Concentrate Leaching on Transitional Material (Only at Fair Bride and Dot s Luck) The first series of tests on rougher concentrate 3 have provided information on the primary grind of 80% passing 75µm. Subsequent test batches of rougher concentrate were then subject to Ultra-Fine Stage refers to the 30Ktpm standalone centralised non-refractory plant. 2 See Annexure for definition of non-refractory. 3 Rougher concentrate refers to first stage of flotation.

Grind (UFG) and Carbon in Leach test work. These tests produced the following grind size Au Recovery curve (Figure ). Figure : Grind Size Recovery Curve Based on the Figure results, a grind size of 79% passing 27µm gives a remarkable overall plant recovery of 88%. The net impact of this high recovery from the UFG test work coupled with the relatively coarse grind of 27µm gives the Company flexibility in evaluating the Fair Bride deeper refractory ore (Annexure 2 Table 2) to delay or even eliminate the oxidation process (e.g. Biox). However, it is anticipated that as mining extends into the deeper portions of the Fair Bride deposit, the refractory nature of the ore will increase and the recovery will change. To address the lower recovery we will be in a position to adjust the grind size to accommodate this change in recovery. Oxide Leaching The initial Stage plant process design and capital cost, with 24 hours residence time in the leach, has been confirmed as a result of the recent test work. The recoveries are tabulated below (Table ). Ultra-Fine Grinding - A Practical Alternative to Oxidative Treatment of Refractory Gold Ores, S. Ellis, Kalgoorlie Consolidated Gold Mines, Kalgoorlie, WA.

Table : Oxide Leaching Au Recovery Sample Calculated Head Grade (Au g/t) Recovery (%) Fair Bride Oxide ROM : 24 hours 3.6 89.6 48 hours 4.02 97.3 Air Sparging 2 24 hours 4.20 96.5 Dot s Luck Oxide ROM: 24 hours.58 9.2 48 hours.46 96.6 Air Sparging 24 hours.74 97.7 Guy Fawkes Oxide ROM: 24 hours 2.80 96.9 Air Sparging 24 hours 2.72 97.5 Based on Table, a conservative recovery factor of 96% (Air Sparging 24 hours) has been used for all of the oxide ores in the Stage scoping study assumptions. Managing Director Dean Cunningham commented All test work to date in Stage confirms the assumptions made in the initial plant design as correct and the recoveries attainable. The 88% recovery from the UFG test work is significant as it has the potential to reduce capital costs significantly. For further information please visit www.aurochminerals.com or contact: Dean Cunningham Managing Director T: +27 824 906 429 E: dcunningham@aurochminerals.com ROM refers to Run of Mine. 2 Air Sparging refers to the introduction of air into each leach vessel to maintain the dissolved oxygen levels.

Competent Person Statement The information in this report that relates to Mineral Resources is based on information reviewed by Dr W.D. Northrop who is a consultant to ExplorMine and is appointed as Independent Geologist to Auroch Minerals NL project team. He is registered by the South African Council for Natural Scientific Professions as a Professional Natural Scientist in the field of practice of Geological Science, Registration Number 40064/87, and as such is considered to be a Competent Person. Dr Northrop has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 202 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Dr Northrop consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears. The information in this Report that relates to in-situ Mineral Resources at Dot s Luck and at Guy Fawkes is based on information compiled by David Williams of CSA Global Pty Ltd. David Williams takes responsibility for those parts of the report. He is a Member of the Australasian Institute of Mining and Metallurgy, and a Member of the Australian Institute of Geoscientists and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person in terms of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 202 Edition). David Williams consents to the inclusion of such information in this Report in the form and context in which it appears. The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by Mr Gordon Koll who is a registered professional natural scientist (Pr.Sci.Nat.) under the South African Council for Natural Scientific Professions (SACNASP) and is a Fellow of the Geological Society of South Africa, which is a recognised professional organisation by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). Mr Koll is a full time employee of the Company. Mr Koll has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 202 Edition of The JORC Code. Mr Koll consents to the inclusion in this presentation of the matters based on the information in the form and context in which it appears. The information in this report that relates to the Scoping Study is based on information reviewed by Professor Jim Porter who is a Fellow of the Southern African Institute of Mining and Metallurgy, visiting Professor to the Faculty of Engineering at the University of the Witwatersrand and has wide experience in gold deposits and mining methods as envisaged in the Scoping Study; accordingly he is a Competent Person in terms of the JORC code. In terms of the Scoping Study he is responsible for the Mineral Reserve Estimate and has reviewed and approved the Scoping Study section of this press release. The information in this report that relates to the Metallurgical Test Work Program being conducted by SGS (Johannesburg) and is based on information received to date. It was compiled by Mr Graeme Farr, who is a Fellow of the South African Institute of Mining and Metallurgy. Mr Farr is contracted by the Company to oversee all issues relating to the design of the beneficiation process. Mr Farr has sufficient experience which is relevant to the type of beneficiation plant under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 202 Edition of The JORC Code. Mr Farr consents to the inclusion in this presentation of the matters based on the information in the form and context in which it appears.

Annexure - Definition of Non-Refractory and Refractory Material Exploration and test work completed to date on the Manica Gold Project indicates that there are several mineralisation types occurring over the Mining Concession (3990C) with the type of gold carrier defining the class of gold occurrence. Non-refractory ores can be defined as those ores where 90% or more of the contained gold is recoverable by conventional process routes such as gravity concentration, milling, and direct cyanide leaching. Where sulphides are the carrier additional selective grinding may be required dependent on the particle size. Refractory ores are defined as those that give gold recoveries of less than 90% when subjected to direct cyanidation or only give acceptable gold recoveries with the use of more complex precyanidation techniques. Techniques commonly associated with recovering gold from refractory material are Bio-oxidation (BIOX), Pressure Oxidation (POX) or Roasting. Annexure 2 - Fair Bride refractory mineral resource estimate Table 2: Fair Bride Refractory Mineral Resource Estimate, February 204 Classification Tonnes Au g/t Ounces Measured 9,565,000.73 53,000 Indicated 0,567,000.64 558,000 Inferred 24,530,000.83,445,000 Total 44,662,000.76 2,534,000 Cut-offs: Measured 0.50g/t; Indicated 0.50g/t <300m and.00g/t >300m; Inferred 0.50g/t Inclusive of the,025,904oz at 4.3g/t Au using a 3.0g/t cut-off This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 202 on the basis that the information has not materially changed since it was last reported.

About Auroch Minerals NL Auroch Minerals NL (ASX:AOU) is developing the multi-million ounce Manica Gold Project, Mozambique. Auroch owns 00% of the Mining Concession which has a granted 25 year Mining Right and is the largest JORC Code compliant gold resource in Mozambique. Manica Gold Project Sectors Category Manica Gold Project Mineral Resource Estimate, February 204 Project Sector Cut-off Au (g/t) Tons (000 ) Grade Au (g/t) Total Au (oz) Measured Fair Bride* 0.50,56.73 642,000 Total Measured Resources,56.73 642,000 Indicated Fair Bride* 0.50 < 300 m.00 > 300 m 0,795.64 570,000 Guy Fawkes.25 420.92 25,600 Dot s Luck 0.50 425.87 25,500 Total Indicated Resources,640.66 62,00 Inferred Fair Bride* 0.50 24,598.83,449,000 Guy Fawkes.25 380 3.90 48,000 Dot s Luck 0.50 455 2.06 30,000 Boa Esperança*.25 330 2.94 30,000 Total Inferred Resources 25,763.88,557,000 Total Manica Gold Project Resource 48,964.79 2,820,00 Inclusive of the,025,904oz at 4.3g/t Au using a 3.0g/t cut-off of refractory material *This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 202 on the basis that the information has not materially changed since it was last reported.