Florida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects



Similar documents
LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

Q: Why does it take so long to download the ProjectSolve Plug-Ins, the first time logging on to the System?

Section 10.8 AUGER CAST PILES

Section 10.9 STRUCTURAL STEEL AND MISCELLANEOUS METAL COMPONENTS

Spec. Standard: 11/27/ Revision: 11/27/06

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

MANAGING THE PROJECT RECORD

Common File Server The secure common file server provided by the Department for storage of all contract documents.

GUIDELINES FOR AUGUST 1995

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Ocoee, FL July 01, 2016 Advertisement No. 1

ALABAMA STATE DEPARTMENT OF EDUCATION

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT S. Marion Avenue, Mail Station 2015 Lake City, Florida

SPECIFICATIONS FOR NW CONTROL CENTER, HURRICANE HARDENING - SARASOTA ISSUE FOR CONSTRUCTION

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Ocoee, FL May 13, 2016 Advertisement No. 1

Electronic Plan Submittal Application Process

ADMINISTRATIVE PROCEDURES

Chapter 4: Contractor Quality Control

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

PROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES

ITEM DOCUMENT CONTROL MANAGEMENT DESCRIPTION:

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Section 5.6 QUALITY CONTROL PROGRAM

ADDENDUM #2 FORMAL BID

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

Consultancy Services Proposal

Design-Build Demonstration Program Volume IV Document Management Plan

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

FEMC Document Control

Joyce Plummer, Procurement Agent

LICENSE APPLICATION FOR CONSTRUCTION TRADES (INSTRUCTIONS)

Open for Business Streamlined Permitting Orange County PERMITTING STANDARDS

PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/2015

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

PROJECT MANUAL INCLUDING SPECIFICATIONS FOR OXNARD SCHOOL DISTRICT EDUCATIONAL SERVICE CENTER DATA ROOM ALTERATION. Oxnard, CA

Section 100 Contractor Quality Control Program

Assistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides

REQUEST FOR INFORMATION FOR # POINT OF SALE SYSTEM. November 18, 2015

Nursing Student Loan Forgiveness Program Renewal Packet

Document Management Operations Audit Checklist

IMPORTANT NOTICE REGARDING THE LANDSCAPE ARCHITECTURAL REGISTRATION EXAMINATION ("L.A.R.E.")

VDOT GOVERNANCE DOCUMENT

DGS Prolog Manager & Prolog Converge User Manual

Attachment 5 Electrical Engineering

GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUOTES (RFQ)

This request for qualifications seeks the following type of service providers:

CULVER CITY UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS. May 21, 2015

Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll

PRIME CONSULTANT SERVICES

COMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

Supplier prequalification Document

LEGAL NOTICE REQUEST FOR BID SEALED BID For SQL MONITORING SOFTWARE RE-BID. For ST. CHARLES COUNTY GOVERNMENT ST.

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised )

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

Surgi Manufacturing Quality Manual

LAKEHAVEN UTILITY DISTRICT. Developer Extension Agreement Application

New Electronic Stamping Regulations

Construction Management At-Risk

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

REQUEST FOR QUALIFICATIONS Environmental and/or Industrial Hygiene Consultants September 2013 September 2016

Request for Proposal RFP # Printing & Mailing Services

REPUBLIC OF KENYA MINISTRY OF FOREIGN AFFAIRS AND INTERNATIONAL TRADE PRE-QUALIFICATION/REGISTRATION OF SUPPLIERS FY /

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO

Contractor s Guide to Creating and Processing Electronic Construction Documents

CITY COLLEGE OF SAN FRANCISCO May 2008 PROJECT INSPECTION SERVICES

CITY OF LANCASTER RFP NO LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M.

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

Helical Products Co., Inc.

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Quality Assurance QUALITY ASSURANCE PLAN

EXHIBIT 2-2-C PROGRESS SCHEDULES

Change Healthcare ERA Provider Information Form *This form is to ensure accuracy in updating the appropriate account

Request for Qualifications (RFQ) Number PUBLIC WORKS CONTINUING CONSTRUCTION AND ENGINEERING INSPECTION AND PROJECT MANAGEMENT SERVICES

Debt Collection Services

COST SAVINGS INITIATIVE PROPOSAL

Transcription:

General: Florida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects The information outlined within this document, depicts a portion of Florida s Turnpike Shop Drawing Review Processes which includes guidelines, protocols and requirements. For more detailed information, please reference the following documents: Turnpike s Plan Preparation and Practices Handbook Volume I, Chapter 28 http://www.floridasturnpike.com/design/prod_design/tppph/tppph.html Plans Preparation Manual, Volume I, Chapter 28 http://www.dot.state.fl.us/rddesign/ppmmanual/ppm.shtm Material certifications, welding procedures, and concrete mix designs are typically submitted by the Contractor to the Resident Engineer (CEI), who forwards the certifications to the State Materials Engineers in Gainesville. These items do not need to be submitted to the Department s Shop Drawing Review Office for review and approval by the Engineer of Record (EOR). They are submitted through the ProjectSolve sp system as Pre-Qualified submittals to the CEI for approval. For non-standard items, the CEI will typically request approval by the EOR regarding applicability. Material certifications for items on the Approved Product List (APL) are typically submitted by the Contractor to the CEI thru ProjectSolve sp. These items are cataloged in the Shop Drawing/Submittal Item List as Pre-Qualified submittals, which are routed directly to the CEI for review. Shop Drawing/Submittal Item List: Prior to the submission of any shop drawings/submittals, the Contractor shall submit a Shop Drawing/Submittal Item List (Schedule). The list is to be submitted in electronic format (excel spreadsheet, which will be provided by the CEI to General Contractor), within 60 days of the start of construction operations. Page 1 of 8

For each planned submittal, define the following; description of item, structure identification number, bridge number, location, identify Toll Gantry Structures by site location, specification section numbers and roadway divisions. Adherence to the Shop Drawing/Submittal Item List (Schedule) is intended to allow for the planning of resources and to reduce the possibility of a large number of submittals being forwarded for review concurrently. Reference the attached flow chart which depicts the review coordination of the shop drawing/submittal item list. Note to Contractor: ensure that submission of item list is submitted in ample time as outlined in Standard Specifications to accommodate this flow. The Contractor shall submit the list to the CEI. Electronic Submission of Shop Drawings: 1. Prior to submission of shop drawings electronically, the Contractor, shall consecutively number each sheet of the submittal and indicate the total number of sheets in the series (i.e., 1 of 12, 2 of 12.12 of 12). Include on each sheet the following items as minimum requirement: FPID, Bridge Number(s), drawing title and number, title block showing the names of the fabricator or producer and the Contractor for which the work is being done, initials of the person(s) responsible for the drawing, the date on which the drawing was prepared, the location of the item(s) within the project, the Contractor s approval stamp with date and initials, and when applicable, the signature and engineering seal of the Specialty Engineer. A resubmittal will be requested when any of the required information is not included. Stamp and initial each drawing, page, cut sheet, etc. of the submittal, indicating it has been reviewed for compliance with the contract plans and specifications. Any comments or markings provided by the Contractor or Subcontractor shall be in blue or black ink. In the case there is no place for the stamp on the front, please stamp the back side of each sheet, indicating the page number (i.e., back of Page 1 of 6). Ensure that this page is also scanned in.pdf. Page 2 of 8

2. Submit Shop Drawings/Submittals electronically by utilizing Florida s Turnpike Enterprise Construction Management s internet website, ProjectSolve sp. Assign a unique submittal number to the Shop Drawing. Contact Florida s Turnpike Enterprise Shop Drawing Review Office for assistance with access to website. 3. Shop drawings shall be scanned in.pdf, using 300 dpi resolution and in 8-bit up to 24-bit color. Once the Contractor has uploaded the shop drawing to ProjectSolve sp, the Architect of Record/Engineer of Record (AOR/EOR) will be notified via email that a shop drawing has been submitted for their review; the CEI, is copied on this email notification. 4. Shop drawings shall be no larger than 11 x 17 (plotted in 11 x 17 format). For plotting requirements, please refer to FDOT CADD Manual. The website can be found at: http://www.dot.state.fl.us/ecso/downloads/publications/manual/default.shtm 5. If the shop drawing consists of samples, as outlined in the Contractor s shop drawing item list, the Contractor shall submit three (3) samples for proper processing, in addition to the number of samples needed by the Contractor. The Contractor is required to stamp the samples, include FPID and their Shop Drawing Submittal Number. Initiate the shop drawing review process through ProjectSolve sp, by uploading their transmittal letter and indicate in the Comment area on the shop drawing module page, samples have been forwarded to the AOR/EOR via Overnight Courier Service. The AOR/EOR shall confirm in the Comment area in ProjectSolve sp, stating they are in receipt of samples. Once the shop drawing has been processed, Florida s Turnpike Enterprise Shop Drawing Review Office will provide, if allotted number of samples are provided, one (1) sample original to AOR/EOR, one (1) to the CEI and Florida s Turnpike Enterprise Shop Drawing Review Office will retain one (1) for their files. Any remaining samples will be provided to the Contractor. If samples include Manufacturer, Product Name and Product Number, it is acceptable for the Contractor to scan the data and upload to ProjectSolve sp. These pages need to be stamped as well. It will be at the discretion of the Department, if submissions of original samples are required. The Contractor shall coordinate with Florida s Turnpike Enterprise Architectural Department prior to the submission. Page 3 of 8

6. Stamping Requirements for Signed/Sealed Calculations and Shop Drawings: For Contractor-Originated Design or for items which require design and drawing preparation of components, systems or installation methods and equipment for specific temporary portions of the project work or for special items of the permanent work not fully detailed in the plans and required to be furnished by the Contractor, a Specialty Engineer must sign and seal each drawing, as well as the cover sheet of any design calculations. Prior to Contractor uploading shop drawing to ProjectSolve sp, ensure the seal (rubber ink stamped or embossed) is legible in the scanned image. Failure to do so will constitute the submission as incomplete and shop drawing will be routed back to Contractor, Not Reviewed, and resubmittal will be required. It is acceptable for the Contractor and the AOR/EOR to stamp the cover page of the calculations only and stamp each sheet of the shop drawing. 7. Contractor shall not use shop drawings for obtaining clarification regarding contract plans or specification requirements. At the time of each submission, the Contractor shall have given specific written notice, along with an itemized list of all deviations/variations from the Contract Plans and Specifications, in a transmittal letter along with the Shop/Erection Drawing submission. In addition, the drawings shall contain a specific notation which explicitly and prominently calls out any deviations. Approval of Shop/Erection Drawing will not constitute nor be considered grounds for approval of a variation in which the project requirements are affected unless specifically indicated as such and noted on the shop drawing, by the AOR/EOR and/or the Department s approval comments as returned with the shop drawing submittal to the Contractor. Contractor s request for contract change in time, scope, cost, design, material or product type, specification requirements and/or remedial design for correction construction/fabrication deficiencies, shall not be submitted as a shop drawing, but shall be submitted in proper format to the CEI for further handling and processing. Page 4 of 8

8. Shop Drawings shall bear AOR/EOR s code disposition stamp. The Department will continue to overview those shop drawings deemed Critical (ADA, Life Safety or Specialty elements). A project specific list of Critical shop drawings will be developed by FTE Shop Drawing Review Staff. Upon review of these shop drawings, the Department s reviewer will stamp, sign and date shop drawing. 9. AOR/EOR submits the shop drawing submission through ProjectSolve sp to Florida s Turnpike Enterprise Shop Drawing Review Office for final processing back to Contractor. The CEI, Construction Project Manager, Project Manager and Architect of Record/Engineer of Record are also notified, via email when shop drawing has been final processed by Florida s Turnpike Enterprise. Welding Procedures Specification Reviews (WPS) The review process for welding procedures specifications (WPS) will be per the Materials Manual, Chapter 11 Steel and Miscellaneous Metal Products, Section 11.2 Welding Procedures Specification Review and Approval Process. http://www.dot.state.fl.us/statematerialsoffice/administration/resources/library/publications/materialsmanual/index.shtm WPS shall not be submitted as a shop drawing through ProjectSolve sp. Florida s Turnpike Enterprise Shop Drawing Review Office (Address for Courier Services) Florida s Turnpike Enterprise Headquarters Shop Drawing Review Office Transportation Development, Room 3115 MP 263, Florida's Turnpike (Building 5315 Turkey Lake Service Plaza) Ocoee, FL 34761 (Address for U.S. Mail) Florida s Turnpike Enterprise Headquarters Shop Drawing Review Office Transportation Development, Room 3115 (Building 5315) P.O. Box 613069 Ocoee, FL 34761 Tel: 407.532.3999 Fax: 407.822.5821 Page 5 of 8

ProjectSolve sp - Florida s Turnpike Enterprise Shop Drawing Website Shop Drawings can be tracked daily by utilizing ProjectSolve sp. Contact Florida s Turnpike Enterprise Shop Drawing Review Office for assistance with access to website. The purpose of ProjectSolve sp is to provide the Contractor, CEI, AOR/EOR, Project Managers, Construction Managers and Turnpike Management with up-to-date information/latest status of the Construction Project, whether it be related to shop drawings, RFIs, correspondence or MOT Notifications for every ongoing/active construction contract. It will serve as a tracking tool for project related documents and assist in expediting the construction process. Visit the following website for Florida s Turnpike Enterprise general shop drawing requirements and useful information for all project personnel. http://design.floridasturnpike.com/prod_design/shopdrawings/shopdrawings.html ProjectSolve sp Administrator Robert Laurence, Network Systems Manager Florida s Turnpike Enterprise, Pompano Operations Building Tel: 954.934.1146 Email: robert.laurence@dot.state.fl.us Page 6 of 8

Start FTE Flow Chart for Shop Drawing Item List for Critical Review Coordination for Design Bid Build (Conventional) Projects Contractor Contractor Submits Shop Drawing/Submittal Item List to Resident Engineer (CEI) Resident Engineer (CEI) Resident Engineer (CEI) submits Shop Drawing/ Submittal Item List to FTE Shop Drawing Review Office Florida s Turnpike Enterprise Shop Drawing Review Office FTE Shop Drawing Review Office sends item list to the EOR for review/ verification of technical components of Shop Drawing Architect of Record/ Engineer of Record AOR/EOR verifies list and coordinates any deficiencies with the CEI and/or Contractor. Once Item List is verified, AOR/EOR forwards to FTE Shop Drawing Review Office and copies FTE Design Project Manager FTE Discipline Reviewers Items are identified as Critical to be Reviewed by FTE. List is provided to the FTE Shop Drawing Review Office FTE Shop Drawing Review Office FTE Shop Drawing Review Office Provides list to Discipline Reviewers to determine those items deemed Critical, which required FTE Overview ProjectSolve SP Administrator Robert Laurence Imports shop drawing/submittal item list into ProjectSolve SP. Confirmation via email is sent to all parties. End Page 7 of 8

FTE Shop Drawings Routing Chart for Design Bid Build (Conventional) Projects Start Subcontractor, Suppliers, Fabricator Contractor Initiates and submits shop drawing electronically thru ProjectSolve SP Architect of Record/ Engineer of Record Receives email notification from ProjectSolve SP and reviews shop drawing. Reviewed shop drawing is routed to FTE upon completion. CEI is copied on email notification. FTE Shop Drawing Review Office FTE submits final processed shop drawing thru ProjectSolve SP Email Notifications are sent to all interested parties: Design-Build Architect of Record/Engineer of Record: Design-Build General Contractor: Construction Engineering Inspection Firm (CEI): Florida s Turnpike Construction Project Manager: Florida s Turnpike Project Manager: End Welding Inspection Firm if applicable: Structural Coating Inspection Firm if applicable: FDOT District Precast Inspector if applicable: Page 8 of 8