Building plans approval explained

Similar documents
SUBDIVISION OF AGRICULTURAL LAND ACT 70 OF 1970

No Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act

LESS FORMAL TOWNSHIP ESTABLISHMENT ACT 113 OF 1991

DEVLOPMENT APPLICATION PROCEDURES

Development Variance Permit Application Package

ARTICLE V ADMINISTRATION AND ENFORCEMENT

H 5815 S T A T E O F R H O D E I S L A N D

CITY OF SUBIACO. PLANNING POLICY 1.4 (September 2013) PUBLIC NOTIFICATION OF PLANNING PROPOSALS

PUBLIC NOTICE OF INTENT. Bylaw No A BYLAW FOR ESTABLISHING A DEVELOPMENT LEVY FOR LANDS THAT ARE TO BE DEVELOPED OR REDEVELOPED WITHIN THE

CITY OF CAPE TOWN ZONING SCHEME REGULATIONS

Building Report & Consent

ACCOUNTING OFFICERS CHIEF FINANCIAL OFFICERS HEADS OF PROCUREMENT GUIDELINE FOR BID COMMITTEE MEMBERS

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

LOUISIANA STATE BAR ASSOCIATION PLAN OF LEGAL SPECIALIZATION

How To Apply For Land Division In Australia

Government Gazette REPUBLIC OF SOUTH AFRICA. AIDS HELPLINE: Prevention is the cure

BBB Rules of Non-Binding Arbitration for Extended Service Plans/Extended Service Coverage Naming BBB as Administrator

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Kingston Rd Removal of a Holding Provision (H) Application Final Report

GAS INDUSTRY ACT 2001 COST RECOVERY ORDER IN COUNCIL

Reporting Service Performance Information

Local Government Requirements: A Handbook for CHILD CARE PROVIDERS

Zoning Most Frequently Asked Questions

Health Services Act 1997 No 154

BUILDING AGREEMENT. between: ( the Owner ) and. ( the Builder )

Statement of Guidance: Outsourcing All Regulated Entities

Fence By-law. PS-6 Consolidated May 14, This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada

Pre-Application Planning Advice

RE: PCAOB Rulemaking Docket Matter No. 004 Statement Regarding the Establishment of Auditing and Other Professional Standards

Practice Guidance Note 6 Environmental Impact Assessment - Screening & Scoping Opinions

4-1 Architectural Design Control 4-1 ARCHITECTURAL DESIGN CONTROL 1

Public Invitation of Ideas for Developing a Global Tourism Hub in Yumeshima

[Second Reprint] SENATE, No. 123 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION

ENGINEERING COUNCIL OF SOUTH AFRICA

DEVELOPMENT MANAGEMENT

Land Use Series. Check List # 1I For Adoption of an Amendment to a Plan. December 22, Bringing Knowledge to Life!

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) SUBMISSION TO THE ECONOMIC REGULATION AUTHORITY

CONSUMER DEPOSIT POLICY

A Guide to the Design Build Process

PRACTICE DIRECTIONS IMMIGRATION AND ASYLUM CHAMBERS OF THE FIRST- TIER TRIBUNAL AND THE UPPER TRIBUNAL

CERTIFIED FINANCIAL PLANNER BOARD OF STANDARDS, INC. FINANCIAL PLANNING PRACTICE STANDARDS

The Shareholder Rights Directive becomes law.

BUSINESS ENTITIES PART I LIMITED LIABILITY PARTNERSHIPS

Guide to Planning and Zoning Laws of New York State

In force as of 15 March 2005 based on decision by the President of NIB ARBITRATION REGULATIONS

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

Draft code of practice no: 13 Governance and administration of occupational defined contribution trust-based schemes

The Companies Act Audit requirement and other matters related to the audit

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

Loan regulations (Adopted by the Administrative Council by Resolution 1562, on 14 November 2013)

IBA Guide on Shareholders Agreements

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Submission to WorkCover Western Australia. Legislative Review 2013

BUILDING CONTRACT MEMORANDUM OF AGREEMENT AND CONDITIONS OF CONTRACT

Sample Contractual Clauses for an Asset Management Agreement. by the. Industry Organisation for Asset Management. of the

COMMONWEALTH OF PENNSYLVANIA AGRICULTURAL SECURITY AREA HANDBOOK

PROMOTION AND PROTECTION OF INVESTMENT BILL

REPUBLIC OF ARMENIA LAW ON COMPULSORY INSURANCE OF LIABILITY ARISING OUT OF THE USE OF MOTOR VEHICLES CHAPTER 1 GENERAL PROVISIONS

AS TABLED IN THE HOUSE OF ASSEMBLY

RULES OF THE ALTERNATIVE DOMAIN NAME DISPUTE RESOLUTION PROCEDURE FOR.SI TOP-LEVEL DOMAINS (ARDS Rules)

Pre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014)

Endorsement Guide. A brief overview of ALTA Title Insurance Endorsements

Code of practice no: 13 Governance and administration of occupational trust-based schemes providing money purchase benefits

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

Employee Benefits & Investment Management Update

MAINE REVENUE SERVICES PROPERTY TAX DIVISION PROPERTY TAX BULLETIN NO. 10

The principle of excess land is a fundamental concept in appraisal practice,

LAWS AND GUIDELINES REGARDING YOUR INVOLVEMENT IN SHAPING HEALTH POLICY

Shed Application Package

Risk management systems of responsible entities: Further proposals

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

SITE PLAN APPROVAL PROCESS INTRODUCTION

SUPPORTING INNOVATION AND RESILIENCY IN THE CHARITABLE AND NON-PROFIT SECTOR

NORTHERN TERRITORY ELECTRICITY RING-FENCING CODE

NEW HOME BUYER PROTECTION (GENERAL) REGULATION

CONTACT(S) Riana Wiesner +44(0) Jana Streckenbach +44(0)

Registered at the Post Offıce as a Newspaper CONTENTS

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

Mobile Homes Act new licensing enforcement tools

Alternative Dispute Resolution (ADR) Procedures

CANADA PROVINCE OF QUEBEC ENFORCEMENT OF FOREIGN JUDGMENT

Rules of Arbitration

Transport Regulations (Port Tariff,Complaint, Dispute Resolution and Planning)

Development Control of Buildings in Hong Kong

Background. Audit Quality and Public Interest vs. Cost

TORONTO MUNICIPAL CODE CHAPTER 880, FIRE ROUTES. Chapter 880 FIRE ROUTES

Planning Committee. Terms of Reference

EMERGENCY MANAGEMENT ACT

More immediately, existing economic and human capital must be maximised as the country faces the challenges of the current financial crisis.

HOW TO DO A CITY REFERENDUM

Saskatchewan Human Rights Commission Accessibility Rights of Persons with Disabilities Building Standards

Recent Developments Affecting the Disclosure of Test Data and Materials: Comments Regarding the 1996 Statement on the Disclosure of Test Data 1

Practice Note

The FOS Approach Mortgagee sales

17. What is the effective date of this rule? A: This rule is effective March 17, 2014 (60 days from the date of publication).

GENERAL LAWS OF MASSACHUSETTS

GUIDANCE NOTE DECISION-MAKING PROCESS

Concept of and need for assurance

SAMPLE MULTI-YEAR LEASE AGREEMENT

Client Relationship Model ( CRM ) - Frequently Asked Questions

Land Acquisition and Development Finance Part IV

Transcription:

Building plans approval explained Most architects, many builders, certainly the majority of property developers, and a significant number of private home owners, have had some kind of exposure to the processes of applying for municipal approval of development proposals. This has either been in the form of a simple building plan application or via the more delicate procedure of changing land use rights by means of a consent or rezoning in order to facilitate the re-development of a parcel of land. Unfortunately, many of these people will have some painful memories associated with the complexities of local authority approval processes. As somebody on the other side of the fence, a council official, I sympathise particularly with those who are unaware of the nuances and the pitfalls to be encountered when trying to get to grips with the various pieces of legislation that govern the use of land and buildings. This brings us to the purpose of this article. My objective, stated simply, is to try to explain how and why the system of building control operates, and to shed some light on aspects of building control that are not always easy to understand. Although the principles discussed are generic, it should be born in mind, however, that my approach is from the vantage point of a large metropolitan municipality, and specifically that of the City of Johannesburg. Scope I propose, by means of these articles, to describe the legislation and standards that form the basis for all local authority building control measures; to clarify the difference between building regulations and deemed to satisfy rules ; to briefly describe the interaction between this legislation and a town planning scheme; and to list important town planning procedures that need to be attended to prior to obtaining building plan approval. Your indulgence is requested, however, in that while I am a practitioner of building control, I am not a legal expert I cannot point you to interpretations of the finer points of legislation, or a dissection of judgements and precedent. I am confident, however, that the reader will benefit from a logical unpacking of the background as well as the practical interpretation and application of building control legislation and standards in the day-to-day operation of a local authority as it interacts with the property development community. And that, ultimately, is what this process comprises an interaction between two parties the City council and the owner or developer of a piece of land and its buildings. Both parties have a vital interest in the process of developing land and erecting buildings. Ideally, this interaction should assume the characteristics of a partnership rather than a confrontation, as bureaucratic mystique is unravelled and dispelled on the one hand and, on the other hand, there is a growing appreciation of the importance of development controls that are applied and managed by an impartial agent.

The legislation The National Building Regulations and Building Standards Act (Act 103 of 1977 together with its subsequent amendments) is the cornerstone of building control in South Africa. And the National Building Regulations (SABS 0400) are essential to the implementation of this legislation. Prior to the promulgation of this Act, every town council in South Africa had its own set of building by-laws, many of which were archaic and convoluted, to say the least. Act 103 of 1977 swept the old order aside and introduced a fairer dispensation, which was aligned with the technical realities of building construction and design in the late twentieth century. Derived from the Nordic model, this piece of legislation was intended to provide for the promotion of uniformity in the law relating to the erection of buildings in the areas of jurisdiction of local authorities; for the prescribing of building standards; and for matters connected therewith (to quote the long title of the Act). Its aim which was given effect when the National Building Regulations were published was to provide a simplified and uniform system of building control, irrespective of whether this was to be accomplished in a country town or in one of the major urban centres. The primary focus of the Act was not on constricting design, or prescribing compliance with a myriad of technical factors, but rather on simply ensuring that buildings would be designed and constructed in such a way that people could live, work and play in a healthy and safe environment. That is not to say that the Act and its regulations are unsophisticated on the contrary, this was a progressive piece of legislation in its day and the regulations that were published pursuant to the Act, while dated in certain respects in today s terms 1, were based on a system that has achieved worldwide recognition in the subsequent two decades. And this brings one to the nub of the question, which is the National Building Regulations themselves. The Building Regulations Building by-laws were traditionally prescriptive in nature they prescribed in definite terms and in considerable detail what a designer had to do in order to obtain the necessary approval to build. This was a narrow approach that worked well in the early years of the century, but it became an impediment to the ideal of innovation in design and construction as buildings became more sophisticated; and it perpetuated a homogeneous but constrictive technical paradigm. 1 I must qualify this statement by adding that this situation has been remedied in that the SABS has just completed an exhaustive process of updating and revising the National Building Regulations.

With the formulation of the National Building Regulations 2, an entirely different approach was adopted, whereby each regulation prescribes only the performance required from a building or its elements and components. The onus is then on the designer to prove that a specific design complies with the performance requirements. These performance regulations are, however, accompanied by a set of deemed to satisfy rules, which are a set of specific prescriptions. Any designer who complies with these rules is automatically considered to have met the requirements of the regulation. Thus, the system allows for individualism and innovation, but it also provides a set of tools that are readily applicable in the case of more conventional buildings. This system is based on the Nordic five-level structure 3. The levels of the Nordic system are as follows: Objectives addressing the essential interests of the total community with regard to buildings; Functional requirements stating in qualitative terms the required performance of buildings or elements thereof in order to achieve the stated goal; Performance requirements stating in quantitative terms the performance required to achieve a functional requirement (these, in effect, are the regulations ); and Verification methods systems or methodologies that enable verification of compliance with performance requirements. There are two categories of verification methods: the first is performance-based (testing, assessment and the application of well-established engineering principles); the second makes use of deemed to satisfy rules (a set of prescriptions that satisfy performance requirements). The latter is, essentially, the fifth level in the system. Drawbacks Unfortunately, the culture of local government in devising administrative systems and procedures for building control has, by default, created a paradigm whereby the prescriptive aspects of the National Building Regulations are deferred to and given prominence to the extent that some building control practitioners have, in fact, forgotten about the fact that building control is essentially performance-based. Applicants that is building industry professionals and property developers benefit, by and large, from a regime of ensuring compliance with the deemed to satisfy rules, simply because of the predictability and certainty involved. 2 Published in the form of SABS 0400-1990, South African Standard Code of Practice for the application of the National Building Regulations, by the South African Bureau of Standards, Pretoria. 3 Watermeyer, R.B., and Milford, R.V.: The Use of Performance Based Building Codes to attain Sustainable Housing Objectives: The South African Approach Global Policy Summit on the Role of Performance-Based Building Regulations in Addressing Societal Expectations, International Policy, and Local Needs, National Academy of Sciences, Washington, DC, November 2003, pp 9-10.

But it is also important to assert the right to submit unconventional designs for approval. The sole requirement is that such proposals should be accompanied by a comprehensive motivation on the basis of recognised tests or a rational application of engineering principles, demonstrating to the satisfaction of the local authority that the performance requirements of the relevant regulations have been met by the design. And should a local authority prove to be obdurate or unreasonable in assessing such proposals there is recourse by way of an appeal to the South African Bureau of Standards Review Board, a body that has been set up to arbitrate in instances where an applicant disagrees with the local authority in regard to the approval or refusal of a set of building plans. Other applicable laws The National Building Regulations and Building Standards Act, in setting out the parameters for approval by a local authority of building plan applications, makes the following stipulation 4 : If a local authority having considered a recommendation referred to Section (6) (a) 5 is satisfied that the application in question complies with the requirements of this Act and any other applicable law, it shall grant its approval in respect thereof. The key words here are any other applicable law. Local authorities, in accordance with various provincial ordinances, regulate the use of land for development by means of town planning schemes, effectively a set of rules setting out the administrative and technical parameters for such things as changes in the use of land and buildings (also known as rezoning or an amendment scheme ), sub-division of land, consents such as building line relaxations and site development plan approvals and the establishment of townships. Insofar as any one of these aspects of a town planning scheme has a direct impact on a building plan application, the local authority is then required to ensure that the building plan application in question complies, not only with the National Building Regulations and Building Standards Act, but also with specific clauses in the relevant town planning scheme. An example Let s take the example of a property developer who purchases a parcel of land comprising an existing house and its outbuildings, with the intention of constructing a small office block on the site. The developer instructs an architect to design the office block and to submit drawings to the local authority for approval. The architect proceeds in terms of 4 Section 7 (1) (a) of Act 103 of 1977 as amended. 5 This is the recommendation made by the appointed building control officer, or those to whom he has delegated this function, that a building plan application be approved by the local authority. Section 5 of the Act deals with the appointment of a building control officer by the local authority, and Section 6 with the functions of a building control officer.

this mandate, carefully ensuring that the design proposals comply in every respect with the deemed to satisfy rules of the National Building Regulations and that the application itself is submitted in the format required by the Act and regulations. The local authority, however, refuses to approve the application on town planning grounds. The architect approaches the local authority for clarification and is advised that the parcel of land is currently zoned Residential 1, which means that the only kind of building that is permitted on the stand is a house and its outbuildings. In order to erect and use an office block on the site it would be necessary to formally apply for the site to be rezoned Commercial in accordance with both the applicable town planning scheme and the relevant provincial ordinance. This is a separate process, involving town planning expertise, and could take up to 18 months to complete. In addition, let s say that the proposed office block in my hypothetical example is to be built directly upon the street boundary, whereas the town planning scheme dictates a six metre building line a zone of six metres from the street where no buildings may be erected. In order to erect a building within this zone it is necessary to apply for the council s consent, again in terms of the town planning scheme and provincial ordinance, for the relaxation of the building line, another separate process that would take about two months to complete. The local authority may have appeared to have been obstructive in refusing the initial application, but it can be seen that it is in fact obliged by law to ensure that the provisions of the town planning scheme (and the relevant ordinances) are applied when a property is redeveloped and therefore cannot approve the building plans until the conditions that pertain to land use are legally changed to permit the kind of development for which building plan approval has been sought. Pre-conditions for building plans There a number of town planning procedures that must be complied with prior to submitting a building plan application to the local authority for approval. I have listed some of the most important of these procedures bear in mind, however, that there are differences between councils, and, particularly, between provinces, in the way in which town planning schemes are set up and administered. Township proclamation A building plan application, other than one for agricultural buildings, can only be considered if the piece of ground on which the building is to be erected has been proclaimed as a township, and therefore forms a part of the urban system. There are still many parcels of land on the periphery of the major urban centres that are agricultural portions and these are often the most

sought after parcels of ground for the development of townhouses, cluster houses and retail developments, none of which can be approved without prior township proclamation. Building line relaxation Whenever a designer proposes that a building is built (or extended) across a building line, a separate application has to be made for the relaxation of that building line. In cases where the building line is a condition in the title deeds of the property, the application for relaxation of the building line would also involve an application for removal of that particular title deed condition in terms of the legislation governing the removal of title deed restrictions. The services of a professional town planner are essential in the latter case. Site development plan approval Specific land use zonings, as well as the new conditions that may be spelled out when land is rezoned, require that a site development plan is submitted to the local authority for approval prior to the submission of building plans. This process must not be confused with the site plan that is submitted with a building plan application. Approval of a site development plan is, in itself, a formal consent that has to be given by the local authority in terms of the applicable town planning scheme, and involves the submission of a set of plans that shows, among other things, how the town planning rights (floor area ratio, coverage, density and so forth) are utilised in the proposed development, the layout of the development, its appearance, the use of landscaping, and any other specific factors that may be called for by a particular local authority. Subdivision In a set of circumstances where a parcel of land is to be divided into smaller portions, the council s consent to the subdivision is required, and the subdivision must be registered at the Deeds Office before building plan applications can be submitted for new buildings on the proposed new portions. In more complex situations, application for a subdivision may also necessitate the removal of restrictive conditions of title from the title deeds and/or rezoning. Rezoning ( amendment schemes ) In cases where the use of a proposed building development differs from that which is permitted on a particular piece of ground in terms of the applicable town planning scheme, an application has to be made to the local authority for a change in the uses applicable to the stand, hence the popular term rezoning (the correct term is an amendment scheme, because the applicable town planning scheme is amended so as to permit a different set of uses and conditions on the specific erf in question). This can be a lengthy process involving advertising of the intention to rezone, an opportunity for objections to be submitted to the local authority by interested and affected parties, the circulation of the application by the local authority to a number of other departments and government bodies for

comment, the preparation of an environmental impact assessment report in accordance with environmental legislation, and the calculation of development contributions (moneys that would have to be paid to compensate the local authority for the additional infrastructure that would have to be provided in view of the change in use of the stand). A rezoning application is also required in cases where, although the use of the property remains the same, a change in conditions such as the height restriction, the coverage allowed, the density zoning or the permitted floor area ratio are necessitated by the proposed new building development. Rezoning applications are subject to a formal hearing when there are objections by interested parties, and the final decision can also be subject to an appeal to a higher authority (such as the Townships Board). Conclusion Submitting building plans for approval by a local authority is a lot more complex than it seems on the surface, and I think it is also clear that this is a process that requires specific professional expertise and which can take a considerable amount of time. Potential property developers, and those who are about to purchase a property with the intention of either altering existing buildings or erecting new buildings, need to realistically factor this aspect of the process into both their estimates of the time and the costs that will be involved. This article was first published in <i>metrobuild</i> (Malnor Publishing), 2006, as a two part series. The author, Richard M Holden, is the building control officer for the City of Johannesburg.