Tender request: Airlifting of bags ( Bags ) of Heather Brash ( the Works )

Similar documents
CLIENT / PROJECT MANAGER AGREEMENT

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Schedule 1 SERVICE SPECIFICATION PEST CONTROL SERVICE

Code of Practice for Agents Undertaking Renovation Grants

Date Ratified 03/12/2012 Human Resources Committee Review Date 01/12/2014 Director of Finance and Information Expiry Date 02/12/2015 Withdrawn Date

Name and Contract Number

The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees

PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006

LUONNOS. Client s representatives In contract matters In matters related to project execution

CONSTITUTION PART 4 CONTRACT PROCEDURE RULES

Mitchell Shire Council

MDB Harmonised Particular Conditions

CONDITIONS FOR SUPPLY OF SKIPS AND CONTAINERS AND FOR THE DISPOSAL OF THE CONTENTS OF THE SKIPS AND CONTAINERS

Manual Handling. Procedure

General Terms of Public Procurement in service contracts JYSE 2009 SERVICES

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO

THE BRIEF FOR THE PROVISION OF SWATH BATHYMETRY TO IHO ORDER 1A

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

Procedure: OHS CONTRACTOR MANAGEMENT

WHS Contractor Management Procedure

REQUEST FOR QUOTE. RFQ Reference Number: RFQ <<INSERT e.g SWR 03-11/12>> <<Enter Course Name>>

OHS Contractor Management Procedure

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

Employment Policies, Procedures & Guidance CONTRACT HIRE (CAR LEASING) SCHEME

Procurement of Goods, Services and Works Policy

Version Author Revisions Made Date 1.6 David Sharkey Executive Board 27 March Robin Hunt

Special Conditions / Expenses

Post No. : LON074 Grade : Section : Quantity Surveying Location : NPS London Ltd

A Guide to Standard forms of Construction Contract Outlining Key Characteristics and Components

The South African Council for the Project and Construction Management Professions (SACPCMP)

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/ Galloper Wind Farm Limited

Health and Safety Policy and Procedures

Shift working and working time for police staff Policy

Financial Management (Public Liability Insurance) Determination 2005*

THE UNIVERSITY OF THE WEST INDIES, MONA CAMPUS

Developer Constructed Headworks Process Information Guide

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES

A Guide to Small Works. A brief explanation

ENERGY PERFORMANCE CONTRACT

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

E-Zec Medical Transport Services Ltd

Request for Quotation (RFQ) for Adjustable Sit to Stand Desk Reference No.: UNWHQRFQ31. [Insert Title of Goods]

Guide to Procedure for Competitive Tendering March 2003

Licence to Trail or Drag Hunt on Ministry of Defence Land

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

CAPITAL WORKS GUIDANCE DOCUMENT

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

PORT HEDLAND PORT AUTHORITY

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

ARTWORK COMMISSION AGREEMENT

Lawful Development Certificates

Chapter 4: Contractor Quality Control

KIRKLEES COUNCIL CONTRACT PROCEDURE RULES

Breed Communications Limited - limited company consultancy agreement

Schedule of Prices. Project Name Contract No. Contract Number

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No.

PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/2015

Clubs / Organisations are NOT permitted to use Council Reserves or Pavilions without first having WRITTEN approval from Hume City Council.

CSA CONSTRUCTION, INC McAllister Road Houston, Texas SUBCONTRACTOR AGREEMENT

PRIVATE INVESTIGATORS (PSA 42:2015)

Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation

PUBLIC POWER CORPORATION S.A. DISTRIBUTION

Anglo American Procurement Solutions Site

WHS CONTRACTOR MANAGEMENT PROCEDURE

TRAFFIC MANAGEMENT PLAN

TfNSW Standard Requirements TSR T Technical Management

Capital Works Management Framework Document No. GN 1.7. Standard Conditions of Engagement for Consultancy Services (Technical)

Project Management Procedures SECTION 3 PROCUREMENT

Eskom Holdings SOC Ltd s Standard Conditions of Tender

Date: 7 February 2013

ST HELENA TELECOMMUNICATIONS ORDINANCE, CAP 106 LICENCE TO OPERATE BROADCASTING STATIONS AND TO BROADCAST SERVICES (TELEVISION BROADCASTING LICENCE)

South Liverpool Homes. Invitation to Tender. Mobile Phone Contract

FAMIS Facilities Management Information System Training Manual

PUBLIC LIGHTING CODE April 2005

Procurement Services Document Control Sheet

Certified Installer Partnership Code of Practice

QUOTATION AND TENDER PROCESS

ORDER FORM. Part 1 - Order Form

The services must be operated with a plane with at least 30 seats.

For the Provision of animal collection and impound services.

MIDSHIRES CARE LIMITED T/A HELPING HANDS HOME CARE TERMS & CONDITIONS OF BUSINESS

SUMMER WORKS SCHEME (SWS) 2014

Minimum Safety Requirements for temporary Helicopter Landing Areas.

Health and Safety Policy

Smarter Resources Smarter Business Recycling

The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

Procedures for Tenders and Contracts. October Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

Appendix A. Call-off Terms and Conditions for the Provision of Services

DENTAL ACCESS PROGRAMME INSURANCE GUIDANCE

Question 1: Details of parties to be insured CONSTRUCTION. 1.1 Please enter the name and address of the Main Proposer:

Belfast Rowing Club Address: Hay Island, 10 Lockview Road, Stranmillis, Belfast BT9 5FJ Web:

City of Johannesburg Supply Chain Management Unit

Provision of Managed Network Services to the Transport for NSW [FIVE] ORDER FORMS

1. INTEGRATED ROADS INFORMATION SYSTEM General 1

Contractor Safety Management

Tender for. Provision of Risk Management Services for the Eyre Peninsula Local Government Association and Member Associations

Contract and Vendor Management Guide

Private Lease Agreements

STANDARD CONTRACT PROVISIONS ROADS

Transcription:

Moors for the Future Partnership. The Moorland Centre. Field head. Edale. Hope Valley. Derbyshire. S33 7ZA Dear Contractor, David Hargreaves Moors for the Future Countryside Ranger s Office Clegg Nook Cragg Road, Mytholmroyd HX7 5HR Tel: 07917392812 David.hargreaves@peakdistrict.gov.uk Tender request: Airlifting of bags ( Bags ) of Heather Brash ( the Works ) Under the Brash Airlifting Framework agreement Brash Airlifting Works 2012/ 2013 Moors for the Future. You are requested to tender a price for Airlifting Brash on to Manor of Rochdale Commons, Langfield Common and Rishworth ( the Site ). There are 830 Bags to be delivered to Blackstone Edge Common (three airlifting points), 230 Bags to Butterworth Common (three airlifting points in total), 144 Bags to airlift on to Langfield Common (1 airlifting point), 500 Bags to airlift to Rishworth (1 airlifting point) and 42 Bags to airlift on to Walsden Common (1 airlifting point) between 2nd t January 2014 and 28 th February 2014 (the Contract Period ). The Works will be carried out in the approximate areas shown on the maps attached ( the Work Areas ). N.B. Some airlift sites will serve more than one Work Areas The approximate distances to the Work Areas from the proposed Lift Sites is shown on the attached maps. Such information is indicative and should not be replied upon.the Contractor is expected to satisfy itself as to the distances. 1. Tender Procedure 1.1. Tender Return Date: Please can you complete and return this Tender by 12noon Friday 6 th December 2013. A decision will be made by the 13 th December 2013. 1.2. The tender return must be signed and returned by email directly to, and only to, The Chief Financial Offer of the Peak District National Park Authority. Philip.Naylor@Peakdistrict.gov.uk The tender return must comply with Section 2 of the Framework Agreement (Information on Submitting a Tender)

1.3. Please complete the tables below Information Contact name Company Name & Address Contact details Itemised Costs: General Items and Preliminaries:- Work Required Unit Quantity Rates Total Cost s (ex VAT) Items Contractual Requirements 1 Insurance against damage to persons or property ( 10,000,000). Item 1 Specific Requirements 2 Positioning Fee Item 1 3 Cost per Hour flying (please calculate number of hours to complete the job) Hour 4 Accommodation & Subsistence cost per day (please calculate number of days accommodation required to complete the job) Per day 5 Cost of crew per day. (please calculate number of crew days required to complete the job) Per day

Total Additional Information for indicative purposes only: Please specify A Unit Cost of Fuel (Indicative Cost only: see Section 3 Part C Clause 5) Litre 1 n/a B Maximum lift weight of a single load. Kg n/a n/a C C1 C2 C3 C4 C5 C6 Estimated number of flying days to lift 1746 bags Lift site A (Walsden Common, Langfield & Blackstone Edge Common North (North of power lines)) estimated length of time to airlift 271 lift bags. Lift site B (Blackstone Edge North (South of power lines)) estimated length of time to airlift 270 bags. Lift site C (Blackstone Edge South and Butterworth Common North) estimated length of time to airlift 637 lift bags. Lift site D (Butterworth Common Southwest) estimated length of time to airlift 24 lift bags. Lift site E (Butterworth Southwest & Rishworth Commons) estimated length of time to airlift 544 lift bags. Lift Site C (to Blackstone Edge South) up to 3 geojute bales plus 5000 staples ) Day n/a n/a Hrs Hrs Hrs Hrs Hrs Hrs D Re-Positioning Fee (if instructed to leave the job and come back to complete at a later time) Item 1 n/a

1.4. The Works are to be awarded within the existing Framework Agreement ( Brash Airlifting Works 2012/2013 Moors for the Future (MFF). One or more of the Framework Contractors shall be awarded a contract or purchase order for the Works. If applicable, a Framework Contractor will be required to promptly execute and return to the Authority a signed contract incorporating this Invitation to Tender, tender return, the Standard Conditions referred to below, the Framework Agreement and any variations. 1.5. The tenderer is assumed to have carried out all enquiries and inspections necessary before replying to this request. 1.6. The Authority is not obliged to accept the lowest tender rate and the tender will be evaluated on the rates submitted, availability and quality. 1.7. The tender return is valid and binding for 30 days from the date of the tender return. 2. Work Period The Work Period will commence from the week beginning the 6 th January 2014. This may be subject to change depending on the availability of supply of Brash. The dates shall be confirmed in advance by the Nominated Officer. 3. Works Specification 3.1. Bags may be flown up in pairs (the number of Bags per lift is dependent upon the lift capacity of each individual machine, but is it required that each hook is to have a maximum of two Bags on the hook). Such decision is at the discretion of the Contractor. The exact location of the Drop Sites will be identified to the Contractor by Authority personnel (the Nominated Officer) at the Work Areas prior to the commencement of each day that the Works are undertaken. It is the responsibility of the Contractors to ensure they have the required Equipment to complete the Works. The Contractor must be capable of getting the Equipment required to the Lift Site. 3.2. For the avoidance of doubt the Contract shall only relate to Works confirmed by the Authority by way of a Purchase Order Form. 3.3. Confirmed Lift Site A Information: for airlifts to Walsden Common & Langfield & Blackstone Edge North (North of Power Lines) (Grid Ref: SD 96129, 20352) 3.3.1. Location Maps and Plans relevant to the Lift Site are contained within Annexure 1 Location Maps and Plans 3.3.2. The Lift Site is accessed from the B6318 Turvin Road. 3.3.3. The track from the B6318 to the Lift Site is part of the United Utilities holding and is also Open Access under the CROW Act 2000 and is open to the public. Care must be taken to ensure that the track remains open at all times and that members of the public are kept safe. 3.3.4. The access route from the B6318 to the Lift Site is surfaced with aggregate. It is suitable for vehicles but not for large lorries. 3.3.5. The Lift Site must not be accessed during any Restricted Dates provided by the Nominated Officer in advance.

3.3.6. The Lift Site is to be kept in a neat and tidy condition commensurate with its use as a temporary lift site within a SSSI area. 3.3.7. The Nominated Officer shall give instructions to the Contractor before the Works Commencement Date as to extent of land at the relevant Lift Site that can be used in connection with the Deliveries and Works (including, if applicable provision of a copy of any permissions granting use of the Lift Sites). The Contractor must comply with these instructions and any conditions contained in any permission (including any conditions of any landowner, tenant or United Utilities) and ensure that all sub-contractors are notified of the same. 3.3.8. The Contractor shall not damage or permit damage of any Lift Site or access tracks. In the event of any damage, the Contractor shall procure that the same is reinstated to the absolute satisfaction of the Nominated Officer within 1 month of the last lift from the relevant Lift Site or by the 31 st March 2014, whichever is soonest. 3.3.9. Contractor access is to be restricted to daylight hours only during the Contract Period. The Contractor should liaise with the Nominated Officer at least 48hrs before requiring initial access to any Lift Site, in order that the landowner, tenant and other stakeholders can be advised. 3.4. Confirmed Lift Site B Information : for airlifts to Blackstone Edge Common North (Grid Ref: SD 96615, 18213) 3.4.1. Location Maps and Plans relevant to the Lift Site are contained within Annexure 2 Location Maps and Plans 3.4.2. Paragraphs 3.3.2 to 3.3.9 apply to this lift site also. 3.5. Confirmed Lift Site C information: for lift site to Blackstone Edge Common South and Butterworth Common North. (Grid Ref SD 99158 15401) 3.5.1. Location Maps and Plans relevant to this site are contained with Annexure 3 Location Maps and Plans. 3.5.2. The Lift Site is accessed from the A672 just north of Junction 22 of the M62 3.5.3. The track from the A672 to the Lift Site is part of the Yorkshire Water s holding and is also Open Access under the CROW Act 2000 and is open to the public. Care must be taken to ensure that the track remains open at all times and that members of the public are kept safe. 3.5.4. The access route from the A672 to the Lift Site is surfaced with aggregate. It is suitable for vehicles but not for large lorries. 3.5.5. Paragraphs 3.3.5 to 3.3.9 apply to this Lift Site also (save that any reference to United Utilities shall be deemed to refer to Yorkshire Water).. 3.6. Confirmed Lift Site D information: for lift site to Butterworth Common South (West) Grid Ref SD 98226 14362 3.6.1. Location Maps and Plans relevant to these site are contained with Annexure 4 Location Maps and Plans 3.6.2. The Lift Site is accessed from the A672 just south of J22 of the M62 3.6.3. The track to the Lift Site is open access under the CROW Act 2000 and is open to the public. It is also on the Trans Pennine Trail and care must be taken to ensure that the track remains open at all times and that members of the public are kept safe. 3.6.4. The access route from the A672 to the Lift Site is surfaced with aggregate. It is suitable for vehicles but not for large lorries 3.6.5. Paragraphs 3.3.5 to 3.3.9 apply to this Lift Site also.

3.7. Confirmed Lift Site E information: for lift site to Butterworth Common South (East) and Rishworth Common Grid Ref SE 00405 13291 3.7.1. Location Maps and Plans relevant to these sites are contained with Annexure 5 Location Maps and Plans 3.7.2. The Lift Site is accessed from the A640 Huddersfield Road 3.7.3. Paragraphs 3.3.5 to 3.3.9 apply to this Lift Site also. 4. Detailed Conditions 4.1. Environmental Requirements: 4.1.1. All works to be undertaken by the contractor must comply with the codes of practice for Operations on Sites of Special Scientific Interest, Water Catchment Land, Environment Agency Regulations, Regulations issued by Dept. Of Environment, DEFRA and all current Health and Safety Regulations. 4.2. Health and Safety 4.2.1. The contractor will be responsible for health and safety during the Works Period. 4.2.2. Method statements (including operational risks assessments) must be submitted with the tender return. These must be approved by the Nominated Officer. Failure to submit method statements and risk assessments may result in the disqualification of the tender. 4.2.3. Copies of Site risk assessments for the Site will be required before the commencement of the Works. 4.2.4. The Contractor is to provide his own welfare facilities for the duration of the Works. 4.2.5. Health and Safety Plan: 4.2.5.1. The contractor is to submit to the Nominated Officer with its tender return a copy of its health and safety policy, issued to his employees. This will form part of the site safety plan. 4.2.5.2. The risk assessment will also form part of the site safety plan. 4.2.5.3. Before commencing the Works the contractor will submit any alterations to the method statements that may be necessary, for the approval of the Nominated Officer. The contractor s health & safety plan will be subject to the Nominated Officers approval, prior to the commencement of the Works. 4.2.6. Potential Hazards Associated with the Works 4.2.6.1. The Contractor should identify all potential hazards associated with the Works and how they shall be mitigated within the risk assessments and method statements with the tender return. Hazards should be considered in terms of: 1. The Site(s) and any other locations utilised during the Works; 2. Works(s) and operations and activities undertaken when delivering the Works and the potential impacts of these on the Site(s) and the users; 3. Users, any and all individuals, groups, organisations and companies that may have reason to visit the Site on which the Works are being undertaken.

4.3 Materials All Brash and Bags will be provided by the Authority and remain the property of the Authority. 4.4 Insurance The contractor (and any sub-contractors) shall be required to maintain and provide evidence of insurance in accordance with the Standard Conditions in the sum of 10,000,000 (Ten million pounds). 4.5 Team supervision and management The contractor shall ensure that a dedicated foreman is assigned to the Works for the entire Works to ensure continuity of management and consistent delivery of the Works. The identity of the foreman will be notified to the Nominated Officer on or before the commencement of the Works. The contractor shall not change the foreman without the prior approval of the Nominated Officer. 4.6 Standard Conditions The contractor shall comply with the Authority's Standard Conditions - a copy of which can be found with your original tender documentation. Regards, David Hargreaves David Hargreaves Project Manager South Pennine Commons Countryside Ranger s Office Cragg Nook Clegg Road Mytholmroyd HX7 5NH 07917392812 David.hargreaves@peakdistrict.gov.uk

Annexure 1 - Maps Airlift Site A Location Map & Plan : For Walsden, Langfield & Blackstone Edge Common North (North of Power Lines) Crown Copyright. All Rights Reserved. Licence 1000005734. 2013

Airlift Site B Location Map & Plan : For Blackstone Edge Common North

Airlift Site C Location Map & Plan : For Blackstone Edge Common South & Butterworth Common North

Airlift Site D Location Map & Plan : For Butterworth Common South (East)

Airlift Site E: Location Map & Plan : For Butterworth Common South (West)

Airlift Site E: Location Map & Plan : For Rishworth