Project Team Name/Company Phone

Similar documents
SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

Example Specification for Concrete using Current Building Code Requirements

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

(B) Reinforcing and Tie Bars shall conform to the requirements of Mn/DOT 3301 unless otherwise shown on the Contract Drawings.

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Concrete Specification for Cooling Tower and Basin

Embedded Parts Introduction - Anchors

The minimum reinforcement for the stem wall is the placement of:

FORM DESIGN. easy to work with, and generally available.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

STANDARD OPERATING PROCEDURE BUILDING & SITE DEVELOPMENT

Wastewater Capital Projects Management Standard Construction Specification

Cold Weather Concrete Practices

Acceptance Codes APPENDIX - A. Acceptance Criteria

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

SECTION 1 GENERAL REQUIREMENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

Presentation Goals and Outline. Introduction to Post-Tensioning. The Precast Show 2014 NPCA 1. Post-Tensioning Institute.

FIVE STAR PRODUCTS, INC. (800)

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

MeltonStone Cast Stone Product Specifications

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

C. Section TESTING LABORATORY SERVICE.

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

Strengthening and Repair of Reinforced Concrete Structures. Ian Wienholt Business Development Manager

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

LAYING BLOCK AND BRICK

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Chockfast Red HF Epoxy Grout

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Structural Foundation System

Resurfacing Concrete. Page 1 of 5

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Guide Specification Precast Concrete Products

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

PART E SPECIFICATIONS

SECTION GUARDRAILS

SECTION PRECAST CONCRETE STRUCTURES

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Division 4 Section Concrete Masonry Specifications

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

COMMONLY USED RESIDENTIAL BUILDING CODES

Installation PowerPoint for Grasscrete Formers

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

6 RETROFITTING POST & PIER HOUSES

PUMP JACK SYSTEM AND ACCESSORIES

Section 500 Rigid Pavement

Precast Concrete Parking Structures

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

MATERIALS DIVISION MEMORANDUM

Operations and Instruction Manual Might Swivel - Part # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Quality Assurance Concepts. Outline

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

CONCRETE CHAPTER 19. Italics are used for text within Sections 1903 through 1908 of this code to indicate provisions that differ from ACI 318.

Properties of Fresh Concrete

Concrete Pavement Rehabilitation: Repairing Florida One Slab At A Time

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

FIRESTOPPING & SMOKE SEALS

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

REPAIRS, MODIFICATIONS, AND STRENGTHENING WITH POST-TENSIONING

SECTION POLISHED CONCRETE FINISHING

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Virginia Approach Spans

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS

DENVER MODEL 30 X 30 SPECIFICATIONS

White rust on galvanized and galvanized pre-painted steel. Technical Information

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

DMS REINFORCED CONCRETE PIPE AND MACHINE-MADE PRECAST CONCRETE BOX CULVERT FABRICATION AND PLANT QUALIFICATION

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

SECTION 807 PUMP STATION REHABILITATION

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Chapter. Restoration of Damaged Structures

Transcription:

City of Bellevue POST-TENSIONED CONCRETE PRECONSTRUCTION MEETING AGENDA APPENDIX B3 Project Name/Location: Meeting Date: First Pour Date: Project Team Name/Company Phone Email Building Official* Building Inspector* Structural Engineer* General Contractor* Special Inspector* PT Supplier Rebar Supplier Concrete Supplier PT Placer Rebar Placer Concrete Placer Concrete Finisher * Attendance is required. Submittals The following submittals shall be reviewed, approved, and on-site prior to placing concrete for post-tensioned beams and/or slabs: Concrete Mix Design Rebar Shop Drawings Formwork Shop Drawings or System Information Slab penetration & in-slab conduit layout PT Shop Drawings Stressing pocket bonding agent & grout data Embedded items Deferred Submittals (Hold Down Anchors, In-Slab Duct Systems, Etc.)

A. GENERAL PT ITEMS 1.) Pour Statistics Expected Number of Pours: Number of Levels: Typical Slab Thicknesses: Largest Pour: C.Y. S.F. Typical Pour: C.Y. S.F. 2.) Concrete Mix The concrete mix shall be approved by the Structural Engineer (EOR), and shall be as follows: Mix design # will be used. Mix is continuously approved: Yes No The maximum aggregate size is inches. The minimum clearance or spacing is inches. The maximum allowed slump is inches. The minimum slump for use with PT is 4 inches. Design concrete strength is psi at days. Strength for stressing is psi at days. NOTE: The maximum slump for the mix may not be exceeded, even if the drawings or specifications allow a higher slump. Under no circumstances shall the maximum slump allowed be the average slump expected. 3.) Concrete Sampling Tests shall be taken at the point of placement whenever possible. 4.) Rejection Procedures Concrete not in conformance with the mix designs or other stated requirements shall be rejected. Rejection procedure shall be: 5.) PT Samples Sample pieces of PT cable approximately 6 feet long are to be delivered with every shipment of cable to the job site. Samples shall be from the same batch or heat as the strands with which they were sent. These samples are to be tagged and held in the testing laboratory along with the mill certifications. 6.) Stressing Equipment Well calibrated, properly maintained equipment is critical to reliably stressing PT cables. Will 2 sets of stressing equipment be kept on site? Yes No Will matching ram and gauge calibrations be supplied? Yes No 2

NOTE: Extra equipment may be useful in cases of equipment malfunction or tolerance problems. 7.) Structural Observation Structural observation by a representative of the EOR is strongly encouraged. The planned structural observation schedule includes: Observation of PT with the inspector prior to the first pour: Yes No Pre-pour observation of any subsequent placements with significant differences from the first: Yes No Observation of PT for total pours. Observation report will be written and submitted to. 8.) Mechanical/Electrical/Plumbing Coordination The contractor shall ensure that placement of nonstructural systems is coordinated with the placement of reinforcement. 9.) Unusual Conditions Please note any conditions that make the PT for this project unusual or different from typical project completed in this area: PT Beams or Walls: Corrosion-Resistant Systems: Large or Numerous Deck Openings: Stressing Accessibility: In-Slab Ducting System: Other Conditions: B. ITEMS REVIEWED PRIOR TO EACH PT DECK POUR 1.) Overpour Check vertical element for overpours. Overpours are locations where vertical sections have been poured higher than per plans such that they extend vertically into the slabs or beams. Concrete walls and columns shall not extend more than 1/2 inch into the bottom of beams, slabs, or drop caps. If slip joints are used at the top of a wall, no overpour is acceptable. 2.) Formwork Formwork shall be stable, cambered if required, clean, and properly supported to carry the weight of all materials and construction loading. 3.) Construction Joints All construction joints shall be inspected for any required keyways and added rebar per the structural drawings. 4.) Stud Rails The size, length, spacing, and number of studs and the thickness, length, and width of the bottom plate shall be reviewed to verify compliance with the structural drawings. The number, placing, and positioning of the stud rail shall also be reviewed to verify compliance with the structural drawings. 3

5.) PT Support All PT cables shall be supported by rebar, on chairs, or on continuous slab bolsters at a maximum spacing of 4 feet on center. All cables shall be securely tied to these supports to ensure final position after concrete placement. Back-up bars are required at all anchor locations per the structural drawings and the PT shop drawings. Hairpins are required at locations where horizontal curvature of the cable is severe as defined in the structural drawings. 6.) PT Placement PT cables shall be installed and placed to the allowable tolerances as indicated on the structural drawings. Slab tendon tolerance shall be +/- inches for the vertical profile as shown on the PT shop drawings. The special inspector shall review all cable counts, spacings, profiles, and anchorages prior to placing concrete. All stressing end anchors and pocket formers shall be firmly connected to the edge form. Grommets shall be well greased. 7.) PT Clearance A minimum clearance of inches (3 is typical) shall be verified from PT cables to the edges of openings or sleeves. Sleeves may not be used near anchors. 8.) PT Encapsulation For encapsulated systems as shown on the structural drawings, all PT system components shall be enclosed in a watertight assembly. Because PT cables under stress corrode much faster than typical steel, this assembly is critical to providing a high level of durability. All components of the systems shall be firmly attached to the anchors. Translucent sleeves shall be completely filled with grease. Cuts or tears in the cable sheathing shall be taped with a spiral wrap. No bare cable may be exposed. The inspector shall issue a report verifying that these conditions have been satisfied for each pour. 9.) Rebar All rebar shall be installed and placed within allowable tolerances as indicated in the structural drawings and per ACI 318. The special inspector shall review all rebar sizes, spacings, clearances, and laps prior to pouring. No wet setting of rebar is permitted. 10.) Unexpected Pour Interruptions The contractor shall have a contingency plan for the creation of construction joints to allow for the unexpected interruption of a pour due to pump failure, concrete supply interruption, heavy rains, etc. This plan should be discussed with the EOR in advance, and materials for additional keyways and reinforcing should be available on site. 11.) 4 Hour Waiting Period A 4 hour minimum time between the special inspector s approval of reinforcement and placing of the concrete shall be observed. The purpose of the waiting period is to assure that work is complete, inspected, and approved prior to the start of the pour. Exception: The city inspector may make an exception to the 4 hour minimum rule for a minor item provided the concrete is never placed at any point on the deck until the inspector has completed the final inspection and has approved all mild steel and PT cable placement in writing. No other workers may be on the deck during this 4

final inspection. Violations may result in a stop-work order posted by the city (usually a 3 day minimum to have a stop-work order removed). C. ITEMS REVIEWED DURING EACH PT DECK POUR 1.) Special Inspection During the Pour Special inspection shall be provided continuously throughout the pour. At a minimum, one special inspector shall observe the placement of concrete on the deck and one inspector shall meet the concrete trucks to verify batch tickets and take test cylinders at the point of delivery. 2.) Pour Watch The contractor shall designate an individual to be on pour watch and accompany the special inspector to correct any PT or other reinforcement that is displaced during the pour. This individual may not have other duties that will conflict with the pour watch. 3.) Test Cylinders The city requires a minimum of 3 laboratory cured cylinders for every 150 cubic yards of concrete placed. Of those, one is to be tested at 7 days and two at 28 days. In total, the special inspector shall take total test cylinders for verifying the concrete strength. These shall be as follows: at 3 days (for stressing must be field cured) at 7 days at 28 days at 56 days at 90 days It may be helpful to take one additional cylinder to hold in case of problems with other cylinders. Other testing issues to consider: Will maturity testing be used? Yes No Are 4x8 cylinders acceptable? Yes No May all the cylinders be field-cured? Yes No Field cured cylinders must be placed on the deck or in a thermocouple box connected to the deck and protected in such a way as to assure that they benefit from the deck s heat of hydration. Under no circumstances may lab cured cylinders be used in place of field cured cylinders for determining the strength of the deck for stressing purposes. 4.) Air Entrainment and Slump Air content as specified in the drawings is air content at the point of placement. Target slump as specified in the mix design shall be the slump allowed at the point of placement. If the concrete is pumped, the concrete supplier shall coordinate with the contractor to provide the proper allowance for air loss and slump changes due to pumping to ensure that air content and slump will be as specified. Concrete with excessive slumps will not be placed. 5

5.) Adding Water No water shall be added to the concrete at the site unless the supplier has withheld an equal or greater amount from the total water shown on the approved mix design. Each batch ticket shall clearly show how much water, if any, may be added. The person responsible for ordering the concrete and requesting that permissible amounts of added water be listed on the batch ticket is. The ticket shall be provided to the inspector who will observe the addition of any water and log it in the inspection report. 6.) Superplasticizer A superplasticizer may be added at the site after the concrete has been successfully tested for slump. A quality-control representative of the concrete supplier should be on site to establish the dosage for the initial loads. Superplasticizer shall not be used in conjunction with air entrainment unless the potential air loss has been accounted for by the supplier. 7.) Concrete placement Place concrete per the requirements of ACI 301, taking any necessary precautions for hot or cold weather conditions if required. Do not dislocate rebar, post-tensioning cables, or other reinforcement while placing concrete. Special precautions may be necessary if concrete is being placed with a bucket due to the surge at the discharge point, or if hoses are being dragged across the deck. 8.) No wet setting All rebar and post-tensioned placement should be completed within the area of the pour before the pour begins. No placing of rebar, post-tensioning, inserts, sleeves, conduit, dowels, anchor bolts, etc., shall be allowed after the inspector has given the final approval to pour. 9.) Consolidation Consolidation, particularly around the PT anchors, is critical. It is difficult to segregate PT concrete mixes with a vibrator, so additional vibration should be done if there are any doubts about adequate consolidation. Concrete has failed at anchors due to inadequate consolidation. Besides requiring repair, these failures involve high forces and flying concrete and can be extremely dangerous. Disturbing the concrete around the PT anchors after it has been placed and consolidated is prohibited. 10.) Evaporative Retarder Evaporative retarder as specified in the structural drawings or specifications shall be applied. Plastic shrinkage cracks are created by excessive evaporation from the top of the slab, and may begin to form immediately. To prevent this, the top of the slab must be sealed as soon as possible with an evaporative retarder. An evaporative retarder is sprayed on the slab immediately after placing and reduces evaporation until the top of the slab is finished. Ensure that this product is compatible with the curing compound. 11.) Curing Follow curing procedures as specified in the structural drawings or specifications. Good curing is one of the most important strategies in creating quality concrete. If curing with a spray-applied curing compound, apply the product immediately after slab finishing. On slabs with a broom finish or other roughened finish, apply two 6

coats in opposite directions. See the drawings or specifications for additional curing information. D. ITEM REVIEWED AFTER EACH PT DECK POUR 1.) Stressing Preparation Clean out any slurry or concrete from the anchors to allow proper seating of the wedges. Clean the tendon tails of grease with a cloth or other means in order to accept the paint that the inspector will use for measuring the elongation. 2.) Concrete Stressing Strength Concrete strength shall be a minimum of psi for stressing. 3.) Stressing The contractor shall follow the stressing procedures given on the structural drawings and the PT shop drawings. Stressing involves extremely high forces and failure to follow proper procedures may cause serious injury. Stressing shall consist of stressing one cable, then stopping while the stressing foreman and the special inspector both independently measure the elongation. If the elongation as determined by the special inspector is within tolerance, they may repeat this procedure for a second cable. If the second cable is also within tolerance, they may repeat the procedure for a third cable. If the third cable is also within tolerance, it is acceptable for the stressing crew to proceed slightly ahead of the special inspector. This procedure shall be repeated as often as is deemed necessary by the special inspector. The special inspector shall observe all stressing operations and record all final measurements. Where multiple stressing crews work simultaneously, multiple special inspectors are required. Measured elongation tolerances shall be: 7% of the calculated value unless noted:. For short pulls, are tolerances of ¼ acceptable? Yes No In cases where the actual elongation falls outside of this range, do not proceed. Contact the EOR and the PT supplier to determine the problem before continuing. Stressing shall not continue until the EOR approves the resumption of stressing. Note that special inspector measures elongations and gauge readings, but does not operate the stressing equipment. 4.) Elongation Reports Once stressing is completed, the inspector shall fax (or email) the final stressing report to the EOR for review and approval as soon as possible. The tendon tails may not be cut off until approval is received. 5.) Cutting and Capping Tendon Tails Cutting and finishing of the tendon tails shall be witnessed by the special inspector. The watertight cap shall be applied immediately to the anchor to ensure that the cable, which was dried during the cutting process, remains dry. Finishing of the stressing end shall be verified by the inspector. 7

6.) Stressing Blockouts Stressing blockouts shall be patched within one week of receiving approval to cut the tendon tails. Before patching, the concrete in the blockouts shall be kept clean and free of rust inhibitors or other materials which may interfere with the bond of the grout patch. 7.) Stripping Forms Unless noted otherwise on the structural drawings, slab and beam formwork may be stripped after the stressing report has been approved. Verify the reshoring schedule with the formwork supplier before loading the newly poured deck with formwork. 8.) Soffit Curing When required by the structural drawings or specifications, apply a spray-applied curing compound to the bottom of the slab and beams after removal of the forms. This limits drying on the underside of the structure after the concrete is exposed and improves the quality of curing. 9.) Closure Strips Closure strips may require that forms remain in place on each side of the closure until the strip has been poured and the concrete in it has reached 75% of its design strength. Closure strips for this project shall be poured no sooner than days after the slab on both sides has been poured and stressed. 10.) Cutting, Coring, and Drilling The contractor shall take precautions when cutting, coring, drilling, or shooting into PT slabs and beams to avoid damage to the reinforcing. Cables and rebar shall be located and the information submitted to the EOR for review. Work may not begin until the EOR has approved the specific location where work is to be done. E. ADDITIONAL PT DECK ISSUES Other issues specific to this project to be considered are: 8