Logistics Emergency Teams Annual Report 2014



Similar documents
Adopted by the Security Council at its 7268th meeting, on 18 September 2014

FOM International CSR Research Conference Implementing Sustainable CSR Management Solutions

International emergency response

Public-Private Sector Partnerships in Disaster Reduction Private sector companies are major contributors in response to disasters worldwide

WFP (Global) SPECIAL OPERATION SO (200345)

GUIDELINE STATEMENT REGARDING POSSIBLE EBOLA DEPLOYMENT BY PHS STAFF/VOLUNTEERS

Indonesian National Network on Disaster Resource Partnership (DRP)

Reg. Humanitarian Emergency Affairs (HEA) Director

Emergency Plan of Action (EPoA) Kiribati: Tropical Cyclone Pam

Humanitarian Logistics:

UNHCR provided tents, plastic sheets and kitchen equipment for families affected by Typhoon Haiyan in the Philippines

IASC Inter-Agency Standing Committee

GLOBAL MULTI-LAYER PLATFORM FOR RAPID RESPONSE & HUMANITARIAN AID

Road Freight Management. Customizable Products for Reliable Deliveries

How Humanitarian Logistics Information Systems Can Improve Humanitarian Supply Chains: A View from the Field

Yusen Logistics (Italy) S.p.A. A Company Profile

Novartis disaster relief process

Second Annual FedEx Award for Innovations in Disaster Preparedness Submission Form II. Basic Information on Project

The Regional Office with the Strategic Health Operation Centre and Subunits in Bangkok and Delhi is well prepared to respond to disease outbreaks and

7 FAM 1843 RESPONSIBILITY OF GOVERNMENTS

Ensuring WHO s capacity to prepare for and respond to future large-scale and sustained outbreaks and emergencies

Around the Corner or Around the World

DHL CARGO INSURANCE RELAX. YOU RE IN SAFE HANDS

Global health emergency workforce

WFP ETHIOPIA SPECIAL OPERATION SO

Disaster Management:Operations technical advice

WORLD HEALTH ORGANIZATION

Emergency Plan Of Action update

IOM Global Procurement and Supply Unit and its role in disaster management operations

E Distribution: GENERAL ADMINISTRATIVE AND MANAGERIAL MATTERS. Agenda item 13 REPORT ON THE USE OF CONSULTANTS IN WFP.

NINETY-FIRST MEETING WASHINGTON, D.C. APRIL

EBOLA RESPONSE ROADMAP

EBOLA RESPONSE ROADMAP ROADMAP SITUATION REPORT

The Asian Event Dedicated to Homeland and Civil Security

TERMS OF REFERENCE. Junior Professional Officer (JPO) Programme

Humanitarian Supply Chain Management An Overview

Full-time MSc in Logistics and Supply Chain Management

Mental health and psychosocial aspects of disaster preparedness in Thailand

Technical Level Lessons Learned Meeting Thematic Focus on Slow Onset Humanitarian Crises. Lessons Identified and Discussion Points - Overview

Chapter 7: Japan s humanitarian assistance

Multi-Hazard Disaster Risk Assessment (v2)

Disaster Preparedness and Response World Health Organization Regional Office for Europe. Introduction to the VRAM

HUMANITARIAN AFFAIRS THINK TANK

Malaria prevention through social media

SUMMARY OF VOLUNTARY PRINCIPLES IMPLEMENTATION EFFORTS DURING 2012

Ebola outbreak in West Africa What are the lessons learned from a coordinated network response in East Africa? CORDS HQ, Lyon 3 rd August 2014

UNICEF NIGERIA COUNTRY OFFICE Monthly Humanitarian Situation Report Date: 23 April, 2012

INTERNATIONAL FREIGHT FORWARDING

Emergency Plan of Action (EPoA) Philippines: Typhoon Hagupit

IASC In-Country Team Self-Assessment Tool for Natural Disaster Response Preparedness

TRANSITION FROM RELIEF TO DEVELOPMENT: Key Issues Related to Humanitarian and Recovery/Transition Programmes

Enhancing Regional Nuclear Emergency Preparedness in ASEAN. Alistair D. B. Cook NTS Centre Contact:

News service. DB Schenker: A reliable partner of the automotive industry

Global Logistics Service

Florida s Public Health and Medical Emergency Response System Emergency Support Function 8

GENERIC TERMS OF REFERENCE Environmental Field Advisor (EFA) OCHA Environmental Emergency Section (EES)

Vacancy Notice No. 2015/009

Human Resource (HR) Management Strategy

Long Term Recovery and Rehabilitation. Issues for discussion. Recovery

Comparison of internet connection records in the Investigatory Powers Bill with Danish Internet Session Logging legislation

DSV Air & Sea, Inc. Aerospace Sector. DSV Air & Sea, Inc. Aerospace

The Dynamics of Disaster Economics: The Philippines Recovery and Response to Typhoon Haiyan (Yolanda)

Joint Declaration on Post-Crisis Assessments and Recovery Planning

Nonprofit Saves 20 Percent in Data Center Costs with Cloud Solution

How To Help Disaster Recovery

The Training Material on Supply Chain Collaboration & Logistics Solutions has been produced under Project Sustainable Human Resource Development in

Your Success is Our Mission

(1) State of Disaster and Issues Stemming from Tropical Storm Ondoy and Typhoon Pepeng

Submission by the United States of America to the UN Framework Convention on Climate Change Communication of U.S. Adaptation Priorities May 29, 2015

USAR Nepal Earthquake Response Technical Evaluation

WHO HEALTH EMERGENCY PROGRAMME RESULTS FRAMEWORK AND BUDGET REQUIREMENTS May 2016

Security Risk Assessment Tool

Kuala Lumpur, Malaysia, May Report

ASEM Manila Conference on Disaster Risk Reduction and Management 4-6 June 2014, Manila, Philippines. Post- Haiyan/Yolanda A Way Forward

INTERNATIONAL CONFERENCE ON AFRICA S FIGHTAGAINST EBOLA - PLENARY OF AFRICAN HEADS OF STATE AND GOVERNMENT 21 July 2015

Moustafa Osman Disaster Management Expert

Doing More Without More

global Food Security Cluster INFORMATION MANAGEMENT FRAMEWORK

U.S. Army Contracting Command Rock Island Needs to Improve Contracting Officer s Representative Training and Appointment for Contingency Contracts

Volunteering with MapAction: Information for Prospective Volunteers

Sensitive handling of your sensitive shipments

How To Manage A Flood In Mozambique

ASEM Manila Conference on Disaster Risk Reduction and Management. Post- Haiyan A Way Forward Manila, Philippines June 2014

emergency.lu aims to improve the worldwide preparedness and rapid response capacity by filling the communication gap in the first hours and days

Towards a UNITAR office in Bergen, Norway

Company Profile. ISRA FREIGHT & LOGISTICS, basically handling Air, Ocean & Land import & export shipments to & from various worldwide destinations

Charter on Access to Health in Developing Countries

CONSULTANCY. Initial Terms of Reference Outbreaks and Humanitarian Emergencies Supply Chain Development Project

The best practice guide for businesses and human resources

sdv.com DEFENSE & SECURITY

AID FOR TRADE CASE STORY: ZIMBABWE

PAKISTAN - FLOODS AND COMPLEX EMERGENCY

P.O. Box No , Dubai, United Arab Emirates Tel : , Fax: info@oceanfrontdxb.com Website

Outbreak control and International Health Regulations (IHR)

The Emergency Market Mapping and Analysis (EMMA) Review A Summary

Cash transfer programming and the humanitarian system

Mapping of the Typhoon Haiyan Affected Areas in the Philippines Using Geospatial Data and Very High Resolution Satellite Images *

International Kidney Cancer Coalition. Patient organisations working together globally to support those affected by kidney cancer.

Business, Resiliency and Effective Disaster Recovery. Anne Kleffner, PhD Haskayne School of Business, University of Calgary

Transcription:

Annual Report 2014

LET Vision: To provide pro bono services, expertise and assets to the Logistics Cluster to support the humanitarian response for three to six weeks immediately following a large scale natural disaster LET Background & History January 2005 The Logistics Emergency Teams was initiated at the World Economic Forum to bring together the collective strengths of global logistics companies to support the UN World Food Programme, which is the appointed Logistics Cluster Lead agency during large scale natural disasters, and the UN partner to the LET. January 2008 The LET was officially operationalised at the World Economic Forum in Davos. The WEF facilitates the LET by providing a neutral platform for private sector logistics and transport companies to engage with the humanitarian community in response to a large scale natural disaster through the interface of the Logistics Cluster. LET Services Operationally, the LETs are small teams of representatives from participant companies composed of logistics experts. The teams are deployed in support of the Logistics Cluster during times of natural disaster where UN security phase is at level three or below. LET Strategy Focus Areas In 2014 the Logistics Cluster, WFP and the LET member companies conducted an operations lessons learned review and subsequently redesigned the requirements for deploying trained volunteers. This resulted in significant changes to the training and preparedness program as greater emphasis is put on local knowledge and logistics expertise. Communication & Engagement: Improve the communications capabilities of the LET for more effective engagement of employees, partners and suppliers Operations Model: Optimisation of the LET operations model to better support the Logistics Cluster Customs clearance and other services Operations management Service provisions including transportation Impact Measurement: Improve how we measure our effectiveness and performance Asset deployment Warehousing Capabilities & Competencies: Enhancement of capabilities and competencies of LET partners and the Logistics Cluster p 2

Becoming better responders through preparedness The Logistics Emergency Teams (LET) is comprised of three of the largest global logistics and transportation companies: Agility, Maersk and UPS, which work together to support the Logistics Cluster led by the United Nations World Food Programme. The partnership was initiated by the World Economic Forum in 2005. The LET welcomes new members who are committed to the LET mission to work in collaboration with the Logistics Cluster to enhance global preparedness, response and recovery, through the deployment of personnel, resources and technical expertise. The LET unites the capacity and resources of the logistics industry with the expertise and experience of the humanitarian community to provide more effective and efficient disaster relief. A key reason for cooperating through the LET is to provide demand-driven, efficient response. The LET is the first partnership of its kind, formalising a multi-stakeholder cooperation between the private and public sector. It remains one of the best WEF-initiated and operationalised public-private partnerships. LET Highlights 2014 In the absence of Emergency Response Missions to major natural disasters in 2014, LET efforts focused on preparedness and training activities in order to build staff capacity and be better responders when called upon. prone countries. This contributes to an increased level of preparedness and a better support to the humanitarian sector. LET guidance documents and procedures were revised accordingly. In 2014, ten Steering Committee meetings were held, of which two were conducted as face-to-face meetings in Rome, Italy (hosted by WFP) and Manila, Philippines (hosted by Maersk). Agility was responsible for operational aspects and as part of this initiated the coordination of LET involvement in updating the Logistics Capacity Assessments in West Africa. Maersk assumed two responsibilities: being the LET Chair for a two-year term and the lead company for LET communication. UPS was responsible for capacity development efforts and organized and assisted in facilitating the training of 22 LET members in Manila, Philippines. The Logistics Cluster has provided the LET with a new webpage, an agreement which includes a complete redesign of the previous website and its migration to a new platform inside the Logistics Cluster website. The LET communication approach was revised and as a result a Communication Strategy document has been finalized. Drawing on the well-established LET guidelines and practices tested during natural disasters, the companies provided bilateral logistical support upon request from the Logistics Cluster in the countries affected by Ebola and in the Philippines. Based on the experiences and lessons learnt in the Philippines operation, the LET has shifted its focus from deploying international staff towards training senior local supply chain specialists in disaster LET Activities 2010 Miami 2011 Jakarta, Amsterdam, Miami 2012 Bangkok 2014 Manila 2011 Nigeria 2012 Turkey, Kuwait, Indonesia 2013 Dominican Republic, Rwanda Myanmar Cyclone 2008 Philippines Typhoon 2009 Philippines Tropical Cyclone 2012 Philippines Typhoon 2014 Haiti Tropical Storm 2008 Haiti Earthquake 2010 West Africa Ebola 2014 Horn of Africa Famine 2011 Pakistan Floods 2010 West Sumatra Earthquake 2009 Japan Earthquake & Tsunami 2011 Indonesia Earthquake 2007 Disaster response When large-scale, sudden onset natural disasters strike, the LET partners are called by the WFP, acting as the Logistics Cluster lead, to provide humanitarian logistics support. The LET companies may then provide pro-bono assets and services and deploy highly trained experts to join the Logistics Cluster's staff in the disaster area. Logistics Capacity Assessments (LCAs) reports on critical elements of the logistics supply chain, such as port/airport capacities, road networks, storage facilities and transport resources. They are conducted in the countries that are most prone to natural disasters. Tranings Employees from LET companies who are selected as LET volunteers attend a three day training which focuses on humanitarian logistics, contingency operations and the natural disaster context. Only after completing this training can they be called upon to participate in the LET disaster response and preparedness activities. To date more than 150 employees have been trained as LET experts. Disaster Response outside the LET scope - in 2014, the LET member companies provided bilateral support to the Ebola and Typhoon Hagupit Response Operations. p 3

LET Operations Summary 2014 Training in Manila, Philippines In December 2014, 22 employees from Agility, Maersk and UPS participated in a three-day intensive Logistics Emergency Teams Responders training session at the Maersk local office in Manila, Philippines. The participants learned that an effective response to a natural disaster requires tremendous skill, determination, and collaboration. The overall training objective was to familiarize trainees with the Logistics Cluster approach and emergency mechanisms and to prepare LET volunteers for leadership roles during deployment after a natural disaster. "Preparedness is key to any emergency response and having a pool of experts from the LET trained on Logistics Cluster operations provides us with very valuable surge capacity." John Myraunet Deputy Global Logistics Cluster Coordinator, WFP Based on lessons learned, the LET revised its triggering process for deployment during natural disasters to focus on three priorities: local knowledge, rapid mobilization, and increased expertise of personnel. The LET now focuses on engaging local senior supply chain specialists as opposed to deploying international LET personnel to disaster areas in order to ensure that the first responders have good knowledge about local infrastructure, resources and culture. Additionally, the LET respondents are now engaged during the first 24 hours of the response effort to assist the Logistics Cluster in assessing the disaster landscape and assisting with developing the humanitarian supply chain solution. Each LET participant is now prepared to assume a local lead role, and support local disaster response preparedness. The content of the training included topics such as supply chain solution design, coordination, planning and information management, operational communication and health and safety. In addition, topics such as leadership and communication were considered crucial, as a deployed employee will be expected to operate independently and will be asked to communicate the LET s experiences to each organization after deployment. Participants also learned that during deployment they have to be able to operate in a high-stress environment, determined to achieve results and work as a team to prepare an effective response to a natural disaster. Conditions may be extreme and tasks can be physically and mentally challenging at times. Additionally, the LET training addressed challenges including behavior and personal safety during deployment and how to properly represent the Logistics Emergency Teams while operating under the UN banner. The training was facilitated by senior staff of the LET companies, previously deployed persons and senior UN personnel. "The real life case of a simulated teleconference between the Global Cluster Coordinator and the LET Steering Committee was great and really helped to understand the background and the process before a deployment." Participant of the training session LET Training 2014 49 hours of training sessions provided 22 LET experts trained people from 8 disaster prone countries attending p 4

Addendum Using the well-established LET guidelines and practices, Agility, Maersk and UPS have provided bilateral support to the Ebola and Typhoon Hagupit Response Operations. Although these Responses do not fall within the predefined scope of the LET Partnership, the companies agreed to step in, proving the value and adaptability that is key to the success of this unique partnership. Ebola Response Activities, West Africa The current outbreak of the Ebola Virus Disease in West Africa started in Guinea, with the first cases being reported in March 2014, and rapidly increased in scale and scope with cases being identified in Liberia and Sierra Leone. Since the virus was first discovered in 1976 this is the largest outbreak of Ebola with the highest number of infections and deaths. Under the framework of the LET partnership, the three member companies agreed to bilaterally support the Logistics Cluster in its response to the Ebola crisis. Even though this crisis did not strictly meet the LET triggering requirements in that it was not a sudden onset natural disaster the LET companies realized that this humanitarian emergency would require a high level of global logistics support. Agility, Maersk and UPS are therefore assisting the Logistics Cluster in filling gaps and bridging local knowledge for the Ebola crisis operation as it develops. with a total available capacity of more than 8,750 tons to the Ebola affected countries. So far, the shipped relief cargo included food aid, medical supplies and heavy duty vehicles for humanitarian organizations operating on the ground. Maersk also provided access to local logistics capacity and infrastructure information and, in addition, allocated four refrigerated and 21 dry containers which are being used for the storage of medical and humanitarian supplies. UPS has committed substantial resources and in-kind support including air, ocean and ground transposition for multiple relief shipments to West Africa. Through the LET partnership agreement, UPS together with the Logistics Cluster established an Ebola response air cargo staging area at the Cologne-Bonn Airport in Germany. The staging area, which was underwritten by UPS, provides around 3,000 square metres to support humanitarian organizations that need to transport critically required aid material by air. With the help of government funding, 265 tons of relief supplies have been processed and airlifted to West Africa by the WFP at no cost to 33 humanitarian agencies. UPS is committed to providing services for an average of three charters per month to ensure vital supplies are reaching the impacted countries in the coming months. Assistance under the LET framework Ebola Virus Disease Outbreak 2014 8,750 tons of free ocean fright 329 shipped containers 5,500 square metres Warehouse and open storage space 20,206 people infected 7,905 reported deaths 3 countries Access to local knowledge on logistics and infrastructure Bilateral engagements of LET member companies The Ebola Response is ongoing and as of 31 December 2014, the LET members companies had provided the assets and services described below. In its capacity as the LET operational lead, Agility coordinated the response activities provided by the companies. Through the LET partnership, Agility offered the Logistics Cluster 500 square metres of warehouse space and 2,000 square metres of shipping container and open storage space near the port of Tema in Ghana. Additionally, Agility has sought to provide storage space near the UN Humanitarian Response Depot which is currently the operational headquarter for the Logistics Cluster s Ebola response operations. Agility has also provided ground transportation services in Europe to transport critical cargo to the air staging area in Cologne, Germany. Maersk allocated significant resources to provide logistical support for the Ebola response operations. The Group is committed to staying in West Africa and continues maintaining its operations in Guinea, Liberia and Sierra Leone. Since the start of the response operation, Maersk has provided free ocean transportation of 329 shipping containers The LET member companies bilateral engagements with the Logistics Cluster proves the value and adaptability of the LET partnership in that it allows the largest logistics companies in the world to directly and bilaterally provide substantial support to humanitarian organizations in many different humanitarian emergencies worldwide. Without the LET partnership, this cooperation would not be possible. Typhoon Hagupit Response, Philippines Typhoon Hagupit first made landfall in the province of Eastern Samar, Philippines on the 6th of December 2014. It subsequently landed in the provinces of Masbate, Marinduque and Batangas and weakened into a tropical depression before leaving the Philippines on the 10th of December 2014. As of then, the Typhoon had affected around 2.7 million people across nine regions. A total of 1.4 million people were being assisted by evacuation centres. p 5

Under the framework of the LET partnership, the three member companies in cooperation with the WFP, the lead agency of the Logistics Cluster, agreed to provide bilateral support for the government-led response to Typhoon Hagupit. Even though this natural disaster did not strictly meet the LET triggering requirements in that the Logistics Cluster was not officially activated, logistics coordination, information sharing and logistics services were provided and augmented by the local expertise of the LET representatives. In addition to highlighting the adaptability of the unique partnership, the response proves the value of the new LET Training approach, implemented in the session held in Manila just days before Typhoon Hagupit made landfall. Within 24 hours, newly trained, local LET staff attended the operational coordination meetings held by the Logistics Cluster, providing information on infrastructure constraints, access limitations and logistics and supply chain operations in the typhoon affected areas. for the distribution of goods. In addition, Agility donated pallets, handling equipment and the transportation of six heavy haul trucks from Cebu to the distribution operations in Tacloban. UPS donated five trucks in the Tacloban area which were used for local aid distribution. All three LET member companies assisted with providing information about the status of ports, airports, air traffic and sea traffic. Five LET company staff members attended different Logistics Cluster Coordination Meetings, all of them had previously participated in the LET training which took place at the beginning of December in Manila. Assistance under the LET framework Bilateral engagements of LET member companies As LET operational lead, Agility coordinated the LET response provided by the companies and donated two trucks for the period of one month Donation of 7 trucks 5 LET experts assisting Access to logistics capacity and infrastructure information p 6