Relocation of a water meter



Similar documents
repairing leaks to your service pipe increasing water efficiency

LEAKING SUPPLY PIPE? YOUR GUIDE TO WATER SUPPLY LEAKS. You were out when we visited today.

Standard terms and conditions

Water Leakage & Your Responsibilities

Replacing lead and common supply pipes

NETWORK OPERATIONS. Siteworks Charging. From May

Your Guide to Household Water Metering

Finding and fixing leaks Our Code of Practice for leakage from domestic water supplies

South East Region Leakage Code of Practice. Affinity Water Limited CODE OF PRACTICE ON LEAKAGE

Leakage Code of Practice. Domestic Customers

CITY OF ST. CATHARINES. A By-law to regulate the supply of water and to provide for the maintenance and management of

Leaks on supply pipes....and how they can affect you

Water Main Breaks After Normal Operating Hours

DISTRIBUTION CONNECTION

Getting the job done: Moving your gas supply. Why would I need to alter my gas supply? What to expect. Working on your property

Business Entire Plumbing Contractions And Reviews

Advisory Note. Plumbing Regulation PLUMBING AND DRAINAGE SERVICES INSTALLED IN PROXIMITY OF OTHER SERVICES AND UNDERGROUND OBSTRUCTIONS

Water Main Break During Normal Operating Hours

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Working together to prevent leaks. dripping

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

SEWER BACK UP PREVENTION PILOT PROGRAM

Guidelines for Excavations

Water meter maintenance guide. How to look after the meter so we can charge you correctly

Judgment category classification: C Judgment ID number: [2011] NTMC 012 Number of paragraphs: 31

CONNECTIONS AND OTHER DISTRIBUTION SERVICES CHARGES

CONSTRUCTION PERMIT REQUIREMENTS

Getting the job done: Moving your gas supply. Why would I need to alter my gas supply? What to expect. How we work

COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS

Getting Connected. A guide to how to apply for a New Connection to the Network

Reference Guide for Obtaining Permits and Utility Services For New Construction

Additional Services Charges

Dealing with leaks. Our code of practice: on leakage

When your water supply has a leak

your electric service: from overhead to underground

Underground Commercial Electric Service

CD i -STREETS- Detail #

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Guidelines for Rights of Way

Leakage from customers supply pipes. code of practice

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Close-Out Documents... 9

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

guide for obtaining new water and waste water services

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Electrical Safety Tips. Help us keep you safe

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Additional Services Agreement. Part 3: Schedule of our requirements

HERNDON/MUNCEY, INC. Office: (281) INVESTIGATIVE PLUMBING

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Town House Center Highway North Huntingdon, PA 15642

Sports Buildings: budget costs for the Flood Relief Fund

Electric Instantaneous. Water Heaters. Service manual

Trenching and Excavation Safety

code of practice for household customers

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

LS 2540 SEWER LATERALS AND INSPECTION TEES

Application for a water connection to a commercial or mixed use development

Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:

Gas Meter Clearances and Service Installation Requirements

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

DESCRIPTION OF WORK:

Contact Information...12 Payment Methods Accepted...12 Disclaimer...12

Chapter WATERWORKS Sections: Owners responsibility Right of city to prohibit certain uses City not responsible

How To Install An Overhead Sewer

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

o you Our standards of service

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Application for the Alteration of a Gas Supply

A Century of Progress with Pride

New Water/Sewer Connection Application Packet Residential. City of Plummer P.O. Box B, Plummer, ID (208)

TOWNSVILLE WATER Customer Service Standards

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

NCCER Progress Blvd., Alachua, FL Tel: (888) Task Number Item Date(s) Recorded By

STANDARD PLUMBING AND DRAINAGE REGULATION 2003

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions

What do you need to do?

REQUEST FOR ELECTRIC SERVICE Commercial

SEWER BACKUP PREVENTION PROGRAM

Essential Water. Customer Charter

REGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

SECTION STORM DRAIN SYSTEM

Gas Meter Clearances and Service Installation Requirements

UNIVERSITY PRE-SCHOOL & CHILDCARE CENTRE

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

BUSINESS CUSTOMER CHARTER

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

For a building with a crawl space, see Figure

SHALLOW UTILITIES JOINT PROVISIONING GUIDELINES SCOPE

Section I - General. Page 1 of 5

Frequently asked Questions about Drinking Water Supply.

EQUIPMENT OVERVIEW... 4 SETTING UP CALL MANAGER...5

PRIVATE WELL SEPARATION

Connex. Mortarless Masonry Block System

Level 1 Certificate in Network Construction Operations - Gas ( )

Downspout to storm sewer. Leaky laterals

A Guide To The New Termite Standards (revised 09/02/2001)

Transcription:

Relocation of a water meter 20mm and 25mm meters

Relocation of a water meter If you require your water meter to be relocated, the following rules apply: Water meters can only be installed within one metre inside of the front boundary line of the property. Meters may not be raised or lowered by more than one metre. All plumbing work upstream of the meter (from main to meter) will be carried out by Icon Water. For meters that are being moved less than 1.5 metres to the left or right or vertically less than one metre of the current position, Icon Water will complete all plumbing works (both upstream and downstream). For meters that are being moved more than 1.5 metres to the left or right of the current position, a new connection to the main is required and the existing connection to the main will be disconnected. All plumbing work carried out downstream of the water meter must be carried out by a licenced plumber appointed by the customer and external service plans need to be submitted for approval. Water meters must be installed according to Icon Water s Water Supply and Sewerage Standards. The location of underground utilities must be carried out prior to any excavations taking place (Dial Before You Dig). II Relocation of a water meter

Post 1999 Installation garden tap meter cover isolation valve main cock meter Icon Water CONNECTION PIPE to house HOUSE PLUMBING water main 2016 2017 Table of Fees for Meter Relocation (GST does not apply to water services unless otherwise stated). Requirements Options Estimated Cost Raise or lower the water meter by less than one metre Move meter less than 1.5 metres to the left or right of its current position Excavation and backfill by customer Excavation and backfill xi00 by Icon Water xi0 xi Excavation and backfill by customer Excavation and backfill by Icon Water $701 $1033 $701 $1033 L1014 I23456 Move meter more than 1.5 metres to the left or right of its current position Excavation and backfill by customer Excavation and backfill by Icon Water (upstream of meter only) where the main is on the same side of the road as the customer s property * Excavation and backfill by Icon Water (upstream of meter only) where the main is on the opposite side of the road to the customer s property * $2152 $3530 $6349 Relocation of a water meter 1

Where is the water main located? Contact Dial Before You Dig, refer to the Plumbing Tie Search, or contact Icon Water s General Enquiries team at talktous@iconwater.com.au or 6248 3111 (opt 3). What is not included in the quote? Prices quoted are for standard installations that do not include any encumbrances (eg retaining walls, hedges, trees, driveways, paving etc). Icon Water will assess and quote according to the nature of the encumbrance for non-standard installations. Icon Water will not be responsible for any restoration or reinstatement of driveways, pathways, tiling, walls, landscaping, concrete or other structures. How to apply Complete and submit a Request for Quotation for Non-Contestable Hydraulic Work form (available at iconwater.com.au) to talktous@iconwater.com.au. Icon Water will contact you once your application has been processed. Raise or lower the water meter less than one metre Excavation and Backfill by Customer Step 1: Customer organises excavation in preparation for Icon Water attendance, in line with a predetermined time schedule (customer to ensure that excavated area is appropriately barricaded, and made safe). The location of underground utilities must be carried out prior to any excavations taking place (Dial Before You Dig). Step 2: Icon Water isolates water, re-plumbs service to the new meter location and recommissions the connection. Step 3: Customer backfills the trench and re-instates the site with materials approved by Icon Water. 2 Relocation of a water meter

Raise or lower the water meter less than one metre Excavation and Backfill by Icon Water Step 1: Icon Water organises excavation in preparation for meter relocation. Step 2: Icon Water isolates supply, re-plumbs service to the new meter location and recommissions the connection. Step 3: Icon Water backfills the trench with approved materials. Customer is responsible for reinstatement of site and the backfilling of all works downstream of the new meter. Move meter less than 1.5 metres to the left or right of its current position Excavation and Backfill by Customer Step 1: Customer organises excavation in preparation for Icon Water attendance, in line with a predetermined time schedule (customer to ensure that excavated area is appropriately barricaded, and made safe). The location of underground utilities must be carried out by the customer prior to any excavations taking place (Dial Before You Dig). Step 2: Icon Water isolates supply, re-plumbs service to the new meter location and recommissions the connection. Step 3: Customer backfills trench and re-instates the site with materials approved by Icon Water. Move meter less than 1.5 metres to the left or right of its current position Excavation and Backfill by Icon Water Step 1: Icon Water organises excavation in preparation for meter relocation. Step 2 Icon Water isolates supply, re-plumbs service to the new meter location and recommissions the connection. Step 3: Icon Water backfills trench with approved materials. Customer is responsible for reinstatement of site and the backfilling of all works downstream of the new meter. Relocation of a water meter 3

Move meter more than 1.5 metres to the left or right of its current position Excavation and Backfill by Customer Requires new service connection to water main and disconnection of the existing service. External services plans need to be submitted. Step 1: Customer organises excavation in preparation for Icon Water attendance, in line with a predetermined time schedule. This includes excavation of the existing service (where it meets the main), the new service and under road boring (as required). Customer to ensure that excavated area is apparopriatley barricaded and made safe. The location of underground utilities must be carried out by the customer prior to any excavations taking place (Dial Before You Dig). Step 2: Customer organises a licensed plumber to carry out the necessary works on the downstream plumbing. Step 3: Icon Water re-lays a new service from the main to the new meter location, installs the water meter and completes a service tap-in to the water main, commissioning the connection. Step 4: Icon Water disconnects the redundant service. Step 5: Customer backfills trench and re-instates the site with materials approved by Icon Water. 4 Relocation of a water meter

Move meter more than 1.5 metres to the left or right of its current position Excavation and Backfill by Icon Water Requires new service connection to water main and disconnection of the existing service. External services plans need to be submitted. Step 1: Icon Water organises excavation in preparation for the new service connection in accordance with a predetermined time schedule (on the upstream side of the new meter location and the connection point for the redundant service). Step 2: Customer organises a licensed plumber to carry out the necessary works on the downstream plumbing. Step 3: Icon Water re-lays a new service from the main to the new meter location, installs the water meter and completes a service tap-in to the water main, commissioning the connection. Step 4: Icon Water disconnects the redundant service. Step 5: Icon Water backfills the trench with approved materials upstream of the water meter. Customer is responsible for reinstatement of site and the backfilling of all works downstream of the new meter. Relocation of a water meter 5

Talk to us E talktous@iconwater.com.au T (02) 6248 3111 @iconwater GPO Box 366, Canberra ACT 2601 iconwater.com.au Language assistance 13 14 50 24 hours Icon Water Limited ABN 86 069 381 960