Supplier anti-counterfeit requirements April 2016

Similar documents
Counterfeit Parts Prevention

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

Aerospace Industries Association (AIA) Counterfeit Parts IPT

The New DoD Rules on Counterfeit Electronic Parts. Chris Haile Cathy Kunz Richard Arnholt Grant Book Jason Lynch June 5, 2014

Industry Assessment. Awareness and Industry Efforts to Combat Counterfeits in Aerospace & Military Electronic Component Procurement

Presentation of April 22, 2015

AEROSPACE QUALITY MANAGEMENT SYSTEM

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.

QCI Counterfeit Avoidance and Mitigation Procedure

UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme

Introduction to AS 9100

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Counterfeit Mitigation

AS9100C Revised Standard Improves Aerospace Quality

Kevin Sink VP of Quality TTI, Inc Fort Worth, Texas, USA

AS9100 B to C Revision

AEROSPACE AS6174 REV.

SOFTWARE VERIFICATION RESEARCH CENTRE SCHOOL OF INFORMATION TECHNOLOGY THE UNIVERSITY OF QUEENSLAND. Queensland 4072 Australia TECHNICAL REPORT

Aerospace Defense Medical Industrial. ERAI Supply Chain Security 2015

AS9100:2016 Transition Guide

DoD final rule for the detection and avoidance of counterfeit electronic parts impacts contractors operations

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ALL PRODUCTS MFG & SUPPLY

Supplier Quality Requirements F16 Program

ArmstrongRM.com. Our team has worked hard to earn this accreditation that will be a major benefit as we sell into this market.

Plan QAQ Supplier Quality Requirements (Rev 10)

Purchase Order Clauses and Conditions

Army Regulation Product Assurance. Army Quality Program. Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED

4. Quality Management System 4.1b & 4.2.2c

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

Helical Products Co., Inc.

Supplier Quality Assurance Requirements Manual

Quality Supplier Requirements for Beckwith Electric Co., Inc.

How DCMA Helps To Ensure Good Measurements

Presentation from: The Cyclops Group. Everything you expect from a class leading independent stocking distributor... and more.

NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES

IEC TC 107: your strategic tool in process management for avionics

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

Quality Assurance Provisions

Quality Management System Quality Manual

Aerospace Quality Management Requirements Update: April 2009

Supplier Requirements Manual M M 0 3

Steel procurement in major projects: Guidance on the application of social issues. Purpose

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

COVER: to be inserted. APIA Industry Guideline for Effective Auditing and Enhanced HSE Performance

AS9100 Quality Manual

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

Perception vs Reality: What Independent Distribution actually brings to the Supply Chain

Pb-free Electronics Risk Management (PERM) Consortium

Supplier Quality System Requirements

Support Services. Engineering solutions for operational excellence SERVING THE WORLD S RAILWAYS. Technical. Manufacturing Services

DEFENSE INDUSTRIAL BASE ASSESSMENT: COUNTERFEIT ELECTRONICS

1) CERTIFICATE OF COMPLIANCE/CONFORMANCE

AEROSPACE QUALITY MANAGEMENT SYSTEMS AUDIT, CERTIFICATION & TRAINING SERVICES

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT

QUALITY MANAGEMENT SYSTEM FOR THE AEROSPACE INDUSTRY

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

Uncontrolled Document

ISO 9001:2008 Audit Checklist

NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

Independent Distributor / Broker - Requirement Specification / Questionneire Version 3. exceet electronics

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

AMETEK Airtechnology Group Ltd

Quality Management System Manual ISO9001:2008

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

VENDOR QUALIFICATION APPROVAL FORM

TfNSW Standard Requirements TSR T Technical Management

ISO 9001:2015 Overview of the Revised International Standard

IAQG AS 9104 System Process Flowcharts

QUALITY MANAGEMENT SYSTEM Corporate

ISO 14001:2015: Key Changes

Services. Through Life Spares.

Title: Rio Tinto management system

INTRODUCTION: PURPOSE:

Supplier Quality Requirements and Clauses

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

THE BENEFITS. Facts/Figures

S i g N a t u r e D N A M a r k i n g

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

Version 1.0 July 11, Developed by: Electronic Enterprise Integration Committee Aerospace Industries Association, Inc.

Space project management

Generic CMMS Quality Assurance Plan

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

IEC Electronics Terms and Conditions

Product Order Quality Requirements Meggitt (Orange County), Inc.

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

Preparing yourself for ISO/IEC

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Quality management systems

TÜV UK Ltd Guidance & Self Evaluation Checklist

DEFENCE INSTRUCTIONS (GENERAL)

Turbo Resources International Quality Procedure

Transcription:

Supplier anti-counterfeit requirements April 2016 Prepared by: Jo Vann IEC TC107 WG3 Counterfeit electronic parts; avoidance, detection, mitigation, and disposition in avionics applications convener, see http://www.iec.ch/dyn/www/f?p=103:14:0::::fsp_org_id,fsp_lang_id:5736,25 Member of : SAE: G19A, G19AD, G19C, G19CI, AMPC, IAQG IEC TC107 WG3 IECQ WG6 UK CAWG 1

Counterfeit components Counterfeit wires (CALCE 2015): Counterfeit parts are on the rise, Paul Romano, Fusion Trade Figure 1: A counterfeit device that has been coated with a compound that will not be detected by normal permanency testing, but can be chipped off to reveal the remarked device. Vertical launches online component market to defeat counterfeit chip fraud, Dean Takahasi From Kozio blog 2

Recycling is increasing Uncontrolled processes 3

General Counterfeit statistics The Europol 2015 Situation Report on counterfeiting in the EU, see https://oami.europa.eu/ohimportal/documents/11370/80606/2015+situation +Report+on+Counterfeiting+in+the+EU: Ø 87,000 cases of detentions in 2013, resulting in nearly 36 million articles compared with 7,553 in 2002 EU taxations and Customs union IPR statistics from 2014, >95,000 cases were registered by Customs: large numbers of small packages detained containing cigarettes, toys, medicines, car spare parts and foodstuffs. International Anti-counterfeiting Coalition (IACC) estimates: Ø Ø 23,140 total number of IPR related seizures in 2014 from U.S. Department of Homeland Security, Intellectual Property Rights Seizures Statistics, Fiscal Year 2014 http://www.cbp.gov/sites/default/files/documents/2014%20ipr%20stats.pdf $1.77 Trillion is the Projected Value of Global Trade in Counterfeit and Pirated Goods in 2015 from the International Chamber of Commerce / BASCAP, Estimating the Global Economic and Social Impacts of Counterfeiting and Piracy (2011). 4

What is the Avionics problem? In 2010/2011 the USA DoD identified upwards of a million counterfeit components in their Military supply chain. This resulted in the anti-counterfeit DFAR 252.247.7007 invoked in contracts of major Avionics OEMS. Researcher IHS analysed electronics industry data in 2013 concerning counterfeit parts that were reported from 2001 until early 2012: Ø More than 12 million counterfeit parts have been reported over the last five years to 2013 Ø 57% of counterfeit part reports involved obsolete or end of life parts. Ø Nearly 37% of counterfeit parts involve components still being produced by manufacturers. Ø A single incident of a counterfeit part can cause up to 64 weeks of production line downtime and cost up to $2.1 million to resolve. Ø Counterfeit parts are mostly sold on the open market. 5

ERAI reported non-conforming and suspect counterfeit parts in USA 6

International anti-counterfeit standards for supply chains G19A SA E G19CI G19CI G-14 AAQS C ISO900 0 risk assess ment IEC Q IE C G21 AS6081 for nonfranchise d buys IECQ WG6 IEC/ TC107 WG3 DRAFT AS6171 and 16 Test Methods G19AD AS6496 Franchise d distributor G19C AS6301,AS646 2 audit checklist s AS617 4 for materiels Trade Body inspection guidelines, e.g. BEAMA AS5553 electronic component s IDEA STD 1010 visual inspection microcircuit s AS9100 rev C changin g to rev D April 2016 Draft ISO9001 new traceability audit for any industry IEC/TS 62668-1 for Avionic s OEMS IEC/TS 62668-2 risk assessm ent 7

IECQ anti-counterfeit audit roadmap IECQ WG6 has developed Third Party audit schemes for ( see http://www.iecq.org/publications/rules-procedures/ ) SAE AS5553A, OD 706-1 for any OEM in medium to high reliability industries SAE AS6081, OD706-2 for non-franchised distributors in medium to high reliability industries New IEC/TS 62668-1, OD706-3 for Avionics OEMs New draft ISO9001 Clause 6 risk mitigation - General Traceability audit for any industry- work in progress Benefit of IECQ audit schemes: On-line certificates viewable by any one Audits are available in your local language, please contact your IECQ CB, see http://www.iecq.org/members/bodies/mb-list.htm e.g. LCIE, DKE, DANSK, CNCA, JISC, BSI for BEC 8

Avionics Supply Chains and contract flow-down which includes AS9100 flow-down: USA Military DFARS in contracts DFAR 252.246.7007 electrical and SAE AS6171 Anti-C flowdown AS5553 ARP 6328 or IEC/TS 62668-2 risk assessmen t and/or SAE AS6171 General Avionics Customer NATO Directive referring to external standards OEM AS9100 UK Military DEF STAN 05-135 anticounterfeit, electronics and materials Avionics customer Anti-C flowdown IEC/ TS62668-1 and IEC/TS 62668-2 NEW DFAR Trusted supplier and Additional trusted supplier ARP 6178 nonfranchised distributor SAE AS5553 flowdown to suppliers ARP 6328 or IEC/TS 62668-2 risk assessmen t or SAE AS6171 SAE AS6496 Franchised distributors SAE AS6174 Materials OEM suppliers AS9100 preferred 9

Comparison between IEC/TS 62668-1:2016 edition 3 and SAE AS5553A for Avionics 10

Key steps for a business to avoid counterfeit and recycled components. START Restrict PO to OCM or franchised distributor Minimise buys from nonfranchised distributors Publish an anticounterfeit policy or plan Establish standard PO anti-counterfeit notes for suppliers Request supply chain traceability back to the OCM for all POs Trade-body Policy or external anticounterfeit standards END Manage excess stock and scrap Risk assess components from nonfranchised sources Implement an obsolescence management plan Implement an anti-counterfeit training program 11

Format of an anti-counterfeit plan Typically: Formatted in WORD as a traditional 6 part spec format under configuration control containing : Figures or an overall flowchart Clause 1. Scope, Clause 2. References Clause 3. Definitions and acronyms and abbreviations, Clause 4. Technical requirements directly addressing the mandatory requirements of the external standard or Trade- Body standard appropriate to your industry : Ø IEC/TS 62668-1 for an Avionics OEM who manufactures and services repairs etc. Ø SAE AS5553A section 4 for an OEM manufacturing electronic assemblies Ø SAE AS6496 for a franchised distributor Ø SAE AS6081 for a non-franchised distributor selling components into a high reliability customer. Ø SAE AS6174 for an OEM manufacturing mechanical assemblies Clause 5. Plan administration Clause 6. Bibliography and annexes where the annex contains a cross reference matrix of the auditees procedures which comply with the external standard mandatory requirements that is most appropriate. 12

SAE AS5553A mandatory requirement s i.e. shall requirements SAE AS5553A section 4 clauses for clause 4 of the OEMs anti-counterfeit plan Detailed requirements - keep clause 4 sub-clauses in the same sequence as SAE AS5553A section 4. OEM who owns the design IP where means the requirement shall be achieved. 4.1 Requirement for an anti-counterfeit plan 4.1.1 Personnel training OEMS s PCB subcontractor assembler 4.1.2 Parts availability i.e. obsolescence management plan 4.1.3 Purchasing process addressing how suppliers are audited and controlled, that preference is given to buying from OCMs and franchised sources and buys from non-franchised sources are risk assessed to a stated method. 4.1.4 Purchasing information for supply chain traceability back to the original source of supply. Flow down to subcontractors. Have evidence that an authorised supplier is selected for each Purchase order. The OEM manages this The OEM may: (1) provide their Approved Supplier List (ASL) and manage the auditing of suppliers on behalf of the subcontractor or (2) Only supply an Approved Manufacturer list (AML) and could allow the subcontractor the freedom to buy components themselves or (3) provide an AML and only allow the subcontractor to buy from the OCM or franchised sources. 13

SAE AS5553A anti-counterfeit management plan section 4 SAE AS5553A requireme nt Requirements 4.1.5 Verification of purchased or returned product required depending on product risk to determine authenticity of product e.g. visual inspection to IDEA-STD-1010 etc. 4.1.6 In process investigation of failures which could be caused by counterfeit or recycled components 4.1.7 Failure analysis shall include the testing needed to verify component authenticity 4.1.8 Material control of excess and non-conforming parts to prevent them from entering the supply chain under fraudulent circumstances, e.g. suspect components cannot be returned for a refund. 4.1.9 Reporting shall occur as appropriate to customers, local law enforcement etc. OEM who owns design IP OEM s PCB subcontr actor The OEM may manage this 4.1.10 Post delivery support shall be available for product returns and customer failures. Manged by OEM 14

IECQ WG6 proposed Traceability audit i.e. a 3 way check of part numbers for ISO9001 supply chains complying to ISO9001 Clause 6 Part B op'onal capability enhancing ac'vi'es to mi'gate against counterfeits, see Table 1 Industry segment recommended Test methods e.g. from Trade Bodies or external standards bodies, see Annex A Part number on Bill of Material Risk Mi'ga'ons: Sample verifica'on tests for nonfranchised buys and verifica'on of special tracking schemes Part number received Traceability paperwork Part number ordered Franchised suppliers The Part A traceability audit defined in the blue circles is a 3 way check to ensure: the manufacturer s part number of the component required is the same as the manufacturer s part number ordered and is the same as the manufacturer s part number received with supply chain traceability back to the original manufacturer. The Part B optional capability enhancing activities are rated on a score of 2 to 12 to indicate the robustness of the organisation to mitigate against the use and supply of counterfeits Approved communi'es Vertical audit in Goods Inwards/Stockroom : Select 6 or 8 parts off a Bill of Material, 15

Standard Anti-counterfeit standards summary Market sector Description Comments AS/EN/JISQ9100 Avionics OEMS General Quality Management System SAE AS5553 SAE AS6174 General industry but mainly used by Avionics OEMs General industry but mainly used by Avionics OEMs Set of 11 mandatory detailed requirements for how to buy, manage, and dispose of electronic components with reporting mechanisms when counterfeits are found Similar to SAE AS5553 for the procurement, management and disposal of electronic components but modified for material and mechanical components All Avionics OEMs are expected to operate to this standard which is currently at rev C. Revision D (due out in 2016 includes anticounterfeit requirements for material, mechanical and electrical components. This is a game changer for avionics industry Currently at revision A. Can be used to satisfy AS9100 rev D electrical component anti-counterfeit requirements. Next revision, rev B is in process to align it better with DFAR 252.246.7007. Mandated by most USA Prime Contractors. Can be used to satisfy AS9100 rev D anticounterfeit requirements. Use rev A. Please join the committee if you have concerns contact Robert Tipton, robert.tipton@wyle.com USA DFAR 252.246.7007 Military US supply chain OEMs Set of 12 mandatory detailed requirements for how to buy, manage, and dispose of electronic components with reporting mechanisms when counterfeits are found Used in US Military contracts. Set of mandatory rules for covering how to buy and dispose of electronics components with reporting rules when counterfeits are suspected or found. Can use SAE AS5553 and or IEC/TS 62668-1 and IEC/TS 62668-2 to comply 16

Standard Anti-counterfeit standards summary Market sector Description Comments UK Defence Standard 05-135 UK Military supply chain OEMs General overall anti-counterfeit requirements Used in UK Military contracts. Part of the UK Counterfeit Avoidance Maturity model which is used to assess how counterfeit aware suppliers are. Can use SAE AS5553 and/or IEC/TS 62668-1 and IEC/ TS 62668-2 to comply IEC/TS 62668-1 Avionics OEMs Anti-counterfeit requirements for the purchase and management of electrical components, management of the products IP and control of spares and repairs IEC/TS 62668-2 Avionics OEMs Risk assessment of electrical components purchased from non-franchised sources Allows the use of SAE AS5553 plans for components coming into a business. Considered to provide a more holistic approach to Avionics anti-counterfeit as covers spares and repairs operations. Preferred by European Prime contractors and suppliers. Complements SAE AS5553 and IEC/TS 62668-1 and advises on typical test methods without being overly prescriptive. ARP 6328 General industry but mainly used by Avionics OEMs Risk assessment to accompany SAE AS5553 when revision B is published. Contains updated SAE 5553A annexes in preparation for SAE AS5553B which will have no annexes AIR 6273 Terms, Definitions, and Acronyms- Counterfeit Materiel or Electrical, Electronic and Electromechanical Parts In ballot 17

Standard Anti-counterfeit standards summary Market sector Description Comments SAE AS6496 Franchised distributor for high reliability, Aerospace and Defence market Fraudulent/Counterfeit Electronics parts: Avoidance, Detection, Mitigation and Disposition- Authorised/ Franchised Distribution Released 2014 SAE AS6171 Component Test Houses for any market Test Methods Standards; Counterfeit Electronic Parts Main spec and 16 test methods are being balloted. Contains extensive risk mitigation process. Overly prescriptive to mitigate against legal liabilities. Very complicated and will be expensive to implement. Excellent deterrent. Not known who will request this. AS6081 Non-franchised distributors Fraudulent/Counterfeit Electronics parts: Avoidance, Detection, Mitigation and Disposition- Distributors; Counterfeit Electronic Parts: Avoidance Protocol, Distributors Parts are offered by non-franchised distributors with some basic testing which Avionics OEMs need to review in their application risk assessment process. Considered an input into SAE AS5553 or IEC/TS 62668-2 risk assessment ARP 6178 Non-franchised distributors Fraudulent/Counterfeit Electronic Parts: Tool for Risk Assessment of Distributors Very useful Excel spread-sheet with macro to remotely audit non-franchised distributors. Considered an input into SAE AS5553 or IEC/TS 62668-2 risk assessment 18

Standard Anti-counterfeit standards summary Market sector Description Comments AS6462A Auditing bodies and OEMS AS5553A Counterfeit Electronic Parts: Avoidance, Detection, Mitigation and Disposition Verification Criteria Audit checklist for SAE AS5553A for use by OEMs and Third party auditing bodies. AS6301 Auditing bodies and OEMS AS6081 Fraudulent/ Counterfeit Electronics parts: Avoidance, Detection, Mitigation and Disposition- Distributors Verification criteria Issued in 2014 19

UK Defence Standard 05-135 Avoidance of counterfeit material, published July 2014 High level language requiring a clear requirement to manage the risk in supply chains depending on the criticality of the material in relation to performance and safety where the supplier is aware of the final use of the materiel ( electronic components, material and mechanical components). The supplier shall be able to demonstrate the materiel meets the original qualification requirements and the safety and performance of the deliverable materiel and ensure it is not degraded. Ø Ø Ø Ø Ø Ø Ø Ø An anti-counterfeit policy Flow-down to suppliers Appointment of a management representative Training Purchasing controls Test and verification Control of non-conforming product Reporting On-line web-based training packages being developed. Information has been provided to NATO who may issue anticounterfeit guidance soon to all members. 20

IEC committee TC107 WG3 Counterfeit electronic parts see http://www.iec.ch/dyn/www/f?p=103:14:0::::fsp_org_id,fsp_lang_id:5736,25 Ø IEC/TS 62668-1, PROCESS MANAGEMENT FOR AVIONICS COUNTERFEIT PREVENTION Part 1: Avoiding the use of counterfeit, fraudulent and recycled electronic components Ø Published a revision in 2014, with a revision due out soon to explain the DFAR Ø Allows the use of SAE AS5553A plans for components coming into the business. Ø Enables OEMs to have one overall plan for SAE AS5553A and IEC/TS 62668-1 Ø Discusses when recycled components become fraudulent components and why the Avionics industry cannot use them. Ø Also manages spares and repairs Ø Refers to the now published IEC/TS 62668-2 PROCESS MANAGEMENT FOR AVIONICS COUNTERFEIT PREVENTION Part 2: Managing electronic components from nonfranchised sources. Ø Used as the IEC/TS 62668-1 non franchised distributor risk assessment process. Ø Revision in process to refer to SAE AS6171 test methods and other risk assessments Ø Can also be used as a risk assessment process for the following: Ø SAE AS5553A, Ø DFAR rule 252.246.7007 Ø DEF STANDARD 05-135 21

SAE International Anti-counterfeit Specifications SAE AS5553A for Electronic components See http://www.sae.org/ G-19 committee has active membership mainly from the USA and UK SAE AS5553A was published in January 2013 superseding SAE AS5553 which has misleading definitions. Manages components coming into a business only. Targeted at general industry and AS9100 requirement is not mandatory. Revision B was started to incorporate DFAR 252.246.7007 to the extent that general industry will allow. Meetings still on-going. The SAE has no Third Party auditing activities but is working with PRI http://p-r-i.org/ to establish an audit process which Boeing may endorse. The audit checklist for SAE AS5553A is published as SAE AS6462A. IECQ WG06 has the documents for SAE AS5553 auditing if your customer endorses an IECQ audit. The APMC committee will host an anti-counterfeit update April 19 th, contact John Clatworthy of the SAE if you wish to attend. 22

How one anti-counterfeit plan can address: DEF STD 05-135 DFAR 252.246.7007 SAE AS5553A IEC/TS 62668-1 using the nonfranchised risk assessment process from: IEC/TS 62668-2 23

2016 Avionics anti-counterfeit supply chain 24

The Avionics Supply Chain Using COTS components targeted for other markets (what we cannot control) To build products that must meet mil-aero requirements (what we must control) Aerospace Electronics Depends on materials and components developed for other industries Vastly different lifecycle applications Requirements flow - down vs. products flow - up process is disrupted here 1. Parts & Materials Suppliers Parts Boards Solder etc. 3-6 yr Lifecycle 2. Board Assemblers Contract Mfg. Aerospace Captive 3. Avionics OEMs, Logistics, Maintenance and Repair Suppliers Suppliers 4. Platform Integrators 15-40 yr Lifecycle Customers 5. Operators & Regulators Global Supply Chain SAE AS5553A counterfeit avoidance IEC/TS 62668-1/SAE AS5553A Anticounterfeit and IEC/TS 62239-1 ECMP Most life cycle costs are incurred here and managed by ECMP 25 25

Overview 26

Anti-counterfeit summary 2016 Contact information: Jo Vann, TC107 WG3 Anti-counterfeit convenor, CEO- Component Technology, GE Aviation Systems Ltd., T +44 (0)1242 632927 F +44 (0)1242 661151 E jo.vann@ge.com www.ge.com/aviation 27