How To Work For A Farmhouse Oil Farm (For A Small Family)

Similar documents
Edmonton, AB. April 26 30, 2016 (Tue Sat) Late additions. rbauction.com. Unreserved public auction. 3 of 8 Caterpillar 631E.

FEMA's SCHEDULE OF EQUIPMENT RATES

301.7D. Mini Hydraulic Excavator

Sample Career Ladder/Lattice for Energy (Petroleum Sector)

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

A&W WATER - SUPERIOR ENERGY SERVICES, INC.

Wastewater Collection Practice Test #3 Page 1 of 15

ANNEX 4 - IG Rate Comparison TECHNICAL COMPARISON OF CONTRACT TERMS T&T BISSO

12. Hall of Fame Marina

History of the SPCC Rule

Arkansas Natural Gas Severance Marketing Costs

City of Springfield, Illinois Office of Public Works Sewer Division. Equipment Inventory & Replacement Program

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Specifications For Rehabilitation Hudson #1A Hudson #2 Foster Island Well #41

Good Housekeeping BMP

Exhibit A - Scope of Work

<Your> Yacht Club. Oil Spill Response Plan

BRAKE SYSTEM OVERVIEW AND OPERATION PROCESS 1. BRAKE SYSTEM GENERAL INFORMATION 1) DESCRIPTION AND OPERATION 16-3.

Vehicle and Equipment Policy & Procedure Manual

Rocky Mountain Area VIPR Equipment/Overhead/Supply/Service Items Ordering Guide Version 5/14/15

MASTER CYLINDER. Section 2. Master Cylinder. Tandem Master Cylinder. Master Cylinder

skirt Appendix A Mechanical Containment and Cleanup Technologies Containment Booms

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

Chapter 10. Hauling Equipment

Ambiente Quick Reference Manual

Eagle Ford Oilfield Services, LLC 150 Port Royal, Aransas Pass, Texas 78336

MARINA ENVIRONMENTAL MANAGEMENT POLICY

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

all VAC LIFT ALL-VAC-LIFT Phone Redstart Street Fax

TRAINING BULLETIN Fire Apparatus Pump Test

Preventing and Responding to a Fuel or Oil Spill. Recommended Practices

Topics of the Presentation

SPILL PREVENTION PLAN

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

FUEL & OIL SPILL CONTINGENCY PLAN

Solid Waste Twice a Week Automated Service FAQs

Powered Industrial Truck Safety Program

VEHICLE SERVICE FACILITIES. Best Management Practices

High Capacity Helical Piles Limited Access Projects

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Stormwater BMPs: Secondary Containment and Spill Control. September 2012

Civil Engineering Sector Labour-Management Health and Safety Committee

Nevada Transportation Authority -- Model Tow Tariff (Flat Rate)

COMMITMENT TO EXCELLENCE

Fuel Storage Who to ask: tank farm owners/operators

Grease Traps and Interceptors

WHY A FATS, OILS AND GREASE PROGRAM. Employee Food Service Establishment Information Sheet INTRODUCTION

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Green Energy Oilfield Services, LLC

ROM - SEWER CLEANING EQUIPMENT

STATE OF MINNESOTA PRICING PAGE - FIXED PRICE (Typed Responses Required)

Product Marketing Guide Energy+ Program

ROAD EQUIPMENT PROCUREMENT

EXPORT w w w. k r a n m a n. c o m

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

SECTION 810 SEWER LINE CLEANING

2014 WAGE & EQUIPMENT RATES FOR THE WASHINGTON STATE FIRE SERVICE

Winchester Equipment Rental Rates 121 Indian Hollow Rd Winchester, VA 1(800)

HYDROSTATIC TEST PUMPS

Construction Jobs and Role Descriptions

Oil and Gas Industry. Present. Presenter Connie Brown Assistant Area Director Charleston Area Office

Snow/Ice Removal and Chemical Application For Fauquier Campus and Vint Hill Center, Winter Operations Lord Fairfax Community College

Spill Prevention, Control and Countermeasure (SPCC) Training

General Statement of Duties

Kubota Tractor B50 Cab

Draft. ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINEINE Docket No. PF and

ADMINISTRATIVE SERVICES MANUAL

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

LAKESHORE RESORT POA INC Lake Shore Resort POA,Inc Lake Shore Blvd. Brookville, IN

Auto Boom Breakaway High Floatation Tires (20 x 10 x 8.0) Adjustable Hitch Height 1 Year Sprayer Warranty Manual Boom Section Control

Best Management Practices and Grease Control Device Maintenance for Food Service Establishment Employees

Pollution From Surface Cleaning. Flat work Sidewalks Plazas Building exteriors Parking areas Drive-throughs

303.5E2 CR, 304E2 CR, 305E2 CR, 305.5E2 CR

HOW HYDRAULIC TRUCK CRANES WORK

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

Drilling Rigs, Equipment & Parts

EFFECT. DATE: 01/13/1991 SERIES PURPOSE: The purpose of the automotive mechanic occupation is to repair & maintain cars, trucks & equipment.

SECTION DISINFECTION OF PIPE AND WATER STORAGE FACILITIES

Spill Clean-up. Flammable Liquids Liquids with flash points below 100 degrees Fahrenheit.

Sample Written Program. For. Flammable Liquids

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

Electric forward facing seat/ Three-in-one forklift EFX 410/413.

Twenty-four contracting services environmental claim scenarios you may not have thought about.

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity

Transcription:

Call for 24 Hour Service 7 Days a Week Jeffrey D. Moore Cell Phone# 330-352-2162 Keith R. Moore Cell Phone# 330-352-9142 Shane Limric Cell Phone# 330-352-3093 Field Supervisor

RIG SERVICES 2- SERVICE RIG 38 $155.00/Hourly Rate 1-SERVICE RIG 32 $155.00/Hourly Rate 1- TONGS $350.00 per Trip 1- RIPPER $250.00 per Cut 1- FRAC VALVE $125.00 per Job 1- MUD BOAT $125.00 per Day plus trucking 1- BOWEN 2.5 POWER SWIVEL $90.00 per Hour plus trucking OPERATOR FOR POWER SWIVEL $375.00 per Day plus miles 1-GARDNER DENVER FXO MUD PUMP $90.00 per Hour plus trucking OPERATOR FOR MUD PUMP $325.00 per Day EXTRA LABOR $38.00 per Hour RIG STAND-BY TIME $95.00 per Hour 4-WD DSL 46 Boom Lift $280.00 per Day **Effective September 15, 2006- Service Rig crew travel time- $85.00 per hour- this includes going to and from job site. Overnight expenses charged @ $95.00 per person per day. **5 Hour minimum-charge will apply when the rig is shut down early, at the customer s request. A $760.00 Stand-By charge will be assessed for WHOLE days down at the customer request.

SWAB RIG SERVICES 1- WELL TENDER w/ 7,000 9 16 WIRE LINE $85.00 per Hour Plus cups & Oil Saver 1-FISHING EQUIPMENT- JET STAR CON COYLE $125.00 1- CASING SCRAPER $125.00 **1 Hour travel time @ $85.00 per day with Maximum of 50 miles one way. Overnight expenses charged @ $95.00 per person per day. **5 Hour minimum charge will apply when the rig is shut down early, at the customers request. A $375.00 Stand-By charge will be assessed for WHOLE days down at the customer request.

DOZER: EQUIPMENT LIST 1-TD8E w/ WINCH 1-KOMATSU 65 $70.00 per Hour $120.00 per Hour EXCAVATORS: 1-MINI EXCAVATOR $60.00 per Hour BACKOHES: 1-416 B CAT $55.00 per Hour SCRAPER TRACTORS: **(Disc, York Rake, Brush Hog, Etc) $45.00 per Hour

EQUIPMENT LIST TRUCKING: 1- FIVE AXLE TRUCK w/ WINCH $75.00 per Hour LOWBOY OR FLOAT, TANK HAULER 1- SINGLE AXLE DUMP TRUCK $60.00 per Hour 1-SINGLE AXLE DUMP w/trailer $65.00 per Hour

WATER TRUCK & TREAT TRUCK SERVICES 2- TANDEM AXLE VACUUM WATER TRUCK $70.00 per Hour 75-80 BBL. TANKS 1-7,000 FT DEEP INJECTION WELLS $1.10 per BBL (PRODUCTION WATER ONLY) OTHER WATER SERVICES FRAC TANKS 4-300 BBL: 50 MILE RADIUS $400.00 per Tank plus trucking HALF TANK *Plus Delivery, Clean out and Disposal* $400.00 per Tank 2-2 TRASH PUMPS $20.00 per Hour *PLUS LABOR 2-3 TRASH PUMPS $35.00 per Hour *PLUS LABOR 1-4 TRASH PUMP $30.00 per Hour *PLUS LABOR (PUMPS ONLY AVAILABLE WITH MOORE WELL SERVICE LABOR)

ROUSTABOUT SERVICE 1- TON ROUSTABOUT TRUCKS $60.00 per Hour w/ TOOLS- 1 MAN EXTRA MAN WELDER CHARGE HOUSE GAS TEC $38.00 per Hour $75.00 per Hour $70.00 per Hour HOT TAP 2, 3, 4 - - - - - - - - - - -WILL QUOTE- - - - - - - - - - - - - - - - - - - - - - - - - - LINE LOCATION SERVICE SNOW PLOWING PORTABLE STEAM CLEANING- 1 MAN $85.00 per Hour $65.00 per Hour $70.00 per Hour PLASTIC PIPE PUSHING FEE 1 ¼ TO 2 $1.25 to $1.50 2 TO 3 $1.50 to $1.85 500 FOOT OR LESS- BILLED @ TIME & MATERIAL RATE IF PIPE LINE FLUSH IS NEEDED- BILLED AT TIME & MATERIAL RATE WELDER FOR TIE-IN CONNECTION (IF NEEDED) $75.00 per Hour ROAD BORING UP TO 100 PRICE PER FOOT Pipeline & Tank Battery Installation available by Quote or Hourly Rate

OIL SPILL CONTAINMENT & CLEANUP LABOR $50.00 per Hour $60.00 Overtime 2-80 BBL VACUUM TRUCKS $90.00 per Hour 1- PORTABLE DRUM VACUUM $40.00 per Hour Equipment ONLY 1- A.T.V. W/TRAILER $35.00 per Hour Equipment ONLY DISPOSAL OF FULUIDS AT $1.80 PER BBL ABSORBENT PADS, BOOMS, PEATSORB & OTHER CONTAINMENT MATERIAL AVAILABLE. PICK UP & DRIVER MECHANIC HOT SHOT SERVICE $47.00 per Hour $65.00 per Hour TRAVEL TIME & EXPENSES OVERNIGHT $90.00 per Person Per Day *ALL SERVICES WILL BE BILLED AT ONE HOUR MIMIMUM *24 HOUR SERVICE * 7 DAYS A WEEK*