Electron Microscopy Centre

Similar documents
VCR Ion Beam Sputter Coater

SALES SPECIFICATION. SC7640 Auto/Manual High Resolution Sputter Coater

Balzers Sputter Coater SCD 050

The Basics of Scanning Electron Microscopy

BAL-TEC SCD 005. Scientist in charge: Lhoussaine Belkoura 07/14/06. softcomp soft matter composites 1

PC1131 Electric Air Compressor

SC7610 Sputter Coater. Operating Manual

PC1130 Electric Air Compressor

Ion Beam Sputtering: Practical Applications to Electron Microscopy

Electricity. Investigating spontaneous gas discharge in air as a function of pressure. LD Physics Leaflets P Sel

orlando OWNER S MANUAL

Zenith Solar thermal 4.5m pump station Installation manual

San josé OWNER S MANUAL

Vacuum Pumping of Large Vessels and Modelling of Extended UHV Systems

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

Measurement of Specific Heat Capacity Using Differential Scanning Calorimeter

GAS CYLINDER SAFETY. 2. GRADES OF GASES BOC have divided the gases that they supply into 3 grades.

SC7640 Auto/Manual High Resolution Sputter Coater Operating Manual

National- Spencer Inc.

ecomax Instructions for use Wall hung room sealed fan assisted condensing boilers For the user

TUTTNAUER OLD AUTOCLAVE OPERATING PROCEDURE

Large Systems Commissioning

SPUTTERING PROTOCOLS

Autoclave Safety. Autoclaves are sterilizers using high pressure and high temperature steam. The potential safety risks for the operators are:

Eurovacuum EV Series. Single Stage Oil Sealed Rotary Vane Pump

Your safety and the safety of others are very important.

OPERATING YOUR JEN-KEN GLASS KILN

K575X Sputter Coater Instruction Manual

Ell STEERING COLUMN CONTROLS STEERING COLUMN CONTROLS

High Rate Oxide Deposition onto Web by Reactive Sputtering from Rotatable Magnetrons

MICA HEATER INSTRUCTION MANUAL Model No: UHM V 50Hz 2200W

ACCUMULATOR INSTALLATION

Oxygen. Do not use flammable products, such as aerosol sprays, rubbing alcohol, paint thinners, and other oil-based lubricants near oxygen.

Extraction: Separation of Acidic Substances

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: & OPERATING & MAINTENANCE INSTRUCTIONS GC04/12

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

Duo-tec Combi HE A Range. User s Operating Instructions & Important Warranty Information. Gas Fired Wall Mounted Condensing Combination Boiler

The MKII Controller Operator s Guide 1

OWNERS MANUAL FOR CORDLESS INFLATOR AIR260

TECHNICAL BRIEF Critical Point Drying

Guide to good leak testing

Thermo Scientific Hi-Temp Programmable Vacuum Oven

Wilesco D365, D366, D367, D368, D405, D406 D407, D409 Operating Instructions

OHIO MEDICAL CORPORATION. Medical Gas Panel. Installation and Maintenance Manual

Coating Technology: Evaporation Vs Sputtering

NITROUS TRANSFER PUMP INSTRUCTIONS

Full Technical Catalog For Closed-loop Sampling System

SunMor SM-V30 Solar Water Heater Installation Manual

Baxi Combi 80e & 105e

Baxi Combi Instant 80e & 105e. User s Operating Instructions. Gas Fired Wall Mounted Combination Boiler

4 in 1 Air Compressor

Survival Laser SL-001BB Laser Parts Bundle Assembly & Operation Instructions

Validation Guide. USTR 805j (5) Steam sterilization of Pall filter assemblies which utilize replaceable filter cartridges

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494

AGA GAS MARK 2 BURNER (CONVERSION) FITTING INSTRUCTIONS

INFRARED QUARTZ WALL HEATER

Fuel Injection Pump, Rotary ( )

DENTAL CHAIR AND UNIT SP- CIELA IMPORTANT

Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?

Flushing and Cleaning the A/C System

USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102

HIGH PRESSURE TECHNOLOGY HYDRAULICS PNEUMATICS TESTING EQUIPMENT

System Diagnosis. Proper vehicle diagnosis requires a plan before you start

PBX Series Quick Fit Connector Bimetallic Steam Traps

Baxi Platinum Combi HE Range. User s Operating Instructions & Important Warranty Information. Gas Fired Wall Mounted Condensing Combination Boiler

Instructions For SF 6 Refill Kit

OWNER S MANUAL FOR DRY VACUUM PUMP MODELS 2585B-01, 2585B-50, 2585B-55 & 2585Z-50

Instruction manual of pumps WQ, WQF, SN, Furiatka, Furia, KRAKEN, BIG, IP, IPE, SWQ, CTR

TA INSTRUMENTS DIFFERENTIAL SCANNING CALORIMETER (DSC) Insert Nickname Here. Operating Instructions

Understanding Anesthetic Delivery Systems Dean Knoll, CVT, VTS (Anes.) Anesthesia Technician Supervisor University of Wisconsin Madison, WI May 2003

INSTALLATION AND OPERATIONS GUIDE FOR GRAND CANYON GAS LOG SYSTEMS

Adjustments for the Active Pneumatic Vibration Isolation Table during Final Installation (File version 6)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

INDIRECT WATER HEATER. Installation and Operating Instruction Manual

2 HP / 4 GALLON AIR COMPRESSOR OWNER'S MANUAL

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

Modular Glovebox Systems Gas Purifier Units Antechambers Accessories

User Guide and Important Warranty Information. Heatmax Combi HE Range. Condensing Combination Boiler

K500X Manual Sputter Coater Instruction Manual

The Use of Hydrogen Carrier Gas for GC/MS

Code of Practice for the Manual Handling of Gas Cylinder and exchange of regulators

Vacuum Control. Vacuum Applications. Vacuum Regulators. Vacuum Breakers (Relief Valves) Vacuum Control Devices. Vacuum Terminology

Ultrasonic support removal tank

Tech. Services: (800) Fax: (800) Order Entry: (800) Fax: (800) Internet Address:

VOYAGER 570G. 744A Sprayer Control

Lasers Design and Laser Systems

How compact discs are made

Oxy-Fuel Gas Welding. Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to:

Combi 30 HE. User s Guide and Important Warranty Information

WINDOW ROOM AIR CONDITIONER

SECTION 1-5 OPERATION OF INSTRUMENTS AND CONTROLS Lights, Wipers and Defogger

SHHH AIR COMPRESSOR Model Nos. SHHH2 - SHHH2/9 - SHHH3/9 - SHH3/24

K550X Sputter Coater Instruction Manual

High performance. Architectural glazings utilise thin. low-emissivity coating. Coating technology

SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

Lab Exercise 3: Media, incubation, and aseptic technique

Full Spectrum Laser Cutter 45W Safety Guidelines

Ductless Split Air Conditioner

2006 HEADSHOK Service Video #1

Transcription:

Electron Microscopy Centre Title: STANDARD PROCEDURES TO USE THE SPUTTER COATER Equipment: Bio-Rad JBS-PS-3 Sputter Coater Revision: 1.0 Effective Date: 12/12/2005 Author: X. Yang

Warning! Before you attempt to operate this equipment for the first time, please make sure you are aware of the precautions that you must take to ensure your own safety. Working Environment Do not use electrical equipment in: Rain or excessive moisture environment The presence of flammable or explosive gases The equipment is not designed to be water or splash proof, or to be used in area where there are flammable or explosive gases or fumes. 1

Standard Procedures to Use the Sputter Coater The purpose of sputter coating is to apply a thin layer of a charge conducting material to nonconducting specimen. This prevents charge build-up in sample while under the electron beam. 1. Mount Dried Specimens onto SEM stub with double-sized tape or conductive glue. 2. Remove the metal top plate and glass work chamber carefully (two separate pieces; handle by glass work chamber). 3. Place stub(s) in the sputter coater chamber (maximum 6 stubs allowed). Gloves and forceps should be used when loading stubs. 4. Re-place the work chamber and top plate back on. 5. Check the leak valve is closed (fully clockwise). 6. Set the timer to minimum position (30 seconds). 7. Turn on cooling water valve mounted on the wall: turn the valve anticlockwise and check that a trickle of water flows. 8. Check both cylinder valve (fully clockwise) and regulator valve (anticlockwise) are closed. 9. Turn on argon: slowly turn the cylinder valve clockwise until there is a reading at the first meter. Slowly turn the regulator clockwise until the second meter is reading between 5-8 psi. Note: Please refer to a separate document for detailed operation procedures for handling high pressure gas cylinder. 10. Switch on the power. The rotary pump will start immediately and the needle of the vacuum gauge will register falls. If the needle is falling below 0.2 mbar, the Ready light will be illuminated. The unit should then be left pumping until a vacuum of better than 0.1 mbar is reached. Note: A vacuum of better than 0.1 mbar indicates that there are no major leaks in the system. If the needle could be fall under 0.1 mbar for a quite while, contact the EMC staff for support. 11. Turn the leak valve counter-clockwise slowly to flush the specimen chamber with ultra pure Argon gas. The chamber pressure should rise to about 0.5 1 bar for at least 15 seconds during the flushing. 2

12. Close the leak valve and allow the work chamber to pump down. The needle of the vacuum gauge should fall back to below 0.1 mbar and reach its minimum position. Repeat step 10 and 11 at least 2 more times before process next step. 13. If the chamber vacuum drop to 0.04-0.06 mbar, gently turn the leak valve counter-clockwise until the pressure just starts to rise (~ 0.07 mbar). This requires approximately three to four turns of the knob. 14. Press onto the TEST button and monitor the plasma current reading. If the reading is below or above 18 ma, adjust the leak valve so to set the plasma current reads around18 ma while pressing the button. 15. Release the TEST button to quit test procedure. 16. Set the timer to desired value, e.g. 80 to 100 seconds. 17. Press the START button to start coating. The discharge will now be visible in the chamber as a blue or purple glow. The discharge will cause the sputtering of gold onto the base plate. The discharge will terminate after the preset time. Note: The plasmas current will be around 18 ma after the Start button has been pressed although the initial outgassing of the system may tend to make the current unstable. Adjust the leak vale so the plasma current remains at 18 ma. 18. Repressing the start button will repeat the coating process it is required to have more than once coating. Note: In most case, a total of 110 seconds should give a good coating. User has the option of a single sputtering time of between 30 and 140 seconds or alternative any number of short sputtering bursts. 19. Switch off power after the coating. Turn off water valve and cylinder valve while the regulator valve is on. 20. Turn the leak valve fully anticlockwise to vent the chamber with residue argon gas. By doing this, user not only vents the work chamber but also release the residue high pressure argon gas remained in the regulator and tubing. 3

Note: User could also admit the air into the work chamber by tilting the Vent valve located on the metal top plate of the chamber. In this case, user should remember to release the pressure in the regulator and tubing. 21. Close the regulator valve by turning the knob counter-clockwise when regulator meters read zero. 22. Close the leak valve (fully clockwise). Remove the work chamber, top plate and specimens (with powder free gloves). 23. Replace work chamber and top plate. 24. Record the usage of sputter coater on the log book. 4

The Layout of JBS-PS-3 Sputter Coater 5