The Transmission System Operator as Service Provider The Example of the Procurement of Grid Losses in Austria



Similar documents
Tempora mutantur, nos et mutamur in illis : The Transmission System Operator as Service Provider Using the Example of the Procurement of Grid Losses

Program for Energy Trading, Derivatives and Risk Management by Kyos Energy Consulting, dr Cyriel de Jong Case studies

Modelling Electricity Spot Prices A Regime-Switching Approach

Managing Risks and Optimising an Energy Portfolio with PLEXOS

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS

Market Risk Capital Disclosures Report. For the Quarter Ended March 31, 2013

CALYPSO ENTERPRISE RISK SYSTEM

The pivotal role of TSOs in European energy market integration

OneWest Bank N. A. Dodd-Frank Act Stress Test Disclosure

CITIGROUP INC. BASEL II.5 MARKET RISK DISCLOSURES AS OF AND FOR THE PERIOD ENDED MARCH 31, 2013

Risk Management for Fixed Income Portfolios

Asymmetric Correlations and Tail Dependence in Financial Asset Returns (Asymmetrische Korrelationen und Tail-Dependence in Finanzmarktrenditen)

Measuring downside risk of stock returns with time-dependent volatility (Downside-Risikomessung für Aktien mit zeitabhängigen Volatilitäten)

4 DAY Course Outline. Power Purchase Agreements. for Emerging Countries

Simulation of the Central European Market for Electrical Energy

ROYAL LONDON ABSOLUTE RETURN GOVERNMENT BOND FUND

As of July 1, Risk Management and Administration

Assessment of Price Risk of Power under Indian Electricity Market

Updating the Gas Target Model

Risk Management Programme Guidelines

Hosted Treasury Management Solution

Risk Management. Risk Charts. Credit Risk

Disclosure 17 OffV (Credit Risk Mitigation Techniques)

Basel II: Operational Risk Implementation based on Risk Framework

Market-Consistent Valuation of the Sponsor Covenant and its use in Risk-Based Capital Assessment. Craig Turnbull FIA

ESC Project: INMES Integrated model of the energy system

Moody s Analytics Solutions for the Asset Manager

Risk Practitioner Conference

ICAAP Required Capital Assessment, Quantification & Allocation. Anand Borawake, VP, Risk Management, TD Bank anand.borawake@td.com

Item 7A. Quantitative and Qualitative Disclosures about Market Risk. Risk Management

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

Measurement of Banks Exposure to Interest Rate Risk and Principles for the Management of Interest Rate Risk respectively.

joint Resource Optimization and Scheduler

Hedging in the electricity market

Hot topics Treasury seminar

AVANTGARD Treasury, liquidity risk, and cash management. White Paper FINANCIAL RISK MANAGEMENT IN TREASURY

Developments in Risk Attribution

Master of Mathematical Finance: Course Descriptions

Principles and Practices in Credit Portfolio Management Findings of the 2011 IACPM Survey.

INTEREST RATE RISK IN THE BANKING BOOK

THE INSURANCE BUSINESS (SOLVENCY) RULES 2015

Procurement Category: Energy. Energy Market Forces: Friend or Foe?

Energy Trading. Jonas Abrahamsson Senior Vice President Trading. E.ON Capital Market Day Nordic Stockholm, July 3, 2006

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

Risk Management. Risk Management Overview. Credit Risk

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing

Risk Decomposition of Investment Portfolios. Dan dibartolomeo Northfield Webinar January 2014

Load Serving Entities and the Day-Ahead Market

Statement of Policy for the Risk Management Program

PUBLIC DEBT MANAGEMENT OFFICE: MAIN FUNCTIONS AND REQUIRED SKILLS

Asset Liability Management / Liability Driven Investment Optimization (LDIOpt)

PRODUCT HIGHLIGHTS SHEET

EEX Product Brochure Power

System Adequacy for Germany and its Neighbouring Countries: Transnational Monitoring and Assessment

Sensex Realized Volatility Index

Contents. List of Figures. List of Tables. List of Examples. Preface to Volume IV

ERM Exam Core Readings Fall Table of Contents

Valuation, Model and Data Risk Management

Rules on Southern Companies Energy Auction Participation

A SURVEY ON DEFAULT TIMES AS A TOOL FOR PORTFOLIO MANAGEMENT

Security of Supply Concept and Definition: On the Way to a Common Understanding?

Winter Impacts of Energy Efficiency In New England

Robust software capable of performing either using the Free of License SQL Express or the Standard edition of Microsoft, when available.

Copyright 2015 All rights reserved. Phelix Power Futures

Summary: Gas Balancing Study Austria

A Regime-Switching Model for Electricity Spot Prices. Gero Schindlmayr EnBW Trading GmbH

NATIONAL BANK OF ROMANIA

June Position Paper Contribution to the debate on electricity market design and capacity markets

Subject ST9 Enterprise Risk Management Syllabus

2013 IEEE. Digital Object Identifier:

Response by NIE Energy (PPB)

(Part.1) FOUNDATIONS OF RISK MANAGEMENT

The UK Electricity Market Reform and the Capacity Market

Basel Committee on Banking Supervision. Basel III counterparty credit risk - Frequently asked questions

An introduction to Value-at-Risk Learning Curve September 2003

A constant volatility framework for managing tail risk

Best Practices in Managing Market Data for ETRM Solutions

Olympia Capital Management

Investing in Volatility Strategies

Risk Management at a Leading Canadian Bank An Actuarial Science Graduate's View

The Master of Science in Finance (English Program) - MSF. Department of Banking and Finance. Chulalongkorn Business School. Chulalongkorn University

BASICS OF CREDIT VALUE ADJUSTMENTS AND IMPLICATIONS FOR THE ASSESSMENT OF HEDGE EFFECTIVENESS

Only a leader in Alternative Investments can offer you such a choice

International Financial Reporting Standard 7. Financial Instruments: Disclosures

Risks and uncertainties

Forward Risk-Hedging Products PC_2012_E_13

Risk Based Capital Guidelines; Market Risk. The Bank of New York Mellon Corporation Market Risk Disclosures. As of December 31, 2013

Valuation of Natural Gas Contracts and Storages

APT Integrated risk management for the buy-side

How To Know Market Risk

ARMS Counterparty Credit Risk

SaPHAL Sales Prediction powered by HANA and Predictive Analytics

Investment management of the Exchange Fund

The Methodology for the Mid-Term Forecasting of the Financial Results of Firms Belikov V.V., Gataullina R.I., Tregub I.V.

Investment Symposium March I3: Challenges in Implementing and Managing a Derivatives Program. Moderator Stephen Stone

SEI s Approach to Asset Allocation

Impact assessment of the new liquidity rules on Luxembourg banks

Das Risikokapitalmodell der Allianz Lebensversicherungs-AG

Financial Statistics & Risk Management Master s Degree Program

Model-based analysis of market integration and congestion in the

Transcription:

The Transmission System Operator as Service Provider The Example of the Procurement of Grid Losses in Austria Dr. Florian Leuthold, UMM / Market Management

Framework AUSTRIAN POWER GRID AG 15.04.2011 2

The Regulated Business In Austria the ElWOG law stipulates the role of the transmission system operator Amongst these tasks are regulated activities that requires marketbased methods Primary control Secondary control (Tertiary control) (Flow-based) Allocation of cross-border capacities If this creates rents, the transmission system operator is obliged to use the rents for price decrease or investments AUSTRIAN POWER GRID AG 15.04.2011 3

New Challenges and Opportunities Beginning with 2009, the Austrian regulator ECG evaluated whether the procurement of grid losses could be carried out centrally Coordinated procurement Procurement of standard products similar to those traded via exchanges or on the OTC market Daily clearing of residual positions via power exchanges Central clearing of balancing energy Loss forecast by the (distribution) system operators but monitoring by the APG Will be implemented if APG can gather 60% of Austrian s grid losses. Non-regulated activity! Incentive for APG to participate required! AUSTRIAN POWER GRID AG 15.04.2011 4

Portfolio Management AUSTRIAN POWER GRID AG 15.04.2011 5

Grid Losses in 2008 (APG) 500 450 400 350 Last [MW] Load [MW] 300 250 200 150 100 50 0 0 1000 2000 3000 4000 5000 6000 7000 8000 Zeit T AUSTRIAN POWER GRID AG Time T 15.04.2011 6

Decomposition of net position ( Lastgangzerlegung ) MW MW Compare Borchert et al. (2006) standard products T residual position base product peak product In a derivatives market netposition will be separated in a marketable part as well as in a spot market part Standard products are marketable liquidly at derivatives market; residual position will be counterbalanced at the spot market AUSTRIAN POWER GRID AG 15.04.2011 7

Load Decomposition: Minimizing Spot Market Quantities Objective: Minimizing the open spot quantity position Min: t (Load_forecast t -Hedge t ) 2 Pros: Easy to implement Market knowledge is not required Cons: Inter-temporal hedging options based on price-correlations are not taken into account Price gaps between futures and spot market cannot be exploited One-dimensional criterion Assessment: The open spot position itself is not a sufficient criterion in a liberalized electricity market Financial aspects and volatilities are more important than pure quantities AUSTRIAN POWER GRID AG 15.04.2011 8

Load Decomposition: Minimizing Spot Market Values Objective: Minimizing the market value of the open spot quantity position Min: t ((HPFC t *(Load_forecast t -Hedge t )) 2 ) Pros: Market prices are included (price forecasts required) Easy to implement Cons: Risk is in price volatilities not in absolute price numbers Price gaps between futures and spot market cannot be exploited One-dimensional criterion Assessment: The market value is consider to be a deterministic parameter The optimization is based on deterministic future prices (HPFC, Hourly Price Forward Curve) This approach fulfills the minimal requirements regarding a liberalized electricity market AUSTRIAN POWER GRID AG 15.04.2011 9

Load Decomposition: Minimizing Risk Measures Objective: Minimizing the market risk of the open spot quantity position Min: CVaR(Open_Position) See next slides Pros: Risk of spot market purchases is adequately taken into account Constraints due to risk attitudes can be included Market prices are included (price forecasts required) Reliable methodology Cons: Price gaps between futures and spot market cannot be exploited Assessment: The market value of the open position is treated as stochastic parameter State-of-the-art methodology for a liberalized electricity market Compatible with standard risk measures AUSTRIAN POWER GRID AG 15.04.2011 10

Load Decomposition: CVaR Definition Risk definition (CVaR) for the purchasing cost taking into account volatilities Probability VaR CVaR Maximum loss 0 Probability 1-ß Portfolio loss AUSTRIAN POWER GRID AG 15.04.2011 11

Load Decomposition: CVaR Minimization Based on Borchert and Schemm (2007) Min CVaR s. t. p _ fo VaR s t VaR p ( P _ 1 n * (1 ) H p * pm t, p s ) ( VaR P _ S t spot _ simu * P _ S ( P _ H * fp * pm ) VaR s t t, s t p p p t, p s t ) CVaR VaR VaR P_H p P_St p_fo t pm t,p fp p spot_simu t,s Variable for Conditional Value-at-Risk (objective value) Variable for Value-at-Risk Variable for values above Value-at-Risk Variable for hedge position per product p Variable for spot position in time increment t Parameter for load forecast in time increment t Parameter for product matrix describing which product p covers time increment t Parameter for futures (forward) price for product p Parameter for spot price in simulation s for time increment t n Scalar for number of simulations s Scalar for confidence level (e.g. 0.95 for 95%) s t Index for simulation Index for time increment AUSTRIAN POWER GRID AG 15.04.2011 12

Parameter Preparation 1. Correction for spikes 2. Impact of holidays and weekends 3. Local regression for seasonal corrections 4. Principal Component Analysis (PCA) to explain remaining variances AUSTRIAN POWER GRID AG 15.04.2011 13

Spot Price Simulations Stochastic processes First five factors of PCA explain 95% of the variance 1st factor loading: modeled by two processes ( Kalman filter) 2nd to 5th factor loading: modeled by one process each Jump diffusion process to model price spikes HPFC generation 1st step: Mean values of the processes 2nd step: Fitting to the observed forward prices ( arbitrage-free) Spot price simulations Monte-Carlo simulations of the factor loadings yield different HPFCs ( scenarios ) Spot price simulations not (yet!?) carried out by APG (external provider priceit) AUSTRIAN POWER GRID AG 15.04.2011 14

Load Decomposition: Efficient Frontier 10000 8000 Purchasing potential 6000 4000 2000-2000 Minimum CVaR Additional purchasing potential Minimal Spot Market Value Minimal Spot 0 Quantities 23500 24000 24500 25000 25500 26000 26500 27000 Risk Capital CVaR For a given risk attitude, the optimal expected purchasing cost can be realized AUSTRIAN POWER GRID AG 15.04.2011 15

Risk Management AUSTRIAN POWER GRID AG 15.04.2011 16

Procurement Path Price volatilities and market liquidity for forward products vary, i.e.: Long-term range (~ > 2 years): Low volatility, low liquidity Mid-term range (~ > 6 month): Medium volatility, medium liquidity Short-term range (~ < 6 month): High volatility, high liquidity S-strategy Procurement Path T - 2 year T Order strategy defines how much and when energy should be bought In the S-strategy, most of the quantities are within the mid-term rang AUSTRIAN POWER GRID AG 15.04.2011 17

Quantity Limits: Example Order path Limit paths Upper limit path Actual order Procurement path T - 2 years Limit for open long position [MWh] Lower limit path Limit for open short position [MWh] AUSTRIAN POWER GRID AG 15.04.2011 18

How to group that risks? Usually the energy business is subject to the following risk groups: Market Risk Credit Risk Operational Risk The spread risk of generation as well as the volumetric and weather risk associated with asset generation are borne by the generation companies. AUSTRIAN POWER GRID AG 15.04.2011 19

Market Risk Market risk describes the risk resulting from changes in market parameters which affects all open positions at asset-, trading and wholesale transactions Drivers: Market prices, volatilities, exchange rates, spreads, interest rates, correlations, different basis Measures: Definition and monitoring of Value-at-Risk (VaR) limits, Stress Limits, stop loss limits, volumetric limits AUSTRIAN POWER GRID AG 15.04.2011 20

Measure: Value at risk (VaR) The VaR decribes the maximum potential loss within a considered period (T) with a certain probability (confedence level) under the assumption of normally distibuted absolute daily market value changes ( MV). t 1 1 VaR a * T * T * MV t0 i t The Conditional Value-at-risk (CVaR) is the expected value of the losses that is greater than the VaR. i 0 CVaR ( a) * T 1 p * t 0 T * 1 t t 1 i 0 MV i AUSTRIAN POWER GRID AG 15.04.2011 21

Credit Risk Credit risk describes the risk resulting from business partners non-compliance with contractual obligations (e.g. not able or not willing to pay, insolvency) Drivers: Drivers are credit worthiness of business partners, delivery period, Markto-Market of the deal and contractual terms like payment conditions, withdrawal clause, netting agreement Measures: Definition and supervision of limits per Counterpart (Scoring) Counterpart and exposure monitoring Management of securities Netting AUSTRIAN POWER GRID AG 15.04.2011 22

Free credit limits per trade partner 20 18 16 exposure Exposure and und limits Limit of der counterparties Handelspartner Limit Exposure 20 18 16 14 12 10 8 6 4 2 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Credit Kredite line Mio in Mio 14 12 10 8 6 4 2 0 AUSTRIAN POWER GRID AG 15.04.2011 23

Operational Risk Operational risk describes the risk that results from financial damage due to lacks within the internal organisation (processes, systems, human activities) respectively financial damage because of external events (natural catastrophe, man-made disaster) Drivers: Drivers are change, complexity, complacency, as well as capacity, capability, availability Measures: Monitoring of error rates and documentation of faults (risk diary) Documentation of business processes Access rights in IT systems Measures for business continuity and business recovery in case of disaster AUSTRIAN POWER GRID AG 15.04.2011 24

Operational risk: A permanent beast Operational risk has some unfavourable characteristics: It forms a bundle of highly diverse risks It is inherent to business and therefore often taken unconsciously It may hit directly and indirectly, i.e. via a credit risk or a market risk Mostly, there is no reward for taking it Low frequency-high impact events play a very prominent role It is in most cases the operational risk that forms the second largest exposure of a bank! (e.g. internal fraud at Société Générale a couple of years ago) AUSTRIAN POWER GRID AG 15.04.2011 25

Organizational Issues AUSTRIAN POWER GRID AG 15.04.2011 26

Regulations and hierarchy of rules Public Bodies Laws, regulations, market rules etc. Board of Directors (group level) Executive orders e.g. organisation, authorisation, tasks Board or Responsible Board Member/Holding (competence area) Group policies e.g. rulebook, credit policy Managing Directors (inside trading company) Company policies e.g. risk management, documentation, archiving Departments (inside trading company) Working orders e.g. deal capture Collected in operations manual AUSTRIAN POWER GRID AG 15.04.2011 27

Group directive Company Rulebook Covers all activities of power trading and wholesale including energy related activities like emission trading, fuel hedging, etc. Objectives & Principles of Risk Management Transaction Principles Basic Orders and Overall Mandates for Trading, Wholesale and Retail Roles and Responsibilities in Risk Management Approved Trading Counterparties, Markets and Products Market and Product Approval Process Risk Management Methodologies (VaR etc.) Compliance & Reporting & Escalation Procedure to Risk Management Committee AUSTRIAN POWER GRID AG 15.04.2011 28

Conclusions AUSTRIAN POWER GRID AG 15.04.2011 29

Conclusions New tasks of the transmission system operator as service provider for other system operators Challenges Higher orientation towards established market methodologies to cope with and control new risk factors New know-how has to be brought into the company Opportunities Returns that do not result from the regulated business AUSTRIAN POWER GRID AG 15.04.2011 30

Further Developments / Challenges Building-up standard procedures regarding market data and analyzes Building-up knowledge in simulating market price developments HPFC Spot price simulations This is where the (research) action is! AUSTRIAN POWER GRID AG 15.04.2011 31

References / Bibliography Borchert, Jörg, and Ralf Schemm (2007). Einsatz der Portfoliotheorie im Asset Allokations- Prozess am Beispiel eines fiktiven Anlageraumes von Windkraftstandorten. Zeitschrift für Energiewirtschaft, 31(4), 311-322. Borchert, Jörg, Ralf Schemm, and Swen Korth (2006). Stromhandel eine quantitative Einführung in Institutionen, Marktmodelle, Pricing und Risikomanagement. Stuttgart: Schäffer- Poeschel Verlag. Müsgens, Felix and Burkhard Steinhausen (2010). Portfoliomanagement: Optimale Energiebeschaffung unter Berücksichtigung von Risiken. Zeitschrift für Energiewirtschaft, 34(2), 109-116. Weigt, Hannes (2009): Modeling Competition and Investment in Liberalized Electricity Markets. Dissertation, Dresden University of Technology. Available: http://nbnresolving.de/urn:nbn:de:bsz:14-qucosa-24711 AUSTRIAN POWER GRID AG 15.04.2011 32